agata detector characterization: scanning setup at orsay concept of the orsay scanning system (last...

12
AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens & A Korichi for the Orsay (IPN-CSNSM) Group

Post on 19-Dec-2015

215 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

AGATA detector characterization: scanning setup at Orsay

Concept of the Orsay scanning system (last Agata week – K. Hauschild)

Status and plans

A. Lopez-Martens & A Korichi for the Orsay (IPN-CSNSM) Group

Page 2: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

LN2

XYZ table

Ge segment andanode signals / NaI

500 MBq

Digital [TNT]/Analogueelectronics

Industrial PC

ScanningScanning

PC Linux [NARVAL]+ SDLT + 1.3 TB NAS

NaI

Linux

Experimental hall at the CSNSMExperimental hall at the CSNSMExperimental hall at the CSNSMExperimental hall at the CSNSM

EM shielded and air conditionned Area & EMC control

Page 3: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

Concept : xyz Table + TOHR (Orsay)

Digitalelectronics

Focal point

2r

F e

dd’

Positionning rods

Tungten sheet

Brace

•40 triangular–shaped 200m thick W-plates •Plate separation : 200 m•200 m diameter holes on a hexagonal lattice

Agata detector : movmentXy movmentTohr : z movment Coincidences : 6 NaI detectors

Intense Source : 15 mCi

Volume /scan point : 2 x 2 x 2-3 mm3 : 3D Scan of the whole detector

From simulations, the number of single interaction Compton scatter events at a given position : 400/h @front face and 10/h @the back of the detector

TOHR NaI Gamma-beam

AGATA Ge

Compton scatter

Page 4: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

Collimated 137Cs delivered : 477 MBq -> 2 kHz

After a heavy safety procedure (A. Lopez-Martens) we are allowed to use the source

Security trolleySecurity lock down

More security

Page 5: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

G4 simulations have shown that TOHR collimator are too thin (K. Hauschild)

Double up the thikness

Recalibration of each TOHR module (focal point) Done (J. Robin & F. Le Blanc)

Page 6: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

Mechanics ready (P. Pariset)A conventional XY table, the motorised rotational plate to turn the AGATA detector and the stepping motor for the z-translation of TOHR : delivered Programming Software for the different movements : done (E. Legay, N. Dosme and X. Grave)

Page 7: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

VME interface ACQ-CAMC

__________________

CAMAC Analogique

___________________

TNT2 + trigger___________________

HT et BT détecteur___________________

ATCA AGATA

The analog electronics: 3x(16 channels) CADC cards developped and tested VME interface ACQ- CAMAC : under way(D. Linget, E. Legay, S. Leboutelier, X. Grave)

Electronics housing :Spécial temperature

Controlled rack

Page 8: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

AP1 Infrastructure : ready

Analogue electronics (48ch) and DAQ (Narval) ready

Digital electronics : 10 TNT2 cards (Gabriela) are under tests at Strasbourg

Commmissioning of the set-up with a real Agata detectorPossible from April 2006

Orsay set-up : Ready to scan summer 2006

Summary

Page 9: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

VME interface ACQ-CAMC

__________________

CAMAC Analogique

___________________

TNT2 + trigger___________________

HT et BT détecteur___________________

ATCA AGATA (plus tard)

PC-Linux ACQ

__________________PC table xy,

Commande moteur__________________

LN2-Auto_

Page 10: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

Status : future prospects

Manque ACQ et électronique analogique

TNT2 cards under tests at iresReady in few weeks

Commmissioning of the set-up with a real agata detectorApril 2006 Ready to scan summer 2006

Liste des gens

Page 11: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens

Collimated 137Cs source

‘security’ trolley

‘security’ lock down

more ‘security’

Page 12: AGATA detector characterization: scanning setup at Orsay Concept of the Orsay scanning system (last Agata week – K. Hauschild) Status and plans A. Lopez-Martens