City of Greater Geraldton 2012-2013 Budget
By Work Area
The attached work area statements are indicative in nature and do not form part of the statutory budget document
INDEX
Members of Council – Tony Brun ...................................................................................... 3
Office of the Chief Executive Officer – Tony Brun ............................................................ 5
Mullewa District Office – Tom Hartman .............................................................................. 7 Economic Development & Innovation - Karen Godfrey ...................................................... 9
Department of Treasury and Finance – Bob Davis ......................................................... 14
Finance – Kim Chua ........................................................................................................ 16 Finance – Paul Radalj ..................................................................................................... 17 Commercial Property Development – Brian Robartson .................................................... 19 Geraldton Airport– Bob Urquhart ..................................................................................... 23
Department of Sustainable Communities- Director Phil Melling ................................... 25
Urban and Regional Development – Murray Connell ....................................................... 27 Building Assessment – Dave Gibson (Acting) .................................................................. 29 Environmental Health & Sustainability – Mark Chadwick ................................................. 30 Community Law and Safety – Konrad Seidl ..................................................................... 33
Department of Community Infrastructure – Director Neil Arbuthnot ............................ 36
Operations – Gerard Sherlock ......................................................................................... 38 Works – Peter Faraone ................................................................................................... 40 Fleet and Support Services – Scott Carroll ...................................................................... 44 Parks Department – Kim Trotter ...................................................................................... 45 Aquarena – Jen Spriggs .................................................................................................. 48 Infrastructure Planning & Design – Mark Atkinson ........................................................... 50 Major Projects – Moneer Fates ........................................................................................ 52 Regional Energy and Waste – Mark Wong ...................................................................... 55
Department of Creative Communities – Director Andrea Selvey ................................... 59
Community Empowerment & Development ..................................................................... 61 Library & Heritage Services – Susan Smith ..................................................................... 65 Arts Culture & Events – Chris Budhan ............................................................................. 67 Bright Stars Family Day Care – Karen McDowell ............................................................. 69 Customer Service and Tourism– Jenny Rolston .............................................................. 71
Department of Organisational Performance – Director Cheryl Wood ........................... 74
Human Resources & Organisational Development – Delwen Granville ........................... 75 Governance and Risk – Towela Mutale ........................................................................... 77 Information Services ........................................................................................................ 79
2012-2013 Budget Overview by Work Area
Page 3 of 79
Members of Council – Tony Brun Elected Members of Council
Responsibilities: • Strategy • Local Laws • Policy • Appropriations • Oversight of CEO • Oversight of the City’s operations through the application of operations consistent
with the set Laws, Strategies, Policies and Appropriations as determined by Council.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income Operating Expenditure 1,139 Capital Expenditure Net amount appropriated to fund services
1,139
Significant Operating Projects for 2012-13:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Strategy 5.1.2: Strengthen and empower the Council
Member of Council
Operation of the elected Council
Operation of Council
Major Policy Initiatives: N/A Outcomes, Products or Services:
• Leadership of community • Stewardship of community assets and finances
Key Performance Indicators:
1. As determined by the department of Local Government
2012-2013 Budget Overview by Work Area
Page 4 of 79
Significant Issues for 2012-13:
1. Ongoing review of standards and the application of the new Integrated Planning Framework by the State Government.
2012-2013 Budget Overview by Work Area
Page 5 of 79
Office of the Chief Executive Officer – Tony Brun
Responsibilities: • Overall management and direction of the organisation
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (140) Operating Expenditure 739 Capital Expenditure 0 Net amount appropriated to fund services
599
Significant Operating Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Strategy 5.1.1: Provide visible leadership and advocacy for the greater good of the community
Strategic Initiatives
Projects relating to major initiatives and programs identified through the office of the CEO
Individual project delivery
$273
Significant Capital /Works Projects: Nil
Major Policy Initiatives: 1. Ongoing review of all Council Policies; 2. Review and implementation of the Integrated Planning Framework
Outcomes, Products or Services:
1. Executive leadership and coordination of the City’s operations 2. Administrative support of the Council including:
a. Policy b. Councillor engagement (Councillor Help desk) c. Council processes (e.g. meetings).
3. Delivery of strategies initiatives within the Community Strategic Plan 2011-2021 including:
a. Australian Square Kilometre Array Pathfinder and Square Kilometre Array Project;
b. Oakajee Port and Industry Precinct; c. Geraldton-Midwest Renewable Energy Hub; d. Smarter Cities and Digital Economies Initiatives
2012-2013 Budget Overview by Work Area
Page 6 of 79
4. Regional, State and Commonwealth Government affairs 5. International affairs.
Key Performance Indicators:
1. Effective delivery of decision of Council 2. Effective financial management of the organisation 3. Effective leadership for the organisation and within the community
Significant Issues for 2012-13:
1. The implementation of the new Integrated Planning Framework as required by the State Government (due 1st July 2013);
2. Implications of the carbon tax on City operations and finances; 3. Resolving and finalising long term strategic project such as Sporting Futures.
2012-2013 Budget Overview by Work Area
Page 7 of 79
Office of the Chief Executive Officer –Tony Brun Mullewa District Office – Tom Hartman
Responsibilities: • Mullewa District Office • Mullewa Special Projects • Mullewa Engagement & Planning
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (379) Operating Expenditure 1,607 Capital Expenditure 727 Net amount appropriated to fund services
1,955
Significant Operating Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Outcome 1.3: A safe, secure and supportive community
Community engagement
Engaging and empowering the community through the Mullewa Progress Association
Effective planning and prioritisations of initiatives
$113
Outcome 2.1: A diverse sustainable, economic and employment base
Economic & Social Development
Coordinate & implement community, Indigenous, Economic programs in Mullewa
A diverse & sustainable, economical & employment base
$104
2012-2013 Budget Overview by Work Area
Page 8 of 79
Significant Capital /Works Projects:
• Renewal of the Mullewa Recreation Centre Roof and improvements • Renewal of the Mullewa Town Hall roof and improvements • Continued upgrade of the Mullewa Waste Water Scheme • Development work on the Midlands Route of the Exploring Wildflower Country Trails
Project. • Development work for the Mullewa Town Revitalisation Project.
