bid 14297 1846 5 1 - nhai.org.in · pdf filerewoghot -muzafjarpurof nh-l02 ... • imparted...
TRANSCRIPT
•
Name of Firm
Name of Staff
Profession
Date of Birth
Me Consulting Engineers Pvt. ltd.
Virendra Kumar Roy
Civil Engineering
2" March 1960
,,I;~ .
: ~$f _Years with
Firm/Entity
Membership of
Professional Societies
Available for Assignment
• Life Member -Indian Roads Congress
Nationality: Indian
Detailed Task Assigned• Review the entire Project planning, project management and implementation activities of the.
• Overall in-charge of the project supervision of the construction package.
• Act as Representative of the consulting firm appointed by the Authority.
• Involve overall superintendence over the Resident Engineers and other experts of the
construction package.
• Guide, monitor, supervise and control all the activities related to supervision for the
construction packa'ge.
• Interact with the Project Director and the other officials of the Authority .
1. M/s.
Shapoorji
Pallonji & Co.
Ud.
Chief
Project
Manager
Construction of Four Laning Section March
from Algier to Oran having length of 2012
400 km in Algeria. Project Cost: INR
2200 crore.
Till date As detailed
below
Ministry of
Transport,
Algeria
M/s. Gulf Team
Consultant Lea'der cum,(L.L.C), Dubai Sr. Highway
Engineer
2.
M/S. Nature
Construction,
Dubai (U.A.E.)
Chief
Project
Manager
Dubai BYPAS ROAD - Construction of
12 Lane Phase 2 Dubai Bypass Road
stretching 35 km in length and 57 m.
in width with 6 travel lane each side+
Medians + each side shoulder +
space for Future extension for RTA
Dubai, UAE on BOT basis. (equivalent
to 4-Lane, 1-1.5km)
Consultancy Services for Preparation
of Detailed Project Report of 6/8
Laning Flexible Asphaltic Pavement
of existing roads, footpaths and
walkways in ALRAS area (Phase II) in
Deira Dubai, Length of the Project -
31 km 6 Lane & 20 km 8 lane
(equivalent to 4-Lane, 85 km), Cost of
the Project INR 415 Crore
Sept.
2010
July
2007
Feb.~2012
Aug.
2010
As detailed
below
As detailed
below
Road
Transport
Authority,
Cubai
Road
Transport
Authority,
Dubai
•
21\;1•
AE - Chhopro. Rewoghot - Muzafjarpurof NH-l02
,.
APPENDIX B-5-CURRICULUM VITAE
3.
8. M/s. MASCO,
AL SWAILEM
GROUP Saudi
Arabia
-4.
5.
-
M/s. Atkins Sr. Highway
Limited Engineer
.
Project
Engineer
Consultancy Services for Preparation
of Detailed Project Report of 6/8
Laning Bur Dubai to Corniche
Promenade including Emirates
Roads. Length of the Project 3S km 6
Lane & 25 km 8 Lane (equivalent to
4-Lan.e, 97 km), Cost of the Project
INR 480 Crore.
Consultancy Services for 4 lane dual
carriageway for Preparation of
Detailed Project Report of Seventh
Ring Road Expressway Project.
Project length 42km, project Cost
lNR 487 Crare.
Construction Supervision of New 6
lane AI Khail Road on Build, Finance,
Operate and Transfer Basis till
Operation & Maintenance Period,
Total Length 32km, Project Cost INR
218 Crore. Client : Road Transport
Authority, Dubai
Construction Supervision of New 8
Lane Sixty Ring Road Expressway
(West Section) Project on Build,
Finance, Operate and Transfer Basis
(BOT) till Operation & Maintenance
Period, Total Length 36km
(equivalent to 4-Lane, 72 km),
Project Cost INR 340 Crore
Construction Supervision of New 6
Lane Business Way Project on Build,
Finance, Operate and Transfer Basis
(BOT) till Operation & Maintenance
Period, Total Length 46 kms, Project
Cost INR 207 Crore. Client Road
Transport Authority, Dubai
Construction Supervision and
Operation & Maintenance of 6/8
laning of First Ring Expressway,
Extension of Faheel Expressway and
No. 40 of total length 77km in the
State of Kuwait executed under BOT
basis. Project cost (INR 3162
Crores)
Construction Supervision of 4-Laning
Highway from Hail.to Jouf Part 4 Part
1 Access Controlled Highway for
Build, Finance, Operate and Transfer
Basis till Operation & Maintenance
Period, Road Leng'th 29 Km. Project
Cost US$82.00 million (equivalent to
INR 384 Crore),
Mar.
2006
Oct.
2004
Feb.
2003
Feb.
2001
Nov.
1997
June
2007
Feb.
2006
Sept.
2004
Jan.
2003
Dec. 2000
As detailed
below
As detailed
below
AS detailed
below
As detailed
below
As detailed
below
As detailed
below
As detailed
below
Road
Transport
Authority,
Dubai
Road
Transport
Authority,
Dubai
Road
Transport
Authority,
Dubai
Road
Transport
Authority,
Dubai
Ministry of
Public
Works, State
of Kuwait
Ministry of
Transport,
Kingdom of
Saudi Arabia
211AE- Chhapra - Rewaghat - Muzaffarpurof NH-l02
APPENDfXB-5-CURRICULUM VITAE
10. : April June As detailed Department
1993 1995 below of Road,
Govt. of
Nepal
-~_._-April March As detailed Department:
1990 1993 below of Road, I
Govt. of
Nepal
,, 9.
,
I,;.,
M/s. East
Consult (P)
Ltd., Nepal in
association
with Hyundai
r' Engineering
1
11Co. Ltd.,
I Seoul, Korea
Site
Engineer
Site
Engineer
Construction Supervision of Duality
for Taif - Albaha Road from Taif to
Albaha for Build, Finance, Operate
and Transfer Basis till Operation &
Maintenance Period, Road Length
30.778 Kms, Project Cost US$S7.70 ,
million (equivalent to INR 268 Crore) ~
Preparation of Detailed Design and
Construction Supervision for
Strengthening & Widening to Doti
Road, 2 Lane, 30km. Client
IDepartment of Road, Govt. of Nepal.
