bid 14297 1846 5 1 - nhai.org.in · pdf filerewoghot -muzafjarpurof nh-l02 ... • imparted...

22
Name of Firm Name of Staff Profession Date of Birth Me Consulting Engineers Pvt. ltd. Virendra Kumar Roy Civil Engineering 2" March 1960 , , I;~ . : ~$f _ Years with Firm/Entity Membership of Professional Societies Available for Assignment Life Member -Indian Roads Congress Nationality: Indian Detailed Task Assigned Review the entire Project planning, project management and implementation activities of the. Overall in-charge of the project supervision of the construction package. Act as Representative of the consulting firm appointed by the Authority. Involve overall superintendence over the Resident Engineers and other experts of the construction package. Guide, monitor, supervise and control all the activities related to supervision for the construction packa'ge. Interact with the Project Director and the other officials of the Authority . 1. M/s. Shapoorji Pallonji & Co. Ud. Chief Project Manager Construction of Four Laning Section March from Algier to Oran having length of 2012 400 km in Algeria. Project Cost: INR 2200 crore. Till date As detailed below Ministry of Transport, Algeria M/s. Gulf Team Consultant Lea'der cum , (L.L.C), Dubai Sr. Highway Engineer 2. M/S. Nature Construction, Dubai (U.A.E.) Chief Project Manager Dubai BYPAS ROAD - Construction of 12 Lane Phase 2 Dubai Bypass Road stretching 35 km in length and 57 m. in width with 6 travel lane each side+ Medians + each side shoulder + space for Future extension for RTA Dubai, UAE on BOT basis. (equivalent to 4-Lane, 1-1.5km) Consultancy Services for Preparation of Detailed Project Report of 6/8 Laning Flexible Asphaltic Pavement of existing roads, footpaths and walkways in ALRAS area (Phase II) in Deira Dubai, Length of the Project - 31 km 6 Lane & 20 km 8 lane (equivalent to 4-Lane, 85 km), Cost of the Project INR 415 Crore Sept. 2010 July 2007 Feb.~2012 Aug. 2010 As detailed below As detailed below Road Transport Authority, Cubai Road Transport Authority, Dubai 21\;1 AE - Chhopro. Rewoghot - Muzafjarpurof NH-l02

Upload: voque

Post on 19-Mar-2018

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

Name of Firm

Name of Staff

Profession

Date of Birth

Me Consulting Engineers Pvt. ltd.

Virendra Kumar Roy

Civil Engineering

2" March 1960

,,I;~ .

: ~$f _Years with

Firm/Entity

Membership of

Professional Societies

Available for Assignment

• Life Member -Indian Roads Congress

Nationality: Indian

Detailed Task Assigned• Review the entire Project planning, project management and implementation activities of the.

• Overall in-charge of the project supervision of the construction package.

• Act as Representative of the consulting firm appointed by the Authority.

• Involve overall superintendence over the Resident Engineers and other experts of the

construction package.

• Guide, monitor, supervise and control all the activities related to supervision for the

construction packa'ge.

• Interact with the Project Director and the other officials of the Authority .

1. M/s.

Shapoorji

Pallonji & Co.

Ud.

Chief

Project

Manager

Construction of Four Laning Section March

from Algier to Oran having length of 2012

400 km in Algeria. Project Cost: INR

2200 crore.

Till date As detailed

below

Ministry of

Transport,

Algeria

M/s. Gulf Team

Consultant Lea'der cum,(L.L.C), Dubai Sr. Highway

Engineer

2.

M/S. Nature

Construction,

Dubai (U.A.E.)

Chief

Project

Manager

Dubai BYPAS ROAD - Construction of

12 Lane Phase 2 Dubai Bypass Road

stretching 35 km in length and 57 m.

in width with 6 travel lane each side+

Medians + each side shoulder +

space for Future extension for RTA

Dubai, UAE on BOT basis. (equivalent

to 4-Lane, 1-1.5km)

Consultancy Services for Preparation

of Detailed Project Report of 6/8

Laning Flexible Asphaltic Pavement

of existing roads, footpaths and

walkways in ALRAS area (Phase II) in

Deira Dubai, Length of the Project -

31 km 6 Lane & 20 km 8 lane

(equivalent to 4-Lane, 85 km), Cost of

the Project INR 415 Crore

Sept.

2010

July

2007

Feb.~2012

Aug.

2010

As detailed

below

As detailed

below

Road

Transport

Authority,

Cubai

Road

Transport

Authority,

Dubai

21\;1•

AE - Chhopro. Rewoghot - Muzafjarpurof NH-l02

Page 2: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

,.

APPENDIX B-5-CURRICULUM VITAE

3.

8. M/s. MASCO,

AL SWAILEM

GROUP Saudi

Arabia

-4.

5.

-

M/s. Atkins Sr. Highway

Limited Engineer

.

Project

Engineer

Consultancy Services for Preparation

of Detailed Project Report of 6/8

Laning Bur Dubai to Corniche

Promenade including Emirates

Roads. Length of the Project 3S km 6

Lane & 25 km 8 Lane (equivalent to

4-Lan.e, 97 km), Cost of the Project

INR 480 Crore.

Consultancy Services for 4 lane dual

carriageway for Preparation of

Detailed Project Report of Seventh

Ring Road Expressway Project.

Project length 42km, project Cost

lNR 487 Crare.

Construction Supervision of New 6

lane AI Khail Road on Build, Finance,

Operate and Transfer Basis till

Operation & Maintenance Period,

Total Length 32km, Project Cost INR

218 Crore. Client : Road Transport

Authority, Dubai

Construction Supervision of New 8

Lane Sixty Ring Road Expressway

(West Section) Project on Build,

Finance, Operate and Transfer Basis

(BOT) till Operation & Maintenance

Period, Total Length 36km

(equivalent to 4-Lane, 72 km),

Project Cost INR 340 Crore

Construction Supervision of New 6

Lane Business Way Project on Build,

Finance, Operate and Transfer Basis

(BOT) till Operation & Maintenance

Period, Total Length 46 kms, Project

Cost INR 207 Crore. Client Road

Transport Authority, Dubai

Construction Supervision and

Operation & Maintenance of 6/8

laning of First Ring Expressway,

Extension of Faheel Expressway and

No. 40 of total length 77km in the

State of Kuwait executed under BOT

basis. Project cost (INR 3162

Crores)

Construction Supervision of 4-Laning

Highway from Hail.to Jouf Part 4 Part

1 Access Controlled Highway for

Build, Finance, Operate and Transfer

Basis till Operation & Maintenance

Period, Road Leng'th 29 Km. Project

Cost US$82.00 million (equivalent to

INR 384 Crore),

Mar.