Major Policy Initiatives: Nil Outcomes, Products or Services: To ensure the effective management of the Mullewa District Office and maintaining a flow of information and compliance with organisational policy and practice, and to also ensures effective community engagement and liaison with the Mullewa community and ensuring a smooth transition following from the reform process. Key Performance Indicators:
1. Survey community members regarding their satisfaction of services provided in the Mullewa District;
2. Percentage of customer complaints received; and 3. Carryout rural roads and parks & open space programs for the Mullewa District on
time and on budget. Significant Issues for 2012-13:
1. Continue to work through any issues regarding the impact of the amalgamation; and
2. Continue to work with other relevant directory staff to provide appropriate services to the Mullewa District.
2012-2013 Budget Overview by Work Area
Page 9 of 79
Office of the Chief Executive Officer –Tony Brun Economic Development & Innovation - Karen Godfrey
Responsibilities: • Facilitate regional economic growth and tourism development; encourage a robust,
diverse and sustainable local economy. • Provision of media and marketing services to all business units/departments within
CGG • Ensure the public are kept informed of CGG programs and projects in a timely
manner
ECONOMIC DEVELOPMENT & INNOVATION
PR & Marketing
• Media engagement • Marketing • Web site development • Tourism Strategy
Economic & Foreign Affairs
• Economic development • Regional Economic development • Regional Cities Alliance • Digital Economy/Smarter Cities • Sister Cities
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 685 Capital Expenditure 0 Net amount appropriated to fund services
685
2012-2013 Budget Overview by Work Area
Page 10 of 79
Significant Operating Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Opportunities for Creativity: Outcome 3.4 Recognised internationally as a leader in the integration of research, sustainability and community empowerment
IBM Smarter Cities
Smart Energy Smart Data Smart Services
Three week project delivery of IBM Smarter Cities initiative to assist the City in achieving: Smart Energy – Creating a carbon neutral region which seeks to transform the application of Smart technology, the Geraldton and Mid West energy consumption and demand. Smart Data – Leveraging of the NBN architecture which results in Geraldton being the Point of Interconnect for the bulk of northern WA. Smart Services – Transforming relationships between the City and Agencies to improve services.
Opportunities for Creativity: Outcome 3.4 Recognised internationally as a leader in the integration of research, sustainability and community empowerment
NBN Digital Hubs
Two year Federally funded education program ($275k) to promote and enhance community’s digital knowledge and awareness of the NBN
Community Empowerment and Social Connectivity – through state of the art digital technology and training facilities, and platforms/apps to enable digital transformation within the community.
$275
Leading the Opportunities: Outcome 5.2.3 Actively utilise technology to support engagement and reporting processes
NBN Digital Local Government
Three year Federally funded program ($375k) to improve and transform the City services to the community through facilitation of the NBN and technology.
Community Empowerment and Social Connectivity – through state of the art digital technology and internal training facilities, and platforms/apps to enable digital transformation within the City and community.
$375
2012-2013 Budget Overview by Work Area
Page 11 of 79
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
A diverse sustainable, economic and employment base
NBN Digital Enterprise
Two year Federally funded program ($275k) to encourage business and community associations (not for profits_ to take up NBN for improved business and community outcomes.
Community Empowerment and Social Connectivity – through state of the art digital technology and internal training facilities, and platforms/apps to enable digital transformation within the City and community
$275
Outcome 2.3 Greater Geraldton as a major regional centre 2.3.3 – Increase the national and international profile of Greater Geraldton through partnerships with Government, industry and international municipalities.
Regional Capitals Alliance
A strategic approach and collaboration to regional development within Western Australia and Australian Regional Capitals
A more collaborative approach for better outcomes for regional development within Western Australia and Australia for regional capital cities.
$287
Outcome 2.3 Greater Geraldton as a major regional centre 2.3.3 – Increase the national and international profile of Greater Geraldton through partnerships with Government, industry and international municipalities.
Sister Cities Project
To implement the Sister Cities Policy and increase international relationships
Collaboration and promotion in enhancing economic development cross cultural community development, international cooperation and educational exchanges and learning.
$55
2012-2013 Budget Overview by Work Area
Page 12 of 79
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
5.2 Citizen and stakeholder focused services
Internal delivery of services in media and marketing. External engagement with media, Web development and promotion of CGG business units through the units home page.
Provision of media and marketing services to all business units/departments within the city of Greater Geraldton
Ensure the community are kept well informed of CGG programs and projects in a timely manner. Improved relations with media. Provide timely accurate and consistent media and marketing advice internally and externally
$55
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Nil Outcomes, Products or Services: Key Performance Indicators:
1. Deliver Digital Strategy, Digital Action Plan, Digital Engagement & Communications Strategy, Digital Directions – Online Services Strategy by June 2013.
2. Successful implementation of the Digital Hubs (2 year program), Digital Enterprise (2 year program) and Digital Local Govt program (3 year program) respective Stage I, by June 2013.
3. Successful delivery of the IBM Smarter Cities Project by November 2012. 4. Media Engagement Strategy by June 2013. 5. Integrated marketing and branding Strategy by June 2013. 6. Progression towards Sister City relations with China in accordance with the sister
City Relationships Council Policy CP024. 7. Deliver six monthly economic snapshot reports on the state of the economy for
Geraldton.
