captain andy butterfield, usn
DESCRIPTION
Captain Andy Butterfield, USN. Deputy Mission Support Group Commander Joint Base McGuire-Dix-Lakehurst. Agenda. Mission Joint Base McGuire-Dix-Lakehurst 2005 BRAC Non BRAC Mission Partners Organization Facility Requirements Contracting Opportunities. 87 ABW Mission Statement. - PowerPoint PPT PresentationTRANSCRIPT
1
87th Air Base Wing
Deputy Mission Support Group Commander
Joint Base McGuire-Dix-Lakehurst
Captain Andy Butterfield, USN
2“WIN AS ONE”
Agenda
• Mission
• Joint Base McGuire-Dix-Lakehurst
• 2005 BRAC
• Non BRAC
• Mission Partners
• Organization
• Facility Requirements
• Contracting Opportunities
3“WIN AS ONE”
87 ABW Mission Statement
“To provide mission-ready Warfighters to support Unified Combatant
Commanders in global military operations and unrivaled installation management for America’s only tri-
service joint base.”
4
Joint Base Legislation
• The Base Realignment and Closure Commission 2005 legislation directed the DoD to realign 26 separate installations into 12 Joint Base installations
• Specifically to our installation, the legislation “realigned Fort Dix NJ and Naval Engineering Station Lakehurst NJ, by relocating the installation management functions to McGuire AFB NJ, establishing Joint Base McGuire-Dix-Lakehurst NJ”
5
• Phase 1 Bases• NAS Little Creek/ Ft Story VA • Ft Myer / Henderson Hall VA• Andrews AFB / NAF Washington MD • McGuire AFB / Ft Dix / NAES Lakehurst NJ• Navy Base Guam / Andersen AB GUAM
• Phase 2 Bases• Anacostia Annex / Bolling AFB DC • NS Pearl Harbor / Hickam AFB HI • Ft Lewis / McChord AFB WA• Charleston AFB / NWS Charleston SC • Elmendorf AFB / Ft Richardson AK • Lackland AFB / Randolph AFB / Ft Sam Houston TX• Langley AFB / Ft Eustis VA
Joint Base
6“WIN AS ONE”
SpringfieldTwp
PembertonBorough
PembertonTownship
North Hanover Township
WrightstownBorough
New Hanover Twp
Plumsted Township
ManchesterTownship
JacksonTownship
LakehurstBorough
Bordering Townships& Boroughs
McGuire
Fort Dix
Lakehurst
7“WIN AS ONE”
• Relocate Army/Navy/Marine Units to McGuire AFB (Part 68)
• Create Joint Mobilization Site (Part 144)
• Establish First Tri-Service Joint Base (Part 146)
BRAC Legislation
8“WIN AS ONE”
• 37 Army/Navy/Marine Acft to McGuire: 57% Increase
• Personnel Increase: ~700+ Full-Time, ~1500+ Part-Time
• $218M+ in DoN MILCON
BRAC Relocation – Part 68
9“WIN AS ONE”
• 23 Army Guard Aircraft moving to Lakehurst• 18 UH-60 Blackhawk Helicopters• 4 UH-72A Lakota Helicopters• 1 C-12
• Guard Personnel Increase • 100 Full-Time• 430 Part-Time
• $50M+ in MILCON
Non-BRAC Relocation
10
95% Increase
JB Acft
63
123A
cft
2006
2011
0
Supported Personnel
2006
2011
Su
pp
ort
ed P
erso
nn
elPart-
time P
ersonnel
Full-time Personnel
19% Increase
763034% In
crease
~11037
6398
~7625
Combined Effects
11“WIN AS ONE”
JB M-D-L
• Number assigned grew 51% (+1,077): • Force Support Sq: 90% increase (+475)
• Civil Engineering Sq: 85% increase (+316)• Contracting Sq: 60% increase (+28)
• Security Forces Sq: 55% increase (+139)
• Wing Staff: 46% increase (+40)
• Logistics Readiness Sq: 19% increase (+64)
