castaldi report draft - e|agenda.neteagendatoc.brevardschools.org/02-25-2014 special school board...

23
BUILDING - 2 CASTALDI REPORT MID-SOUTH AREA SUPPORT FACILITY PREPARED FOR: BREVARD PUBLIC SCHOOLS PREPARED BY: MELBOURNEORLANDOWEST PALM BEACHATLANTAWASHINGTON Board of Architecture License No. AA C000149 Board of Professional Engineers License No. 1439 BRPH ARCHITECTSENGINEERS, INC. BRPH NO. C06853.001.00 5700 NORTH HARBOR CITY BOULEVARD, SUITE 400 FEBRUARY 10, 2014 MELBOURNE, FL 32940

Upload: others

Post on 08-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT MID-SOUTH AREA SUPPORT

FACILITY

PREPARED FOR:

BREVARD PUBLIC SCHOOLS

PREPARED BY:

MELBOURNEORLANDOWEST PALM BEACHATLANTAWASHINGTON

Board of Architecture License No. AA C000149 Board of Professional Engineers License No. 1439

BRPH ARCHITECTSENGINEERS, INC. BRPH NO. C06853.001.00 5700 NORTH HARBOR CITY BOULEVARD, SUITE 400 FEBRUARY 10, 2014 MELBOURNE, FL 32940

Page 2: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT FEBRUARY 10, 2014

____________________________________________________________________________________________________________________________________________________________________________________________________

TABLE OF CONTENTS

PAGE 1. EXECUTIVE SUMMARY ................................................................. 1

2. OEF FORM ............................................................................... 2

3. CASTALDI FORMULA .................................................................. 3

4. CASTALDI AGE OF BUILDINGS ..................................................... 14

5. FISH PLANS ........................................................................... 19

6. LIFE SAFETY REPORTS.............................................................. 22

Page 3: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT FEBRUARY 10, 2014

____________________________________________________________________________________________________________________________________________________________________________________________________

Section 1

1. EXECUTIVE SUMMARY On December 17, 2013, the School District of Brevard County contracted with BRPH Architects-Engineers, Inc. to provide a Castaldi Report for Building 2 of the Mid-South Area Support Facility. The attached documentation is required for the Castaldi Report to satisfy the Florida Department of Education requirements for the demolition of school buildings.

Page 4: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT FEBRUARY 10, 2014

____________________________________________________________________________________________________________________________________________________________________________________________________

Section 2

2. OEF FORM

Page 5: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

Office of Educational Facilities Florida Department of Education 

Room Condition Change Building Replacement/Raze 

 

District/Community College    Contact Person Joseph Ranaldi, Dir. of Planning/Prj. Mgmt.  Brevard County School District       Phone   (321) 633‐1000, Ext 446       Facility/Campus Name Mid‐South Area Support Services    Facility Number  47  Building Number(s) 2                             Parcel/Site Number(s) 50                   This Proposed Project will: □   Change the condition of permanent rooms from satisfactory to unsatisfactory (if yes, go to 

Section I and complete certification in Section III). (Not applicable to community colleges) □   Change the condition of permanent rooms from unsatisfactory to satisfactory (if yes, go to 

Section I and complete certification in Section III). (Not applicable to community colleges) x   Raze permanent building(s) (if yes, go to Section II and complete certification in Section III). □   Replace permanent building(s) (if yes, go to Section II and complete certification in Section 

III). Major Capital Outlay Funding Source(s) – Original Building   Local Millage     Major Capital Outlay Funding Source(s) – Replacement Building   NA        

      This form is not required for razing a single, freestanding structure that is less than 750 NSF and is debt free, or multiple small structures on a single campus whose total area is less than 750 NSF and are debt free.  This form must be completed for any structure 750 NSF or greater and any structure, regardless of size, that is not debt free. 

 A. DISTRICT/COMMUNITY COLLEGE CERTIFICATION 

The district/community college must submit this certification document, completed and signed by the  appropriate  school  officials,  along with  all  required  or  necessary  supporting  documentation pertaining to the proposed project. 

 The Brevard County School Board hereby certifies that: 

 I.  CONDITION CHANGE: (Not applicable to community colleges)  II.  RAZE/REPLACE PERMANENT BUILDING(S): 

1. All fund sources have been researched and no current indebtedness or outstanding debt exists for the building(s) that will be razed and/or replaced. 

