Building a Spatial Decision Support System for Natural Gas Pipeline Risk
Matt Landry – Project ManagerFrank Yeboah - Specialist
CONNECT. TRANSFORM. AUTOMATE.
Source: "FullMoon2010" by Gregory H. Revera - Own work. Licensed under CC BY-SA 3.0 via Wikimedia Commons -http://commons.wikimedia.org/wiki/File:FullMoon2010.jpg#/media/File:FullMoon2010.jpg
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
Source: Wikipedia.org
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
𝑅𝑖𝑠𝑘𝐹𝑎𝑖𝑙𝑢𝑟𝑒 = 𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦𝐹𝑎𝑖𝑙𝑢𝑟𝑒 X 𝐶𝑜𝑛𝑠𝑒𝑞𝑢𝑒𝑛𝑐𝑒Failure
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
B2 - Probability
of 3rd Party
Unaware of One-
call (from
Method of
Communicating)
B3 - Probability
of ROW Signs not
Recognized (from
Placement
Frequency)
B4 - Probability
of Permanent
Marker Failure
(from Warning
Tape Presence)
E1 - Probability of
3rd Party
Unaware of
Pipeline
B5 - Probability
of 3rd Party
Choosing not to
Notify (from
Penalty for not
Notifying)
B6 - Probability
of Third Party
Failure to Avoid
Pipeline (from
Default Value –
0.40)
E2 - Probability of
3rd Party
Negligence
E3 - Probability of
Activity not
Notified by 3rd
Party
B7 - Probability
of ACMP
Personnel not On
Patrol During
Activity
B8 - Probability
of Other ACMP
Personnel not
Observing
Activity
E4 - Probability of
Operator
Unaware of
Activity
B9 - Probability
of Excavation
Prior to
Operator’s
Response (from
Response Time)
B6 - Probability
of 3rd Party
Failure to Avoid
Alignment (from
Default Value –
0.40)
B10 & B12 -
Probability of
Temporary Markers
Incorrect (from
Marking Method
and Data Source)
B6 - Probability
of 3rd Party
Failure to Avoid
Alignment (from
Default Value –
0.40)
E5 - Probability of
Absence of
Temporary
Markers
E6 - Probability of
Incorrect
Temporary
Markers
E7 - Probability of
Failure of
Temporary
MarkersB4 - Probability
of Permanent
Marker Failure
(from Warning
Tape Presence)
E8 - Probability of
Failure of
Alignment
Markers
E9 - Probability of
Alignment Not
Properly Marked
B11 - Probability
of Accidental
Interference with
Marked
Alignment
EI Mitigation
Score
(1-10)
OR
OR
OR
OR
AND
AND
AND
AND
AND AND
B12 - Probability
of Centerlines
Incorrect (from
Data Source for
Centerlines)
B13 - Probability
of One-Call
System Failure to
Notify Operator
(from State One-
Call Grade)
OR
OR
𝑃𝑟𝑜𝑏𝑎𝑏𝑖𝑙𝑖𝑡𝑦𝐹𝑎𝑖𝑙𝑢𝑟𝑒 = Exposure × 𝑀𝑖𝑡𝑖𝑔𝑎𝑡𝑖𝑜𝑛 × 𝑅𝑒𝑠𝑖𝑠𝑡𝑎𝑛𝑐𝑒
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CP Annual Survey Water Analysis
Atmospheric Corrosion Survey Close Interval Survey
Bond Inspection A/C Monitoring Form
Rectifier Inspection ILI Evaluation (3 parts):
Bacteria Serial Dilution • Project Details
Chemical Usage Report • Pipe Tally
Corrosion Coupon Report • Anomaly Evaluation
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
Failure
Mode
(XX)
Health and Safety
Consequence
Score
Financial Consequence ScorePublic Image
Consequence Score
Environmental
Consequence Score
Lost Lives From
Explosion
Lost Commodity
Cost
Structure
Damage CostDowntime Cost
Pipe
Repair
Cost
Public Impact Environmental Impact
Leak w/
Ignition (LI)X X X X X X X
Leak w/o
Ignition
(LNI)
X X X X X
Rupture w/
Ignition
(RI)
X X X X X X X
Rupture
w/o
Ignition
(RNI)
X X X X X
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
Gas Gathering SystemR_GGS_FACTS.fmw
[R_GGS_FACTS]
SEGMENT_IDR_SEGID_FACTS.fmw
[R_SEGID_FACTS]
GISID_IDR_GISID_FACTS.fmw
[R_GISID_FACTS]
SUBSEG_IDR_SUBSEGID_FACTS.fmw
[R_SUBSEGID_FACTS]
CONNECT. TRANSFORM. AUTOMATE.
R_GGS_FACTS.fmw
CONNECT. TRANSFORM. AUTOMATE.
R_SEGID_FACTS.fmw
CONNECT. TRANSFORM. AUTOMATE.
R_GISID_FACTS.fmw
CONNECT. TRANSFORM. AUTOMATE.
R_SUBSEGID_FACTS.fmw
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
Weather and Outside Forces Process
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
Image Source: http://www.utc.wa.gov/publicSafety/Documents/Williams%20Presentation%20-%20ILI%20Technologies.pdf
CONNECT. TRANSFORM. AUTOMATE.
Image Source: http://www.utc.wa.gov/publicSafety/Documents/Williams%20Presentation%20-%20ILI%20Technologies.pdf
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
Voronoi Polygons
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
SUBSEG_IDR_SUBSEGID_FACTS.fmw
[R_SUBSEGID_FACTS]Fields: 36
Row Count: 193388Unique ID: SUBSEG_ID
GGSR_GGS_FACTS.fmw
[R_GGS_FACTS]18 Fields198 Rows
Unique ID: GGS_NUM
GISIDR_GISID_FACTS.fmw
[R_GISID_FACTS]Fields: 62
Row Count: 9820Unique ID: GISID
SEGMENT_IDR_SEGID_FACTS.fmw
[R_SEGID_FACTS]Fields: 13
Row Count: 6177Unique ID: SEGMENT_ID
CONNECT. TRANSFORM. AUTOMATE.
CONNECT. TRANSFORM. AUTOMATE.
Thank You!
• Questions?
• For more information:• Matt Landry, [email protected]
• Frank Yeboah, [email protected]