Municipal Infrastructure Support Agent ___________________________________________ _________ Contribution of the Municipal Infrastructure Support Agent (MISA) towards the Achievement the Universal Access to Electricity and Sustainable Supply Briefing to the Select Committee on Economic Development Date: Tuesday, 08 October 2013, Venue: E249, 2 nd Floor, National Assembly Wing, Parliament, Cape Town

Upload: alta

Post on 15-Jan-2016

30 views

Category:

Documents


0 download

DESCRIPTION

Municipal Infrastructure Support Agent ____________________________________________________ Contribution of the Municipal Infrastructure Support Agent (MISA) towards the Achievement the Universal Access to Electricity and Sustainable Supply. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

Municipal Infrastructure Support Agent____________________________________________________

Contribution of the Municipal Infrastructure Support Agent (MISA) towards the Achievement the Universal

Access to Electricity and Sustainable Supply

Briefing to the Select Committee on Economic Development

Date: Tuesday, 08 October 2013, Venue: E249, 2nd Floor, National Assembly Wing,

Parliament, Cape Town

Page 2: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CONTENTS

1. INTRODUCTION

2. OVERVIEW OF MISA

3. KEY MISA PROGRAMMES

4. MISA’S ROLE IN THE ENERGY SECTOR

5. KEY CHALLENGES

6. CONCLUSION AND WAY FORWARD

23-04-21 MISA Briefing to Select Committee on ED 2

Page 3: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

INTRODUCTION

• This presentation outlines how MISA’s support programmes contribute towards the achievement of the universal access to electricity and ensuring sustainable supply.

• MISA is a dedicated government component established under the Ministry of CoGTA with the mandate to provide technical capacity support and assist municipalities to build their internal capacity for improved delivery and management of infrastructure and service provision.

• MISA’s programmes focus on supporting mainly low and medium capacity municipalities that continue to struggle with the development and maintenance of infrastructure and service provision.

• Support to identified municipalities focusses mainly on the water and sanitation, energy, waste management , as well as roads and stormwater

• Implementation of MISA’s programmes is guided by government’s key policy imperatives such as the National Development Plan (NDP), New Growth Path, Strategic Integrated Projects (SIPs), as well as the broader legislative framework on energy supply.

• The focus of MISA’s programme on Energy is intended to address electricity backlogs, maintenance and refurbishment of existing infrastructure and development internal technical through skills development.

23-04-21 MISA Briefing to Select Committee on ED 3

Page 4: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

OVERVIEW OF MISAInstitutional Form

• MISA was established by Presidential Proclamation 29 of 2012, which was gazetted on the 11th May 2012, in terms of section 7(5) (c) of the Public Service Act.

• The establishment of MISA was one of the key thrusts of the Local Government Turnaround Strategy (LGTAS) aimed at creating a dedicated vehicle to support and build technical capacity in local government for the improvement of municipal infrastructure provisioning, refurbishment and maintenance;

• Anticipating the establishment of MISA, government took a decision to unbundle Siyenza Manje with the infrastructure component transferred to CoGTA and financial management component transferred to National Treasury, with effect from 01 April 2011.

• MISA is operationally ring-fenced from the Department of Cooperative Governance, but linked to it for policy implementation purposes.

• The head of MISA is the Accounting Officer in terms of the Public Finance Management Act, No.1 of 1999, as amended.

• MISA has been allocated its own operational budget of R820m over the MTEF period, with R262m allocated for 2013/14 FY.

23-04-21 MISA Briefing to Select Committee on ED 4

Page 5: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

OVERVIEW OF MISA Core Mandate

MISA has a two-pronged mandate can be summarised as follows: i. To render technical advice and support in order to optimise municipal

infrastructure provisioning and management.ii. To coordinate the development and implementation of programmes

designed to strengthen the capacity of municipalities for planning, development, operations and maintenance of their municipal infrastructure.

It is not within MISA’s mandate to provide grants to municipalities for either infrastructure projects implementation or the costs of maintaining and refurbishing such infrastructure. Its mandate is to give technical assistance to enable municipalities to perform these functions effectively.