2012-2013 Budget Overview by Work Area
Page 13 of 79
Significant Issues for 2012-13:
1. Negotiations with the Commonwealth and State Government over the rollout of the NBN;
2. Resourcing of key delivery outcomes; and 3. Managing expectations from the IBM Smarter Cities Challenge and the roll out of the
NBN.
2012-2013 Budget Overview by Work Area
Page 14 of 79
Department of Treasury and Finance – Bob Davis
Responsibilities: • Leading the Department of Treasury and Finance with responsibility for executive
functions, strategic policy and development and the efficient and effective operations of the Department.
• Responsibility for ensuring all relevant statutory compliance obligations related to the Department are met.
• Undertaking the role of Chief Financial Officer • Land and Property Development • Planning, development and operation of Geraldton Regional Airport
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 305 Capital Expenditure Net amount appropriated to fund services
305
Significant Operating Projects: Refer to details listed for Finance, Airport and Land / Property.
Significant Capital /Works Projects: Refer to details listed for Finance, Airport and Land and Property.
Major Policy Initiatives: Review of financial sustainability policy framework, consistent with Local Government Integrated Planning framework, and development of 10 year financial plans. Outcomes, Products or Services:
• Leasing and development of property and land owned or vested in the City • Geraldton Airport planning, development and operation • Operation and control of expenditures and revenues with efficient and effective
financial systems
Key Performance Indicators:
1. Maintaining less than 10% variance from Budgets across the financial year. 2. Effective and timely collection of City revenues. 3. Effective management of City investment and loan portfolios.
2012-2013 Budget Overview by Work Area
Page 15 of 79
4. Introduction of innovation in financial management and accounting procedures and practices including workflow automation and improved management reporting systems.
5. Achievement of progress with major land subdivision, development and sale projects to generate funding for the City.
6. Implementation of Airport Master Plan objectives including completion of stage one Car Park project and progress in development of the Airport Technology Park project.
Significant Issues for 2012-13:
• External pressure on revenues and funding, flowing from State and Federal policies and Budgets, including Carbon Tax impacts.
• Post-GFC stabilisation issues in the Eurozone and Americas and potential for impacts on Australian economic activity levels, with flow-on effects to the Mid-West.
• Rapid expansion in use of Geraldton Airport facilities putting pressure on existing facilities.
• Progressing major land development projects including Olive Street, Verita Road, Cape Burney, Eastward Rd Depot site.
2012-2013 Budget Overview by Work Area
Page 16 of 79
Department of Treasury and Finance – Director Bob Davis Finance – Kim Chua
Responsibilities: To provide timely and accurate financial information, in accordance with statutory accounting principles and practices, to the work areas of the City to enable them to properly manage their operations and activities.
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (44,611) Operating Expenditure 1,644 Capital Expenditure 8,512 Net amount appropriated to fund services
(34,455)
Significant Operating Projects: Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
4.4.2 Achieving statutory compliance
Long Term Financial Plan
Developing long term financial management tools to ensure sustainability
Financial systems integration and organisational structure change
100
Significant Capital /Works Projects:
Major Policy Initiatives: Nil Outcomes, Products or Services:
1. Complete Financial Audit by October 2. Annual electors meeting by December
Key Performance Indicators:
1. Non-qualified financial audit report. 2. Better user knowledge of the accounting and power budget system. 3. Annual budget adoption by June.
Significant Issues for 2012-13:
Financial Sustainability Major funding opportunities Improve cash surplus and accounting ratios
2012-2013 Budget Overview by Work Area
Page 17 of 79
Department of Treasury and Finance – Bob Davis Finance – Paul Radalj
Responsibilities:
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 239 Capital Expenditure 0 Net amount appropriated to fund services
-239
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
5.1 Leadership and Good Governance
Community Grants
Biannual funding to support “one off” community events/activities/projects
Empowering the community to provide outcomes linked to Council’s Strategic & community plans
$360
Recurrent Grants
Recurrent funding over a triennial period that supports ongoing community events/activities/projects
Empowering the community to provide outcomes linked to Council’s Strategic & community plans
$381
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Nil
2012-2013 Budget Overview by Work Area
Page 18 of 79
Outcomes, Products or Services:
• Maintain and efficient and effective grants management system • Long term and forward capital budget planning • Effective reserve utilisation and investment returns • Business analytical application and measurement of business performance
Key Performance Indicators:
1. Development and implementation of business analytics to measure organisation financial performance.
2. Update and profile Council’s forward capital plan by 28th February 2013 3. Development and continual update of investment plans and evaluation of land
development proposals
Significant Issues for 2012-13:
• Minimising debt costs and maximising rates of return associated with land development to increase strategic Cash Reserves associated with asset development and in support of funding opportunities.
2012-2013 Budget Overview by Work Area
Page 19 of 79
Department of Treasury and Finance – Bob Davis Commercial Property Development – Brian Robartson
Responsibilities: • The facilitation of the statutory obligations, maintenance, development and
achievement of outcomes relating to land and property development, land rationalisation and leasing.
• City land and property management – leases, contracts, agreements, vesting orders, titles easements and management orders
• Custodian of Capital and Recurrent expenditure budgets for all buildings • Facilitation of programmed preventative and operational (break/fix) maintenance
services. • Development and the project management of land for sub-division and land sale
projects.