2006

Oct.

2004

Feb.

2003

Feb.

2001

Nov.

1997

June

2007

Feb.

2006

Sept.

2004

Jan.

2003

Dec. 2000

As detailed

below

As detailed

below

AS detailed

below

As detailed

below

As detailed

below

As detailed

below

As detailed

below

Road

Transport

Authority,

Dubai

Road

Transport

Authority,

Dubai

Road

Transport

Authority,

Dubai

Road

Transport

Authority,

Dubai

Ministry of

Public

Works, State

of Kuwait

Ministry of

Transport,

Kingdom of

Saudi Arabia

211AE- Chhapra - Rewaghat - Muzaffarpurof NH-l02

Page 3: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

APPENDfXB-5-CURRICULUM VITAE

10. : April June As detailed Department

1993 1995 below of Road,

Govt. of

Nepal

-~_._-April March As detailed Department:

1990 1993 below of Road, I

Govt. of

Nepal

,, 9.

,

I,;.,

M/s. East

Consult (P)

Ltd., Nepal in

association

with Hyundai

r' Engineering

1

11Co. Ltd.,

I Seoul, Korea

Site

Engineer

Site

Engineer

Construction Supervision of Duality

for Taif - Albaha Road from Taif to

Albaha for Build, Finance, Operate

and Transfer Basis till Operation &

Maintenance Period, Road Length

30.778 Kms, Project Cost US$S7.70 ,

million (equivalent to INR 268 Crore) ~

Preparation of Detailed Design and

Construction Supervision for

Strengthening & Widening to Doti

Road, 2 Lane, 30km. Client

IDepartment of Road, Govt. of Nepal.

, Cost ofthe Project US$ 5.5 Millioni 4

I Construction Supervision of

, Strengthening, Widening and

Maintenance of East-West Highway

from Belbari to Chuharwa Section in

the Eastern Region. 2 Lane, 40km,

I Client Department of Road, Govt. of

I Nepal. Road Improvement Project,

I

Phase II (EC No. 81l funded by ADB,

Cost of the Project US$ 8.5 Million

Sep. I Oct. i9971995

As detailed

below

Ministry of

Transport,

Kingdom of

iSaudi Arabia,

l,

Education:

-------I Training:

• B. Sc. Engineering (Civil), from Bihar University in 1990. Passed in First class with

Distinction

• Training for "Quality Control of Highways/ Bridges"

• Survey and Investigation of Roads and Bridges and Construction and Widening and

Strengthening of Highways

• Imparted Training to Engineers for Quality Control and Quality Assurance of Highway and

Bridge related works

I Mr. Roy is a Graduate Civil Engineer and has over 25 years of professional career in Highway Sector in India & Abroad and

I has sound engineering practices in the field of Construction and Supervision of dual carriageways Highways, Express

Highways, Bridges Over-pass and Underpass & Culverts etc. He was responsible for reviewing the entire Project

implementation activities of the Concessionaire. He was checking all the Designs being prepared by the Concessionaire,

execution of works on site as per specification and standards, continuously interact with the Oient and the Concessionaire.

He was reviewand suggests modifications to the existing road Maintenance Manual, Annual Maintenance Programme of the

Concessionaire. Review of emergency response arrangements needs special attention. Hewas regularProjectsitevisitsandguide,

supervise, coordinate and monitor the work of other experts in lis team as well as those of the Concessionaire. He has

also experience ofsupervising, organising and managing of Project preparation W.r.t construction/maintenance of higllvvay

projecl5,financed by international lending agencies and others.

He has a very strong background in Construction supervision, investigation and study of both Flexible/Rigid pavements. His

experience includes multi-dimensional aspects of road and bridge construction including process control pertaining to laying

of Rigid Pavement & Asphalt Concrete operation on a number of projects. He has been responsible for day-to-day

Supervision and work progress, variation orders, weekly and monthly progress reports, bill of Quantities, working drawings

subsoil investigations, Material Survey, geometric and pavement Survey. He has worked on a number of projects funded by

International funding organization and is well conversant with MORTH, IRC regulations and FIDIC conditions of contract. He

has also been responsible for mix design of bituminous courses like DBM and BC, testing of aggregates from different

sources and assessing their suitability in road construction. He has been directly responsible for all Earthwork, Sub-grade:

GSB,WMM, DLC and PQC work. His sound experience in the area of supervision of and Flexjb pavement'.._-----

'i

AI: Chhapra - Rewaghat - Muzaffarpur of NH-l02

V,renJoa. t<u.mqo f<..1Y~

Page 4: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

------_.-construction has many a time helped the project on excellent cost effective solutions and having trouble shooting

capabilities on site. He is fully familiar with latest construction technology of highway works viz, mechanized surface

dressing, use of hot mix plant for asphalt works, use of sensor pavers for bituminous surface construction and modern!

survey techniques and geometric designs.

He has implemented systems for accurate monitoring of progress at site. His experience includes superviSion,

strengthening, and maintenance of roads, highways and bridges, Construction of Flexible and Rigid Pavement, Quality

control at various stages during the construction Supervision of Projects. He has been involved all types of road

maintenance i.e. emergency, routine, periodic maintenance. During his tenure he was responsible for road property

management incident management and Toll fee collection wherever it was applicable. He has good experience in junction

improvement providing crash barrier and construction of Truck and Bus Lay byes. He is well versed with modern methods

of Highways and Bridge Construction including Quality Control Procedures.

He is fully conversant with the FIDIC Conditions of Contract

accepted best practices/Indian Standards and Specifications.

I

aodm__D_d_'_'_OCDO>''''''DO ",hOD logy .:d 'O"~"'t1D",IIY.1

Employment Record:

_.~

Project Name

location

Duration

Construction of Four Laning Section from Algier to Oran having length of 400 km in

I Algeria. Project Cost: INR 2200 crore.-----:J Alger_,, _

~March 2012 to till date----- --,

Client Ministry of Transport, Algeria

---;

Total Length: 400 km f4LaneJ. Project Cost: INR 2200 crore. Project was executed

i'under BOT basis.

t-; ,'ChiefPrOject~;nager --- --- -- -,

l-H; was ~esponsible for Design review and modiflca;ions in -d-raWingS,specificatio~,'1

quantities to suit the prevailing site conditions, design and drawing for temporary.

works, working drawings and as built drawing, variation orders, instructions,

contractual notices, correspondences, day to day construction supervision and

inspection of works, sampling and testing of materials and works, quality assurance,

measurement of works and materials testing, price adjustment aspects, checking and

certification of materials from quarries and borrow areas for coarse aggregates and

GSB material etc. scrutiny of executed works/checking /certification of advances,

interim bills/invoices, maintenance certificates, as-built drawing and project

completion reports; organizing/conducting project progress review meetings and co-

coordinating! Iiaisoning with funding agencies, clients, contractors, other Government

and local agencies.