23-04-21 MISA Briefing to Select Committee on ED 5

Page 6: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

KEY PROGRAMMESOverview of Key Support Programme

23-04-21 MISA Briefing to Select Committee on ED 6

Municipal Technical Support Programme – to ensure that MISA provides technical support to those municipalities that require assistance with technical aspects of infrastructure planning, implementation, operation and/or maintenance. Support provided is based on a needs assessment and agreement with municipalities. This buy-in from municipalities is essential for ownership and sustainability of support initiatives.

Sectoral Support, Coordination and Grants ensures that resources from different departments and institutions are properly coordinated to address sectoral priorities towards eradication of service backlogs in water and sanitation, energy, solid waste management and roads and storm water. This programme also supports municipalities to ensure effective utilization of grants, especially the Municipal Infrastructure Grant.

Capacity Development Programme ensures that technical capacity is developed in local government for planning, delivering, operating and maintaining municipal infrastructure. Capacity development is implemented through various programmes, including apprenticeships, young professionals, experiential learning and rotating key municipal officials to the private sector and academia for exposure. Bursaries are made available for studies in built environment, especially engineering, to build a pipeline of future technical officials for municipalities. The programme also provides mentorship opportunities for technical officials in municipalities to meet the requirements for professional registration. Working in partnership with other public institutions, private sector companies, tertiary institutions and professional bodies forms an important part of MISA’s capacity development strategy.

Page 7: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYMISA’s Overall Focus on Energy

23-04-21 MISA Briefing to Select Committee on ED 7

MISA’s support programme on energy is focussed on the following:

1.The Implementation of Integrated National Electrification Programme (INEP).2.Approach to Distribution Assets Management (ADAM) Programme.3.Business-Adopt-A-Municipality (BAAM) Support Programme in Collaboration with Eskom.4.Capacity building support to municipalities for accelerated delivery and proper maintenance of electricity distribution infrastructure.5.Presidential Infrastructure Coordinating Commission (PICC) Programme.

Page 8: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGY Roll-out of INEP and Green Energy

23-04-21 MISA Briefing to Select Committee on ED 8

• Backlogs on electrification are currently at 3.5 million households and growing at a rate of

7% per annum. It is projected that at the current rate of connecting households, it would take

another 17 years to achieve universal access, without factoring in future growth

requirements.

• MISA is a member of the National Electricity Advisory Committee (NEAC) that oversees the roll out and monitoring of the Integrated National Electrification Programme (INEP) with budget allocation for financial year of R1,6 billion.

• Through MISA’s technical support programme technical experts (electrical engineers) are supporting 7 (seven) municipalities (Randfontein, Empfuleni, Phumelela, Lesedi, Baphalaborwa, Ngwathe) to enable improvement of their performance on electricity provision.

• In addition 27 Municipalities are receiving support in relation to targeted areas within the electricity distribution value chain through professional service providers (PSPs) contracted by MISA.

Page 9: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGY List of Municipalities Receiving Support through PSPs

23-04-21 MISA Briefing to Select Committee on ED 9

PROVINCE MUNICIPALITIES MAIN AREAS OF SUPPORT

Eastern Cape Engcobo, Emalahleni, Sakhisizwe, Gariep, King Sabata Dalindyebo, Mhlontlo

Electricity Infrastructure and revenue loss study and Strategy, Electricity Master Plans, Electricification, Bulk Electricity Infrastructure.

Free State Masilonyana, Nala, Mohokare, Ngwathe Electricity Master Plans

Gauteng Lesedi, Westonaria Electricity Loss Reduction Strategies

Kwazulu-Natal Ingwe, Umzimkhulu, Umdoni, Umzumbe, Hlabisa, Mtubatuba, Jozini, Umdoni, Ubuhlebezwe, Greater Kokstad, Vulamehlo

Electricity Master Plans, Electricity Maintenance and Refurbishment Plans

Limpopo Lephalale, Ba-Phalarwa, Elias Motsoaledi Master Plans, Energy Efficiancy Strategies, Electricity Maintenance and Refurbishment Plans

Northern Cape Gasegonyana, Gamagara Electricity Projects Funding Plans, Operations and Maintenance Plans, Energy Master Plans

North West Lekwa-Teemane, Mamusa, Tswaing, Ratlou Energy Master Plans

Page 10: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYApproach to Distribution Asset Management (ADAM)

• In 2012 DoE, adopted a strategy called the Approach to Distribution Asset Management (ADAM).

