Sheet1ASTRAL CONSTRUCTORS (Pvt)LtdBAZ MUHAMMAD CONTRACTOR WORK BILLSr NoDescriptionNoLBHQtyUnit RateCost1Floor1302060020120002P.ProtectionFront137.753113.25Back137.753.16119.29Left122.332.5857.6114Right122.33366.99Total357.1414207142.8283B.RoomP.Protection115.25345.75Back115.253.3350.7825Left114.582.1631.4928Right114.58343.74Total171.7653203435.3064Soakage pit ( Brick work)116.4911181.39203627.8Excavation60005Bath TileWall866288Floor26672Total360Deduct doors272.535Total32535113756OHWT PlasterExternal28.163.8362.505623.753.8328.725Internal27.41344.4623318Bed17.41322.23 Plinth sidePlaster162.161.593.24Bath prapetplaster154.160.6635.7456Total300.7218257518.045Bath prapet7Masonry52.160.6634.4256401377.0248Earth Levelling15009Paint 2 coats3000010Centering and Shuttering of ECD shades and concrete pouring800011OHWT Concrete pouring4000Total Cost95976.003
RizwanullahSeniour supervisor