He has also been actively associated in providing design of embankments and

pavements. He was involved in flexible pavement design / Construction. preparation

of design standards, computerized design of horizontal and vertical alignment, super-

elevation design, preparation of drawings.. __ i- __---t"_

Position

Activities Performed

Main Project Features

-1.1 Chhapra. Rewaghat - Muzaffarpur of NH.1D2

Vi~l?doCl.. I<u. rna'" I<.O.f

[.~~ iJ!Il!)i~,1':I!m

Project Name

:=: 1Mh00rr•• !l'!@;~ <~"'J; LDubai BYPASROAD - Construction of 12 Lane Phase 2 Dubai Bypass Road stret.chin~ '

..L 3~ km in length an~ 57 m. in width_ with 6 travel lane ea~~ ~i~e~_Medjans + eac~ side .

•Ith-

Page 5: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

I_. -

shoulder + space for Future extension fo~-RTADubai, UAE on BOT basis. (equivalent

, to 4-lane, 115 km)----

location , Dubai, UAE----- -----Duration , Sept. 2009 to Feb. 2012

-- --

Client , Road Transport Authority, Dubai

-- --- - -- --- -_.Main Project Features , Total Length: 35 km (12 Lane) (equivalent to 4-Lane, 115 kml. Project was executed

under BOT basis.- --~-- - - - ------ ._. -----

Position , Chief Project Manager

-- -+ --- ----_._-Activities Performed , As a Chief Project Manager, he was responsible for execution of highway and

structure works as per specification, contract drawings and with environmental

provisions; checking the setting out, preparation of work programme using MS-Project

Software; preparation of methodology for the execution of various works and

Isubmitting for the approval, preparing of methodology for the execution of various

,works and submitting for the approval, preparing quality management plan and,

I method statements and getting it approved by the client. Submitting method

istatement fo' road aod bridge works, producing detailed working drawings,

calculation reports; physical and financial charts for approval; ensuring site safety

; during construction, preparation of various project progress reports, imparting

I training to the sub-ordinates; liason with client and preparation of bill of executed

, work; The duties included design review of flexible pavement and road geometries in

light of site conditions, checking the setting out, checking the bills and as - built

, drawings, preparation of construction supervision manual, quality control of

materials and completed works, preparation of variation orders, etc Ensured that,

the execution of the completed works met with the intent of specification. he was

I activeiy involved in the supervision and construction of laying of WBM, GSB and Be;

I design of temporary works; checking of stability of staging and shuttering work well

I before the concreting; preparation of diversion plan aod submitting fo, the

I consultants approval for smooth flow of existing traffic and keeping in view the safety,,

I of road users during execution of the project by providing diversions and road signage

~--1

- -,

~~l:001!1~&lID ~jllINn.~~ 'il~m.1l..~I!l'&"-o('Il~~

, Project Name I ' • Consultancy Services for Preparation of Detailed Project Report of 6/8 Laning

I Flexible Asphaltic Pavement of existing roads, footpaths and walkways in ALRAS

area (Phase II) in Deira Dubai, Length of the Project - 31 km 6 Lane & 20 km 8

Lane (equivalent to 4-Lane, 8S km), Cost of the Project INR 41S Crore.

• Consultancy Services for Preparation of Detailed Project Report of 6/8 Laning Bur

Dubai to Corniche Promenade including Emirates Roads. Length of the Project 35

km 6 Lane & 25 km 8 Lane (equivalent to 4-Lane, 97 km), Cost of the Project INR

480 Crore.

AI.. Chhapra - Rewaghat - Muzojfarpur of NH-l02

v,',e.rdoo. KI.<. rryQ.'O

Location

• Consultancy Services for 4 lane dual carriageway for Preparation of Detailed

Project Report of Seventh Ring Road Expressway Project. Project Length 42km,

Project Cost INR 487 Crore. JDubai

-------

Page 6: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

Duration

Client

Main Project Features

Position

Activities Performed

,.

July 2007 to Aug: 2010

Road Tra~sport Authority, Dubai

As above.

Team Leader cum Sr. Highway Engineer

As a Team Leader cum Sr. Highway Engineer, he was responsible for survey,

Investigation, fixing of alignment, assistance in preparation of design standards,

design ,of highways and preparation of drawings using computer aided design,

preparation of cost estimates and Tender documents. Has been responsible for

assisting":' in design of road geometries, road pavement, and road drainage besides

preparation of lead c~arts, ascertaining market rates of materials and labour at site of

work, fixing hire charges of machinery, preparation of rate analysis, estimation of

quantiti~~ and cost, preparation of bill of quantities and bidding documents, helping in

preparat'i"on of detailed specifications for the projects.

",

Feb. 2001 to June 2007 Mis. Atkins Limited

'Project Name

location

Duration

Client

Main Project Features

Position

Activities Performed

Project Name

Construction Supervision of New 6 lane AI Khail Road on Build, Finance, Operate

and Trari:~fer Basis till Operation & Maintenance Period, Total length 32km, Project

Cost INR'218 Crore. Client: Road Transport Authority, Dubai

Dubai

March 2006 to June 2007

Road Tra'i1sport Authority, Dubai

This project includeseonstruetion 0[6 iane dual carriageway (32km).

Senior Hi'ghway Engineer (equivalent to RE)

He was responsible for 'construction supervision and contract management following

FIDIC me~sure. Design review and modifications in drawings, specification, quantities

to suit the prevailing site conditions, design and drawing for temporary works,

working ;drawings and as built drawing, variation orders, instructions, contractual

notices, correspondences, day to day construction supervision and inspection of

works, sampling and testing of materials and works, quality assurance; measurement

of works,and materials testing, price adjustment aspects, checking and certification of

materials from quarries and borrow areas for coarse aggregates and GSBmaterial etc.

scrutiny of executed works/ checking! certification of advances, interim bills/invoices,

maintenance certificates,. as-built drawing and project completion reports;

organizing/conducting project progrr;-ss review meetings and co-coordinating/

Iiaisoning with funding agencies, clients, contractors, other Government and local

agencies.