, Cost ofthe Project US$ 5.5 Millioni 4
I Construction Supervision of
, Strengthening, Widening and
Maintenance of East-West Highway
from Belbari to Chuharwa Section in
the Eastern Region. 2 Lane, 40km,
I Client Department of Road, Govt. of
I Nepal. Road Improvement Project,
I
Phase II (EC No. 81l funded by ADB,
Cost of the Project US$ 8.5 Million
Sep. I Oct. i9971995
As detailed
below
Ministry of
Transport,
Kingdom of
iSaudi Arabia,
l,
Education:
-------I Training:
• B. Sc. Engineering (Civil), from Bihar University in 1990. Passed in First class with
Distinction
• Training for "Quality Control of Highways/ Bridges"
• Survey and Investigation of Roads and Bridges and Construction and Widening and
Strengthening of Highways
• Imparted Training to Engineers for Quality Control and Quality Assurance of Highway and
Bridge related works
I Mr. Roy is a Graduate Civil Engineer and has over 25 years of professional career in Highway Sector in India & Abroad and
I has sound engineering practices in the field of Construction and Supervision of dual carriageways Highways, Express
Highways, Bridges Over-pass and Underpass & Culverts etc. He was responsible for reviewing the entire Project
implementation activities of the Concessionaire. He was checking all the Designs being prepared by the Concessionaire,
execution of works on site as per specification and standards, continuously interact with the Oient and the Concessionaire.
He was reviewand suggests modifications to the existing road Maintenance Manual, Annual Maintenance Programme of the
Concessionaire. Review of emergency response arrangements needs special attention. Hewas regularProjectsitevisitsandguide,
supervise, coordinate and monitor the work of other experts in lis team as well as those of the Concessionaire. He has
also experience ofsupervising, organising and managing of Project preparation W.r.t construction/maintenance of higllvvay
projecl5,financed by international lending agencies and others.
He has a very strong background in Construction supervision, investigation and study of both Flexible/Rigid pavements. His
experience includes multi-dimensional aspects of road and bridge construction including process control pertaining to laying
of Rigid Pavement & Asphalt Concrete operation on a number of projects. He has been responsible for day-to-day
Supervision and work progress, variation orders, weekly and monthly progress reports, bill of Quantities, working drawings
subsoil investigations, Material Survey, geometric and pavement Survey. He has worked on a number of projects funded by
International funding organization and is well conversant with MORTH, IRC regulations and FIDIC conditions of contract. He
has also been responsible for mix design of bituminous courses like DBM and BC, testing of aggregates from different
sources and assessing their suitability in road construction. He has been directly responsible for all Earthwork, Sub-grade:
GSB,WMM, DLC and PQC work. His sound experience in the area of supervision of and Flexjb pavement'.._-----
'i
AI: Chhapra - Rewaghat - Muzaffarpur of NH-l02
V,renJoa. t<u.mqo f<..1Y~
------_.-construction has many a time helped the project on excellent cost effective solutions and having trouble shooting
capabilities on site. He is fully familiar with latest construction technology of highway works viz, mechanized surface
dressing, use of hot mix plant for asphalt works, use of sensor pavers for bituminous surface construction and modern!
survey techniques and geometric designs.
He has implemented systems for accurate monitoring of progress at site. His experience includes superviSion,
strengthening, and maintenance of roads, highways and bridges, Construction of Flexible and Rigid Pavement, Quality
control at various stages during the construction Supervision of Projects. He has been involved all types of road
maintenance i.e. emergency, routine, periodic maintenance. During his tenure he was responsible for road property
management incident management and Toll fee collection wherever it was applicable. He has good experience in junction
improvement providing crash barrier and construction of Truck and Bus Lay byes. He is well versed with modern methods
of Highways and Bridge Construction including Quality Control Procedures.
He is fully conversant with the FIDIC Conditions of Contract
accepted best practices/Indian Standards and Specifications.
I
aodm__D_d_'_'_OCDO>''''''DO ",hOD logy .:d 'O"~"'t1D",IIY.1
Employment Record:
_.~
Project Name
location
Duration
Construction of Four Laning Section from Algier to Oran having length of 400 km in
I Algeria. Project Cost: INR 2200 crore.-----:J Alger_,, _
~March 2012 to till date----- --,
Client Ministry of Transport, Algeria
---;
Total Length: 400 km f4LaneJ. Project Cost: INR 2200 crore. Project was executed
i'under BOT basis.
t-; ,'ChiefPrOject~;nager --- --- -- -,
l-H; was ~esponsible for Design review and modiflca;ions in -d-raWingS,specificatio~,'1
quantities to suit the prevailing site conditions, design and drawing for temporary.
works, working drawings and as built drawing, variation orders, instructions,
contractual notices, correspondences, day to day construction supervision and
inspection of works, sampling and testing of materials and works, quality assurance,
measurement of works and materials testing, price adjustment aspects, checking and
certification of materials from quarries and borrow areas for coarse aggregates and
GSB material etc. scrutiny of executed works/checking /certification of advances,
interim bills/invoices, maintenance certificates, as-built drawing and project
completion reports; organizing/conducting project progress review meetings and co-
coordinating! Iiaisoning with funding agencies, clients, contractors, other Government
and local agencies.
He has also been actively associated in providing design of embankments and
pavements. He was involved in flexible pavement design / Construction. preparation
of design standards, computerized design of horizontal and vertical alignment, super-
elevation design, preparation of drawings.. __ i- __---t"_
Position
Activities Performed
Main Project Features
-1.1 Chhapra. Rewaghat - Muzaffarpur of NH.1D2
Vi~l?doCl.. I<u. rna'" I<.O.f
[.~~ iJ!Il!)i~,1':I!m
Project Name
:=: 1Mh00rr•• !l'!@;~ <~"'J; LDubai BYPASROAD - Construction of 12 Lane Phase 2 Dubai Bypass Road stret.chin~ '
..L 3~ km in length an~ 57 m. in width_ with 6 travel lane ea~~ ~i~e~_Medjans + eac~ side .
