  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    1/19

    PROFESSIONAL PRACTICE I

    [QSD 289]

    1Mohd nazri bin abdullah

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    2/19

    INTRODUCTION

    PROFESSIONAL BODIES

    SERVICES OF THE QS

    2

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    3/19

    3

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    4/19

    4

    DESIGN TEAM

    CLIENT/EMPLOYER

    BUILDING TEAM

     Architect

    C&S Engineer

    M&E

    Engineer

    QS

    Land

    Surveyor

    Main Contractor

    Domestic Sub-

    Contractor

    Nominated

    Sub- Contractor

    Nominated

    Supplier

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    5/19

    5

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    6/19

    6

    BOARD OF QUANTITY

    SURVEYORSMALAYSIA (BQSM)

    PROFESSIONAL

    BODIES

    INSTITUTION OF

    SURVEYORSMALAYSIA (ISM)

    http://www.bqsm.gov.my 

    http://ism.org.my 

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    7/197

    VISION

    "To be the prime agency of excellence governing

    the quantity surveying and cost engineering

    profession.“ 

    MISSION

    "To promote the growth of a world class quantitysurveying and cost engineering profession

    through regulation and continuous professional

    development."

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    8/19

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    9/199

    To continuously improve the standards ofprofessional practice and ethics.

    To promote the welfare and professional

    development of members.

    To expand by incorporating related disciplines intoour profession.

    To continue to be relevant and of benefit to the

    public.

    MISSION

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    10/19

    10

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    11/1911

    BASIC

    SERVICES

     ADDITIONAL

    Pre-Contract

    Post-Contract

    The scope of consultancy services to be

    carried out by the Consulting Q.S. shall

    comprise the following 

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    12/1912

    BASIC SERVICES

    Preparation of preliminaries estimates & cost plans.

    Preparation of bills of quantities & tender

    document.

    Preparation of tender reports & contractdocuments.

    Preparation of tender documents, tender reports &

    contract documents for Prime Cost Sum &

    Provisional Sum items. Valuation of works in progress for interim valuations

    including V.O.

    Preparation of final accounts.

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    13/1913

     ADDITIONAL SERVICES

    Preparation of feasibility studies including cash flow.

    Preparation of final costs for contracts based on

    provisional quantities.

    Pricing of bills of quantities or pricing & agreeingschedule of rates.

    Re-measurement of the whole or part of the

    building works.

    Preparation & attendance for arbitration/litigation.

    Preparation of documents & reports for pre-

    qualification of contractors.

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    14/1914

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    15/1915

    BASIC

    Pre-

    ContractPost-Contract

    Preparation of PreliminaryEstimates. E.g. PreliminaryDetailed Abstract (PDA) andCost Plans.

    Preparation of Bills ofQuantities, TenderDocuments and Tender TableDocument.

    Preparation of TenderEstimate.

    Preparation of As TenderedDetailed Abstract (ATDA)

    Preparation of ContractDocuments.

    Preparation of Tender Documents,Tender Estimates, Tender Reports andContract Documents for worksallowed under P.C. and ProvisionalSums other than those under thecharge of Mechanical and ElectricalConsultants.

    Valuation of Works in progress forInterim Valuation/Certificates,including measurement of variationworks and preparation of all relateddocuments for Variation of Work otherthan those under the charge ofMechanical and Electrical Consultant. 

    Preparation of Revised ATDA (ifnecessary) and Adjustments ofContract Sum.

    Preparation of Final Account and AsCompleted Detailed Abstract (ACDA).

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    16/1916

     ADDITIONAL SERVICES

    Preparation of Cost Analysis based on accepted

    Contract Sum.

    Preparation of Tender Price Index based on accepted

    Contract Sum.

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    17/19

    17

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    18/1918

  • 8/13/2019 Chapter 2 - Duties & Services by QS - PRE CONTRACT

    19/1919