• Area of Responsibility will increase more than 10-fold: from 3,600 acres to 42,000 acres
• Number of facilities increased 8-times: from 502 to 3,933
• Value of infrastructure grew 4-times: from $2.2B to $9.3B
• Number of mission partners grew approx 2.5-times: from 30 to 80
• Serviced population grew 1.5-times: from 17,000 to 41,000
12“WIN AS ONE”
• FORSCOM Power Generation Platform
• Primary North East Reserve Component Training Location
•Army, Army Res/NG, Navy, AF Combat Training• Contingency Operating
Location (COL) — “Tiger”• Urban Assault
• Convoy Ops
• Combat Supt
• Detainee Ops
Urban Assault Training
Contingency Operating Location (COL)
Joint BaseThe Partners – Ft Dix
13“WIN AS ONE”
• NAVAIR Aircraft Launch and Recovery (ALRE)• Design/Test
Catapults, Arresting Gear, Flight Deck Landing Aids
•CERDEC Flight Activity Capabilities: provides sensor integration and test support on airborne platforms
C-17 Assault Strip
Joint BaseThe Partners – Lakehurst
14
• Ground Combat Skills Training
• Rapid Airbase Opening
• Rapid Global Mobility
• Airlift
• Air Refueling
• Aerial Port Operations
• Weapons School
• Expeditionary Combat Support
• Installation Management
Joint BaseThe Partners – McGuire
15
USAF
Rapid GlobalMobility
ExpeditionaryCombat Supt
OEF Cargo
Jt Base Lead
NAVY
ResearchTest/Eval
NAVAIRTech Training
Launch &Recovery
Production
ARMY
MobilizationTrainingCenter
Multi-serviceTraining
RangeTraining
Installation Support Functions
America’s Premier Joint Warfighting Base!
Joint BaseVision
17
87th Air Base Wing
Deputy Base Civil Engineer
Joint Base McGuire-Dix-Lakehurst
Christopher Archer
18“WIN AS ONE”
Agenda
• Joint Base Organization
• Construction Projects (Recently Completed)
• Construction Projects (BRAC/Ongoing)
• Construction Projects (Planned)
• Housing Privatization
• Energy Projects
• Contracting Opportunities
• 87 CES POC Information
20“WIN AS ONE”
Joint Base Organization
18th Air Force Commander Lt Gen Allardice
Joint Base Commander Col Gina Grosso
87 Medical Group Col Glenn Yap
87 Mission Support Group
Col Michael Carrell
87 Civil Engineer Sq
uadron – Maj Karen Cosgrove
87 Contracting Sq
uadro
n - Lt Col Dave Searle
87 Force
Support
Squadron Lt Col (sel)
John Barlett
87 Security Forces Sq
uadro
n - Lt Col Tim Heintzelman
87t
h Communications
Squadron -
Lt Col Rob Licciardi
87t
h Logistics Readiness
Squadron -
Lt Col
Kevin
Gangadeen
Deputy Joint Base CommanderCol Joe Poth
21
CommanderMaj Cosgrove
Deputy Base Civil EngineerChris Archer
CEPPrograms
Flight Linda
Chominski
CEAAsset Mgt
FlightRich Sample
CEOOperations
FlightBill Garron
CEFFire Protection
FlightCMSgt
Cavaliero
CEXReadiness & Emerg Mgt
FlightSteve Robertson
CERResources
FlightBob Goss
CEDExplosive Ordnance Disposal
Maj Stanford
87 Civil Engineer Squadron
23“WIN AS ONE”
Success
• Team -- n. A group organized to work together <a team of scientists>. vt. To harness or join together to form a team.
• Partner – n. A person associated with another in a venture, occupation, or challenge. n. Either of two persons dancing with each other. v. To bring together as partners.
• Success – n. The gaining of something desired, planned, or attempted.