Construction Supervision of New 8 lane Sixty Ring Road Expressway (West Section)

Project 6n Build, Finance, Operate and Transfer Basis (BOT) till Operation &

Maintenance Period, Total length 36km (equivalent to 4-lane, 72 km),-"Project Cost

INR 340 Crore

AE - Chhtlpra - Rewaghat-. Muzaffarpur 0/ NH-l0Z

Page 7: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

"

APPENDIX B-S-CURRICUWM VITAE

location

Duration

Client

Main Project Features

Position

Activities Performed

Project Name

location

Duration

Client

Main Project Features

: Dubai

: Oct. 2004 to Feb. 2006

: Road Transport Authority, Dubai

: This projects includes construction Supervision of four lone dual carriageway (36km)

including earth works asphalt roads (consisted of sub grode, sand asphalt as sub base

and subsequent layers of type /, type II & type III asphalt concrete, as base, binder

& wearing course respectively), vehicular & pedestrian concrete (pre cost & cast in

situ) roadway median & side barriers, gullies, box culverts, traffic markings & signs,

traffic signal system, duct crossing, UG Utilities & Services, Micro-tunneling, highway

lighting, irrigation & landscaping, '

Senior Highway Engineer (equivalent to REI

He was responsible for review of design and drawings, Checking alignment plan and

profile, Preparation of Quality Assurance Plan and Construction Manual. which in

turn included, Preparation of mobilization plan, work programme, preparation of

construction methodology etc. He was actively associated in Monitoring, Preparation

of physical and financial progress of work, preparation of cash flow projections etc.,

As Contractor's representative, he was responsible for Enforcing Quality Control

measures, Quality Assurance Plan, setting out of works, monthly and quarterly

progress reports, Attending meeting with supervision consultant & Client, Preparation

of Interim Payment Certificates, execution of works as per specifications and drawings

ensuring public and site safety. review of the Environmental Management Plan etc.,

He supervised overall management of the project works in his capacity as Sr. Project

Manager and in this role was responsible for supervising, organizing coordinating,

monitoring, reporting, and managing man power etc. effectively, He has approved

working drawings, issued site Instructions; controlled the contract administration. He

has been involved all types of road maintenance Le. emergency, routine, periodic

maintenance. During his tenure he was responsible for road property management

incident management wherever it was applicable. He has good experience in junction

improvement providing crash barrier and construction of Truck and Bus lay byes.

Construction Supervision of New 6 lane Business Way Project on Build, Finance,

Operate and Transfer Basis (BOT) till Operation & Maintenance Period, Total length

46 kms, Project Cost INR 207 Crore. Client: Road Transport Authority, Dubai

Dubai

Feb, 2003 to Sept. 2004

Road Transport Authority, Oubai

This projects includes construction supervision of three lane dual carriageway (45kmJ

asphalt toads, (consisted of sub grade, sand asphalt as sub bose and subseguent layers

of Type - I, Type /I & Type /II asphalt concrete, as bose, binder & wearing courses

respectivelyi, median & shoulders, pedestrian bridges, concrete barriers, box culverts,

duct crossing, concrete lined open storm water drainage system, steel guard I safety

rails, traffic markings & signs, traffic lighting and parallel fresh water & TSELines.

6~~l' eenolaa t<u.:mC/'If IZ~ ~1~*GI>~d*-'»-

AE. Chhapra - Rewaghat. Muzaffarpuroj NH.l02 1-"",~ In association with

~1J

Page 8: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

-APPENDIXB-5-CURRICUWM VITAE

to RE)

agement, Contract Administration, checking the

estigations. He was also responsible for reviewing

s for both roads and bridge works. He has been

Client. His duties and responsibilities include

rds ensuring quality construction of the project,

& Maintenance Phase, For this purpose he has

other experts both on roads and bridge sides. He

successfully completing this prestigious project.

d maintenance i.e. emergency, routine, periodic

was responsible for road property management

ollection wherever it was applicable. He has good

t providing crash barrier and construction of

ect Cost: INR 3162 crore.

wait

I. Construction Supervision and Operation & Maintenance of 6/8 laning of First Ring

pressway and No. 40 of total length 77km in the

basis. Project cost: (lNR 3162 Crores)

Expressway, Extension of Faheel Ex

, State of Kuwait executed under BOT

t -~tion , ! Kuwait.- ~

tion , Feb. 2001 to Jan. 2003

--- - -

t , Ministry of Public Works, State of Ku-

n Project Features , Total Length: 77 Km (6/8 Lane); Proj--_.

tion , Senior Highway Engineer (equivalent

- ~- -------- - . -ilies Performed , He was responsible for Project Man

accuracy of all controlled surveys, Inv

design, setting construction standard

continuously interacting with the

ensuring adherence to design standa

which is completion for Operation

constantly interacted with number of

has demonstrated his capabilities by

He has been involved all types of rca

maintenance. During his tenure he

incident management and Toll fee c

experience in junction improvemen

Truck and Bus lay byes

Activ

Project Name

Posi

Dura

loca

~- ---~---------~------

: Clien

~: Mai

S t 19 D 2000MIs. MASCO, Al SWAllEM GROUP Saudi . .

ep. 9S to ec. b' PrOject EngmeerAra 1£.1

ec, 2000

nsport, Kingdom of Saudi Arabia

f 4-Loning Highwav from Hail to Jauf Port_~ Port 1Access Controlled

ild, Finance. Operate and Transfer Basis till Operation & Maintenance

en.91D29 Km, Project Cost U5$82.00 million (equivalent to INR 384

n K.5.A; Client:_Mini~ry of Transport.

of 4 lane Hail.Jouf highway Part 4 partl 29 Kms - Jouf Build, Finance,

ransfer Basis till Operation & Maintenance Period,. Cost of the project

'on. Client - Ministry of Transport, Kingdom of Saudi Arabia

nsible for Project Management, Contract Administration, checking the

yo controlled surveys, Investigations. He was also responsible for reviewing

design, setting construction standards for both roads and bridge works. He has been

continuously interacting with the Client. His duties and responsibilities include

ensuring adherence to design standards ensuring quality construction of the project,

which is completion for Operation & Maintenance Phase. For this purpose he has

constantly interacted with number of other experts both on roads and bridge sides. He

has demonstrated his cap i1ities by successfully completing this prestigious project .

, Construction

Operate and T

US$ 82.00 Milll

- ----

, Saudi Arabia

--Nov.1997 to D

, Ministry of Tra

-ures , Construction 0

Highway for Bu

Period, Road L

I Cfore}, Locatio, : Project Engine,

ed , He was respo

accurac f ali

Client

Project Name

Main Project Feat

Position

Duration

location

Activities Perform

." ••

Page 9: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

APPENDIX 8.S-CURRICULUM VITAE

,

Preparation of Detailed Design and Construction Supervision for Strengthening &

Widening to Doti Road, 2 Lane, 30km. Client: Department of Road, Govt. of Nepal.

