8/13/2019 Boiler & Aux Operation
1/49
POWER PLANTOPERATIONBOILERAUXILIARIES
16 February 2014 PMI Revision 00 1
-
8/13/2019 Boiler & Aux Operation
2/49
Presentation outline
16 February 2014 PMI Revision 00 2
OPERATING PROCEDURE
APH
ID, FD AND PA FAN
FURNACE PURGE
BOILER LIGHT UP
MILLING SYSTEM
-
8/13/2019 Boiler & Aux Operation
3/49
Before starting anyquipm ntENSURE
No PTW is pending on the equipment
which is to be normalized .
Equipment is properly boxed up and no
maintenance staff working.
Local operator is informed before the
equipment is started.
16 February 2014 PMI Revision 00 3
-
8/13/2019 Boiler & Aux Operation
4/49
Pre start checksbefore light up
16 February 2014 PMI Revision 00 4
-
8/13/2019 Boiler & Aux Operation
5/49
16 February 2014 PMI Revision 00 5
Equipment cooling water is charged in boiler side andproper venting is done.
Service water /filter water for sealing in the boiler bottom
is charged .Get the clearance from AHP for sealing of
bottom hopper.
Service and instrument air is charged and air for SADC
and burner tilt are charged .
Fire water/ sprinkler water is available in boiler area.
Before Light up
-
8/13/2019 Boiler & Aux Operation
6/49
DM water is available .
Ensure the availability of aux. steam .
Ensure 6.6 kv, 415 volt , 220 volt DC,110
V AC, 24 V DC SUPPLIES are normal .Ensure that all MCC s are charged. Both
buses are charged independently and Bus
coupler is in OFF position .ensure all
chargers are in charged condition and all
the batteries are in healthy condition .
All unit protections/interlocks ( boiler
,turbine & generator ) are checked and
recorded in the protection register .
16 February 2014 PMI Revision 00 6
Before Light up
-
8/13/2019 Boiler & Aux Operation
7/49
16 February 2014 PMI Revision 00 7
Start LDO PUMP or charge LDO line upto firing floor if
other units are running.
Start HFO pump or charge charge HFO line upto firing
floor on long recirculation if other unit is running. also inform
other units .
charge atomising air and atomising steam lines.
Keep boiler drum vents,SH vents , SH drains ,CRH drains,
HRH drains open.
Ensure all low point drains are closed .
Before Light up
t
-
8/13/2019 Boiler & Aux Operation
8/49
Inform shift chemist to take water
sample before water filling in the boiler
and take clearance from shift chemist.
Inform him to prepare hydrazine ,
ammonia and phosphate solution for
dosing . Check availability of all LP and HP
dozing pumps .
Fill water in the boiler upto normal levelby running one BFP .
Ensure at least two ESP passes are clear
and their inlet / outlet gates are open.Elect. Supply of fields are kept off .
Inspect the boiler up to drum floor .
Ensure that all manholes /peepholes are
closed.
16 February 2014 PMI Revision 00 8
e ore g t up
-
8/13/2019 Boiler & Aux Operation
9/49
Before Light up
Ensure start up vent and ECOrecirculation valve are open.
Charge the SCAPH LINE .
Keep the burner tilt at 0 deg ( horizontal )
Ensure boiler and auxiliaries areas are
clean , safe and properly illuminated .
16 February 2014 PMI Revision 00 9
-
8/13/2019 Boiler & Aux Operation
10/49
16 February 2014 PMI Revision 00 10
A
B
C
D
E
F
ESP
PASS A
ID-A
ID-B
PA-B FD-B
PA-A FD-A
FURNACE
WIND BOX
SCAPH
SA
PAFG
SA
PA
FG
SCAPH
ESP
PASS B
ESP
PASS C
ESP
PASS D
WIND BOX
ESP
I/LX
O
VER
DUCT
ESPO/LX
O
VER
DUCT
SA
X-OVER
DUCT
COLD PA
HOT PA
FLUE GAS
COLD SA
HOT SA
CHIMNEY
FLUE GAS & AIR PATH
APH
APH
MILL
27C
324C
320C
1165C
ECO I/L 493C351C
136C
134C
129C
126C
-
8/13/2019 Boiler & Aux Operation
11/49
AIR PRE-HEATER OPERATION
PRE START CHECKS
Support bearing/ guide bearing lub oilpumps RUNNING and lub oil coolers are
CHARGED.
Bearing temperature NOT HIGH (less than60oC)
Electrical supply to APH motor isAVAILABLE.
Local operation - Isolating valves of air
motors are 'OPEN' and bypass valves ofair motor solenoids are 'CLOSED'.
'Air motors' lub oil level ADEQUATE
Service air pressure is ADEQUATE (> 5
Kg/cm2)
16 February 2014 PMI Revision 00 11
-
8/13/2019 Boiler & Aux Operation
12/49
APH STARTING PROCEDURE
WHEN BOTH APHS ARE OFF
START air motor of APH.
Air motors ON indications come on
Isolating dampers of APHs start opening.INSTRUCT local operator to check, locally
for any abnormal sounds from
bearings/seals.
START air heater electrical motor.Breaker CLOSED & its indication comes
on UCB
Associated air motor stops.
Starting current shoots up and comes
down to normal load current.
16 February 2014 PMI Revision 00 12
AIR PRE-HEATER OPERATION
-
8/13/2019 Boiler & Aux Operation
13/49
16 February 2014 PMI Revision 00 13
AIR PRE-HEATER OPERATION
Isolating dampers of the air heater remain open.
Isolating dampers of the other air heater, not in service, startclosing if its air motor is not ON.
INSTRUCT local operator to check, locally for any abnormal
sounds from bearings/seals.
There should be no abnormal hunting in air heater amperesmeter readings.
There should be no abnormal sounds from air pre-heater
seals or bearings.
Bearing temperatures must be within the normal range (650C -75 0C)
-
8/13/2019 Boiler & Aux Operation
14/49
AIR PRE-HEATER OPERATION
SHUT DOWN PROCEDURE
CHECK Corresponding ID & FD Fans arerunning.
UNLOAD associated ID/FD fans, gradually.The other pair of ID/FD fans (if running)starts loading up on auto.
STOP the associated FD fan. Maintaindesired oxygen percentage.
Furnace total airflow indication dropsslightly. Reduce firing if required.
16 February 2014 PMI Revision 00 14
-
8/13/2019 Boiler & Aux Operation
15/49
16 February 2014 PMI Revision 00 15
FURNACE
PRIMERY AIR HEATER
SECONDRY AIR HEATERMILLS
FD FAN A
PA FAN BPA FAN A
FD FAN B
ESP
ID FAN A
ID FAN B
CHIMNEY
Atmospheric air
Atmospheric air
-
8/13/2019 Boiler & Aux Operation
16/49
ID FAN OPERATION
PRE START CHECKS
WHEN BOTH THE FANS ARE OFF
Fan lub oil pressure is ADEQUATE (1.2Kg/cm2).
Fan bearing temperature is NOT HIGH (