2. Funding Source(s):  a. Original Building:   ___Local Millage_______________ b. If Replaced:    ___NA_______________ 

3.  Voters of the district have approved local bonding for the project: Yes/No 

Page 6: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

a. Date of voter approval: ___NA_______________ 4. Imminent danger exists for the building(s) that will be razed and/or replaced. 

   III.  CERTIFICATION SIGNATURES:     _________________________________    __________________ Director of Facilities Planning       Date    _________________________________    __________________ Superintendent/          Date    _________________________________    __________________ Board Chair            Date   NOTE:  Certification  is  required  by  the  Superintendent  and Director  of  Facilities  Planning  for room condition changes. Certification  is  required by  the Superintendent/President and Board Chair to raze or replace permanent buildings.                          

 

Submit signed form and supporting documents to: Office of Educational Facilities, Room 1054 Florida Department of Education 325 West Gaines Street Tallahassee, Florida 32399-0400

Page 7: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

Procedures and Processes Instructions:  

B. CONDITION CHANGE (Not applicable to community colleges) 1. RATIONALE (provide the following information, as appropriate, to justify changing

the condition of spaces): i. In order to change the space condition from satisfactory to unsatisfactory the

district must certify that the space is no longer physically safe or suitable for occupancy: 1. Unsatisfactory space is typically designated as such due to compromising

effects on the structural integrity, safety, or excessive physical deterioration of a building.

2. Typically, space condition should be the same, either satisfactory or unsatisfactory, for all rooms in a permanent building.

3. Space that has been determined to be unsatisfactory should not be occupied. 4. Application of a facility replacement formula, such as the Castaldi generalized

formula for modernization or other similar facilities study, does not necessarily mean that the condition of the identified spaces is unsatisfactory. The condition code cannot be changed simply due to the results of a planned replacement unless the integrity of the space meets the criteria identified to classify the space as unsatisfactory.

ii. In order to change the space condition from unsatisfactory to satisfactory the district must certify that the space has been successfully reconditioned to meet all applicable regulations regarding occupancy requirements.

2. OEF Review:

i. Site visit by OEF staff, when necessary. ii. Concur with district rationale, data, and analyses:

1. Building(s) approved as unsatisfactory; OEF will make the room condition code changes in FISH.

2. Building(s) approved as satisfactory; OEF will make the room condition code changes in FISH.

iii. Disagree with district rationale, data, and analyses: 1. Building(s) not approved as unsatisfactory. 2. Building(s) not approved as satisfactory.

3. OEF Notify District of Findings and Decision:

i. OEF staff will analyze the district’s data along with all supporting documentation, coordinate any further reviews with the district, make a final decision regarding the proposed room condition changes, and provide a timely response either approving or disapproving the proposed room condition changes.

C. RAZE/REPLACE PERMANENT BUILDING(S) 1. RATIONALE (provide the following information, as appropriate, to justify

razing/replacing permanent buildings):

i. Detailed explanation of need for the proposed project and the expected benefit to the district/community college.

Mid South Support Services site is approximately 6 acres. Building 2, also known as Old Eau Gallie High School and was constructed in 1924. The windows have been boarded up and the building has been vacant since approximately 1984. It is classified as “unsatisfactory” in FISH. Other buildings on the site include a similar two-story building formerly known as Creel Elementary. This building is currently being by maintenance personnel, along with two other buildings that are used for transportation offices and maintenance.

Page 8: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

ii. General scope of the proposed project. The intent of the proposed project is to demolish the existing building which has been deemed to be unsound for utilization and beyond the economic means of the district to renovate or repair. The land will then be utilized for expanding parking for transportation. The potential liability of the existing unsound building will be removed as an identified hazard for the school district.

iii. Building age and year of construction.

Building was constructed in 1924, making it 90 years old this year.

iv. Existing capacity of building(s), include the number of student stations, classrooms, and other instructional spaces.

This building is UNSATISFACTORY in FISH and carries no student stations.

v. Current number of students housed and the projected number of students to be housed in the affected building(s).

NA

vi. Current educational plant survey recommendations and capacity.

NA. This building is UNSATISFACTORY

vii. What alternatives have been considered besides razing/replacement and why are the alternatives not feasible?