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (6,085) Operating Expenditure 23,087 Capital Expenditure 0 Net amount appropriated to fund services
17,002
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 5.2.1.0 Ensure economical, efficient and effective delivery of services
Formulate a building management policy
Preparation of building management policy
Purchaser/provider maintenance model for City building assets
Strategy 5.2.1.0 Ensure economical, efficient and effective delivery of services
Formulate a building business model
Preparation of building business model
Model for rental charging for all tenancies for ALL tenants of City buildings.
2012-2013 Budget Overview by Work Area
Page 20 of 79
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Strategy 4.1.3: Lead and facilitate innovative urban design that provides for diverse built form that meets the needs of our existing and future communities. Strategy 1.2.2 Provide attractive, well planned and multi-use POS
Olive Street Property Development
Wetland development and preparation of final detailed design documentation
Wetlands development and creation & disposal of residential lots
$6,000
Strategy 3.1.1: Create vibrant and diverse neighbourhoods that meet local and regional needs Strategy 4.1.3: Lead and facilitate innovative urban design that provides for diverse built form that meet the needs of our existing and future communities
Boyd Street Development
Planning, subdivision & remediation
Creation of residential/industrial lots for disposal
$2,000
2012-2013 Budget Overview by Work Area
Page 21 of 79
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Strategy 4.1.3: Lead and facilitate innovative urban design that provides for diverse built form that meet the needs of our existing and future communities
Eastward Road (Depot) Development
Planning, subdivision & remediation
Creation of residential/industrial lots for disposal
$1,500
Strategy 3.1.1: Create vibrant and diverse neighbourhoods that meet local and regional needs Strategy 4.1.3: Lead and facilitate innovative urban design that provides for diverse built form that meet the needs of our existing and future communities
Kempton Street Property Development
Planning, rezoning & consultation
Creation of residential lots for disposal.
$3,765
Strategy 3.1.1: Create vibrant and diverse neighbourhoods that meet local and regional needs Strategy 4.1.3: Lead and facilitate innovative urban design that provides for diverse built form that meet the needs of our existing and future communities
North West Coastal Highway Development
Planning, rezoning & consultation
Creation of residential lots for disposal and POS
$100
Strategy 4.4.4: Deliver projects utilising best practice contemporary systems targeting time, cost and quality outcomes
Airport Technology Park
Development and construction of Stage 1 of the Airport Technology Park including the provision of all services utilities
Creation of commercial/ industrial lots for disposal by way of lease. Development of strategic freehold lots for disposal
$7,656
2012-2013 Budget Overview by Work Area
Page 22 of 79
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Nil Outcomes, Products or Services:
• Administering the City’s land leasing arrangements. • Preparation of all new and existing lease renewal documentation. • Conversion of crown land to freehold with the approval of the State Government to
develop significant residential estates, POS subdivisions. • Management of the City’s land acquisition, development and disposal program • The generation of sufficient income, and control of expenditure, of the core
commercial activities to sustain the City’s capital development program financial needs.
Key Performance Indicators:
1. 1. % of project milestone achieved within time and budget 2. % of annual feasibility study reviews undertaken for multi-year projects 3. Net budget vs Actual Variance 4. % of lease renewals and issues in compliance with local government
Significant Issues for 2012-13
• Ability to sell land will be dependent upon market forces, supply and demand for land, economic situation.
• Willingness (or otherwise) of State Government (Department for Regional Development and Lands) to dispose of land or swap it for other land.
• Planning Minister agreeing to dispose of excess POS land or utilisation of funds.
2012-2013 Budget Overview by Work Area
Page 23 of 79
Department of Treasury and Finance – Bob Davis Geraldton Airport– Bob Urquhart
Responsibilities: To ensure airport facilities are developed, maintained and operated effectively and efficiently within Federal, State and Local Government regulatory requirements and community expectations.
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (4,320) Operating Expenditure 2,330 Capital Expenditure 4,203 Net amount appropriated to fund services
2,213
Significant Operating Projects: Nil
Significant Capital /Works Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
4.2.3 Develop regional air services
Airport Car park Introduction of paid parking
Financial contribution toward airport upgrades by users of the facility
$1,500
4.2.3 Develop regional air services
Departure Lounge Extension
Expand security lounge to accommodate increased passenger numbers
Facilitating the ongoing expansion of the Geraldton Airport
$1,000
4.2.3 Develop regional air services
General Aviation Apron
Relocate general aviation apron due to RPT security expansion
Facilitating the ongoing expansion and operation of the Geraldton Airport
$700
4.2.3 Develop regional air services
Taxiway and Security Apron Upgrade
Taxiway modification
Allow segregation of general aviation and RPT services
$100
2012-2013 Budget Overview by Work Area
Page 24 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
4.2.3 Develop regional air services
Air Services Building Refurbishment
Refurbish Air Services building as General Aviation Terminal
Provision of replacement terminal for the Brearley Terminal
$100
Major Policy Initiatives:
• Upgrade of the Airport parking facility to allow for parking management and paid parking.
• Expand departure lounge to accommodate increase in passenger numbers. • Modifications and upgrades to taxiways, security and general aviation aprons to
segregate RPT and general aviation operations.
Outcomes, Products or Services: To facilitate RPT, security screened services, general aviation and fly in fly out aircraft movements and passenger traffic servicing to and from the Midwest.
Key Performance Indicators:
1. Ensure construction of new general aviation apron north of the Airservices Australia building and acquit RADS Grant by May 2013.
2. Ensure Airport compliance with Office of Transport Security regulations 3. Ensure Airport compliance with Civil Aviation Safety Authority regulations
Significant Issues for 2012-13:
1. Staffing levels may inhibit significant capital works projects and overall operation of the Geraldton Airport. (Airport Manager 3 month’s long service leave). An application for an additional staff member is currently being processed.