• This multi phased program in addressing electricity distribution challenges, was aimed at addressing the backlog in maintenance, refurbishment and upgrading of the Electricity Distribution networks.

• The initial work undertaken in implementing ADAM focused on addressing the capital and skills shortage that exists in the electricity distribution industry which was driven by the Electricity Distribution Industry (EDI) Holdings.

• National Treasury has also made additional funds available towards increasing the number of households connection to 200 000 by 2013/14,270 000 by 2014/15 and 350 000 by 2015/16.

• MISA serves in the Mini- ADAM Steering Committee that is overseeing the piloting of ADAM in 12 municipalities with the support of grants to be transferred to these municipalities through DOE.

23-04-21 MISA Briefing to Select Committee on ED 10

Page 11: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYMunicipalities Selected for Mini-ADAM

23-04-21 MISA Briefing to Select Committee on ED 11

Municipality Total ('000)Eastern Cape King Sabata Dalindyebo Municipality (Umthatha) R 60 000 Nelson Mandela Metro Municipality R 35 000 Free State Ngwathe Municipality (Koppies) R 20 000 Moqhaka Municipality (Kroonstad) R 20 000 Nala Municipality R 20 000 Mangaung Metro Municipality R 25 000 KwaZulu-Natal The Msunduzi Municipality R 100 000 Northern Cape Sol Plaatjie Municipality R 20 000 North West Tlokwe Municipality R 20 000 Total R 320 000

Page 12: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYBusiness Adopt a Municipality Programme

23-04-21 MISA Briefing to Select Committee on ED 12

• Business-adopt-a-Municipality (BaaM) programme entails a partnership with Eskom to support struggling municipalities on electricity issues; 27 municipalities have been identified for support during the first Phase of the programme.

• The provision of support to the selected municipalities is preceded by an assessment to establish the exact needs of these municipalities.

• Although the assessment will determine the final areas of support per municipality, the following areas have been identified as common challenges facing a number of municipalities: – Maintenance and rehabilitation of existing infrastructure;– Increased investment in new and existing infrastructure– Need to address high non-technical electricity losses;– Revenue management and tariff setting– Technical skills development

Page 13: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYBAAM Priority Municipalities Province Priority Municipalities

Eastern Cape Nxuba LM Buffalo City Metro King Sabata Dalindyebo LM

Free State Ngwathe LM Nala LM Phumelela LM

Gauteng Westoneria LM Randfontein LM Lesedi LM

Kwazulu-Natal Msunduzi LM Mtubatuba LM Upongolo LM

Limpopo Sekhukhune DM Greater Letaba LM Ba-Phalaborwa LM

Mpumalanga Thaba Chweu LM Nkomazi LM Greater Letaba LM

Northern Cape Sol Plaatjie LM Ge-segonyana LM Magareng LM

North West Ventersdorp LM Mamusa LM Ratlou LM

Western Cape Matzikama LM Cederberg LM Kannaland LM

23-04-21 MISA Briefing to Select Committee on ED 13

Page 14: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYMenu of Support under BAAM Programme

Total menu of support agreed with Eskom :

23-04-21 MISA Briefing to Select Committee on ED 14

Leadership and Management Training and

Development

Maintenance and Operations

Demand Side Management

Investment, Networks &

Master Planning

Business and Financial

Management Support

Contact Centre Access and/or Setup

Energy Losses Management

Pricing and Tariff Structure

Technical Skills Development

Technical Standards Credit and Revenue

Management

Improving Efficiency in

Procurement

Page 15: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYMunicipal Capacity Building: Electricity Supply

MISA’s initiative aimed at strengthening the capacity of municipalities to perform the electricity distribution function entails the following:•Placement of electrical apprentices for operation and maintenance of distribution infrastructure.•Training of officials in municipalities’ electricity/ technical departments focusing on the electricity distribution and solar/renewable energy supply.•Supporting municipal officials and unemployed graduates qualified in the electricity field to register with relevant professional bodies.•Supporting and facilitating the trade testing for both municipal officials and unemployed graduates.•Granting of bursary to students in electrical engineering and related fields. •Currently a total of 234 Electrical Apprentices are placed in 25 municipalities under 6 Provinces (EC, KZN, LM, MP, NC and NW), for experiential learning. •In addition 29 candidates are undergoing experiential learning in municipalities across all nine provinces towards qualifying as Artisans in the electricity sector.