•Ith-
I_. -
shoulder + space for Future extension fo~-RTADubai, UAE on BOT basis. (equivalent
, to 4-lane, 115 km)----
location , Dubai, UAE----- -----Duration , Sept. 2009 to Feb. 2012
-- --
Client , Road Transport Authority, Dubai
-- --- - -- --- -_.Main Project Features , Total Length: 35 km (12 Lane) (equivalent to 4-Lane, 115 kml. Project was executed
under BOT basis.- --~-- - - - ------ ._. -----
Position , Chief Project Manager
-- -+ --- ----_._-Activities Performed , As a Chief Project Manager, he was responsible for execution of highway and
structure works as per specification, contract drawings and with environmental
provisions; checking the setting out, preparation of work programme using MS-Project
Software; preparation of methodology for the execution of various works and
Isubmitting for the approval, preparing of methodology for the execution of various
,works and submitting for the approval, preparing quality management plan and,
I method statements and getting it approved by the client. Submitting method
istatement fo' road aod bridge works, producing detailed working drawings,
calculation reports; physical and financial charts for approval; ensuring site safety
; during construction, preparation of various project progress reports, imparting
I training to the sub-ordinates; liason with client and preparation of bill of executed
, work; The duties included design review of flexible pavement and road geometries in
light of site conditions, checking the setting out, checking the bills and as - built
, drawings, preparation of construction supervision manual, quality control of
materials and completed works, preparation of variation orders, etc Ensured that,
the execution of the completed works met with the intent of specification. he was
I activeiy involved in the supervision and construction of laying of WBM, GSB and Be;
I design of temporary works; checking of stability of staging and shuttering work well
I before the concreting; preparation of diversion plan aod submitting fo, the
I consultants approval for smooth flow of existing traffic and keeping in view the safety,,
I of road users during execution of the project by providing diversions and road signage
~--1
- -,
~~l:001!1~&lID ~jllINn.~~ 'il~m.1l..~I!l'&"-o('Il~~
, Project Name I ' • Consultancy Services for Preparation of Detailed Project Report of 6/8 Laning
I Flexible Asphaltic Pavement of existing roads, footpaths and walkways in ALRAS
area (Phase II) in Deira Dubai, Length of the Project - 31 km 6 Lane & 20 km 8
Lane (equivalent to 4-Lane, 8S km), Cost of the Project INR 41S Crore.
• Consultancy Services for Preparation of Detailed Project Report of 6/8 Laning Bur
Dubai to Corniche Promenade including Emirates Roads. Length of the Project 35
km 6 Lane & 25 km 8 Lane (equivalent to 4-Lane, 97 km), Cost of the Project INR
480 Crore.
AI.. Chhapra - Rewaghat - Muzojfarpur of NH-l02
v,',e.rdoo. KI.<. rryQ.'O
Location
• Consultancy Services for 4 lane dual carriageway for Preparation of Detailed
Project Report of Seventh Ring Road Expressway Project. Project Length 42km,
Project Cost INR 487 Crore. JDubai
-------
Duration
Client
Main Project Features
Position
Activities Performed
,.
July 2007 to Aug: 2010
Road Tra~sport Authority, Dubai
As above.
Team Leader cum Sr. Highway Engineer
As a Team Leader cum Sr. Highway Engineer, he was responsible for survey,
Investigation, fixing of alignment, assistance in preparation of design standards,
design ,of highways and preparation of drawings using computer aided design,
preparation of cost estimates and Tender documents. Has been responsible for
assisting":' in design of road geometries, road pavement, and road drainage besides
preparation of lead c~arts, ascertaining market rates of materials and labour at site of
work, fixing hire charges of machinery, preparation of rate analysis, estimation of
quantiti~~ and cost, preparation of bill of quantities and bidding documents, helping in
preparat'i"on of detailed specifications for the projects.
",
Feb. 2001 to June 2007 Mis. Atkins Limited
'Project Name
location
Duration
Client
Main Project Features
Position
Activities Performed
Project Name
Construction Supervision of New 6 lane AI Khail Road on Build, Finance, Operate
and Trari:~fer Basis till Operation & Maintenance Period, Total length 32km, Project
Cost INR'218 Crore. Client: Road Transport Authority, Dubai
Dubai
March 2006 to June 2007
Road Tra'i1sport Authority, Dubai
This project includeseonstruetion 0[6 iane dual carriageway (32km).
Senior Hi'ghway Engineer (equivalent to RE)
He was responsible for 'construction supervision and contract management following
FIDIC me~sure. Design review and modifications in drawings, specification, quantities
to suit the prevailing site conditions, design and drawing for temporary works,
working ;drawings and as built drawing, variation orders, instructions, contractual
notices, correspondences, day to day construction supervision and inspection of
works, sampling and testing of materials and works, quality assurance; measurement
of works,and materials testing, price adjustment aspects, checking and certification of
materials from quarries and borrow areas for coarse aggregates and GSBmaterial etc.
scrutiny of executed works/ checking! certification of advances, interim bills/invoices,
maintenance certificates,. as-built drawing and project completion reports;
organizing/conducting project progrr;-ss review meetings and co-coordinating/
Iiaisoning with funding agencies, clients, contractors, other Government and local
agencies.
Construction Supervision of New 8 lane Sixty Ring Road Expressway (West Section)
Project 6n Build, Finance, Operate and Transfer Basis (BOT) till Operation &
Maintenance Period, Total length 36km (equivalent to 4-lane, 72 km),-"Project Cost
INR 340 Crore
•
AE - Chhtlpra - Rewaghat-. Muzaffarpur 0/ NH-l0Z
"
APPENDIX B-S-CURRICUWM VITAE
location
Duration
Client
Main Project Features
Position
Activities Performed
Project Name
location
Duration
Client
Main Project Features
: Dubai
: Oct. 2004 to Feb. 2006
: Road Transport Authority, Dubai
: This projects includes construction Supervision of four lone dual carriageway (36km)
including earth works asphalt roads (consisted of sub grode, sand asphalt as sub base
and subsequent layers of type /, type II & type III asphalt concrete, as base, binder
& wearing course respectively), vehicular & pedestrian concrete (pre cost & cast in
situ) roadway median & side barriers, gullies, box culverts, traffic markings & signs,
traffic signal system, duct crossing, UG Utilities & Services, Micro-tunneling, highway
lighting, irrigation & landscaping, '
Senior Highway Engineer (equivalent to REI
He was responsible for review of design and drawings, Checking alignment plan and
profile, Preparation of Quality Assurance Plan and Construction Manual. which in
turn included, Preparation of mobilization plan, work programme, preparation of
construction methodology etc. He was actively associated in Monitoring, Preparation
of physical and financial progress of work, preparation of cash flow projections etc.,
As Contractor's representative, he was responsible for Enforcing Quality Control
measures, Quality Assurance Plan, setting out of works, monthly and quarterly
progress reports, Attending meeting with supervision consultant & Client, Preparation
of Interim Payment Certificates, execution of works as per specifications and drawings
ensuring public and site safety. review of the Environmental Management Plan etc.,
He supervised overall management of the project works in his capacity as Sr. Project
Manager and in this role was responsible for supervising, organizing coordinating,
monitoring, reporting, and managing man power etc. effectively, He has approved
working drawings, issued site Instructions; controlled the contract administration. He
has been involved all types of road maintenance Le. emergency, routine, periodic
maintenance. During his tenure he was responsible for road property management
incident management wherever it was applicable. He has good experience in junction
improvement providing crash barrier and construction of Truck and Bus lay byes.