2012-2013 Budget Overview by Work Area
Page 25 of 79
Department of Sustainable Communities – Director Phil Melling
Responsibilities: • Leading the Sustainable Communities Department with responsibility for executive
functions, strategic policy and development and the efficient and effective operations of the Department.
• Responsibility for ensuring all relevant statutory compliance obligations related to the Department are met.
• Undertaking the role of City Planner and Chief Regulator
Budget Summary: 2012-13
$ ’000 Budget
Operating Income 0 Operating Expenditure 361 Capital Expenditure 0 Net amount appropriated to fund services
361
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 1.3.4: Advocate improvements in housing affordability and access to appropriate housing
Building Better Regional Cities- Karloo Wandina Housing Affordable Housing Project
Karloo Wandina affordable housing development
To facilitate construction of key infrastructure to deliver affordable housing
Capital works expense
Strategy 4.1.1: Lead the development of innovative, strategic and sustainable urban, rural and regional planning & also linked with Strategy 3.4.2: Partner with research institutions in progressing innovative research and evidenced based policy development and advocacy
Cooperative Research Centre Projects
- Low Carbon Cities & Water Sensitive Cities
Partnering with research institutions to develop leading innovative sustainability outcomes with the potential for the City to pilot leading edge initiatives in the Low Carbon Cities & Water Sensitive Cities projects.
Significant Capital /Works Projects: Nil
2012-2013 Budget Overview by Work Area
Page 26 of 79
Major Policy Initiatives:
• Building Better Regional Cities -Karloo- Wandina Affordable Housing Project (in conjunction with the Director of Community Infrastructure).
• W.A. Regional Cities’ Alliance Local Planning Strategy/ Scheme Initiative • Cooperative Research Centre Projects- Low Carbon Cities & Water Sensitive Cities • 2029 and Beyond Precinct Planning -Rangeway/ Karloo/ Utakarra & Sunset Beach
Outcomes, Products or Services:
• Leadership of the Department of Sustainable Communities • Progressing and implementing a sound strategic planning framework for Greater
Geraldton that meets the needs of today and tomorrows community. • 2029 and Beyond – implementation of Designing our City forum outcomes in
conjunction with the Director of Creative Communities • Facilitating and achieving successful sustainability outcomes for the City and its
community
Key Performance Indicators:
1. Progress the development of the new Local Planning Strategy and an Integrated Performance Based Town Planning Scheme
2. Forming alliances and partnership with research institutions leading to involvement in CRC's
3. Progression of the Commercial, Residential Strategies
Significant Issues for 2012-13:
• Co-ordination on major policy initiatives that impact on the City of Greater Geraldton, for example Oakajee- Narngulu Infrastructure Corridor..
• Legislative changes that impact on the City’s service delivery and resources
2012-2013 Budget Overview by Work Area
Page 27 of 79
Department of Sustainable Communities- Phil Melling Urban and Regional Development – Murray Connell
Responsibilities: To provide a proactive town planning framework, timely processing of applications and a strategic town planning direction that more sustainably meets community/business expectations and needs
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (396) Operating Expenditure 885 Capital Expenditure 0 Net amount appropriated to fund services
489
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Goal 4 Outcome 4.1 Strategy 4.1.1
Strategic planning
Various strategic town planning projects
To facilitate strategic planning and enable contribution to strategic planning projects undertaken by other agencies
$75
Goal 4 Outcome 4.1 Strategy 4.1.4
Local Planning Scheme and Strategy
Formulation of a single Local Planning Scheme and Strategy
A more performance based, contemporary town planning instrument to guide future development
$50
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Nil
2012-2013 Budget Overview by Work Area
Page 28 of 79
Outcomes, Products or Services:
• Maintain current assessment times for statutory planning. • Complete a number of components for a new combined Local Planning Strategy and
Local Planning Scheme including a Residential Strategy, Commercial Activity Centres Strategy and Public Open Space Strategy.
• Completion of two precinct plans- Rangeway/ Karloo/ Utakarra & Sunset Beach.
Key Performance Indicators:
1. Assessment of 80% of Applications for Development Approval within 15 working days.
2. Assessment of 80% of applications referred by the WA Planning Commission within 30 working days.
3. Assessment of 80% of Applications for Planning Assessment within 5 working days
Significant Issues for 2012-13:
• Oakajee Project. • Planning and Building reforms and legislative changes. • Prioritisation of significant projects from other Agencies which require Town Planning
input.
2012-2013 Budget Overview by Work Area
Page 29 of 79
Department of Sustainable Communities- Phil Melling Building Assessment – Dave Gibson (Acting)
Responsibilities: • Carry out the City’s statutory requirement of processing building licences via all
relevant legislation and the Building Code of Australia. • Working with industry to fund, project manage and carry out projects that show and
promote energy efficiency and sustainability in the built environment.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (362) Operating Expenditure 937 Capital Expenditure 0 Net amount appropriated to fund services
575
Significant Operating Projects: Nil
Significant Capital /Works Projects: Nil
Major Policy Initiatives:
• Continuing and refining the introduction of the on- line building application system. • Promoting the ability of the City to provide building certification services to the
building industry and public. Outcomes, Products or Services:
• Managing & implementing the new building Act. • Manage expected increased building activity as the region continues to develop
ongoing education and work program with builders, architects and industry. Key Performance Indicators:
1. To assess uncertified applications within 25 working days. 2. To assess certified applications within 10 working days. 3. To achieve assessment of 80% of building applications within 15 working days
Significant Issues for 2012-13:
• Further legislative change as a result of the new Building Act & Building Code of Australia amendments.
• The introduction of private certification to the building approval process.