23-04-21 MISA Briefing to Select Committee on ED 15

Page 16: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYMunicipal Capacity Building: Electricity Supply Cont…

23-04-21 MISA Briefing to Select Committee on ED 16

PROVINCE MUNICIPALITY NO. OF ELECTRICAL APPRENTICES

Eastern Cape Meletswai, Senqu, King Sabata Dalindyebo, Mnquma

8

Kwazulu-Natal Msunduzi, Mpofana, Mandeni, Newcastle, Kwadukuza

69

Limpopo Blouberg, Modimolle, Polokwane 17

Mpumalanga Albert Luthuli, Lekwa, Thaba Chweu, Umjindi, Nkomazi

39

Northern Cape Sol Plaatjie, Kamiesberg, Kareeberg, Kai!Garib

11

North West Rustenburg, Madibeng, Matlosana 10

Total 134

Page 17: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYPICC Initiative

• MISA is leading the process of exploring the option of central procurement of equipment for electricity distribution by municipalities.

• This project is in line with the decision of PICC Manco that recommended that municipalities follow a central procurement approach, using Eskom’s procurement system, when purchasing equipment for electricity infrastructure.

• This approach is intended to apply to the purchase of equipment for both electrification infrastructure and maintenance if existing infrastructure assets.

• It is further proposed that a provision be included in the conditions for Integrated National Electrification Programme (INEP) to give effect to the PICC decision.

• The rationale for pursuing this model is to enable government to reap cost savings accruing from economies of scale and accelerate the electrification programme.

• The initial work towards the development of a mechanisms for implementing this approach has just commenced.

23-04-21 MISA Briefing to Select Committee on ED 17

Page 18: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CURRENT SUPPORT ON ENERGYPICC Initiative Continue…

• Municipalities are experiencing challenges in relation to the implementation of Strategic Integrated Support Projects (SIPs).

• To address this challenge, MISA is in the process of creating institutional capacity for supporting municipalities in the implementation of the Strategic Integrated Projects (SIPs).

• The aim is to provide technical support to municipalities on the implementation of key elements of SIPs that deal with infrastructure for service delivery, especially those touching on the local government functions such as SIPs 8 and 10, among others.

• SIP 8 (Green Energy in Support of the South African Economy) – supporting sustainable green energy initiatives through a diverse ranges of clean energy options.

• SIP (Electricity Transmission and Distribution for All) - expand the transmission and distribution network to address historical inbalances, provide access to electricity for all and support economic development.

23-04-21 MISA Briefing to Select Committee on ED 18

Page 19: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

KEY CHALLENGES

• Most municipalities are also faced with massive and growing backlogs in relation to households access to energy, as well as maintenance and refurbishment of their distribution assets.

• These municipalities lack requisite institutional capacity and funding required to address these two challenges.

• Municipalities continue to allocate insufficient budgets to deal with maintenance and refurbishment of their distribution assets.

• There is generally poor uptake of alternative/green energy opportunities by municipalities.

• MISA and DOE need to forge stronger working relationship to leverage from each other’s capacity and knowledge base, as well as promoting coordinated supporting to municipalities.

23-04-21 MISA Briefing to Select Committee on ED 19

Page 20: Briefing to the Select Committee on Economic Development Date:Tuesday, 08 October 2013,

CONCLUSION AND WAY FORWARD

• There is a great need for MISA refine its programme for supporting the provision if energy by municipalities to optimise its impact.

• As an initial step towards beefing up the capacity for supporting municipalities on energy supply function, MISA will be appointing and assign nine (9) Senior Electrical Engineers – one professional for each province.

• Priority will continue to be given to the improving collaboration with the Department of Energy.

• With the guidance and support from DOE MISA will play an active role in supporting municipalities to exploit opportunities in alternative/green energy.

• An area that also warrant more attention is the building of internal capacity in individual municipalities for better operations and maintenance of electricity infrastructure.

23-04-21 MISA Briefing to Select Committee on ED 20