Page 1: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

• BIL Chamber Equipment Status

• Wires

• Gas Leak Test Results and Gas Distribution Related Items

• Analysis and Results from the Cosmic-Ray Test Stand

Mauro Iodice - MDT Italia - Pavia, 30 Settembre, 1 Ottobre 2002

Page 2: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

26 sett. 2002

FILI ROTTI FILI ROTTI Gas Bar Gas Bar Gas Bar Gas Bar LUOGO Perdita TOMO

lato RO MLO lato RO MLI latoROMLO latoROMLI latoHVMLO latoHVMLI

RM-001 BIL2A01 1 l̂ayer:2 ,̂22 d̂a sx 4 l̂ayer:12 d̂a sx S6R0022 S6L0019 S6L0023 S6R0024 ROMA3 2 mbar/d si

RM-002 BIL4A01 nessuno nessuno ROMA3

RM-003 BIL6A01 nessuno 3 l̂ayer:36 d̂a dx S6R0016 S6L0015 S6L0017 S6L0018 CERN 1.4 mbar/d

RM-004 BIL2A05 nessuno nessuno P6R0014 P6L0013 P6L0011 P6R0012 CERN 0.3 mbar/d si

RM-005 nessuno nessuno CERN* si

RM-006 BIL4A05 nessuno nessuno P6R0010 P6L0007 P6L0009 P6R0008 ROMA3 2 mbar/d

RM-007 BIL6A05 nessuno nessuno ROMA3 si

RM-008 BIL2A09 nessuno nessuno S6R0030 S6L0026 S6L0028 S6R0020 ROMA3 7 mbar/day si

RM-009 BIL4A09 nessuno nessuno ROMA3

RM-010 CERN

RM-011RM-012 BIL4C01 nessuno nessuno S6L0041 S6R0033 S6R0034 S6L0043 ROMA3 1ML OK

RM-013 BIL6C01 2 l̂ayer:36 ;̂4 l̂ayer:20^ 4 l̂ayer:5 ̂da sx S6L0031 S6R0029 S6R0027 S6L0032 ROMA3 <1 mbar/d

RM-014 BIL2C05 nessuno 1 l̂ayer:8 ;̂3 l̂ayer:36^ ROMA3

RM-015 BIL3C05 3 l̂ayer:32 d̂a sx nessuno ROMA3

Chamber Equipment and gas leak test Status :

15 BIL Chambers (side A sectors 01, 05, 09 - side C sectors 01, 05)

received from Roma1, out of 19 built so far.

Al 6 Settembre 2002

Page 3: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Wires :

RM-012

RM-014

RM-015

6 Sett.2002 27 Sett.2002

Vista lato HVFilo sfilato lato HV

Filo sfilato lato RO (tube bar-code side)

( RM-013 3 fili rotti - stabile )

Page 4: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Chamber Suddenly Starts to Leak !!!

Gas Leak Test Results :

Back to Normal (0.6 mbar/day) after connector plate substitution

BIL4A05 Gas Leak Test

BIL2A05 Gas Leak Test

Page 5: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

• Test gas bar OK

• Montaggio su camera ...

• Test Multilayer …. KO !!!

• Perdite dal gas connector (half jumper)

• Sempre in tubetti 3o o 4o Layer

Gas Leak Test Recent results

Page 6: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

The gas distribution system …Freiburg investigation !

FAILURE RATE :

Failure/ML ~ 6

6 tubi /48 tubi_totali = 12 %

6 tubi /24 tubi_3o-4o Layer = 25 % !!!

8 “Gruppi” assemblati con perdite evidenti mandati a

Friburgo (Gregor) per “analisi”

Leak

Page 7: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

From: Gregor Herten <[email protected]>To: Mauro Iodice <[email protected]>Cc: Gregor Herten <[email protected]>, "Mohr, Wolfgang" <[email protected]>, Ulrich Landgraf <[email protected]>, Filippo Ceradini <[email protected]>, [email protected], Agostino Lanza <[email protected]>Subject: Re: gas leak problems

Dear Mauro,

we have received your 8 tubelets and have checked them.