Cost of the Project US$ 5.5 Million

Nepal

Project Name

Location

He has been involved all types of road maintenance i.e. emergency, routine, periodic

maintenance. During his tenure he was responsible for road property management

incident management and Toll fee collection wherever it was applicable. He has good

experience in junction improvement providing crash barrier and construction of

Truck and Bus Lay byes

Project Name , Construction of Duality for Taif-Albaha Road-third sector 30.778 kms-Abha. Cost of

project US$ 57.70 million. Client - Ministry of Transport, Kingdom of Saudi Arabia

Location , Saudi Arabia

Duration Sep.1995 To Oct.1997

Client , Ministry ofTransport, Kingdom of Saudi Arabia

Main Project Features , Construction of Duality for Toif Alboho Rood {rom Taif to Albaha for Build, Finance,

Operote and Transfer Basis till Operot'ion & Maintenance Period. Rood Length 30.778

Kms, Project Cost US$ 57.70 million (equivolent to iNR 268 Crore), Location K,S.A:

Client: Ministry of transport

Position , Project Engineer

Activities Performed , He was responsible for Project Management, Contract Administration, checking the

accuracy of all controlled surveys, Investigations, He was also'responsible for reviewing

design, setting construction standards for both roads and bridge works. He has been

continuously interacting with the Client. His duties ,nd responsibilities include

ensuring adherence to design standards ensuring quality construction of the project,

which is completion for Operation & Maintenance Phase. For this purpose he has

constantly interacted with number of other experts both on roads and bridge sides, He

has demonstrated his capabilities by successfully completing this prestigious project,

He has been involved all types of road maintenance i.e. emergency, routine, periodic

maintenance. During his tenure he was responsible .for road property management

incident management and Toll fee collection wherever it was applicable. He has good

experience in junction improvement providing crash barrier and construction of

Truck and Bus Lay byes.

April 1990 to June 1995MIs, East Consult (PI ltd., Nepal in association

Site Engineerwith Hyundai Engineering Co. Ltd., Seoul, Korea

Duration April 1993 to June 1995

AE- Chhapra." Rewaghat - MuzaffarpurofNH-10l

Client

Main Project Features

Position

Department of Road, Govt. of Nepal

Project Length: 30km. (l-LaneJ; Cost of the Project U5S 5.5 Million. Proiect financed

by: Ministry of Home Affairs, Govt. of India. The project was executed under FIDfC

Conditions of Contract.

Site Engineer

Page 10: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

Activities Performed , He was responsible '0' supervision to ensure compliance with drawings &

specifications for construction of a network of two lane dual carriageway (4 Lane,

70km), asphalted motorways with median shoulders, concrete paved parking areas for

heavy vehicles & equipment, concrete kerb works, gullies, box culverts, duct banks,

concrete barriers, steel guard I safety rails, civil works related to utilities, services,

street lighting & traffic lighting, traffic marking & signs, checking shop drawings &

review test reports

Project Name , Construction Supervision of Strengthening, Widening and Maintenance of East-West

Highway from Belbari to Chuharwa Section in the Eastern Region. 2 Lane, 40km,

Client: Department of Road, Govt. of Nepal. Road Improvement Project, Phase II IEC

No. 81) funded by ADB, Cost ofthe Project US$ 8.5 Million

location , Nepal

Duration April 1990 to March 1993

Client , Department of Road, Govt. of Nepal

Main Project Features , Project Length: 40km. (2.Lene}; Cost of the Project US$ 8.5 Million. Project financed

by: Asian Dellelopment Bank. The project was executed under FIDIC Conditions of

Contract.

Position , Site Engineer ..

He responsible fo,....

to ensure compliance with drawings &Activities Performed , was supervIsion

specifications for construction of a network of two lane dual carriageway (4 Lane,

70km), asphalted motorways with median shoulders, concrete paved parking areas for

heavy vehicles & equipment, concrete kerb works, gullies, box culverts, duct banks,

concrete barriers, steel guard I safety rails, civil works related to utilities, services,

street lighting & traffic lighting, traffic marking & signs, checking shop drawings &

review test reports

LANGUAGES:

Language

English

Hindi

Speaking

Excellent

Excellent

Reading

Excellent

- Excellent

Writing

Excellent

Excellent

Summary of Qualification & Experience lIis-a-vis the requirements as per TOR:

9 Months

.. .•

In oss«iotion with

Feasibility Study I Detailed Project Report:

• Consultancy Services for preparation of

Detailed Project Report of 6/8 Laning Flexible

Asphaltic Pavement of existing roads, footpaths

and walkways in AlRAS area (Phase II) in Deira

Dubai on BOT basis, Length of the Project - 31

km 6 Lane & 20 km 8 Lane (equivalent to 4-

Lane, 85 km), Cost roject 41S Crore.

~

~

B. Sc. Engineer'ing

(Civil), from Bihar

University in 1990.

Passed in First class

with Distinction

AE. Chhapra - Rewaghat. Muzeffarpurof NH.l02

Qualification: candidate

should be a Systems

Engineer. Post Graduate

Degree in Highway

Engineering will be

preferable.

Page 11: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

if!..:{f)!Jli.=1lir:J.i1«!J.Jt:w- il!IIJ

.'MP.J,l!f('PiJ~,...,

fit '"o~OC'O"O" wi<h (ifj)

9 Months

7 Months

"

34 months

20 months

27 Months

18 months

44 Months

16 Months

• •

Construction Supervision Project:

• Construction of Four Laning Section from Algier

to Oran having length of 400 km in Algeria.

Project Cost: INR 2200 crore.

• Dubai BVPAS ROAD - Construction of 12 Lane

Phase 2 Dubai Bypass Road stretching 3S km in

length and S7 m. in width with 6 travel lane

each side+ Medians + each side shoulder +

space for Future extension for RTADubai, UAE.)

(equivalent to 4-Lane, 11S km)

• Construction Supervision of New 6 Lane AI Khail

Road on Build, Finance, Operate and Transfer

Basis till Operation & Maintenance Period,

Total Length 32km, Project Cost INR 218 Crore.

Client: Road Transport Authority, Dubai

• Construction Supervision of New 8 Lane Sixty

Ring Road Expressway (West Section) Project

on Build, Finance, Operate and Transfer Basis

(BOT) till Operation & Maintenance Period,

Total Length 36km (equivalent to 4-Lane, 7Z

km), Project Cost INR 340 Crore

• Preparation of Detailed Design and

Construction Supervision for Strengthening &

Widening to Doti Road, 2 Lane, 30km. Client:

Department of Road, Govt. of Nepal. Cost of

the Project US$S.SMillion (27 Months)

• Consultancy Services for Preparation of:i

Detailed Project Report of 6/8 Laning Bur Dubai

to Corniche Promenade including Emirates

Roads. Length of the Project 35 km 6 Lane & 25

km 8 Lane (equivalent to 4-Lane, 97 km), Cost

of the Project 480 Crore.