2012-2013 Budget Overview by Work Area
Page 30 of 79
Department of Sustainable Communities- Phil Melling Environmental Health & Sustainability – Mark Chadwick
Responsibilities: Deliver environmental health (public health) program services including meat inspection, food and water safety, pest control, indigenous health, and surveillance of regulated businesses and response to public complaints on public health risks. Carry out funded projects on healthy community initiatives.
Implement environmental sustainability projects relating to; natural resource management and biodiversity, climate change adaptation and mitigation, water conservation, water and energy efficiency. Support community engagement initiatives such as; one million trees project, community nursery, living smart and school environmental education.
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (504) Operating Expenditure 1,725 Capital Expenditure 100 Net amount appropriated to fund services
1,321
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
1.1.1: Advocate and promote access to high quality medical and other health facilities and services for the people of Greater Geraldton
Indigenous Environmental Health Worker Program and Regional Forum
External funded indigenous environmental health service delivery
Improved environmental health and agency collaboration
$158
1.1.2: Promote active, healthy lifestyle options for seniors 1.2.1 Provide accessible active and passive recreational spaces
Go Gero Getting Active Eating Well Made Easy Project
External funded Healthy Communities Initiative implementation
Improved physical activity and nutrition for adult target groups
$142
2012-2013 Budget Overview by Work Area
Page 31 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
4.3.3: Protect biodiversity and provide landscape management through effective conservation and rehabilitation
One Million Trees Project / Community Nursery
2029 Vision towards planting of one million trees by 2013
Achieve 2029 aspiration/increase biodiversity and social benefits
$20
4.3.1: Advocate and progress towards zero waste and carbon neutrality principles and practices and progress towards climate change mitigation and adaptation principles and practices
Energy Efficiency and Renewable Energy Projects
Implement corporate energy projects that reduce the City’s carbon footprint
Reduction in carbon footprint / increased use of renewable energy and efficiency technologies
$150
Significant Capital /Works Projects:
Continue installation of solar photovoltaic arrays, investigate geothermal energy generation, energy efficient water / air handling and lighting systems for City buildings. Establishment of fit for purpose community nursery at Lot 4 Adelaide Street Waggrakine for use by volunteers and to propagate seedlings for the one million trees project. Major Policy Initiatives: Carbon Management Physical Activity and Nutrition Indigenous Environmental Health Feral Animal and Bird Control Outcomes, Products or Services: Environmental Health
• Inspect all 400 plus regulated premises at least once a year. • Ongoing implementation of food safety stars program and increase number of
premises with star rating from 70% to 80%. • Conduct routine assessments of public aquatic facilities and sampling of City’s
beaches and rivers. • Implement Go Gero Getting Active Eating Well Made Easy project. • Implement indigenous environmental health worker programs and chair agency
forums.
2012-2013 Budget Overview by Work Area
Page 32 of 79
Environmental Sustainability
• Complete Carbon Inventory and real time energy monitoring with Planet Footprint and Greensense subscriptions.
• Continue to coordinate climate change adaptation and mitigation planning. • Deliver community sustainability programs including business and community
organisation energy audits, living smart courses and education seminar partnerships with NACC and Durack Institute of Technology.
• Deliver community nursery and one million trees project. • Participate in collaborative research projects on water and carbon management. • Develop actions to address local biodiversity strategy and natural areas assessment.
Key Performance Indicators:
1. Increase (10%) in total businesses achieving 5 star food safety rating. 2. Establishment of new Community Nursery and three Community Gardens. 3. Reduction (7%) in carbon emissions by implementing energy generation and
efficiency initiatives in City buildings .
Significant Issues for 2012-13:
Participation in collaborative research centres for sensitive urban water design, water conservation and water and energy efficiency will be a significant challenge for the team.
The Go Gero project timeframe for delivery has been extended; with no additional budget it will require renegotiation and reallocation of funding. Agency participation and ownership of activity delivery will continue to be challenging limited by commitment and capacity levels.
The establishment of an expanded community nursery at a new site in Waggrakine will be a significant challenge to recruit additional volunteers and sponsors to grow proposed 250,000 seedlings in 2013.
New Public Health Act proposed to be introduced in 2013 will provide some challenges for the environmental health team to adapt to new regulations and implementing local laws.
Recruitment of Environmental Health Officers will continue to be difficult with lack of graduates in the degree courses in Western Australia and decline in local government positions being filled as graduates and experienced officers move into higher paid jobs in state government and private sector. This will increase the use of contracted officers at much higher pay rates impacting on the operational budget.
The City’s feral pigeon population has increased due to buildings being neglected and ineffective control programs, this will be a significant issue to address in 2013 for eradication and prevention of new breeding in the CBD to minimise negative impacts on buildings and potential health hazards.
2012-2013 Budget Overview by Work Area
Page 33 of 79
Department of Sustainable Communities- Phil Melling Community Law and Safety – Konrad Seidl
Responsibilities: To ensure a safe, secure and supportive community by providing quality services in the areas of:
• Emergency Management • Rural Fire Prevention and Response • Crime Prevention • Animal Control • Parking Control • Compliance of Local Laws
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (844) Operating Expenditure 2,233 Capital Expenditure 867 Net amount appropriated to fund services
2,256
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 1.3.1 Support effective community emergency services and animal management
Animal Services to meet Statutory Requirements
Investigate needs of Council to meet expectations of the Dog and Cat Act in terms of resourcing and providing an efficient service.
To enable the City to meet obligations of the Dog and Cat Act.
2012-2013 Budget Overview by Work Area
Page 34 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 1.3.1 Support effective community emergency services and animal management
Emergency Management and Planning
Planning, preparing and meeting Statutory Emergency Management obligations for the City of Greater Geraldton
To ensure a safe and secure City of Greater Geraldton.