The findings of the facility condition assessment determined that the buildings has fulfilled its useful life. Issues such as building envelope deficiencies and accessibility limitations make a strong argument to raze rather than renovate and remodel. The condition of the facility makes it a liability for the future.

viii. School board/community college board approval of the concept of razing/replacing permanent buildings. School Board Agenda February 25, 2014

ix. Building condition/engineer study (optional). Attached

x. Impact if the proposed project is not approved.

The investment required to maintain this facility is a poor investment of capital dollars. The district would be better served by owning a cleared site to utilize for expanded bus parking. Bus parking would have to be located elsewhere

Page 9: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

xi. Other relevant data; identify any major systems (include date, if applicable) that have been replaced or upgraded, e.g., electrical, HVAC, fire alarm, roof, plumbing, drainage, etc. Provide a general scope of work for any previous remodeling, renovation, and addition, and year completed.

4. COST ANALYSIS (Building by Building):

i. Castaldi Analysis (or other cost analysis formula to support the proposed project).

See enclosed Castaldi analysis. Photos of buildings included in engineering report

ii. The following five questions must be addressed: 1. How many years will modernization extend the useful life of the modernized

building(s)? NA 2. Does the existing building(s) lend itself to improvement, alteration,

remodeling, and expansion? If no, explain why not. No. Enrollment and costs do not justify improvement, alteration, remodel, or

expansion. This building is UNSATISFACTORY. 3. Explain how a modernized and a replacement building(s) fits into a

well-conceived long-range plan of the district/community college?

Consolidation of the facilities in this area has been determined to best serve the district’s long-range plan based on existing and projected enrollment. This building will not be modernized.

4. What is the percentage derived by dividing the cost for modernization by the

cost for a replacement building? See attached Castaldi 5. A committee of district officials and independent citizens from outside the

school attendance zone has determined that the replacement of the building(s) is financially justified and no other alternative is feasible? (Not applicable to community colleges)

This building will not be replaced. The land will be utilized to expand bus parking.

iii. Detailed scope of work for modernization of the existing building(s).

NA

iv. FISH building plan and/or schematic drawings of the existing building with FISH

room numbers.

See attached report of the existing building.

Page 10: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT FEBRUARY 10, 2014

____________________________________________________________________________________________________________________________________________________________________________________________________

Section 3

3. CASTALDI FORMULA

Page 11: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

Bu

ildin

g #

212

,704

sf (

FIS

H)

Cos

t/GS

F (

New

):$2

26

Cla

ssro

om

sR

emod

elin

g (1

/2 n

ew):

$113

Ren

ovat

ion

(1/3

new

):$7

5

Age

of b

uild

ing

90ye

ars

Lr

= E

xpec

ted

usef

ul li

fe o

f sch

ool:

10

0ye

ars

Not

e: 1

00 y

ears

util

ized

to a

void

neg

ativ

e nu

mbe

rs.

Lm

= r

emai

ning

use

ful l

ife-

(Exp

ecte

d us

eful

life

min

us a

ge o

f bui

ldin

g)10

SU

RV

EY

RE

CO

MM

EN

DA

TIO

NS

:C

e= C

ost

of

edu

cati

on

al im

pro

vem

ents

GS

FC

ost

/SF

To

tal C

ost

Ren

ovat

e12

,704

$75.

33$9

57,0

35 $0$9

57,0

35C

h=

Co

st f

or

imp

rove

men

ts in

hea

thfu

lnes

s

Cs=

Co

st f

or

imp

rove

men

ts in

saf

ety

Sub

tota

l$0

Ia=

Inde

x of

ade

quac

y of

a m

oder

nize

d bu

ildin

g co

mpa

red

to a

new

bui

ldin

g (S

tate

of F

lorid

a al

low

s .7

5)

R=

rep

lace

men

t of e

xist

ing

+ e

xpan

sion

Cos

t of R

epla

cem

ent:

1270

4 X

$22

6$2

,871

,104

R=

$2,8

71,1

04

Oc=

oth

er e

stim

ated

hid

den

co

sts

or

pro

ject

co

sts

asso

ciat

ed w

ith

rem

od

elin

g/r

eno

vati

on

pro

ject

s 20

% o

f p

roje

ct

Cas

tald

i Gen

eral

ized

Fo

rmu

la f

or

Sch

oo

l Mo

der

niz

atio

n

IF:

(Ce

+ C

h +

Cs)

X (

1+ O

c)<

RT

hen

build

ing

shou

ld b

e m

oder

nize

d; e

lse

build

ing

shou

ld b

e re

plac

ed(L

m)

