BIM-based falling prevention planning BIM Safety research project, Pilot 1 Kristiina Sulankivi & Markku Kiviniemi Kristiina Sulankivi & Markku Kiviniemi VTT Technical Research Centre of Finland

Upload: others

Post on 03-Apr-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: BIM-based falling prevention planning

BIM-based falling prevention planning

BIM Safety research project, Pilot 1 Kristiina Sulankivi & Markku KiviniemiKristiina Sulankivi & Markku Kiviniemi VTT Technical Research Centre of Finland

Page 2: BIM-based falling prevention planning

207/10/2011

Guardrail components for Pilot 1(modelling software: Tekla Structures)

3D presentation: Tekla custom components modelled corresponding to the real guardrail solution used at the site ”new model” 4D-planning: Assemblies in the components correspond to site installation and removing of the railings

Timber railings for the post

Guardrail post for surface installation(Vepe product, rented by Skanska Rakennuskone in Finland)(Vepe product, rented by Skanska Rakennuskone in Finland)

Page 3: BIM-based falling prevention planning

307/10/2011

BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)

Detailed BIM-based falling prevention planning based on p p gthe Tekla structural model of the building

Positions of the guardrail posts g pare planned to avoid need to move the posts during the construction work -> time savingsg-> risk of falling decreased

Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)

Structural engineering and modelling Magnus Malmberg consulting engineers

Falling prevention modelling VTT

Page 4: BIM-based falling prevention planning

407/10/2011

BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)

• Part of the timber railing mustbe removed before the casting mould can be installed

• The railing posts are at right distance from the column, to be able to install the mould--> no need to move the posts

Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)

Structural engineering and modelling Magnus Malmberg consulting engineers

Falling prevention modelling VTT

Page 5: BIM-based falling prevention planning

507/10/2011

BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)

Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)

Structural engineering and modelling Magnus Malmberg consulting engineers

F lli ti d lli VTTFalling prevention modelling VTT

Page 6: BIM-based falling prevention planning

607/10/2011

BIM-based falling prevention planning in Pilot 1,(underground floors: railings to be installed to cast in place vaults)

Railings are located far enough from the slab edge to leave room for installation of wall elements.

No need to remove the guardrail until the wall elements have been assembled -> risk of falling from heights is eliminated

Page 7: BIM-based falling prevention planning

707/10/2011

BIM-based falling prevention planning in Pilot 1,(underground floors: form work and related safety equipment)

Safety nets modelled as part of falling prevention solution planned to be used during form work g

Case building project: New office premises of Skanska, in Helsinki, Finland (the client and the main contractor Skanska)

Structural engineering and modelling Magnus Malmberg consulting engineers

Falling prevention modelling VTT

Page 8: BIM-based falling prevention planning

807/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 9: BIM-based falling prevention planning

907/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 10: BIM-based falling prevention planning

1007/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 11: BIM-based falling prevention planning

1107/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 12: BIM-based falling prevention planning

1207/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 13: BIM-based falling prevention planning

1307/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 14: BIM-based falling prevention planning

1407/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 15: BIM-based falling prevention planning

1507/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 16: BIM-based falling prevention planning

1607/10/2011

BIM-based falling prevention planning in Pilot 1,(overground office floors: railings to be installed to pre-fabricated fixings in beams)

Page 17: BIM-based falling prevention planning

1707/10/2011

VTT creates business fromVTT creates business from technology