$35
Strategy 1.3.1 Support effective community safety and crime prevention
CCTV Mullewa Establish a CCTV system in Mullewa
Enhance Community Safety in Mullewa
$125
Strategy 5.1.3 Implement business, governance, compliance and legislative frameworks
New Local Laws
Finalise and implement new local laws
Enable a Safe, secure and supportive community.
$20
Significant Capital /Works Projects:
Expansion and Renewal of Pass Street Pound to meet requirements of the Dog and Cat Act. Major Policy Initiatives: Finalise the new Community Safety Crime Prevention Plan Outcomes, Products or Services:
• Crime Prevention Initiatives • Animal Control • Off Road vehicle Control • Caravan and Camping • Parking Control • Administering the Local Emergency management Committee and meeting Statutory
requirements of the Emergency Management Act • CCTV • Community Safety Community Awareness Programs • Fire Control
2012-2013 Budget Overview by Work Area
Page 35 of 79
Key Performance Indicators:
1. Ensure that the City is compliant with the Local Emergency Management Act 2. Ensure the Community Safety Crime Prevention Committee is administered and
provides initiatives toward a safer community in line with the set priorities of the Community Safety Crime Prevention plan
3. Ensure that the Pass Street pound can accommodate the future needs of the City of Greater Geraldton in terms of the Dog and Cat Act.
4. Enhance Local Governments Fire response and responsibilities as determined by statutory obligations.
Significant Issues for 2012-13:
• Integrate Ranger Service in Mullewa • Expand and Renew the Pass Street Pound to accommodate for demand with Dogs
and new Cat Legislation • Investigate and implement the legislative requirements of the City of Greater
Geraldton as per the Cat Act. • Finalise the Local Law Project and recommendations. • Implement the Parking Management Plan directions as to be resolved by Council.
2012-2013 Budget Overview by Work Area
Page 36 of 79
Department of Community Infrastructure – Director Neil Arbuthnot
Responsibilities: • Leading the Department of Community Infrastructure with responsibility for executive
functions, strategic policy and development and the efficient and effective operations of the Department.
• Responsibility for ensuring all relevant statutory compliance obligations related to the Department are met.
• Performing the role of City Engineer • Plan and deliver quality infrastructure to the benefit of the Community for the long
term.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 625 Capital Expenditure 0 Net amount appropriated to fund services
625
Significant Operating Projects: Refer to details listed for Works/Parks/Major Projects/ Infrastructure Planning Design and Asset Management/ Operations/ Regional Waste and Energy/ Fleet and Support Services
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Opportunities for Sustainability
Various Road / Parks and Operating Infrastructure and Service Programs
1. Asset Renewal Maintenance Improvement and Management.
2. Parks, Leisure, Works and Waste Management Services Delivery
1.Improved Transport and Accessibility.
2.Infrastructure that meets community growth needs and aspirations and
3.Environmental Sustainability
Through Maintaining and Improving the City’s Asset Base and managing Regional Waste Services.
2012-2013 Budget Overview by Work Area
Page 37 of 79
Significant Capital /Works Projects:
Refer to details listed for Parks/ Major Projects/ Infrastructure Planning Design and Asset Management /Operations/ Regional Waste and Energy/ Fleet and Support Services. Major Policy Initiatives: Implementation of Land Development Engineering Guidelines Outcomes, Products or Services: Projects, Programs and Services that meet or exceed the Goals and Outcomes of the City of Greater Geraldton Strategic Community Plan 2011 – 2012. Key Performance Indicators:
1. Complete Projects and Programs in accordance with City Policies and Procedures to Scope, Quality, Program and Budget.
Significant Issues for 2012-13:
1. Improve the delivery of services through the:- a. Development of agreed Service Levels for all operational services provided by
the Department and, b. Develop Service Level Agreements with Project Proponents for delivery of capital
projects. 2. Improvement in employee engagement and satisfaction through:-
a. Continued communication and participation by Management at the shop floor relevant to the work area issues in particular and organisation in general.
2012-2013 Budget Overview by Work Area
Page 38 of 79
Department of Community Infrastructure – Neil Arbuthnot Operations – Gerard Sherlock
Responsibilities: • Managing the maintenance of all civil works infrastructure for the city and surrounding
districts which provide a foundation for the community needs. • Managing the maintenance of all recreational parks, gardens and infrastructure to a high
safety standard for all users so that they can enjoy a healthy and friendly environment. • Managing all depot sites and operations while ensuring the cost effective
replacement and maintenance of the City’s fleet and plant assets. • Managing the city’s Aquarena asset to ensure that the facility is operating cost
effectively and safely.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 311 Capital Expenditure 110 Net amount appropriated to fund services
421
Significant Operating Projects:
Full details contained under Works, Fleet and Support Services, Aquarena and Parks.
• Infrastructure renewals and expansion programmes including Mullewa district Infrastructure
• Fleet management programmes
Significant Capital /Works Projects:
Full details contained under Works, Fleet and Support Services, Aquarena and Parks.
• Airport car park. • Airport apron and taxiway. • Depot renewal. • Road, street and infrastructure programmes including Mullewa district
Major Policy Initiatives: Nil
2012-2013 Budget Overview by Work Area
Page 39 of 79
Outcomes, Products or Services: Provision of Community Infrastructure support services. Develop and maintain infrastructure requirements and services to meet the Community needs:
• Road, path and cycle way networks. • Recreational parks and gardens, • Aquatic centre swimming facility. • Sanitation services.
Key Performance Indicators:
1. All works are completed within budget and to scope and programme. 2. All services are provided in accordance with city operational policies, procedures and
legislative instruments. 3. All works are carried out in accordance with relevant standards and specifications. 4. Ensure that all work practices are carried out in a safe manner, with all potential risks
identified and where possible reduced or eliminated, resulting in a specified lost time injury ratio of less than 1.
