Brief Report on the Status of the AGATA Project (June 2012) A. Gadea (IFIC, Valencia) the AGATA PM on behalf of the AMB AGATA Collaboration Council Orsay 27 th June 2012 Detector Module and Characterization Front-End Electronics Data Flow Data analysis, tracking and PSA Infrastructure and Complementary Detectors Simulations, Experimental Commissioning and Performance

Upload: betty-benson

Post on 27-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Brief Report on the Status of the

AGATA Project (June 2012) A. Gadea (IFIC, Valencia)

the AGATA PM on behalf of the AMB

AGATA Collaboration Council Orsay 27th June 2012

•Detector Module and Characterization•Front-End Electronics•Data Flow•Data analysis, tracking and PSA•Infrastructure and Complementary Detectors•Simulations, Experimental Commissioning and Performance

GANIL-SPIRAL2Caen

E.Clement

AMB Chairman Project Manager

A.Gadea

AGATA TASKS

Comp. Det. Elec. and DAQ

Integration

Mechanical Infrastructure

J. Strachan

Software: Flow, Services & GRID

Xavier Grave

Complementary Detectors

J.J. Valiente

Global Trigger &Synchronization

Marco Bellato

Detector arrayInfrastructure

Bénédicte Million

Pre-processingIan Lazarus

Hardware: Local Infr. & Network

Henning Schaftner

Infrastructure.Comp. Det.E.Farnea

Front-endElectronics

(P.M.)

Detector ModuleP.Reiter

Data FlowA.Korichi

AGATA MANAGEMENT BOARD AND TEAMS

Resource Manager

(Deputy PM)G.Duchêne

Slow Control & FEE Monitoring

Eric Legay

Pre-Amplifier Digitizer

Alberto Pullia

Detector Characterisation

Bart Bruyneel

Detector CAT &TestingHelen Boston

R & D on gammaDetectors &Applications

Detector &Cryostat

Bart Bruyneel

AGATA Physics & exp. SimulationMarc Labiche

Performance and Simulation

J.Nyberg

QualityControl

CompatibilityEMC, Interfacing

Specificationcontrol

Documentation and Safety

AGATA Commissioning

C. Domingo-Pardo

Technical Coordinator

Engineering Advi.

Data Analysis& TRACKING

Olivier StezowskiA. Lopez-Martens

Data AnalysisA.Boston

GRIDData managing and Analysis

PSA Algorithm Development

R. Gernhauser.

INFN-LNLLegnaro

E.Farnea

AGATA Working Groups

A. Gadea (Project Manager)

GSIDarmstadt

H.J.Wollersheim

Thanks Pete!

A. Boston, G.Duchêne, E. Farnea (LCM LNL), A. Korichi, P. Reiter and J.Nyberg. H.J.Wollersheim (LCM-GSI), E.Clement (LCM-GANIL)

AGATA Capsules & Cryostats Summary32 purchased. No new orders since July 2010. 3 new capsules + 1 new Triple cryostat financed in 201231 Detectors Delivered:A001, A002, A003, A004, A005, A006, A007, A008, A009B001, B002, B003, B004, B005, B006, B007, B008, B009, B010, B011, B012C001, C002, C003, C004, C005, C006, C007, C008, C009, C0101 Detector to be delivered:B0134 Detectors under warranty repair (now expected to be delivered within summer)A009, B006, B007, C007 5 Detectors to be sent for repair A005, B005, B009, C002, C0041 Detector under CATC009 Only 21 Detectors available presently (22 if the 2 CAT’s ok)Deliveries needed to complete the 25 capsule system. Moratoria: waiting for all deliveries before submitting new purchasing ordersMaintenance performed for all Demonstrator Capsules

6 Triple and 5 Double Cryostats available.

IKP-Köln, Uni. Liverpool, IRFU-SAclay, TU-Darmstadt, INFN-LNL, INFN-Padova, IPHC Strasburg, GSI-Darmstadt, LRI Salamanca

Negotiations with Canberra ongoing on repairing costs

AGATA FEE Production

CSNSM Orsay, INFN Padova,IPHC Strasbourg, STFC Daresbury, Uni. Liverpool

SEGMENT MEZZANINE

CORE MEZZANINE

ATCA CARRIER

GTS MEZZANINE

DIGITIZERS:From 11 modules planned all ready tested and working. ATCA CARRIER:24 cards to be produced. Production ongoing, 11 cards already delivered and tested. Other 11 with problems in Network or PS.CORE MEZZANINES:25 tested and available.SEGMENT MEZZANINES:76 in production. Delivery expected during AGATA week. TCLK CARDS: 10 new ones availableGTS MEZZANINES: 37 new produced and tested, LINCO2 READOUT MODULES: 25 Produced and delivered, now under functional testGTS VME CARRIERS: 20 new VME GTS carriers produced and tested.INSTALLATION: at GSI is being performed in two phases, i.e. 15 Capsule and then upgrade to 25.

