by marsalinawati hj omarali marketing officer [email protected]
TRANSCRIPT
BY MARSALINAWATI HJ OMARALIMARKETING OFFICER
Vision and Mission
Multi Purpose Hall
Brunei Shell Marketing Bitumen
To B.S.B To B.S.B
Transit No.3 Transit No.2 A & B Cruise Ship Centre & Transit No. 1
To Bandar Seri To Bandar Seri Begawan (B.S.B)Begawan (B.S.B)
ReeferStation
Container Yard
Muara Port LayoutMuara Port Layout
CONTAINER TERMINAL CONVENTIONAL TERMINAL611m250m
Note:-
Restricted Areas
Workshop
CONTAINER YARD
ContainerFreight Station (CFS)
CAR PARK
CONTAINER YARD
GateHouse
TRAILER PARKING / CONTAINER YARD
MUARAMUARATOWNTOWN
INLAND CONTAINER
DEPOT (ICD)
Muara Export Zone
Trailer Parking
Trailer Parking
PORTS DEPTHQ
MuslimGraveyard
Parking Lots
ReeferStation
BLO
CK
6
BLO
CK
5
BLOCK 1
BLOCK 7
BLOCK 3
BLOCK 2
BLOCK 4
Operation Office
Water Tank
OPEN AREA
Ports DepartmentWarehouses
Car Park
BrusimaCement Silo
OPENAREA
CCFFSS
CARGO STORAGE AREA
Ga
te H
ous
e
Project Updates
Project: Infrastructure / Services
Logistics hubUpgrade warehouse into bonded warehouse
(ongoing)
Hinterland ConnectivityLogistics Development Project
The important task under current development project : road and waterway
1. ICD2. Proposed Lumba-Lumba project
Benefits:• Decrease total logistics cost• Alleviate traffic congestion along the road,• Reduce pollution
ICD Project• Muara ( 100% Completed)• Sg Tujuh (Under construction)• Kuala Lurah ( Completion by January
2010)
Muara Container Terminal
Project: Infrastructure / ServicesNew International MCT Operator
Contract awarded to ICTSI to operate and maintain MCT
Operating since 21 May 2009 Increased productivity and efficiency
Computerized System (ePort)
Project: Infrastructure / Servicese-PORT
Computerised system to manage port operations. Signed on 21 May 2008. Trial run in December 2009 Go-Live by first quarter, 2010
Value Added Services
Project: Infrastructure / ServicesBunkering
Signed 12 Dec 2008Value-added service for incoming vessels
New Facilities/Services
Project: Infrastructure / ServicesPassenger Ferry – Operation since 17 Oct
08Provide connectivity between Brunei and
Malaysia.Facilities:
Ticketing BoothsLoungeShopsTourist Information Counter
Project: Infrastructure / ServicesCar Ferry– Operation end of 2009Connectivity to Labuan and Menumbok,
Malaysia.Status:
Completed construction in 2008.2 Coordination Meetings has been heldTo hold another Coordination Meeting in
January 2010.
Project: Infrastructure / ServicesPassenger & Jetty for Bangar, Temburong
Foundation Laying – 18 April 2009Status: Completion by Jan 2010Objective: To provide better facilities for
domestic passengers and cargo transportation.
Project: Infrastructure / ServicesCruise ship center (Currently serve between
2-4 cruise ship a month before end of 2009)
Cruise Liners2008FUNCHALCOSTA ALLEGRASILVER WHISPERPACIFIC SUNC. COLUMBUSCRYSTAL SERENITYAMSTERDAM
2009 COSTA CLASSICA DAWN PRINCESS AIDAcara MV SEABORNE ODYSSEY SEVEN SEAS VOYAGER M/S ASTOR COSTA ALLEGRA DELPHIN VOYAGER C COLUMBUS ARION SUN PRINCESS COSTA ROMANTICA
Number of Cruise Ships
6
2421
24
0
5
10
15
20
25
30
2006 2007 2008 2009
No of Vessels
No of Vessels
Projected GrowthCruise Vessels in 2010 = 26 vessels
Project: Activities New WebsiteInformation DisseminationDaily Updated Shipping & Ferry ScheduleLatest Cruise ScheduleTender Information
Project: Activities SAFETY CAMPAIGN (Launched 12 Dec 08)ISPS Code (Continuous auditing)
Future Development
Source: BEDB
Pulau Muara Besar
Source: BEDB
Pulau Muara Besar Development• Project Information: Led by Board of Economic Development Brunei
(BEDB)• Status: Consultants works completion by
October 2009
Pulau Muara Besar Development
Exi
stin
g C
hann
el
BridgePhase 1 Phase 2 & Beyond
Reclaimed Land
Source: BEDB6km
3km
Developing PMB
PUALA MUARA BESAR
6km
Export Processing Zone
Petrochemical, Oil Refinery and other downstream export industries
PHASE 2 & BEYONDPHASE 1
Quay length- 700 m straight line
Water depth- min 6m draft Capacity- 800,000 TEUs
Halal Food Distribution Hub Logistics companies WarehousingSource: BEDB
Thank YouFurther Information:
Email: [email protected]: http://www.ports.gov.bn
Marsalinawati Hj Omarali (Lisa)Email: [email protected]