Construction Supervision of New 6 lane Business Way Project on Build, Finance,
Operate and Transfer Basis (BOT) till Operation & Maintenance Period, Total length
46 kms, Project Cost INR 207 Crore. Client: Road Transport Authority, Dubai
Dubai
Feb, 2003 to Sept. 2004
Road Transport Authority, Oubai
This projects includes construction supervision of three lane dual carriageway (45kmJ
asphalt toads, (consisted of sub grade, sand asphalt as sub bose and subseguent layers
of Type - I, Type /I & Type /II asphalt concrete, as bose, binder & wearing courses
respectivelyi, median & shoulders, pedestrian bridges, concrete barriers, box culverts,
duct crossing, concrete lined open storm water drainage system, steel guard I safety
rails, traffic markings & signs, traffic lighting and parallel fresh water & TSELines.
6~~l' eenolaa t<u.:mC/'If IZ~ ~1~*GI>~d*-'»-
AE. Chhapra - Rewaghat. Muzaffarpuroj NH.l02 1-"",~ In association with
~1J
-APPENDIXB-5-CURRICUWM VITAE
to RE)
agement, Contract Administration, checking the
estigations. He was also responsible for reviewing
s for both roads and bridge works. He has been
Client. His duties and responsibilities include
rds ensuring quality construction of the project,
& Maintenance Phase, For this purpose he has
other experts both on roads and bridge sides. He
successfully completing this prestigious project.
d maintenance i.e. emergency, routine, periodic
was responsible for road property management
ollection wherever it was applicable. He has good
t providing crash barrier and construction of
ect Cost: INR 3162 crore.
wait
I. Construction Supervision and Operation & Maintenance of 6/8 laning of First Ring
pressway and No. 40 of total length 77km in the
basis. Project cost: (lNR 3162 Crores)
Expressway, Extension of Faheel Ex
, State of Kuwait executed under BOT
t -~tion , ! Kuwait.- ~
tion , Feb. 2001 to Jan. 2003
--- - -
t , Ministry of Public Works, State of Ku-
n Project Features , Total Length: 77 Km (6/8 Lane); Proj--_.
tion , Senior Highway Engineer (equivalent
- ~- -------- - . -ilies Performed , He was responsible for Project Man
accuracy of all controlled surveys, Inv
design, setting construction standard
continuously interacting with the
ensuring adherence to design standa
which is completion for Operation
constantly interacted with number of
has demonstrated his capabilities by
He has been involved all types of rca
maintenance. During his tenure he
incident management and Toll fee c
experience in junction improvemen
Truck and Bus lay byes
Activ
Project Name
Posi
Dura
loca
~- ---~---------~------
: Clien
~: Mai
S t 19 D 2000MIs. MASCO, Al SWAllEM GROUP Saudi . .
ep. 9S to ec. b' PrOject EngmeerAra 1£.1
ec, 2000
nsport, Kingdom of Saudi Arabia
f 4-Loning Highwav from Hail to Jauf Port_~ Port 1Access Controlled
ild, Finance. Operate and Transfer Basis till Operation & Maintenance
en.91D29 Km, Project Cost U5$82.00 million (equivalent to INR 384
n K.5.A; Client:_Mini~ry of Transport.
of 4 lane Hail.Jouf highway Part 4 partl 29 Kms - Jouf Build, Finance,
ransfer Basis till Operation & Maintenance Period,. Cost of the project
'on. Client - Ministry of Transport, Kingdom of Saudi Arabia
nsible for Project Management, Contract Administration, checking the
yo controlled surveys, Investigations. He was also responsible for reviewing
design, setting construction standards for both roads and bridge works. He has been
continuously interacting with the Client. His duties and responsibilities include
ensuring adherence to design standards ensuring quality construction of the project,
which is completion for Operation & Maintenance Phase. For this purpose he has
constantly interacted with number of other experts both on roads and bridge sides. He
has demonstrated his cap i1ities by successfully completing this prestigious project .
, Construction
Operate and T
US$ 82.00 Milll
- ----
, Saudi Arabia
--Nov.1997 to D
, Ministry of Tra
-ures , Construction 0
Highway for Bu
Period, Road L
I Cfore}, Locatio, : Project Engine,
ed , He was respo
accurac f ali
Client
Project Name
Main Project Feat
Position
Duration
location
Activities Perform
." ••
APPENDIX 8.S-CURRICULUM VITAE
,
Preparation of Detailed Design and Construction Supervision for Strengthening &
Widening to Doti Road, 2 Lane, 30km. Client: Department of Road, Govt. of Nepal.
Cost of the Project US$ 5.5 Million
Nepal
Project Name
Location
He has been involved all types of road maintenance i.e. emergency, routine, periodic
maintenance. During his tenure he was responsible for road property management
incident management and Toll fee collection wherever it was applicable. He has good
experience in junction improvement providing crash barrier and construction of
Truck and Bus Lay byes
Project Name , Construction of Duality for Taif-Albaha Road-third sector 30.778 kms-Abha. Cost of
project US$ 57.70 million. Client - Ministry of Transport, Kingdom of Saudi Arabia
Location , Saudi Arabia
Duration Sep.1995 To Oct.1997
Client , Ministry ofTransport, Kingdom of Saudi Arabia
Main Project Features , Construction of Duality for Toif Alboho Rood {rom Taif to Albaha for Build, Finance,
Operote and Transfer Basis till Operot'ion & Maintenance Period. Rood Length 30.778
Kms, Project Cost US$ 57.70 million (equivolent to iNR 268 Crore), Location K,S.A:
Client: Ministry of transport
Position , Project Engineer
Activities Performed , He was responsible for Project Management, Contract Administration, checking the
accuracy of all controlled surveys, Investigations, He was also'responsible for reviewing
design, setting construction standards for both roads and bridge works. He has been
continuously interacting with the Client. His duties ,nd responsibilities include
ensuring adherence to design standards ensuring quality construction of the project,
which is completion for Operation & Maintenance Phase. For this purpose he has
constantly interacted with number of other experts both on roads and bridge sides, He
has demonstrated his capabilities by successfully completing this prestigious project,
He has been involved all types of road maintenance i.e. emergency, routine, periodic
maintenance. During his tenure he was responsible .for road property management
incident management and Toll fee collection wherever it was applicable. He has good
experience in junction improvement providing crash barrier and construction of
Truck and Bus Lay byes.