X (

Ia)

Lr

Rem

odel

ing

Rep

lace

men

t($

9570

34.6

6666

6667

+ $

0) X

1.2

<$2

,871

,104

612,

502

$

>

$28,

711

(100

-90)

X .7

510

0

The

refo

re:

Bui

ldin

g #2

sho

uld

be r

epla

ced

Min

imu

m C

ost

fo

r C

alst

ald

i to

Wo

rk$2

76,0

68

Act

ual

Est

imat

ed C

ost

fo

r R

equ

ired

Imp

rove

men

ts95

7,03

5$

Page 12: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT FEBRUARY 10, 2014

____________________________________________________________________________________________________________________________________________________________________________________________________

Section 4

4. CASTLADI AGE OF BUILDINGS

Page 13: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

Cas

tald

i Cal

cula

tio

ns

- H

olly

Hill

Mid

dle

Sch

oo

l

BU

ILD

ING

AG

E C

AL

CU

LA

TIO

NS

Pre

sent

yea

r:20

14B

ldg

No.

Are

aY

r. B

uilt

Age

B x

C

212

,704

1924

9011

4336

0

Tot

al12

704

Tot

al11

4336

0

Ave

rag

e ag

e90

jphillips
Rectangle
Page 14: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT FEBRUARY 10, 2014

____________________________________________________________________________________________________________________________________________________________________________________________________

Section 5

5. FISH PLANS

Page 15: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BLD

G 2

BLD

G 3

BLD

G 1

BLD

G 4

N2

48

GUAVA AVEM

ATH

ERS

ST

Mid

-So u

t hB

us P

a rk i

ng

McC

LEN

DO

N S

T

PINEAPPLE ST

Park

ing

Park

ing

T017

MID

-SO

UTH

AR

EASI

TE P

LAN

DR

AWN

BY:

BEL

LAN

GER

, RIC

KD

ATE:

16

Sept

20

09

Page 16: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

10

41

05

10

3

10

21

01

10

01

00

A

10

6

10

6A

10

6B

100B

10

7

10

9

10

8A

10

8

00

11

10

11

0A

11

1

N

01

1

00

6A

00

6B

01

0

00

8

00

9

00

5B0

05

A

00

70

05

00

3

00

6

00

3A

00

40

02

20

1

20

2

20

3A

20

3

20

3D

20

3C

20

3B

20

5A

20

5B2

07

A

20

7B2

07

C

20

52

07D

20

9

20

7

21

8

21

2

21

6

21

4

21

0

10

1C

10

11

01B

10

2C

10

2

10

6

10

1A

10

2B1

02

A10

3A

10

31

05

10

4

10

0

10

0C

10

0A10

0B

10

0D

11

0

109

108

10

6

11

11

12

10

7

10

5

10

4

10

3

10

1

10

2

10

0

Bld

g 3

Bld

g 4

Bld

g 1

20

7E

20

7F

00

1

01

2

10

72

00

00

3B

10

4A

10

0E

11

0B

MID

-SO

UTH

AR

EA S

UPP

OR

T O

FFIC

ESFI

SH P

LAN

DR

AWN

BY:

Bel

lang

er, R

ick

DAT

E: 1

6 Se

pt 2

00

9

Page 17: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

BUILDING - 2 CASTALDI REPORT FEBRUARY 10, 2014

____________________________________________________________________________________________________________________________________________________________________________________________________

Section 6

6. LIFE SAFETY REPORTS

Page 18: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

    

01/25/12

T/A 11:00am

Building Fire Electrical Mechanical Plumbing Other FINAL

X X

1

2

Brevard Public Schools

Daily Inspection File ________Project File                ________

TBD       Permit Number:

TYPE(S) REQUESTED

Area Two Supervisor Ira Fox, Gary Dean

INSPECTION REPORT

Project Name:

Inspected interior of spaces with Gary Dean. First floor, second floor, and the roof structure are all 

wood frame Interior walls are wood frame wood lath and plaster A few spaces have a lot of stored

OFFICE    (321) 633‐3580 Ext. 13073

Contact on Site:

Date of Inspection:

Inspection Request Time:   

Building 2 is a two story Type VB structure built around 1930. The school has not been used for over 30 

years. Due to severe roof leaks and neglect the structure has been boarded up. Access to inside requires 

removal of plywood panels with about 30 wood screws. All utilities disconnected.

