ASTRAL CONSTRUCTORS (Pvt)Ltd BAZ MUHAMMAD CONTRACTOR WORK BILL Sr NoDescription No L B H Qty Unit Rate 1 Floor 1 30 20 600 20 2 P.Protection Front 1 37.75 3 113.25 Back 1 37.75 3.16 119.29 Left 1 22.33 2.58 57.6114 Right 1 22.33 3 66.99 Total 357.1414 20 3 B.Room P.Protection 1 15.25 3 45.75 Back 1 15.25 3.33 50.7825 Left 1 14.58 2.16 31.4928 Right 1 14.58 3 43.74 Total 171.7653 20 4 Soakage pit ( Bric 1 16.49 11 181.39 20 Excavation 5 Bath Tile Wall 8 6 6 288 Floor 2 6 6 72 Total 360 Deduct doors 2 7 2.5 35 Total 325 35 6 OHWT Plaster External 2 8.16 3.83 62.5056 2 3.75 3.83 28.725 Internal 2 7.41 3 44.46 2 3 3 18 Bed 1 7.41 3 22.23 Plinth side Plaster 1 62.16 1.5 93.24 Bath prapet plaster 1 54.16 0.66 35.7456 Total 300.7218 25 Bath prapet 7 Masonry 52.16 0.66 34.4256 40 8 Earth Levelling 9 Paint 2 coats 10 11 OHWT Concrete pouring Total Cost Rizwanullah Seniour supervisor Centering and Shuttering of ECD shades and concrete pouring

Upload: tariq

Post on 08-Nov-2015

214 views

Category:

Documents


0 download

DESCRIPTION

Bill

TRANSCRIPT

Sheet1ASTRAL CONSTRUCTORS (Pvt)LtdBAZ MUHAMMAD CONTRACTOR WORK BILLSr NoDescriptionNoLBHQtyUnit RateCost1Floor1302060020120002P.ProtectionFront137.753113.25Back137.753.16119.29Left122.332.5857.6114Right122.33366.99Total357.1414207142.8283B.RoomP.Protection115.25345.75Back115.253.3350.7825Left114.582.1631.4928Right114.58343.74Total171.7653203435.3064Soakage pit ( Brick work)116.4911181.39203627.8Excavation60005Bath TileWall866288Floor26672Total360Deduct doors272.535Total32535113756OHWT PlasterExternal28.163.8362.505623.753.8328.725Internal27.41344.4623318Bed17.41322.23 Plinth sidePlaster162.161.593.24Bath prapetplaster154.160.6635.7456Total300.7218257518.045Bath prapet7Masonry52.160.6634.4256401377.0248Earth Levelling15009Paint 2 coats3000010Centering and Shuttering of ECD shades and concrete pouring800011OHWT Concrete pouring4000Total Cost95976.003

RizwanullahSeniour supervisor

Sheet2

Sheet3