April 1990 to June 1995MIs, East Consult (PI ltd., Nepal in association
Site Engineerwith Hyundai Engineering Co. Ltd., Seoul, Korea
Duration April 1993 to June 1995
AE- Chhapra." Rewaghat - MuzaffarpurofNH-10l
Client
Main Project Features
Position
Department of Road, Govt. of Nepal
Project Length: 30km. (l-LaneJ; Cost of the Project U5S 5.5 Million. Proiect financed
by: Ministry of Home Affairs, Govt. of India. The project was executed under FIDfC
Conditions of Contract.
Site Engineer
Activities Performed , He was responsible '0' supervision to ensure compliance with drawings &
specifications for construction of a network of two lane dual carriageway (4 Lane,
70km), asphalted motorways with median shoulders, concrete paved parking areas for
heavy vehicles & equipment, concrete kerb works, gullies, box culverts, duct banks,
concrete barriers, steel guard I safety rails, civil works related to utilities, services,
street lighting & traffic lighting, traffic marking & signs, checking shop drawings &
review test reports
Project Name , Construction Supervision of Strengthening, Widening and Maintenance of East-West
Highway from Belbari to Chuharwa Section in the Eastern Region. 2 Lane, 40km,
Client: Department of Road, Govt. of Nepal. Road Improvement Project, Phase II IEC
No. 81) funded by ADB, Cost ofthe Project US$ 8.5 Million
location , Nepal
Duration April 1990 to March 1993
Client , Department of Road, Govt. of Nepal
Main Project Features , Project Length: 40km. (2.Lene}; Cost of the Project US$ 8.5 Million. Project financed
by: Asian Dellelopment Bank. The project was executed under FIDIC Conditions of
Contract.
Position , Site Engineer ..
He responsible fo,....
to ensure compliance with drawings &Activities Performed , was supervIsion
specifications for construction of a network of two lane dual carriageway (4 Lane,
70km), asphalted motorways with median shoulders, concrete paved parking areas for
heavy vehicles & equipment, concrete kerb works, gullies, box culverts, duct banks,
concrete barriers, steel guard I safety rails, civil works related to utilities, services,
street lighting & traffic lighting, traffic marking & signs, checking shop drawings &
review test reports
LANGUAGES:
Language
English
Hindi
Speaking
Excellent
Excellent
Reading
Excellent
- Excellent
Writing
Excellent
Excellent
Summary of Qualification & Experience lIis-a-vis the requirements as per TOR:
9 Months
.. .•
In oss«iotion with
Feasibility Study I Detailed Project Report:
• Consultancy Services for preparation of
Detailed Project Report of 6/8 Laning Flexible
Asphaltic Pavement of existing roads, footpaths
and walkways in AlRAS area (Phase II) in Deira
Dubai on BOT basis, Length of the Project - 31
km 6 Lane & 20 km 8 Lane (equivalent to 4-
Lane, 85 km), Cost roject 41S Crore.
~
~
B. Sc. Engineer'ing
(Civil), from Bihar
University in 1990.
Passed in First class
with Distinction
AE. Chhapra - Rewaghat. Muzeffarpurof NH.l02
Qualification: candidate
should be a Systems
Engineer. Post Graduate
Degree in Highway
Engineering will be
preferable.
if!..:{f)!Jli.=1lir:J.i1«!J.Jt:w- il!IIJ
.'MP.J,l!f('PiJ~,...,
fit '"o~OC'O"O" wi<h (ifj)
9 Months
7 Months
"
34 months
20 months
27 Months
18 months
44 Months
16 Months
• •
Construction Supervision Project:
• Construction of Four Laning Section from Algier
to Oran having length of 400 km in Algeria.
Project Cost: INR 2200 crore.
• Dubai BVPAS ROAD - Construction of 12 Lane
Phase 2 Dubai Bypass Road stretching 3S km in
length and S7 m. in width with 6 travel lane
each side+ Medians + each side shoulder +
space for Future extension for RTADubai, UAE.)
(equivalent to 4-Lane, 11S km)
• Construction Supervision of New 6 Lane AI Khail
Road on Build, Finance, Operate and Transfer
Basis till Operation & Maintenance Period,
Total Length 32km, Project Cost INR 218 Crore.
Client: Road Transport Authority, Dubai
• Construction Supervision of New 8 Lane Sixty
Ring Road Expressway (West Section) Project
on Build, Finance, Operate and Transfer Basis
(BOT) till Operation & Maintenance Period,
Total Length 36km (equivalent to 4-Lane, 7Z
km), Project Cost INR 340 Crore
• Preparation of Detailed Design and
Construction Supervision for Strengthening &
Widening to Doti Road, 2 Lane, 30km. Client:
Department of Road, Govt. of Nepal. Cost of
the Project US$S.SMillion (27 Months)
• Consultancy Services for Preparation of:i
Detailed Project Report of 6/8 Laning Bur Dubai
to Corniche Promenade including Emirates
Roads. Length of the Project 35 km 6 Lane & 25
km 8 Lane (equivalent to 4-Lane, 97 km), Cost
of the Project 480 Crore.
• Consultancy Services for 4 lane dual
carriageway for Preparation of Detailed Project
Report of Seventh Ring Road Expressway
Project. Project Length 42km, Project Cost 487
Crore.
• Construction Supervision of New 6 Lane 1
Business Way Project on Build, Finance, I
~
Operate and Transfer Basis (BOT) till Operation:
& Maintenance Period, Total length 46 kms,
0:j-!,roject Cost INR 207 Crore. Client : Road
Transport Authority, Dubai,
22 years
Dubai, Quatar, Saudi
Arabia & Nepal
Construction/
Supervision: 5
Projects
DPR:4 Project
-- -------13 years
-
Experience in Abroad
_'" Chhapra - Rewaghat. Muzafforpur 0/ NH-l0
Highway Development 4 Project
Projects taken up under
PPP.
