ch2m hill's corporate overview

28
Corporate Overview

Upload: ch2m

Post on 15-Feb-2016

236 views

Category:

Documents


2 download

DESCRIPTION

CH2M HILL's Corporate Overview

TRANSCRIPT

Page 1: CH2M HILL's Corporate Overview

Corporate Overview

Page 2: CH2M HILL's Corporate Overview

2

Innovative

Page 3: CH2M HILL's Corporate Overview

3

Around the world and close to home, CH2M HILL employees provide the full spectrum of consulting, program management, design, construction and operations solutions that support your project goals and improve quality of life.

Page 4: CH2M HILL's Corporate Overview

4

A well-delivered solution requires more than just a great idea. It also takes collaboration with our clients and the experience, tools, and processes to develop and deliver a successful project, however big or small.

TechnologyWhy provide a boxed solution that doesn’t fit? We apply established best practices while finding new ways to use current technologies, and developing new ones, cost-effectively customizing the best answer for your needs.

PeopleThere’s no other way to say it: CH2M HILL is its talented, knowledgeable people. Our experts are driven to be thought leaders, seeking out challenging project assignments and striving for continuous improvement in everything we do.

DeliveryConsistent, reliable results are the focus of our delivery model, developed over decades of experience. Our approach makes team building, strategic planning, cost and schedule management, quality and safety essential to all that we do.

Page 5: CH2M HILL's Corporate Overview

Above: We’re keeping employees, the environment and the community safe during the environmental cleanup of the Central Plateau at the Department of Energy’s Hanford Site, Washington, USA, the largest environmental cleanup project in the nation.

Right: The challenging London Tideway Tunnels project in the United Kingdom will create London’s deepest tunnels, each wider than three buses placed side by side, to help make the River Thames cleaner and healthier.

5

Page 6: CH2M HILL's Corporate Overview

6

Page 7: CH2M HILL's Corporate Overview

7

Golden Ears Bridge at a glance 1-kilometer long, cable-stay bridge with 242-meter long main spans and 121-meter long back spans connected to concrete viaducts on the north and south shores of the Fraser River

Nearly 13 kilometers of two-, four-, and six-lane urban arterial roads and highway construction, including 17 bridge and viaduct structures with a total length of 4,656 meters

11.5 kilometers of local street reconstruction and municipal utility upgrades

Project construction through four different municipalities; relocations for five different utilities and 10 railway crossings

Our work offers challenges…that motivate innovation. For our design-build of the Golden Ears Bridge in Vancouver, British Columbia, Canada, innovative construction techniques helped reduce disruption to aquatic life, and a unique combination of building materials ensured a lighter load to prevent undue settlement of the underlying soil structure. An initiative of TransLink, the local transportation authority, the project will significantly improve transportation mobility among four growing municipalities east of the city.

Golden Ears Bridge spanning the Fraser River in Vancouver, British Columbia, Canada

Page 8: CH2M HILL's Corporate Overview

8

Respectful

Page 9: CH2M HILL's Corporate Overview

9

There’s more to a project than just showing up to work every day. Because our work affects our clients, communities and environment, we look at the long-term outcome of every decision and what it means for everything it touches.

Page 10: CH2M HILL's Corporate Overview

10

CH2M HILL has been promoting corporate responsibility since long before it became a catch phrase. Our values are built around respect for our people within the company and for everything affected by our work outside it. That makes it easy to do the right thing.

CommunityWe give back to the communities where we live and work, both on our projects and through personal involvement. Our relationships with international organizations like Water For People and Engineers Without Borders give us a similar connection with the global community.

ClientOur success on your project depends on collaboration with you. How else can we come to understand your goals and make them our own? It’s your program, and it’s your project, and our job is to help you achieve it safely, cost effectively, and on time.

PlanetSince our company’s founding, our work has helped create a cleaner, safer, more prosperous world. We continually look to protect and enhance economic and societal vitality and preserve environmental resources for future generations.

Page 11: CH2M HILL's Corporate Overview

Above: Active participation in World Water Monitoring Day provides data to help protect waterways while educating people on valuable water resources.

Right: As part of a contract with the U.S. Federal Emergency Management Agency, 298 units of temporary housing were built in a wheat field near Greensburg, Kansas, USA, for residents of the town who were displaced by a major tornado.

