• BIM for Infrastructure in
SwedenSweden• GeoBIM Europe 2014
-
Pontus Bengtson
InfrastructureSvarte BIM BIM Alliance
Running72Football coach
Helsingborg
Svarte
WSP
BIM
Development
Project Manager
Speaker
CityCad
French horn
Parent
9497/00/03
Sweden
-
CommunicationProcessesInformation flow
BIM Technology
Building Information Model
Building Information Modelling
Building Information Management
Develop and Improve
-
DefinitionDefinitionProcessProcess
Data ModelData Model
The evolution ofinformation
-
Purpose & Vision
• Non-profit organization with 160 members from:
– property owners, developers, architects, consultants, contractors,
installers, construction material companies and developers and
suppliers of software
• The highest possible industry collaboration for increased
benefits from BIM
• Vision:
– "We are creating the seamless flow of information
in the processes for community building”
-
Branschsamverkan om BIM
+ +
=
-
Long-term
goalVision
Today
-
Today
-
Röfors – Bridge design without drawings
� Built in 1919
� Concrete bridge, three spans.
� Total length 63,5 m width 5,1 m
� Original bridge railing changed in 1970s.
� Landmarked structure.
-
Phases in the project
• INVESTIGATION: New bridge or repair of the old bridge?
• DECISION: New superstructure on existing abutment reinforced with steel piles.
• DEMAND: Exact clone of the old bridge.• DEMAND: Exact clone of the old bridge.
• IDEA: Why not make it a pilot project with BIM?
-
Ambitions for the model
• No traditional drawings. Only 3D-model!• Swedish technical requirements for bridges (TK Bro) &
Eurocode.
• Schedule of quantities from the 3D-model.• Use the “Swedish construction standards” (BH 90) with:• Use the “Swedish construction standards” (BH 90) with:
• AMA (code system specifying standard construction tasks and objects, for technical specifications and quantities
scheduling).
• SB11 (encoding objects with status labeling, object status etc).
• Digital delivery.• Model for the future maintenance
-
Model usage on site
• Quantity export to till calculation software
• Stack out from the model
• 3D reinforcement including specifications
• Site planning with the model
• Time scheduling and controll
• Work task preparations
• Planning - purchase & delivery
• Planning - Economic & Cash Flow
-
The Stockholm Bypass
Length: 21km
Length of tunnels: 18km
Construction cost 3,1bn euroConstruction cost 3,1bn euro
-
Models in tender documents
General conditions of contract
Document 6.x OTB, Object specific descritption
Document 6.x.1 RFA, Description of the modellDocument 6.x.1 RFA, Description of the modell
Document 6.x.2 Models (New)
Document 6.x Drawings
Document 7.x.1 RFA, Description of the modell
Document 7.x.2 Models (existing conditions)
-
Models showing total
-
Models with estimated thickness of
constructions
-
Models showing geometrical demands
-
Models showing geometrical demands
-
How to feel success
Long-term
goalVision
Today
-
How to feel success
• Based on current conditions what do you think of the level of
ambition for 3D delivery in an open, flexible format?
• Do you think this is a step in the right direction for delivery in an
open and flexible format?
-
2015
-
Insanity
”Insanity is doing the same thing, over and over again, but and over again, but expecting different results”Albert Einstein
-
CHOICECHOICE
-
What is the problem
-
What is the problem?
-
JUST DO IT!JUST DO IT!