Total Experience: Total I
Highway Experience of
10years.
At least 3 years
experience as Team
Leader/Project Manager
or in similar capacity in
O&M and other related
activities (like
Maintenance Manual,
Maintenance
Programmes, Lane
Closures, Traffic
I Management, etc.) of
completed 4/6 lane
highway sections
Experience in position of
Team Leader/Project
i Manager or similar
capacity in project
preparation/Con struct ion
supervision/IE involving
4/6 laning/Expressway
I,,
II
VI"Ire'})< If0.. 1<4m'l~L
I~
~
~ Brief Description of Project
24 months• Construction Supervision and Operation &
Maintenance of 6/8 laning of First Ring
Expressway, Extension of Faheel Expressway
and No. 40 of tota! length 77km in the State of
Kuwait executed under BOTbasis. Project cos.t
: (INR 3162 Crores)
• Construction Supervision of 4-Laning Highway
from Hail to JoufPart 4 Part 1 AccessControlled
Highway for Build, Finance, Operate and
Transfer Basis (BOT) till Operation &
Maintenance Period, Road Length 29 Km,
Project Cost US$82.00million(equivalent to INR
384 Crore), Locatl.~n K.S.A; Client: Ministry of
Transport.
38 months
• Construction Supervision of Duality for Taif -
Albaha Road from Taif to Albaha for Build,
Finance, Operate and Transfer Basis till
Operation & Maintenance Period, Road Length
30.778 Kms, Project Cost US$S7.70 million
(equivalent to INR 268 Crore), Location K.S.A;
Client: Ministry of transport.
• Preparation of Detailed Design and
Construction Supervision for Strengthening &
Widening to Doti Road, 2 Lane, 30km. Client:
Department of Road, Govt. of Nepal. Cost of
the Project US$5.5 Million
25 months
15 Months
• Construction Supervision of Strengthening,
Widening and Maintenance of East-West
Highway from Belbari to Chuharwa Section in
the Eastern Region. 2 Lane, 40km, Client:
Department of Road, Govt. of Nepal. Road
Improvement Project, Phase II (EC No. 81)
funded by ADS, Cost of the Project US$ 8.5
Million
48 months
••• •
221
@)In association withAE- Chhapra - Rewaghat. Muzaffarpur of
•• ~~~t:~~~~~~~, ~~H
!1l ~"~ieij~~":~~~~~bl'l P 0'215--:
H ::l ;0; ti •z.E!e~f:~~l:!~~~~~~ ~•• • u _ :J Ill) ~
0 ~..,,~~~I~"'~~i (f)g~2.u ;~~~~~~~~~~ 0:: (Jr r;;H .1~~"s'I' :, 4:_2.g..,
" ~~>l~~~~E~l~ ~~:!Et:t.!!!O
!!l-/"'~'i~~i~~~~~~.~ ~I~
~~ '~18'"~I 1.H-liiP"'" •• "i
I', I "r~~.1 "t .•t~~hl~hH~~i "t~
[""Hll~It.h~.J!H ~5
fa!" va!fditv' see page ...... - ...--,,-
--. -lrL-",;;;r;;p;,,<>lIlttH!"-If# •n1JH~~f~l-lf. -, BA
F~. -----~.-~-.-,--.-,-..------~.-_-ID~,;r_-------.- 14/03/2011 13/03/2012.L -1,______ _ _
P(INDROY«VIRENDRA<KUMAR««««««««««
J6438189<4IND6003025M1203130«««««««<2
•
,'''';
<II'.,
.i
1')
.,,
'.8044543
,I'.
••,-l'
.'•.\
,'
~••t'.
'
".
:~'
,1
"
, ,":
?~
fq:;ill;;m;r~
.~'.o
(>llJ!
~..._
l,l~
fI,
-'-'.0
1\•••
.,."
!--"'";-c.,.
>.'.$
~••"..,~•..lr
().",
ljnlR
p'l"
I.;'~
Sr<
1(':O
!',{.•.•.•"
f<l'~~r
,4.,-,•.
_",.:t,~t1~\tlLN".nQN
.c:.;'~~""iJl1::'.1'~f,-'rC"'r;.':"~.'.~,r,l:
h.-..'1'i\l"'~
,\'.;"
1!,":f_"':'I.~"::';:~~)~~'.
"\~
\J,K
"~
,.::-~,,~,F
,;'V
.'~l'-lA
Tiu
N,
~I'J')"
':',,,,;;,1•.'','/,j
'.•.
,"",Ttl]'.f'''''::";:-!"
,I",0"',~
",',t;
'.....
';~~..'C'r:;i.
,..f<ll.V
l~~~~f':~
,A~~~i,':'~~
~~.9
~~
31;3
2-0
146P
i\;it~]{~:4~~~G:6f(;t~AS,AP:'~~y"',~;tiJ:~..i."":'~:
.~2..~~l~~~:r
.~f'''''
'"11.";t:-;.l:":l.'"
'I,.
t<
••"r
-.
"')I"
,:.'
~'..
"2',
,r,,","';;'
.,•....•....
l-,..,.
f-"-<"4'
t;S¥X~ft1~iS1
,~.~~~(~
;2N
~;J
~~
""R
CH
1960~ot"
zIlA
SC
.HO
O~~MV
I~fY
:AR
P~
~";t::,:i~l~~{~:i}!~~:".;MlCAR~~
"19.1
t~~:0
;~.:,~o~;,,~g~
<Ij~FlOI1I-,~'~N••.,,'.~'"
'~ll--'
,',.,
.'If
,'.'
,)'4
;11:!:..::'''',L-v."1
!li-I'-lI",ie''.~'
",p~
~.•
,f:.\,')~~
f"Jfl~:tttl&1t'ifettMa1'1;rm
qffI~~
amtm~.F"l~raftqa~:1.....:
,,_I
.r.-'
._~,.•
iJ'."
•"'<
?':l
~",
:!'o
(iI11,....~;;.'~'"
<',:.:"",y
:".'o.ff
,;(
'.,,,
:)'_.
'_<>
_~
,••
,r••
,,,'i
l>'
."
,Q••..