11

Page 12: CH2M HILL's Corporate Overview

12

Page 13: CH2M HILL's Corporate Overview

Mumbai’s Chhatrapati Shivaji International Airport Modernization project at a glance Seven-year, US$2 billion program improving safety and increasing capacity at South Asia’s most important aviation hub

Aligning the efforts of hundreds of designers, contractors and third parties to deliver multiple airside and landside rehabilitation and construction projects simultaneously—with minimal flight interruptions

World-class T2 international terminal setting standards for architecture, planning, technology, functionality and service—the new gateway to India

Reconstructed intersecting airport runway system accommodating the Airbus A380

Client partnership “ We had 32 countries and 20,000 people working on this project …the largest infrastructure project in India. The challenge for us (GVK) was how to get all of our partners, consultants, contractors, and employees, aligned in one direction, with quality being the one central, non-compromising theme.... The contribution CH2M HILL has made (as Program Manager) really got this program to where we are today.”

— Karthi Gajendran, President, Airport Development and Transportation, GVK

Mumbai’s Chhatrapati Shivaji International Airport Mumbai, India

13

Page 14: CH2M HILL's Corporate Overview

14

Holistic

Page 15: CH2M HILL's Corporate Overview

15

You have a vision—and CH2M HILL provides the solutions that support it. Whatever your project requirements may be, we can help you meet them with solutions that reflect the big picture of your goals and needs.

Page 16: CH2M HILL's Corporate Overview

16

CH2M HILL is committed to being your single source for the project solutions you need. On big programs or small projects, we can work with you through the complete lifecycle or on a single phase, safely and cost-effectively.

MarketsOur experience comes from decades of service to a variety of private and public clients. We understand and can work within your specific market, or across a number of markets, to deliver sustainable solutions.

SolutionsConsulting and planning; architecture and design; program management; engineering, procurement, and construction; operations and management; and more. These capabilities are supported by our experience in safely managing both major programs and smaller projects.

RegionsWe are where you are, in local offices around the world. We bring experience and resources from our global projects together with personnel who live and work where you do to meet your community’s specific needs.

Page 17: CH2M HILL's Corporate Overview

City: Anyplace

Country: Anywhere

Population: YouClean drinking water. Efficient transportation. Lean production facilities. Safe energy. Around the world, these are just some of the aspects of daily life we support. Think about everything you do—there’s a part of it that CH2M HILL can help improve.

Take a look at the next page for a simulation of what this means.

17

Page 18: CH2M HILL's Corporate Overview

18

3

2

5

1

Page 19: CH2M HILL's Corporate Overview

19

Energy

Facilities & Urban Environments

WaterEnvironment & Nuclear

We look at the big picture…and we help our clients see it, too. We provide the perspective, knowledge, and innovative tools that enable our clients to take a wider view of their own projects and measure the effects on business, people, communities and the planet, enabling more informed decision making.

Fundamentally, CH2M HILL delivers solutions in five core areas: water, transportation, environment & nuclear, energy, and facilities & urban environments.

Any solution we provide can draw from our customized services, including consulting, program management, engineering-procurement-construction, operations & management, decontamination & decommissioning and tunnels & earth engineering.

Transportation1

42

4

3

5

Page 20: CH2M HILL's Corporate Overview

20

Focused on You

Page 21: CH2M HILL's Corporate Overview

21

Innovation and experience attuned to your vision. Respect for you and the people affected by your project. The breadth of services you need. The result is success for your goals, your community and your future.Focused on You

Page 22: CH2M HILL's Corporate Overview

22

Your communityWe strive to improve quality of life where we all live and work.

“ Our City streets are cleaner, smoother, safer and friendlier. The dramatic changes in our City are due to the professional and dedicated individuals that work for the City and CH2M HILL. I am so humbled to be a part of this historic time in Sandy Springs.”

— City Councilmember Diane Fries, District 2, 2008 Annual Report for the

City of Sandy Springs, Georgia, USA

Your goalsIt’s simple: your goals are our goals.

“ [CH2M HILL’s] desire to perform to the high level of the specification was evident in every action taken. They sought out clear teaming agreements…in a true partnering atmosphere.”

— U.S. Army Corps of Engineers contractor performance evaluation, discussing Edwards Air Force Base,

California, USA

Your futureWe’ll help build a project you can be proud of—now and tomorrow.

“ CH2M HILL has a long-standing history providing high quality professional solutions to [the Public Utilities Board] on water and wastewater infrastructure designs and project management….”