4 have problems in the assembly (black piece not mounted correctly, O-ring squeezed)

4 have problems with the tubelets. There are cracks in the tubelets near the bulge region.

This is exactly the same problems as the US tubelets.

Unfortunately this means that the tubelet problem exists also for the barrel.

My impression is now that we should abandon brass tubelets.

This is expensive but everything else is too risky.

I shall follow this up and inform the collaboration.

The gas distribution system …Problems !

Page 8: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

The gas distribution system …Problems !

CRACKS

Page 9: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Subject: Re: gas leak problems

Mauro,

it is always difficult to find the real reason of a leak after one disassembles the

pieces. All we can say is that 4 tubelets had cracks and the other 4 were o.k.

For these 4 we found that the black piece was not fixed correctly on the bulge.

When you use the assembly tool one should hear a click when the black piece snaps onto the bulge.

For the other 3 we had the impression that the O-rings were tilted.

1) use a lot of alcohol to make sure that the O-rings slide well

2) push the O-rings fully against the black plastic piece (this avoid sliding of O-rings.

……

Gregor

The gas distribution system …Problems !

Questo significa che anche il montaggio non e’ “FAIL PROOF” ?

Page 10: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

The gas distribution system

New GAS-bar holes profile :

Sharp edge damage o-rings

“The OLD problem”

4.4 1.15 4.71.7

Rounded corner

SOLUTION 1Roma

SOLUTION 2Pavia

Page 11: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Gas Distribution System - Come procediamo ?

Scenario n. 1 : Procediamo con annealing dei tubi esistenti e andiamo avanti.In parallelo: procurement altri tubi (acciaio ?) - Test

Scenario n. 2 : Fermiamo l’equipaggiamento delle camere (la costruzione no (?))fino alla disponibilita’ di tubetti piu’ affidabili.

Pros :La produzione va avanti.Viene ulteriormente testato il “montaggio” (HALF JUMPER) e verificata la cura anti-cricche

Cons : La produzione si ferma per MOLTI MESI.Alla ripresa dei lavori …come andra’ il montaggio ? (HALF JUMPER)

Pros : Non si spreca lavoro!Ci si puo’ concentrare in studi di sistemi di distribuzione “alternativi” ?

Cons : Rischiamo di dover riequipaggiare tutte le camere gia’ montate con un sistema nuovo

Page 12: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Cosmic Rays data - tube resolution

reso

luti

on

(m

m)

(Resolution dominated by multiple scattering)

RPC1

RPC2RPC3

RPC hodoscopeequipped with 3 MDT chambers

Page 13: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Tube maps and Timing spectra analysis

Tube maps for chamber BIL4A05 MultiLayer 2

Timing spectra formezzanine 3 1st layer

Page 14: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Total Drift Time distributions

chamberBIL4A05 MultiLayer 1 chamberBIL4A05 MultiLayer 2

Page 15: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Alignement studies with cosmics

x

b(mm)

Wire length coordinate

“TOMOGRAFIA” delle camere con tracciamento sotto raggi cosmici

b

xWire length coordinate

MultiLayer up

MultiLayer down

Large x tracksmall x track

Effetto di una rotazione relativa fra i due MultiLayer

z

y

y

z

Page 16: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Alignement studies with cosmics

“TOMOGRAFIA” delle camere con tracciamento sotto raggi cosmici

Risultato di analisi blindda simulazione (A.de Salvo)

La rotazione di un multilayer rispetto all’altro e’ in accordocon l’osservazione qui riportata???????????????????

WORK in

Pro

gress

b (m)

xWire length coordinate

Page 17: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Gas bar on chamber - Faraday Cage - Meccanica Un po’ di foto

Page 18: BIL Chamber Equipment Status Wires Gas Leak Test Results and Gas Distribution Related Items Analysis and Results from the Cosmic-Ray Test Stand Mauro Iodice

Carrelli - Meccanica - …Un po’ di foto