Exterior walls are nominal 12' x 12" x 12" red terra cotta brick with 5/8" mortar joints, stucco exterior, 

and a 4' parapet at roof. Building was painted 6‐8 years ago and since that time there has been 

significant cracking on north and south walls. East and west walls have minimal cracks. 

Mid‐South Maintenance Yard

INSPECTION 

INSPECTION OBSERVATIONS

Contractors:

3

4

Passed Failed Partial Conditional

X

5

6 Picture file next three pages.

At this time exterior masonry walls stable. The built up roof is in total failure leaking everywhere. The 

roof and floor framing failures will continue to bring down interior walls.  This may eventually create a 

wedge effect against the exterior walls making them unstable. There are large cracks at the north 

exterior wall, particularly at the corners and openings. Appears related to the roof, floor, and wall 

failures at NW corner.

Appears the interior wood framing from foundation piers to roof self supporting with minimal effect as 

to being shear walls or diaphragm member. There are connections to north and south exterior walls, 

did not observe any connections to exterior walls on east and west sides. Roof frames rest on interior 

frame walls, not supported by exterior wall.

Not Ready

CONDITIONS/COMMENTS

wood frame. Interior walls are wood frame, wood lath, and plaster. A few spaces have a lot of stored 

items, elsewhere not much. Second floor empty.

INSPECTION 

Water intrusion has lifted plaster from all surfaces. At the NW corner about 30' x 30' section of roof 

has caved in causing floors to fail taking an interior wall and adjacent group toilet with it.  There are 

other locations where the roof has leaked causing second story floors to be unstable. 

RESULTS

1   of   4

Page 19: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

7

8 Second floor northwest classroom where roof and wall collapsed

Picture of south exterior wall cracks

8 Second floor northwest classroom where roof and wall collapsed.

2   of   4

Page 20: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

9

10

Second floor northwest classroom where roof and wall collapsed.

Second floor northwest classroom where roof and wall collapsed10 Second floor northwest classroom where roof and wall collapsed.

3   of   4

Page 21: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

11

12

                               First floor corridor                                  Second floor corridor

                      Stair to second floor                                              First floor storage

Inspector: License # BU1704Gary Geiser Exp. Date:  11/30/11

4   of   4

Page 22: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

    

8:30am T/A 8:30am

Building Fire Electrical Mechanical Plumbing Other FINAL

X X

1

INSPECTION 

INSPECTION OBSERVATIONS

                         1948 Pineapple Avenue, Melbourne, Florida 32935 

Contact on Site :   Dave Martin, George Rich, Noel Droor PE

OFFICE    (321) 633‐3580 Ext. 13073

Inspection Request Time:   

Buildings 1 and 2 were both built around 1920.  Building 1 is a two story masonry Type IIB structure with 

basement and currently used for south area administrative offices.  Building 2 is a two story Type VB 

structure and due to severe roof leaks and neglect the structure has been boarded up. Building 1 

previously named Creel Elementary.  Building 2 named Eau Gallie High School

Building 2 in a failure condition. Noel Droor P.E. conducted structural inspection. Observed exterior 

wall cracks and interior frame failures particularly due to excessive water intrusion. Roof membrane 

has several large holes. Exterior walls unreinforced red terra cotta brick with ledges to support joists. It 

is assumed first floor 4X8 joists support interior floors, walls, and roof framing. Typically wood 2X4's, 

Project Name:  Old Creel Elementary School and Old Eau Gallie High School.  

Daily Inspection File ________Project File                ________

TBD       Permit Number:

TYPE(S) REQUESTED

INSPECTION REPORT

Date of Inspection:  2/9/2012

2                            Building 1                                                                 Building 2  

2X8's, and 1X8 bracings. Noel to prepare report of findings.

1   of   2

Page 23: Castaldi Report DRAFT - e|agenda.NETeagendatoc.brevardschools.org/02-25-2014 Special School Board Me… · MELBOURNE ORLANDO WEST PALM BEACH ATLANTA WASHINGTON Board of Architecture

3

4                                                        Building 2 interior second floor

                                                       Building 2 interior second floor

5

Passed Failed Partial Conditional

X

6

Inspector: License # BU1704

RESULTS

                                                                     Building 2 roof

INSPECTION  Not Ready

Gary Geiser Exp. Date:  11/30/11

CONDITIONS/COMMENTS

2   of   2