• Consultancy Services for 4 lane dual

carriageway for Preparation of Detailed Project

Report of Seventh Ring Road Expressway

Project. Project Length 42km, Project Cost 487

Crore.

• Construction Supervision of New 6 Lane 1

Business Way Project on Build, Finance, I

~

Operate and Transfer Basis (BOT) till Operation:

& Maintenance Period, Total length 46 kms,

0:j-!,roject Cost INR 207 Crore. Client : Road

Transport Authority, Dubai,

22 years

Dubai, Quatar, Saudi

Arabia & Nepal

Construction/

Supervision: 5

Projects

DPR:4 Project

-- -------13 years

-

Experience in Abroad

_'" Chhapra - Rewaghat. Muzafforpur 0/ NH-l0

Highway Development 4 Project

Projects taken up under

PPP.

Total Experience: Total I

Highway Experience of

10years.

At least 3 years

experience as Team

Leader/Project Manager

or in similar capacity in

O&M and other related

activities (like

Maintenance Manual,

Maintenance

Programmes, Lane

Closures, Traffic

I Management, etc.) of

completed 4/6 lane

highway sections

Experience in position of

Team Leader/Project

i Manager or similar

capacity in project

preparation/Con struct ion

supervision/IE involving

4/6 laning/Expressway

I,,

II

VI"Ire'})< If0.. 1<4m'l~L

Page 12: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

I~

~

~ Brief Description of Project

24 months• Construction Supervision and Operation &

Maintenance of 6/8 laning of First Ring

Expressway, Extension of Faheel Expressway

and No. 40 of tota! length 77km in the State of

Kuwait executed under BOTbasis. Project cos.t

: (INR 3162 Crores)

• Construction Supervision of 4-Laning Highway

from Hail to JoufPart 4 Part 1 AccessControlled

Highway for Build, Finance, Operate and

Transfer Basis (BOT) till Operation &

Maintenance Period, Road Length 29 Km,

Project Cost US$82.00million(equivalent to INR

384 Crore), Locatl.~n K.S.A; Client: Ministry of

Transport.

38 months

• Construction Supervision of Duality for Taif -

Albaha Road from Taif to Albaha for Build,

Finance, Operate and Transfer Basis till

Operation & Maintenance Period, Road Length

30.778 Kms, Project Cost US$S7.70 million

(equivalent to INR 268 Crore), Location K.S.A;

Client: Ministry of transport.

• Preparation of Detailed Design and

Construction Supervision for Strengthening &

Widening to Doti Road, 2 Lane, 30km. Client:

Department of Road, Govt. of Nepal. Cost of

the Project US$5.5 Million

25 months

15 Months

• Construction Supervision of Strengthening,

Widening and Maintenance of East-West

Highway from Belbari to Chuharwa Section in

the Eastern Region. 2 Lane, 40km, Client:

Department of Road, Govt. of Nepal. Road

Improvement Project, Phase II (EC No. 81)

funded by ADS, Cost of the Project US$ 8.5

Million

48 months

••• •

221

@)In association withAE- Chhapra - Rewaghat. Muzaffarpur of

Page 13: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

•• ~~~t:~~~~~~~, ~~H

!1l ~"~ieij~~":~~~~~bl'l P 0'215--:

H ::l ;0; ti •z.E!e~f:~~l:!~~~~~~ ~•• • u _ :J Ill) ~

0 ~..,,~~~I~"'~~i (f)g~2.u ;~~~~~~~~~~ 0:: (Jr r;;H .1~~"s'I' :, 4:_2.g..,

" ~~>l~~~~E~l~ ~~:!Et:t.!!!O

!!l-/"'~'i~~i~~~~~~.~ ~I~

~~ '~18'"~I 1.H-liiP"'" •• "i

I', I "r~~.1 "t .•t~~hl~hH~~i "t~

[""Hll~It.h~.J!H ~5

fa!" va!fditv' see page ...... - ...--,,-

--. -lrL-",;;;r;;p;,,<>lIlttH!"-If# •n1JH~~f~l-lf. -, BA

F~. -----~.-~-.-,--.-,-..------~.-_-ID~,;r_-------.- 14/03/2011 13/03/2012.L -1,______ _ _

P(INDROY«VIRENDRA<KUMAR««««««««««

J6438189<4IND6003025M1203130«««««««<2

Page 14: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

,'''';

<II'.,

.i

1')

.,,

'.8044543

,I'.

••,-l'

.'•.\

,'

~••t'.

'

".

:~'

,1

"

, ,":

?~

fq:;ill;;m;r~

.~'.o

(>llJ!

~..._

l,l~

fI,

-'-'.0

1\•••

.,."

!--"'";-c.,.

>.'.$

~••"..,~•..lr

().",

ljnlR

p'l"

I.;'~

Sr<

1(':O

!',{.•.•.•"

f<l'~~r

,4.,-,•.

_",.:t,~t1~\tlLN".nQN

.c:.;'~~""iJl1::'.1'~f,-'rC"'r;.':"~.'.~,r,l:

h.-..'1'i\l"'~

,\'.;"

1!,":f_"':'I.~"::';:~~)~~'.

"\~

\J,K

"~

,.::-~,,~,F

,;'V

.'~l'-lA

Tiu

N,

~I'J')"

':',,,,;;,1•.'','/,j

'.•.

,"",Ttl]'.f'''''::";:-!"

,I",0"',~

",',t;

'.....

';~~..'C'r:;i.

,..f<ll.V

l~~~~f':~

,A~~~i,':'~~

~~.9

~~

31;3

2-0

146P

i\;it~]{~:4~~~G:6f(;t~AS,AP:'~~y"',~;tiJ:~..i."":'~:

.~2..~~l~~~:r

.~f'''''

'"11.";t:-;.l:":l.'"

'I,.

t<

••"r

-.

"')I"

,:.'

~'..

"2',

,r,,","';;'

.,•....•....

l-,..,.

f-"-<"4'

t;S¥X~ft1~iS1

,~.~~~(~

;2N

~;J

~~

""R

CH

1960~ot"

zIlA

SC

.HO

O~~MV

I~fY

:AR

P~

~";t::,:i~l~~{~:i}!~~:".;MlCAR~~

"19.1

t~~:0

;~.:,~o~;,,~g~

<Ij~FlOI1I-,~'~N••.,,'.~'"

'~ll--'

,',.,

.'If

,'.'

,)'4

;11:!:..::'''',L-v."1

!li-I'-lI",ie''.~'

",p~

~.•

,f:.\,')~~

f"Jfl~:tttl&1t'ifettMa1'1;rm

qffI~~

amtm~.F"l~raftqa~:1.....:

,,_I

.r.-'

._~,.•

iJ'."