'"0
\1,"
~""
,~l,H
A~,
'1',,".)['
,»'L
lt.1
V,,*,.
A•.
I:'~
'.__'l,it.'"
"i:t•••tl\1;~
1;..,S.qIH':'C~
.''0/;
,,'},
.~,_
,••-O
..•.'•..•'
_~'1,
..•.••.h""l'.
'.,,{l~
:'-j•.I'~:,iO
O"~",
)"4l'V"J"~
:.::",,,,,
',.
-",,',""',4r;'",,=•
•,"i:t~
.,1J';;1dt
",'.'..4
--•.•...
)1.:
;"I.:,.m~i,:.,./;.,
•~'"~,:,
'..)"'il}!"
:'lo
\A!':'..-lO
O'.,-.,Il,
:O''1tJ'
;c.',
,.•..
'"v<\'.
t,.,~IN",\IC:1
-l'"N
s.<;'1
\)0,
'.'~lIimA..l?'IH,'"
.,~t\,
,lt.,'"..,'<"'~"':'.I\Rl'l;;IHI\I"
$C
~O
~)l~'l.'."\4""
1~.,".•;~:,~<'1~MAtHJ~1'I01ll
;l!lfl~,l;;--lt'it~:I'\".'v-'P.'
,n,j"'0M~'~;'!,
i~~
.,.,:':PI
:""'IlI,1
!""l~
"~,
~C
I,lQ
',l\~~A
,..,(\"".
~"
..•..t,'~:"';-;'.".'
n'!t'~f"
'.n"t'.
'''.l.,~-i•.•\;;1v'-,~'".....;.~.
,.~.•,'~'I,:;:'',;,,~~,
~_~
Qf,"
":'
~;.)
.:",'.I••,,:
Y"~";"'I~t...:
'~~
,It'"~F••;,ll:i'.1';(;,
'1l,y~gi.o;llf~.
<>tltW
"l'l>
lTI1
ifttrm
t'IT
~.'
•.•,,'4l
.•••"
',.~,
~"\
.)l1
<1t4
IL1"'"'*"
Iq"'4
;,.{
?-!
)-I"
,~'.~I.
&ftt
Il.,.
~.•,
~I(
'll'f,.'ttI
'."__~<".6:'tl;,,\r:-:):.
"'~'f,tO
Ol,.c
:",
,.,"'.
.,.'
,'.
...'
'.;.
-~',.
.fI'l1'T\jf
••~
.,...
,.
.',-
:~'.~
~l:<?::'t
.'.~\
1'rL"~
.••""
'l~11~""
,,'~
I~T,C
j
'.,~,~;;~t"i,'j;
!'&iJ
~f[ffi:it'.~
t.l:
srip
fftrtfrt;
','~
~l"
,,,:,:
1.,'.I"'i:"'"I,,"fW:,,::~~ttiti~.~~.;,.j'
-n'
....•.•
ft,~
'~j..\'fi1
J.
'C1Aq<,CH()0Lill!.l.~,
,.,~
r.M
,~,'
~.
:<J1
!'~
C-L
..S'I
nIt,I.Jlll"
.'IIl'f'I"
fj~,'"I(~r..."L,.i
;:t.o
~...,
'.:;
..lit,'
f:",~ihlA1,C
"'-",~-:,l!•••jt.c.~'"'1"-:0,'!''''',-.'!''''''l,';'',''
!,.••.,'
'.1"."1
.'".,-,,"
'"~",.,
••,"'TI''''-
I."',-''''','~AA,'41I''t'',,JO''
.;.I."";4V
1r-it ".Y
~.o
o'~
:q,~
""bo'O
'oc"
oo':l
oo
°00.
"00
0'0
(1...
,O
't;'Q"'.'l
9'0
01'(0'0
'.
"J,
0'0
'0~
.~'.~
J1~)F-
1l.'4
INA
TlO
:f.~
"',
s"
'i.
.•••
...••
.I.,,~.
'.,\
,,'
\'"
\~
\fc
:rtn
I'\
~~
"t
'f<m
ir:'>"",
'"',.,
,fu
tf.tl
;~'.'.
1l~
''''1~'
.1:"
,""'.:
i:X
"",J!;,iiA
'l-I()I
',,~h~~;,
--~'.;,'ic:
":C
'l".,
.;':t
:l.':l'
['Hl~.,.',
j:,<
;.~'''';:,.''l}
1'.,.',~'j'f~(>'"
'-:'...1'\;X
I'\'\;lNATlr~1
"~I\~,~!!;!!$I;,c':,','j,
~Q:,'!f0'l""_,.~I'.'\0
'(0'
."C0
.'(0.•••.•~ClM
','r.O
,,,~
o,
F,.'"
,(0)
';},:
,:..••.•:3:X;V"i{"JI:.:
.-"f
•••{~:~;~6~'~~::"
;,:4.b~:"4lt.':
;84;
'.48~
56
104
36
ELM
75
PH
Y,.4
,tHo
~'4
',AM
1..65
'45;
'LSN
~62"
:489'
~~,s~'c'o.Nri:~i~~~t?;
..1
1."
~~,~
i:~~';.~C
'~'.,;
i.lO
~.
..[
'•.
t:"."
.'.'.,f'
.1.,'-"
:."1.'.~
,'1:"
;(.:.
'1.ii:,":.~.
_,.
1"iq,
":''''-~IN
Ar!
O,i~A~t~,••,(.-"..f,.'
1,.A
,I.,"t
C_
.",
"".'
•.'",'!
'}""A
..'__~-'J,
c..f!.,•.~"u~,t
,'<
,'.1',',,.;,a.MtN.o.Tl0
i,",~"<-r-•..•(VlI
J"l~
"B.TE('"1..">1''''.~:'~"
'<••,,~,
".'.
'.',,'_
~'_',-'.',.
'-_""".
"\',
"'.'~h
I,'",~-.""
t•.,.
,11"<
"""
il""
"'><
'."
".':.~'
r"',~"k,d',,,,
~,
•
~ i{ 0$
~ ~ t' }
i
~,\,,;.
!.'
(\U/:.'
•.
't1\
'.....,1;i~f.,~_"O,""'''"''"Il__
''',_.,~'.
,~,_.,ji;._
••
' L-
f.'
I,
"b---,"'•••••..•....
~I;
'.--....-.~~
.••.,'
,.
}Sb)'3
r=~"
~,,'"
"
N N •••
...•.',wq'f.ftrl\r •
• ,~_.-.