25
87th Air Base Wing
Joint Base McGuire – Dix - Lakehurst
Construction Projects
(Recently Finished)
26“WIN AS ONE”
Project completed on 6 Jun 09 Cost: $3.3M Project included renovation of 4 restrooms, new wall, ceiling and
floor finishes, HVAC system, lighting, and fire detection/ suppression systems
Repair Community Center, Bldg 2705
27“WIN AS ONE”
Upgrade FTU Facility, Bldg 1928
Project started: 15 Mar 08 (Design/Build Contract) Cost: $2.06M Completed: 27 Jul 09 Project included new roof, brick face, exterior doors/windows,
main and alternate entrances, bathrooms, auditorium, and various classrooms
28“WIN AS ONE”
Project completed 1 Dec 09 Cost: $4.5M Project Included new roof, brick face, auditorium chairs, floor and
wall/ceiling/floor finishes, restrooms, concession area, and new mechanical/electrical systems
Repair Base Theater, Bldg 2909
29“WIN AS ONE”
Construct ShouldersRunway 18/36
FY 08 P-341 D/B Contract Cost: $1.9M Completed: 31 Dec 09 Scope: Project constructed
25 foot wide paved shoulders; utilized crushed concrete from demo projects for stabilizing base
30“WIN AS ONE”
Construct Taxiway Hotel
FY 04 MILCON Army Reserve Cost: $2M Completed: 19 Dec 09 Scope: 25 ft paved shoulders
& taxiway edge lights
31“WIN AS ONE”
Completed Demos
TLF’s 2418 & 2419 (left top & bottom) Squad Ops Bldg 2225 (center top &
bottom) Sewer Shop Bldg 1512 (right top & bottom)
32“WIN AS ONE”
Completed Demos
Alert Facility Bldg 1818 (top & lower Left) Storage Fac 1934 (lower center) BASH Fac Bldg 1927 (lower right and
lower lower right)
33“WIN AS ONE”
Completed Airfield Demos
Transceiver Bldg 1609 (left top & bottom) Receiver Bldg 1612 (not shown) NDI Lab Bldg 1623 (center & right)
35“WIN AS ONE”
Navy & Marine Corps BRAC Projects
P162VAIMD/ASD
FY 09
P151V/P156VNavy
Hangar& Flight
Simulator FY 08/09
P150VMarine Corps
HeloHangar FY 08/09
P096V/P160VMarine CorpsReserve Ctr
FY 08
P157VMunitions
FY 09
P161V ArmyAviation
FY 09
36“WIN AS ONE”
Navy & Marine Corps BRAC Projects
Marine Corps Reserve Center and NOSC Renovations• Award Amt. $23 Million• Harkins Builders, Inc., Marriotsville, MA• Completion Date: Sep 2010
Marine Corps Helicopter Hangar & MAG 49 Hdqtrs• Award Amt. $66 Million• Boro Construction, King of Prussia, PA• Completion Date: Nov 2010
37“WIN AS ONE”
Navy & Marine Corps BRAC Projects
Navy Hangar• Award Amt. $48 Million• C. Pyramid Enterprises, Inc. Robbinsville, NJ• Completion Date: March 2011
Aircraft Intermediate Maint Div/Aviation Supply Dept• Award Amt. $20 Million• Archer-Western Contractors, Atlanta, GA• Completion Date: Feb 2011
38“WIN AS ONE”
Navy & Marine Corps BRAC Projects
Army Reserve Aviation Facility (Hangar Renovation)• Award Amt. $9 Million• Magnum, Inc. Warminster, PA• Completion Date: Feb 2011
Munitions Storage Igloos• Award Amt. $1 Million• Intercontinental Construction Co. Inc., Passaic, NJ• Completion Date: Oct 2010
40
Repair Runway 06/24
Cost: $40M (Includes Design to Harden Underruns)
Awarded to TOLTEST ECD: 5 Jan 11 Before 19 Jan 10; install
fence, lighting ductwork, batch plant site work, and trailer installation.
After 19 Jan 10; finish fence across taxiways, mil runway/taxiways and use the millings to create truck haul routes.
41“WIN AS ONE”
Renovate Dorms 2622/2623
FY08 Projects Cost: $3.1M each (Design/Build
Contract) ECD 1 Sep 10 Includes new wall, floor and
ceiling finishes; bathroom and dayroom renovation; molded drywall replacement
42“WIN AS ONE”