•"'<

?':l

~",

:!'o

(iI11,....~;;.'~'"

<',:.:"",y

:".'o.ff

,;(

'.,,,

:)'_.

'_<>

_~

,••

,r••

,,,'i

l>'

."

,Q••..

'"0

\1,"

~""

,~l,H

A~,

'1',,".)['

,»'L

lt.1

V,,*,.

A•.

I:'~

'.__'l,it.'"

"i:t•••tl\1;~

1;..,S.qIH':'C~

.''0/;

,,'},

.~,_

,••-O

..•.'•..•'

_~'1,

..•.••.h""l'.

'.,,{l~

:'-j•.I'~:,iO

O"~",

)"4l'V"J"~

:.::",,,,,

',.

-",,',""',4r;'",,=•

•,"i:t~

.,1J';;1dt

",'.'..4

--•.•...

)1.:

;"I.:,.m~i,:.,./;.,

•~'"~,:,

'..)"'il}!"

:'lo

\A!':'..-lO

O'.,-.,Il,

:O''1tJ'

;c.',

,.•..

'"v<\'.

t,.,~IN",\IC:1

-l'"N

s.<;'1

\)0,

'.'~lIimA..l?'IH,'"

.,~t\,

,lt.,'"..,'<"'~"':'.I\Rl'l;;IHI\I"

$C

~O

~)l~'l.'."\4""

1~.,".•;~:,~<'1~MAtHJ~1'I01ll

;l!lfl~,l;;--lt'it~:I'\".'v-'P.'

,n,j"'0M~'~;'!,

i~~

.,.,:':PI

:""'IlI,1

!""l~

"~,

~C

I,lQ

',l\~~A

,..,(\"".

~"

..•..t,'~:"';-;'.".'

n'!t'~f"

'.n"t'.

'''.l.,~-i•.•\;;1v'-,~'".....;.~.

,.~.•,'~'I,:;:'',;,,~~,

~_~

Qf,"

":'

~;.)

.:",'.I••,,:

Y"~";"'I~t...:

'~~

,It'"~F••;,ll:i'.1';(;,

'1l,y~gi.o;llf~.

<>tltW

"l'l>

lTI1

ifttrm

t'IT

~.'

•.•,,'4l

.•••"

',.~,

~"\

.)l1

<1t4

IL1"'"'*"

Iq"'4

;,.{

?-!

)-I"

,~'.~I.

&ftt

Il.,.

~.•,

~I(

'll'f,.'ttI

'."__~<".6:'tl;,,\r:-:):.

"'~'f,tO

Ol,.c

:",

,.,"'.

.,.'

,'.

...'

'.;.

-~',.

.fI'l1'T\jf

••~

.,...

,.

.',-

:~'.~

~l:<?::'t

.'.~\

1'rL"~

.••""

'l~11~""

,,'~

I~T,C

j

'.,~,~;;~t"i,'j;

!'&iJ

~f[ffi:it'.~

t.l:

srip

fftrtfrt;

','~

~l"

,,,:,:

1.,'.I"'i:"'"I,,"fW:,,::~~ttiti~.~~.;,.j'

-n'

....•.•

ft,~

'~j..\'fi1

J.

'C1Aq<,CH()0Lill!.l.~,

,.,~

r.M

,~,'

~.

:<J1

!'~

C-L

..S'I

nIt,I.Jlll"

.'IIl'f'I"

fj~,'"I(~r..."L,.i

;:t.o

~...,

'.:;

..lit,'

f:",~ihlA1,C

"'-",~-:,l!•••jt.c.~'"'1"-:0,'!''''',-.'!''''''l,';'',''

!,.••.,'

'.1"."1

.'".,-,,"

'"~",.,

••,"'TI''''-

I."',-''''','~AA,'41I''t'',,JO''

.;.I."";4V

1r-it ".Y

~.o

o'~

:q,~

""bo'O

'oc"

oo':l

oo

°00.

"00

0'0

(1...

,O

't;'Q"'.'l

9'0

01'(0'0

'.

"J,

0'0

'0~

.~'.~

J1~)F-

1l.'4

INA

TlO

:f.~

"',

s"

'i.

.•••

...••

.I.,,~.

'.,\

,,'

\'"

\~

\fc

:rtn

I'\

~~

"t

'f<m

ir:'>"",

'"',.,

,fu

tf.tl

;~'.'.

1l~

''''1~'

.1:"

,""'.:

i:X

"",J!;,iiA

'l-I()I

',,~h~~;,

--~'.;,'ic:

":C

'l".,

.;':t

:l.':l'

['Hl~.,.',

j:,<

;.~'''';:,.''l}

1'.,.',~'j'f~(>'"

'-:'...1'\;X

I'\'\;lNATlr~1

"~I\~,~!!;!!$I;,c':,','j,

~Q:,'!f0'l""_,.~I'.'\0

'(0'

."C0

.'(0.•••.•~ClM

','r.O

,,,~

o,

F,.'"

,(0)

';},:

,:..••.•:3:X;V"i{"JI:.:

.-"f

•••{~:~;~6~'~~::"

;,:4.b~:"4lt.':

;84;

'.48~

56

104

36

ELM

75

PH

Y,.4

,tHo

~'4

',AM

1..65

'45;

'LSN

~62"

:489'

~~,s~'c'o.Nri:~i~~~t?;

..1

1."

~~,~

i:~~';.~C

'~'.,;

i.lO

~.

..[

'•.

t:"."

.'.'.,f'

.1.,'-"

:."1.'.~

,'1:"

;(.:.

'1.ii:,":.~.

_,.

1"iq,

":''''-~IN

Ar!

O,i~A~t~,••,(.-"..f,.'

1,.A

,I.,"t

C_

.",

"".'

•.'",'!

'}""A

..'__~-'J,

c..f!.,•.~"u~,t

,'<

,'.1',',,.;,a.MtN.o.Tl0

i,",~"<-r-•..•(VlI

J"l~

"B.TE('"1..">1''''.~:'~"

'<••,,~,

".'.

'.',,'_

~'_',-'.',.

'-_""".

"\',

"'.'~h

I,'",~-.""

t•.,.

,11"<

"""

il""

"'><

'."

".':.~'

r"',~"k,d',,,,

~,

~ i{ 0$

~ ~ t' }

i

~,\,,;.

!.'

(\U/:.'

•.

't1\

'.....,1;i~f.,~_"O,""'''"''"Il__

''',_.,~'.

,~,_.,ji;._

••

' L-

f.'

I,

"b---,"'•••••..•....

~I;

'.--....-.~~

.••.,'

,.

}Sb)'3

r=~"

~,,'"

"

N N •••

...•.',wq'f.ftrl\r •

• ,~_.-.