AGATA DIGITIZER

Future Electronics R&D

•Group has been busy with the production of the Early Phase 1•Investigation of new ADCs with 8 channels from Linear technologies with considerably reduced power consumption.•Pre-processing Mother board based on Exogam II 220 x 220 mm. •Power consumption 30 to 40 W Price 15 keuros + 20% -0% per capsule.•Requires new manpower available).

INFN-Padova / INFN-Milano Proposal (Distributed Solution):

CSNSM-Orsay Proposal (embedded Electronics concept):

•Partially compatible with the present Electronics•Pre-processing and ADC Electronics already at prototyping stage (firmware partially implemented and tested for 38 channels)•Cost < 25 k€/capsule

ADC Card mounting

Pre-Processing Card

Early Phase 1 AGATA Data Flow NARVAL at GSI

IPN-Orsay, CSNSM-Orsay, INFN-LNL, GSI, GANIL, IFJ-PAN-Crakow, IPN-Lyon

• A substantial upgrade has to be done to the Data Flow Farm for Early Phase 1. Excellent compatibility of new Pizza Boxes with LINCO2.•Narval 1.14.3 version tested and working - Enables to set a depth for the IO buffers - It fixes a start/stop issues in actors - it uses screen title and sessions namesThe new data format has been discussed, new version of the ADF Library available.MBS with AGAVA - AGATA Data Flow working.New Event builder compiled and tested with the new NARVAL version (to be installed)

A new filter called adf analyzer is available, it removes data from ADF frames, the generated output will be used by a pattern builder. Pattern builder and event collectors are already designed. MBS status : two shared libraries to get and send data to MBS aredeveloped and tested.Network and GRID: AGATA@GSI network structure defined. The GSI site is connected to CC-IN2P3-Lyon through the HEPPI-network. Data can be transferred to the AGATA-Grid via this link.

Infrastructure: Mechanics and DSS

IRFU-Saclay, GSI, STFC-Daresbury, IPN-Lyon,JYFL-Jyvaskyla, IPHC-Strasbourg, GANIL, INFN-LNL, INFN-Padova, INFN-Milano

AXIS LVPS:14 AXIS LVPS already available.Patch boxes: test of the prototype patch box successful. Presently under production (few available). Autofill system: The AGATA autofill system has been modified in order to cope with the different cryogenic infrastructure at GSI. It has been delivered and is being commissioned.HV System R&D: IRFU-Saclay has no personnel available to continue with the development. Construction Database: Installed and ready at GSIMechanical Infrastructures:The production was done timely. After the mounting test, in March the installation was completed.All working with only minor issues.Reaction chamber designed and produced at IKP-Cologne.5 Clusters already mounted in the structure

Installation at GSI: All the W.G. participating actively

Data Analysis, Pulse Shape Analysis & Tracking

PSA &Tracking: The PSA team is focusing on the requirements for the GSI phase. Key issues: •The implementation of multiple interaction basis PSA using the Particle Swarm Algorithm (M. Schlarb TUM). •The update of the detector basis data sets and validation of ADL basis. •To agree and understand the requirements for the commissioning experiments. The plan remains to have two PSA codes available for the start of the GSI Campaign: Data Analysis: O. Stezowski has made available an updated version of the analysis software.The EGAN School took place in Liverpool, last November, had 35 participants, with the vast majority looking to gain experience in the analysis of AGATA data.The majority of the material from the school is available for download from the school websitehttp://ns.ph.liv.ac.uk/EGAN/programme.html.Meeting to follow up the AGATA data analysis steps in Q4 2012.Data analysis on GRID is under study at IPN-Orsay and IFIC-Valencia.

CSNSM-Orsay, IPN-Lyon, INFN-Padova, IRFU-Saclay, TU-Munich, Uni. Liverpool

Commissioning: The commissioning is consisting of two parts, a technical one devoted to the integration of AGATA with all subsystems (FRS, LYCCA & HECTOR), and a performance one, devoted to the study of the AGATA performance under experimental conditions typical of GSI/FRS..The AGATA performance commissioning (2nd part of the commissioning) will use aprimary beam of (preferably) 80Kr in order to measure both Coulex and particleknockout. To be done in GSI beamtime Block 2 23 July - 9 September 2012Simulations: produced simulated data for typical GSI experiments, a secondary fragmentation reaction and a Coulomb excitation reaction, with atomic backgrounds included. The output files were made available to the PSA working group to test the different algorithms.The Coulomb excitation simulation is based on a recent GSI experiment (S377 - Coulex of 33Ar). The input file for the AGATA code contains information on the outgoing nucleus from MOCADI, atomic background from the abkg code, and 33Ar transitions from the ToGeant.C script which is part of the Gammaware package

Uni. Uppsala, INFN-Padova, STFC Daresbury, IFIC Valencia, GSI

Simulations, Experimental Commissioning and Performance

AGATA @ GSI-FRS Commissioning

HECTOR

AGATA

ATCADC

ADC

Before DopplerCorrection

Thanks to: M.Reese et al. and the AGATA and GSI collaborators

10k

eV

136Xe (137 MeV/u) + 197Au

v/c ~ 50%

hit pattern of AGATA detectors