— recommendation letter from PUB Singapore discussing the Deep Tunnel

Sewerage System and Changi Water Reclamation Facility that is revolutionizing the

water future for this nation

The result of our work together is your vision delivered. A successful project that enhances quality of life. Peace of mind based on lasting value and responsive service.

Page 23: CH2M HILL's Corporate Overview

Above: CH2M HILL employees work and live in Sandy Springs, Georgia, USA, as part of the community and manage public works for efficient city operations.

Right: The Deep Tunnel Sewerage System has helped the city-state of Singapore to manage used water in a comprehensive and holistic manner.

23

Page 24: CH2M HILL's Corporate Overview

24

Page 25: CH2M HILL's Corporate Overview

Sustainable Solutions at a glanceAt CH2M HILL, we incorporate sustainable solutions into every project. This involves using fewer resources and decreasing carbon footprint while being attentive to safety, cost, quality and the future benefit for you and your customers. Key focus areas include:

The energy-water-carbon nexus—managing the interdependence among energy generation, water usage and carbon footprint

Water management—supporting decision making through understanding the whole system, from raindrop to ocean

Responsible building—using techniques and materials that make any building more safe, efficient and green

Client-community connection—building relationships that achieve the clear vision of the people who live where we work

Renewables—applying technologies to ensure our energy resource demand doesn’t outpace availability

The world is depending on your vision… and CH2M HILL is proud to play a role in helping your community move forward. We understand that big or small, near or far, the solutions we develop with clients for the natural and built environments are crucial to improving our world. Nothing drives us more than helping you reach the goals that achieve your vision of tomorrow.

25

Singapore Active, Beautiful, Clean Waters Republic of Singapore

Page 26: CH2M HILL's Corporate Overview

26

Let us know what’s next for you.

Page 27: CH2M HILL's Corporate Overview

27

Global Headquarters9191 South Jamaica StreetEnglewood, CO 80112USAToll-free: 888.CH2M.HILLTel: +303.771.0900Fax: +720.286.9250

AsiaLevel 34, Gateway West150 Beach RoadSingapore, Singapore 189720Tel: +65.6391.0350Fax: +65.6299.4739

Australia and New ZealandLevel 7, 9 Help StreetChatswood NSW 2067Sydney, AustraliaTel: +61.02.9950.0200Fax: +61.02.9950.0600

Canada540 12 Ave SWCalgary, Alberta T2R 0H4CanadaTel: +403.407.6000Fax: +403.407.6001

EuropeElms House43 Brook GreenLondon W6 7EFUnited KingdomTel: +44.20.3479.8000Fax: +44.20.3479.8001

Latin AmericaAzara 841Piso 1C1267ABQBuenos Aires, ArgentinaTel: +54.11.4309.0201Fax: +54.11.4303.3954

Middle East and North AfricaStar Holdings BuildingP.O. Box 500554G02Dubai Internet CityDubai, United Arab EmiratesPhone: +971.4.451.8029Fax: +971.4.451.7953

Let us know what’s next for you.

CH2M HILL operates out of more than 200 offices worldwide. For a complete list of office locations in your area, please visit us at ch2mhill.com.

Recognition2013 World’s Most Ethical Companies CH2M HILL is proud to have been recognized by the Ethisphere Institute as one of the World’s Most Ethical Companies for the fifth year (2009, 2010, 2011, 2012 and 2013). This award recognizes CH2M HILL’s advancement of best practices in business ethics, compliance practices and corporate social responsibility.

2009 Catalyst AwardCH2M HILL’s Women’s Leadership Initiative became the first in the engineering and construction industry to receive this prestigious award, which honors innovative organizational approaches that advance women in the workplace.

• Consistently listed as a best place to work in the U.S. (2003, 2006, 2008, 2009, 2011 and 2013); named six times to “America’s Most Admired Companies”.

• Financial Post’s “Ten Best Companies to Work For” 2009, 2010 and 2011; Canada’s Top 100 Employers 2009, 2010 and 2011.

• Verdantix, an independent analyst firm focused on sustainable business issues, named CH2M HILL a leader in climate change consulting (2009), sustainable engineering (2010) and environmental services (2012).

• Recipient of ten VPP Star Awards from the U.S. Occupational Safety and Health Administration (OSHA).

Page 28: CH2M HILL's Corporate Overview

© 2014 CH2M HILL CO032009019MKT

To learn more about CH2M HILL, please visit us at ch2mhill.com