~H~~It\~\~

,

i,,-

...-

I --.,...-

"';

"

Page 15: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

. "

/, r. J,.!,

..

,,-

"'1'> " ,,~, ,- . ,,',',", '

"I. <. : ':/'

{'" :".,':' "P,i' ." ':1,

1, "J,

: -"4

"

. !,

i-

'",,

~'

'c>, "

Page 16: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

_____ "_- •• __ ._ •.•.•••_, .. -'" ;6.. - " --_.~.~.~-----

II

._...,"." " ..• +'_. _ .,.J..

I

II

226••

J6438189

NEW DELHI

05/08/2014

7200 DA

I

RA KUMAR«« <: «< <: < <:: <: <: «~<

9600810002674/20142031120143

L

Page 17: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

" .J}' ,,,1\.d

N0 2015/1458, ~J~';;"'lj~l.iirWJ "",-, ~:

.' L.'" .:;' II... t:!)'-! ~) •..•••.•" .

............................................ ,...~

,JLo~ IJ-Aj""; I.?J) : (~,-'Jn,;,.u~0!\J r--'1\) (~) -i.,,-JJ ~

ROY VIRENDRA KUMAR , "",jljl Jj~'.."UI ~c.<J1

i,

MUZAFFARPUR'-;-'" .. ,:

02-03-1960 a IN DE : )')1-:1\ 2L<... ~ i--:.}\::-INDIENNE , ~\

LOTISSEMENTYASSOUAL KOUIDER N° 1231 ERETAGE 'jl)," 01yJI

ZERALDA ALGER

~.CONDUCTEURDE TRAVAUX GENERAL , 41'

DUBAI V' J'e" J 6438189 '~J,"-JljlJ'" Js- (0) }G-

13-03-2021 ,~"' ell te" 14-03-2012 'C'J'--"

01-09-2015 'C'J" ZERALDA ,---< J?

J.-"'}I '-:"""""\..p "La-ol

J'~ V,~.ei1J(OKUlno( j<q

Page 18: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

~5hapoorji Pallol1i

8uilt to lasL.sirlcal86S

TO WHOM IT MAY CONCERN

This is to certify that Mr. Virendra Kumar Roy, S/o. Manager Prasad Roy has wor-king

with this Organization as a Chief. Project Manager since March 2012 to till now for Four

Laning Section of Alger 10Oran (400 k.m) in Algeria ..

During this period his work and behavior have been found good.

We wish to him success in his future life.

Dt. 07.12.2015

Shapoorji Pallonji And Company Private Limited

Corporale Ollie", SP Ce"tre. 41/44. Minoo Desai Marg. C~aba.

!'.lumbai. M"harushtra, Ifldla-4000OS,(7) 67400000 (F) 6633 8176 ••••••••'W.sp-grOlJp.co.in

Regel. Offic~: 70 Nat,jindas Master Road, For1 MlJI'T1bai40002:3

CIN: U45200MH1943PTC003812

s. Shafi-ur Rahman

Vice President (Project)

•• 228

Page 19: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

....::.J1l~~;;~ .1 j b 11NATURE CONSTRUCTION

Date 5th Oct 10 .,

ToThe ManagerDubai Islamic Bank ,.

Dubai. U.A.E

Subj =S=a~la=ry~C~e~rt=ifi=lca~t=e. "

"!'

. . ~:~-

It is certified that Virendra Kumar Roy Indian national holding

passport no B3467450 is employee of Nature Construction.

l. >l.

He is getting monthly salary'AED-10,0001-Kinldy open saving

account in your bank. • i:,In this regard your co-operation will be appreciated.

-;1 -.'.:,f.,~j:

Nature Construction.

,"

"":".t.l- W"iA'i :''-:-'''-~,. i-i"lAAA~, :u-$lj •• ~- :YA~"-'~"_;Q~

- "~

Tel.: 04 -3982200, Fax:04 - 3988866,P.O.Box: 483, DubIi"i - [email protected]

Page 20: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

02/09/2010

TO WHOM IT MAY CONCERN

This is certified that Mr. Virendra Kumar Roy. worked in our organization as

Team Leader cum Senior Highway Engineer sincere July 2007 to August 2010,

for Detailed PRoject Report of Three different package having aggregate

length - 143 km (4/6/8 Lane)

Mr. Roy is an honest and hardworking Engineer with Integrity.

He is leaving us on completion of the Project. Works.

I wish him all success in his profession.

Yononnes Kohsay

Sr. Associate & HOD

PLANNERS. ARCHITECTS ENGINEERS

•.. 23u

Page 21: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

ATKINS,

12 July 2007

To Whom it Mav Concern:

'Virendra 'Kymar Roy

. ,Atkins Limited

The Hub500 Park Avenue

AztecWeslAlmondsburyBristol .

63324RZ

Telephone +44 (0)1454 662000

Fax +44 (0)1454 663333 '

[email protected],com'

I write to confirm that above was employed by Atkins Limited between 01 July

2001 and 30 June 2007 in the role of?enior Highway Engineer.

Prior to Mr. Roy's employment with Atkins he was emPloyed by AL Swailern Group,

Saudi Arabia between Sep. 1995 to Dec. 2000. His employment transferred to us on 01'"

Feb. 2001.

He was sincere in his duties assign to him and having good communication skills. We wish

him all the success in his future assignment.

Victoria Crew

HROperations Advisor

Victori [email protected]

Atkins Limited is a WS Atkins pic companyRegistered Office: Woodcote Grove Ashley Road Epsom Suttey KT18 SSW England Registered in England Number 688424

••

.,

231

Page 22: BID 14297 1846 5 1 - nhai.org.in · PDF fileRewoghot -Muzafjarpurof NH-l02 ... • Imparted Training to Engineersfor Quality Control andQuality Assurance ... I consultants approval

Date: 15.07.1995

To Whom It May Concern

This is to certify that Mr, Virendra Kumar Roy has worked with us as, "Site Engineer" with effect from

April 1990 to June 1995 for Design, Supervision for Strengthening & Widening to Doti Road, 2 Lane, 30km

and East-West Highway from Belbari to Chuharwa Section in the Eastern Region, 2 Lane, 40km ,under

Department of Roads, Nepal

He has been d.isposing his duties very diligently and:devotedly with good technical skills and good technical

knowledge of road and bridge works, He is well conversant with modern technique involved in Construction

of Road and Bridge Works, He is hard working and bears good moral character,

We wish him every success in his life

Authorised RepresentativeEast Consult Pvt. Ltd.

,po Bo", 1_192, liilimpat, K"thmandu,

Phon~:~77+4412062. 977+4413267

• 2.32