AAFES Renovation
Awarded 3 Sep 09 Cost: $4.4M; ECD: 01 Aug
10 Project Includes: BX floors
and ceiling finishes; entire food court renovation; upgrade of both entrances
Schedule: work is divided into 6 phases
44
PRI PrevPRI
PROJECT # PROJECT TITLE
1 1M PTFL063000 BASE OPS / USAF COMMAND POST FACILITY
2 2M PTFL063028 WARFIGHTER AND FAMILY SUPPORT CENTER
3 3M PTFL023003 MUNITIONS STORAGE AREA
4 1D 65596PTFL103001
PHYSICAL FITNESS FACILITY
5 4M PTFL9730091 ELECTRICAL DISTRIBUTION SYSTEM, PHASE II
6 2L NAVY P-254 COMMERCIAL GATE SECURITY IMPROVEMENTS
7 5M PTFL083006P1 AERIAL PORT COMPLEX CONSOLIDATED ADMINISTRATION FACILITY
8 XD PTFL103002 FIRE STATION (DIX RANGE AREA)
9 6M PTFL993010 EDUCATION & PROFESSIONAL DEVELOPMENT CENTER
10 7M PTFL053001MW AIR MOBILITY WING HEADQUARTERS FACILITY
FY11-15 Installation SupportMILCON Projects
45“WIN AS ONE”
Security Forces Facility
FY09 MILCON Awarded Project
Cost: $6.7M (Design/Build Contract)
ECD 10 Feb 11 Scope: 22,000 SF 2-
story facility includes weapons vault, storage, administration, lockers, holding cells, bath rooms & interrogation
46
A/E Design Requirements
REQ ORG PRI PROJECT # PROJECT TITLE
JB 1 PTFL061604 UPDATE JOINT BASE GENERAL PLAN
Lakehurst 2 REPAIR HANGAR #1
305 MXG 3 PTFL091600 RELOCATION STUDY, DE-ICING FAC/LRS (APS CDP)
305 OG 4 PTFL081602 PROFESSIONAL SVCS, BLDG ENVELOPE SURVEYS B1605 & B1828
Lakehurst 5 REPAIR BLDG 5
Lakehurst 6 REPAIR BLDG 88
47
A/E Design Requirements Continued
REQ ORG PRI PROJECT # PROJECT TITLE
LAKEHURST 7 REPAIR BLDG 120
87 ABW 8 PTFL091604 PROF SVCS; PROVIDE BASEWIDE WINDOW BLAST PROTECT SURVEY
87 ABW 9 PTFL021037 ATFP - REPAIR WINDOWS FOR BLAST PROTECTION, MULTI FCLTY
87 MSG 10 PTFL091605 PROFESSIONAL SVCS; PROVIDE OCCUPANT UTILIZATION STUDY, 3101
87 MSG 11 PTFL091603 PROFESSIONAL SVCS; BASEWIDE PARKING LOT UTILIZATION STUDY
48
Sustainment, Restoration and Modernization
Anticipated Annual Budget
Sustainment -- Dix: $20M Sustainment -- Lakehurst: $8M SRM -- McGuire: $13M TWCF -- McGuire Minor Const: $2M TWCF -- McGuire M&R: $3.5M JB-MDL Demolition Target: $1M
49
Proposed FY 10 (DIX)Sustainment Priority List
PRI PROJ # BLDG # TITLE
1 E4000XX9P WAT59 REPAIR POTABLE WATER DISTRIBUTION MAINS
2 E4000XX9P 5903 REPAIR WATER TOWER EXTERIOR
3 E4000XX9P 6969 REPAIR WATER TOWER EXTERIOR
4 E4000XX9P 4376 REPAIR TWWTF LOW LIFT PUMP #3
5 E4000XX9P SAN60 REPAIR SANITARY SEWER SYSTEM
6 E4000118P 9918 REPAIR BRINDLE LAKE DAM
8 E4000068P 5523 REPAIR ROOF
9 E40000X9P 5250 REPAIR ROOF
10 E4002857P 8536 REPAIR ASP BUNKER ROOFS
50
PRI PROJ # BLDG # TITLE
13 EC055079P 5900REPAIR BUILDING INTERIOR FLOORING; (BLDG 5911, 5912, 5913, 5989, 5990, 5991, 5992)
14 EC055XX9P 5600REPAIR BUILDING INTERIOR FLOORING; (BLDG 5602, 5603, 5606, 5611, 5612)
15 DR000118P 5240 REPAIR BUILDING INTERIOR (FLOORING)
16 E4000968P TENAV REPAIR TENNESSEE AVENUE (ALABAMA - NASHVILLE)
17 E4000918P RANRD REPAIR RANGE ROAD (TO 1ST BRIDGE PAST MID-STATE)
18 E4000XX9P TEXAVREPAIR TEXAS AVE (WRIGHTSTOWN CIRCLE TO CHECKPOINT 9)
20 JOC000057P FN081 CONSTRUCT BYPASS ROAD FOR 8000 AREA
25 E4000XX9P WAT60 REPAIR POTABLE WATER DISTRIBUTION MAINS
Proposed FY 10 (DIX)Sustainment Priority List
51
Proposed FY 10 (DIX)Restoration & Modernization
PRI PROJ # BLDG # TITLE
7 PN7XXXX 5501 REPAIR BARRACKS INTERIOR
11 E4000XX9P 5506 REPAIR HVAC, WINDOWS, HALLWAYS
12 E4000XX9P 5507 REPAIR HVAC, WINDOWS, HALLWAYS
19 PN72892 5250 REPAIR UTILITY SYSTEMS & EXTERIOR (WALSON)
