  • 8/13/2019 Boiler & Aux Operation

    1/49

    POWER PLANTOPERATIONBOILERAUXILIARIES

    16 February 2014 PMI Revision 00 1

  • 8/13/2019 Boiler & Aux Operation

    2/49

    Presentation outline

    16 February 2014 PMI Revision 00 2

    OPERATING PROCEDURE

    APH

    ID, FD AND PA FAN

    FURNACE PURGE

    BOILER LIGHT UP

    MILLING SYSTEM

  • 8/13/2019 Boiler & Aux Operation

    3/49

    Before starting anyquipm ntENSURE

    No PTW is pending on the equipment

    which is to be normalized .

    Equipment is properly boxed up and no

    maintenance staff working.

    Local operator is informed before the

    equipment is started.

    16 February 2014 PMI Revision 00 3

  • 8/13/2019 Boiler & Aux Operation

    4/49

    Pre start checksbefore light up

    16 February 2014 PMI Revision 00 4

  • 8/13/2019 Boiler & Aux Operation

    5/49

    16 February 2014 PMI Revision 00 5

    Equipment cooling water is charged in boiler side andproper venting is done.

    Service water /filter water for sealing in the boiler bottom

    is charged .Get the clearance from AHP for sealing of

    bottom hopper.

    Service and instrument air is charged and air for SADC

    and burner tilt are charged .

    Fire water/ sprinkler water is available in boiler area.

    Before Light up

  • 8/13/2019 Boiler & Aux Operation

    6/49

    DM water is available .

    Ensure the availability of aux. steam .

    Ensure 6.6 kv, 415 volt , 220 volt DC,110

    V AC, 24 V DC SUPPLIES are normal .Ensure that all MCC s are charged. Both

    buses are charged independently and Bus

    coupler is in OFF position .ensure all

    chargers are in charged condition and all

    the batteries are in healthy condition .

    All unit protections/interlocks ( boiler

    ,turbine & generator ) are checked and

    recorded in the protection register .

    16 February 2014 PMI Revision 00 6

    Before Light up

  • 8/13/2019 Boiler & Aux Operation

    7/49

    16 February 2014 PMI Revision 00 7

    Start LDO PUMP or charge LDO line upto firing floor if

    other units are running.

    Start HFO pump or charge charge HFO line upto firing

    floor on long recirculation if other unit is running. also inform

    other units .

    charge atomising air and atomising steam lines.

    Keep boiler drum vents,SH vents , SH drains ,CRH drains,

    HRH drains open.

    Ensure all low point drains are closed .

    Before Light up

    t

  • 8/13/2019 Boiler & Aux Operation

    8/49

    Inform shift chemist to take water

    sample before water filling in the boiler

    and take clearance from shift chemist.

    Inform him to prepare hydrazine ,

    ammonia and phosphate solution for

    dosing . Check availability of all LP and HP

    dozing pumps .

    Fill water in the boiler upto normal levelby running one BFP .

    Ensure at least two ESP passes are clear

    and their inlet / outlet gates are open.Elect. Supply of fields are kept off .

    Inspect the boiler up to drum floor .

    Ensure that all manholes /peepholes are

    closed.

    16 February 2014 PMI Revision 00 8

    e ore g t up

  • 8/13/2019 Boiler & Aux Operation

    9/49

    Before Light up

    Ensure start up vent and ECOrecirculation valve are open.

    Charge the SCAPH LINE .

    Keep the burner tilt at 0 deg ( horizontal )

    Ensure boiler and auxiliaries areas are

    clean , safe and properly illuminated .

    16 February 2014 PMI Revision 00 9

  • 8/13/2019 Boiler & Aux Operation

    10/49

    16 February 2014 PMI Revision 00 10

    A

    B

    C

    D

    E

    F

    ESP

    PASS A

    ID-A

    ID-B

    PA-B FD-B

    PA-A FD-A

    FURNACE

    WIND BOX

    SCAPH

    SA

    PAFG

    SA

    PA

    FG

    SCAPH

    ESP

    PASS B

    ESP

    PASS C

    ESP

    PASS D

    WIND BOX

    ESP

    I/LX

    O

    VER

    DUCT

    ESPO/LX

    O

    VER

    DUCT

    SA

    X-OVER

    DUCT

    COLD PA

    HOT PA

    FLUE GAS

    COLD SA

    HOT SA

    CHIMNEY

    FLUE GAS & AIR PATH

    APH

    APH

    MILL

    27C

    324C

    320C

    1165C

    ECO I/L 493C351C

    136C

    134C

    129C

    126C

  • 8/13/2019 Boiler & Aux Operation

    11/49

    AIR PRE-HEATER OPERATION

    PRE START CHECKS

    Support bearing/ guide bearing lub oilpumps RUNNING and lub oil coolers are

    CHARGED.

    Bearing temperature NOT HIGH (less than60oC)

    Electrical supply to APH motor isAVAILABLE.

    Local operation - Isolating valves of air

    motors are 'OPEN' and bypass valves ofair motor solenoids are 'CLOSED'.

    'Air motors' lub oil level ADEQUATE

    Service air pressure is ADEQUATE (> 5

    Kg/cm2)

    16 February 2014 PMI Revision 00 11

  • 8/13/2019 Boiler & Aux Operation

    12/49

    APH STARTING PROCEDURE

    WHEN BOTH APHS ARE OFF

    START air motor of APH.

    Air motors ON indications come on

    Isolating dampers of APHs start opening.INSTRUCT local operator to check, locally

    for any abnormal sounds from

    bearings/seals.

    START air heater electrical motor.Breaker CLOSED & its indication comes

    on UCB

    Associated air motor stops.

    Starting current shoots up and comes

    down to normal load current.

    16 February 2014 PMI Revision 00 12

    AIR PRE-HEATER OPERATION

  • 8/13/2019 Boiler & Aux Operation

    13/49

    16 February 2014 PMI Revision 00 13

    AIR PRE-HEATER OPERATION

    Isolating dampers of the air heater remain open.

    Isolating dampers of the other air heater, not in service, startclosing if its air motor is not ON.

    INSTRUCT local operator to check, locally for any abnormal

    sounds from bearings/seals.

    There should be no abnormal hunting in air heater amperesmeter readings.

    There should be no abnormal sounds from air pre-heater

    seals or bearings.

    Bearing temperatures must be within the normal range (650C -75 0C)

  • 8/13/2019 Boiler & Aux Operation

    14/49

    AIR PRE-HEATER OPERATION

    SHUT DOWN PROCEDURE

    CHECK Corresponding ID & FD Fans arerunning.

    UNLOAD associated ID/FD fans, gradually.The other pair of ID/FD fans (if running)starts loading up on auto.

    STOP the associated FD fan. Maintaindesired oxygen percentage.

    Furnace total airflow indication dropsslightly. Reduce firing if required.

    16 February 2014 PMI Revision 00 14

  • 8/13/2019 Boiler & Aux Operation

    15/49

    16 February 2014 PMI Revision 00 15

    FURNACE

    PRIMERY AIR HEATER

    SECONDRY AIR HEATERMILLS

    FD FAN A

    PA FAN BPA FAN A

    FD FAN B

    ESP

    ID FAN A

    ID FAN B

    CHIMNEY

    Atmospheric air

    Atmospheric air

  • 8/13/2019 Boiler & Aux Operation

    16/49

    ID FAN OPERATION

    PRE START CHECKS

    WHEN BOTH THE FANS ARE OFF

    Fan lub oil pressure is ADEQUATE (1.2Kg/cm2).

    Fan bearing temperature is NOT HIGH (