~H~~It\~\~
,
i,,-
...-
I --.,...-
"';
"
•
. "
/, r. J,.!,
..
,,-
"'1'> " ,,~, ,- . ,,',',", '
"I. <. : ':/'
{'" :".,':' "P,i' ." ':1,
1, "J,
: -"4
"
. !,
i-
'",,
~'
'c>, "
_____ "_- •• __ ._ •.•.•••_, .. -'" ;6.. - " --_.~.~.~-----
II
._...,"." " ..• +'_. _ .,.J..
I
II
226••
J6438189
NEW DELHI
05/08/2014
7200 DA
I
RA KUMAR«« <: «< <: < <:: <: <: «~<
9600810002674/20142031120143
L
" .J}' ,,,1\.d
N0 2015/1458, ~J~';;"'lj~l.iirWJ "",-, ~:
.' L.'" .:;' II... t:!)'-! ~) •..•••.•" .
............................................ ,...~
,JLo~ IJ-Aj""; I.?J) : (~,-'Jn,;,.u~0!\J r--'1\) (~) -i.,,-JJ ~
ROY VIRENDRA KUMAR , "",jljl Jj~'.."UI ~c.<J1
i,
MUZAFFARPUR'-;-'" .. ,:
02-03-1960 a IN DE : )')1-:1\ 2L<... ~ i--:.}\::-INDIENNE , ~\
LOTISSEMENTYASSOUAL KOUIDER N° 1231 ERETAGE 'jl)," 01yJI
ZERALDA ALGER
~.CONDUCTEURDE TRAVAUX GENERAL , 41'
DUBAI V' J'e" J 6438189 '~J,"-JljlJ'" Js- (0) }G-
13-03-2021 ,~"' ell te" 14-03-2012 'C'J'--"
01-09-2015 'C'J" ZERALDA ,---< J?
•
J.-"'}I '-:"""""\..p "La-ol
J'~ V,~.ei1J(OKUlno( j<q
~5hapoorji Pallol1i
8uilt to lasL.sirlcal86S
TO WHOM IT MAY CONCERN
This is to certify that Mr. Virendra Kumar Roy, S/o. Manager Prasad Roy has wor-king
with this Organization as a Chief. Project Manager since March 2012 to till now for Four
Laning Section of Alger 10Oran (400 k.m) in Algeria ..
During this period his work and behavior have been found good.
We wish to him success in his future life.
Dt. 07.12.2015
Shapoorji Pallonji And Company Private Limited
Corporale Ollie", SP Ce"tre. 41/44. Minoo Desai Marg. C~aba.
!'.lumbai. M"harushtra, Ifldla-4000OS,(7) 67400000 (F) 6633 8176 ••••••••'W.sp-grOlJp.co.in
Regel. Offic~: 70 Nat,jindas Master Road, For1 MlJI'T1bai40002:3
CIN: U45200MH1943PTC003812
s. Shafi-ur Rahman
Vice President (Project)
•• 228
....::.J1l~~;;~ .1 j b 11NATURE CONSTRUCTION
Date 5th Oct 10 .,
ToThe ManagerDubai Islamic Bank ,.
Dubai. U.A.E
Subj =S=a~la=ry~C~e~rt=ifi=lca~t=e. "
"!'
. . ~:~-
It is certified that Virendra Kumar Roy Indian national holding
passport no B3467450 is employee of Nature Construction.
l. >l.
He is getting monthly salary'AED-10,0001-Kinldy open saving
account in your bank. • i:,In this regard your co-operation will be appreciated.
-;1 -.'.:,f.,~j:
Nature Construction.
,"
"":".t.l- W"iA'i :''-:-'''-~,. i-i"lAAA~, :u-$lj •• ~- :YA~"-'~"_;Q~
- "~
Tel.: 04 -3982200, Fax:04 - 3988866,P.O.Box: 483, DubIi"i - [email protected]
02/09/2010
TO WHOM IT MAY CONCERN
This is certified that Mr. Virendra Kumar Roy. worked in our organization as
Team Leader cum Senior Highway Engineer sincere July 2007 to August 2010,
for Detailed PRoject Report of Three different package having aggregate
length - 143 km (4/6/8 Lane)
Mr. Roy is an honest and hardworking Engineer with Integrity.
He is leaving us on completion of the Project. Works.
I wish him all success in his profession.
Yononnes Kohsay
Sr. Associate & HOD
PLANNERS. ARCHITECTS ENGINEERS
•
•.. 23u
ATKINS,
12 July 2007
To Whom it Mav Concern:
'Virendra 'Kymar Roy
. ,Atkins Limited
The Hub500 Park Avenue
AztecWeslAlmondsburyBristol .
63324RZ
Telephone +44 (0)1454 662000
Fax +44 (0)1454 663333 '
[email protected],com'
I write to confirm that above was employed by Atkins Limited between 01 July
2001 and 30 June 2007 in the role of?enior Highway Engineer.
Prior to Mr. Roy's employment with Atkins he was emPloyed by AL Swailern Group,
Saudi Arabia between Sep. 1995 to Dec. 2000. His employment transferred to us on 01'"
Feb. 2001.
He was sincere in his duties assign to him and having good communication skills. We wish
him all the success in his future assignment.
Victoria Crew
HROperations Advisor
Victori [email protected]
•
Atkins Limited is a WS Atkins pic companyRegistered Office: Woodcote Grove Ashley Road Epsom Suttey KT18 SSW England Registered in England Number 688424
••
.,
231
Date: 15.07.1995
To Whom It May Concern
This is to certify that Mr, Virendra Kumar Roy has worked with us as, "Site Engineer" with effect from
April 1990 to June 1995 for Design, Supervision for Strengthening & Widening to Doti Road, 2 Lane, 30km
and East-West Highway from Belbari to Chuharwa Section in the Eastern Region, 2 Lane, 40km ,under
Department of Roads, Nepal
He has been d.isposing his duties very diligently and:devotedly with good technical skills and good technical
knowledge of road and bridge works, He is well conversant with modern technique involved in Construction
of Road and Bridge Works, He is hard working and bears good moral character,
We wish him every success in his life
Authorised RepresentativeEast Consult Pvt. Ltd.
,po Bo", 1_192, liilimpat, K"thmandu,
Phon~:~77+4412062. 977+4413267
• 2.32