21 PN60012 5431 REPAIR SLEEPING ROOMS FOR UPH (KITCHENETTES)
22 E4000XX10P 5523 REPAIR INTERIOR/EXTERIOR
23 EQ500588P 5501/5509 CONSTRUCT PARKING LOT (BLDG 5501/5509) (PRI #1)
24 EQ500598P 6700 areaCONSTRUCT PARKING LOT (6700 MAINT AREA @ ALABAMA & 14TH ST) (PRI #4)
52
FY10 Sustainment ProjectList (Lakehurst)
PRI PROJECT # BLDG # PROJECT TITLE
1 83-07-528 1 REPLACE BOILERS NORTH LEAN
2 83-09-020 1 REPAIR BATHROOMS (ADA COMPLIANCE) HANGER #1 CLASSROOMS
3 120 EXTERIOR REPAIRS
4 123 RESURFACE GYM FLOOR
5 194 HANGER 5 & 6 STRUCTURAL INVESIGATION PHASE III
6 834-06-013 197 UPGRADE LIFT STATION
7 834-03-022 313 ROOF AND WALL REPAIRS, COMMINUTER BUILDING
8 834-05-041 362 BOILER AND CONDENSATE REPAIRS, STEAM PLANT
9 834-06-011 362 REPLACE HIGH PRESSURE STEAM BOILER ECONOMIZER
10 834-06-012 362 UPGRADE HIGH PRESSURE PIPING AND VALVES, STEAM PLANT
53
PRI PROJECT # BLDG # PROJECT TITLE
11 BH-06-510a 481 REPAIR HVAC SYSTEM, BARRACKS ROOMS
12 485 MASONARY REPAIRS, FLIGHT DESK CONFERENCE ROOM
13 629 REPLACE ROOF SEABEES SHOP
14 834-05-049 ELECT REPLACE LEAD CABLE AND TRANSFORMER AT MANHOLE MH136
15 GATE INSTALL TEMPORARY INSPECTION SHELTER, COMMERCIAL GATE
16 GATE REPLACE BASE SIGN AT MAIN GATE
17 GROUNDS SIDEWALK CONSTRUCTION PHASE I
18 PARKING PAVE GRAVEL PARKING LOT AT BLDG 120
FY10 Sustainment ProjectList (Lakehurst)
54
FY10 SRMList (McGuire)
REQ ORG PRI PROJECT # PROJECT TITLE
87 MSG 20 PTFL091010 REPAIR CHW PIPING & MOLD/WATER DAMAGE, 87 CONS, B2402
305 OG 21 PTFL09120302 IDC JOINT SEAL AND REPAIR CONCRETE APRON S/R
87 MSG 22 PTFL071091 REPAIR GUTTERS & DOWNSPOUTS, DORMS/VQ 2600 AREA
87 MSG 23 PTFL091048 INSTALL ELECTRIC AIR SOURCE HEAT PUMP, B3104, CES
621 CRW NULL PTFL091053 SECURITY FORCES MOBILITY STORAGE, GRDC COMPLEX
87 MSG 24 PTFL091047 REPAIR BUILDING ENVELOPE B3104, CES
55
FY10 SRMList (McGuire)
REQ ORG PRI PROJECT # PROJECT TITLE
87 MSG 25 PTFL081086 REPLACE AST - BASE RECYCLING CENTER, B2310 R/M
305 MXG NULL PTFL091027 APS COMPLEX SECURITY FENCE
305 MXG 26 PTFL081068 MINOR REPAIRS TO HANGAR 1801
305 OG NULL PTFL091052 INSTALL BOILER, BASE OPERATIONS, B1730
305 OG NULL PTFL091051 ATFP - REPAIR PARKING BLDGS 1730, 1731 & 1738
87 MSG 27 PTFL091015 Install Photovoltaic Power System, Bldg. 3104
87 MSG 28 PTFL091008 Repair Photovoltaic Power System, Dining Hall, Bldg. 2635
87 MSG 29 PTFL091058 Replace Base Exchange HVAC
56
FY10 Demolition Straddle List
REQ ORG PRI PROJECT # PROJECT TITLE FY305 OG 1 PTFL091043 DEMOLISH AIRFIELD PAVEMENT
NEAR NW LIMA TAXIWAY2010
87 MSG 2 PTFL081085 DEMOLISH FACILITY 2618 2010
87 MSG 3 PTFL081008 DEMO BE COVERED STORAGE FCLTY, B3449
2010
87 MSG 4 PTFL071051 DEMOLISH DORM (VAQ) B2609 2010
87 MSG 5 PTFL081005 DEMO POWER CHECK PAD, FAC 1925
2010
305 MXG 6 PTFL021068 DEMO BASE SUPPLY & EQUIP WAREHOUSE, B1827
2010
87 MSG 7 PTFL081006 DEMO BSE HAZARD STOR FCLTY, B3424
2010
87 MSG 8 PTFL081059 DEMOLISH DORMITORY 2611 2010
58“WIN AS ONE”
Privatized Family Housing
2,364 McGuire/Dix family housing units conveyed to United Communities Sep 2006
Redevelopment Scope (over $350M): demolish 1,915; renovate 449; build 1,635;
Total end state - 2,084 units (78.5% new and 21.5% renovated)
Jan 2010 Status: demo’d 1,709; renovated 449; built 1098 units
Projected Redevelopment Completion: Feb 2011
Customer Satisfaction: 88% (vs 76% Avg for 24 AF PFH projects)
Newly Constructed JNCO Housing
Starlifter Housing Area
60
McGuire:Energy Neutral by 2015?
• Key Air Mobility Command airbase on East Coast
• Designated one of two AF “Model Energy Bases”
• Set the ambitious goal to be “off the grid” by 2015
• Can we do it given:
• Historically the USAF is an energy consumer, not producer?
• Geographic location?
• Abundance of old, inefficient legacy infrastructure?
• Limited resources?
61“WIN AS ONE”
McGuire Energy Savings Performance Contract (ESPC)
DOE Super ESPC Project (Ameresco) • Awarded: 28 Dec 09; Energy Improvements: $43M• Guaranteed Cost Savings: $137M• Energy Savings: 322,000 MBTUs/YR (Reduces Energy
Consumption by 42%)• Project Term: 21 YRS (Includes Construction/Maintenance)
Energy Conservation Measures• ECM 1: CHP Decentralization $29M (25%)• ECM 2: Lighting Upgrades $4.3M (3%)• ECM 3: Energy Management Control System $7.7M (8%)• ECM 4: Chiller Plant Upgrades $2.5M (6%)
62“WIN AS ONE”
Solar Photovoltaic (PV)
• Completed Solar PV Projects at McGuire AFB Base Library -- 12.25 KW Med Center -- 75 KW
• Proposed Solar PV Projects• Dining Hall -- 46 KW• Fitness Center -- 70 KW• Base Theater -- 12 KW• Shoppette -- 60KW• Commissary -- 70 KW• CE Maintenance -- 46KW
63“WIN AS ONE”
Solar PV Power Purchase Agreement
Ground Based 18 Acre Project: 6MW Rooftop Based 350k SF Project: 4MW Competitive Solicitation (FEDBIZOPS) Economics: NJ Rebates + NJ RECs + 30% Fed
• Tax Credit + Fed Accelerated Depreciation AF Benefits:
• Reduced Electric Energy Cost• Energy Security
Joint Base Initiative (Lakehurst)
65“WIN AS ONE”
Contract Opportunities
Contract opportunities are “posted” on the Web
• Federal Business Opportunities (FedBizOpps)
Includes a synopsis of the requirement
Download Bid Packages (Solicitation)
Synopsis of Award
Sources Sought Notices
www.fbo.gov
67“WIN AS ONE”
Unique Needs For Construction
Contracts >$100,000 (Miller Act)
• Performance and Payment Bonds Mandatory
100% of the original contract price
Additional bonding required if contract price increases
Contracts from $30,000 - $100,000
• Two of the following payment protection required:
• Payment bond; irrevocable letter of credit (ILC); tripartite escrow agreement; or certificate of deposit
69“WIN AS ONE”
87th CES Points of Contact
Major Karen Cosgrove (Commander) – 609-754-2642
Mr Chris Archer (Deputy Base Civil Engineer) – 609-754-2768
Ms Helene Talley (Secretary) – 609-754-3722
Ms Linda Chominski (Programs Chief) – 609-562-2228
Mr Steve Lyman (Engineering, McGuire/Dix) – 609-754-6181
Mr Michael Lawlor (Engineering, Lakehurst) – 732-323-4768
Mr Rich Sample (Asset Management) – 609-754-1536