Significant Issues for 2012-13:
• Fully utilise and implement change management programs over the next financial year resulting in the improvement of efficiency and quality of service and systems including HP TRIM, Project Management Framework, Peoplestreme and Interplan.
• Increase the delivery of customer service standards across the City over the next financial year resulting in: a) help desk enquiries actioned within designated timeframes b) customer service satisfaction remains at current level or increase including the annual phone survey. c) all correspondence is actioned within designated time frames whilst ensuring feedback is correct, accurate and precise
2012-2013 Budget Overview by Work Area
Page 40 of 79
Department of Community Infrastructure – Neil Arbuthnot Works – Peter Faraone
Responsibilities: Works Department is responsible for the maintenance, renewal and minor upgrade of rural and urban roads, drains, footpaths and signage while promoting a cost effective, efficient delivery of these services to the community.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 30,673 Operating Expenditure 14,328 Capital Expenditure 36,101 Net amount appropriated to fund services
-19,756
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
1.2.2 Develop a functional network of roads, paths and drainage
Gravel & Pavements
Maintenance grading , dust control ,gravel patching stabilisation
Maintain safe and functional unsealed roads
$1,093
1.2.2 Develop a functional network of roads, paths and drainage
Road seals pothole patching, mill & patch chip seals
Maintain a safe network of sealed roads
$493
1.2.2 Develop a functional network of roads, paths and drainage
Verges Wash-outs & contouring
Minimise and repair damage to verges during and after storm events
$159
1.2.2 Develop a functional network of roads, paths and drainage
Underground Drainage
Repair & control damage to drainage, gullies & side entries, pit cleaning
Maintain a function underground drainage infrastructure
$422
2012-2013 Budget Overview by Work Area
Page 41 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
1.2.2 Develop a functional network of roads, paths and drainage
Pathways Repair & control damage to footpaths i.e. broken slabs
Maintain and improve pedestrian access throughout the City
$416
1.2.2 Develop a functional network of roads, paths and drainage
Bridges/Major Culverts
Periodical inspections & repairs to bridges & major culverts
Repair and maintain major culverts throughout the City and minimise flooding risks
$35
1.2.2 Develop a functional network of roads, paths and drainage
Reinstatements Service trench reinstatements roads and paths
Minimise disruptions to the road and path network
$150
1.2.2 Develop a functional network of roads, paths and drainage
Street Lighting Repair & control damage to street lighting
Maintain a safe road and path infrastructure to the city after hours
$70
1.2.2 Develop a functional network of roads, paths and drainage
Street Furniture Repair & control damage to street furniture
Repair and maintain bus shelters to improve transport within the City
$40
1.2.2 Develop a functional network of roads, paths and drainage
Signage Repairs, Renewal and printing of signs and banners
Maintain clear wayfinding throughout the City
$372
1.2.2 Develop a functional network of roads, paths and drainage
Street Sweeping
Daily sweeping of CBD and programmed sweeping of other areas Including car parks
Provide a clear road and drain network for the City
$404
1.2.2 Develop a functional network of roads, paths and drainage
Line marking Renewal of parking bays and car park line marking
Provide clear parking provisions
$80
1.2.2 Develop a functional network of roads, paths and drainage
Pathway Sweeping & Spraying
Sweeping & spraying of CBD paths and programmed sweeping & spraying of other areas
Provide safe and clean path network
$343
2012-2013 Budget Overview by Work Area
Page 42 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
1.2.2 Develop a functional network of roads, paths and drainage
Shoulders & Open Drains
Shoulder repairs and visual clearing
Provide a safe road infrastructure to the community
$50
Significant Capital /Works Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome 2012-13 ‘000 Budget
1.2.2 Develop a functional network of roads, paths and drainage
Upgrade of Roads and Drains
Various roads and streets
Improve a functional network of roads, paths and drainage
$30,812
1.2.2 Develop a functional network of roads, paths and drainage
Renewal of Roads and Drains
Various roads and streets
Maintain a functional network of roads, paths and drainage
$3,915
1.2.2 Develop a functional network of roads, paths and drainage
Road Recycling Continue the use of recycled Road, Kerb and rubble for alternative road building materials
Investigate and promote recycling of road waste to the City
$100
Major Policy Initiatives: Nil Outcomes, Products or Services:
• Addressing maintenance and customer service issues proactively • Comprehensive maintenance of the City’s roads, drainage and signage assets • Undertake a whole of life approach to asset maintenance • Implementing a system of service level agreements for asset maintenance. • Develop Schedules and programming to improve and maintain a cost effective and
realistic service level. Key Performance Indicators:
1. Employee Engagement -Increase the Employee Opinion Survey Result over the next financial year whilst ensuring that all performance measures continue to be achieved.
2. OH&S - Ensure that all work practices within your department / team are carried out in a safe manner, with all potential risks identified and where possible reduced or eliminated, resulting in a specified lost time injury ratio within the next 12 months.
2012-2013 Budget Overview by Work Area
Page 43 of 79
3. Customer Service- Respond to customer service requests within the customer service charter timeframes, providing details in relation to the timeframe that customer service requests will be addressed.
Significant Issues for 2012-13:
After identifying priority services within the Works Department and carrying out cost and resource analysis in 11/12 it was determined that the major issues that Works will face in 12/13 is lack of people resources to carry out the required services in the areas of:
• Reach Mowing (road shoulder mulching of wattles) • Underground Drainage cleaning and Inspections (high pressure water jetting and
camera inspections to identify renewal requirements to the failing drainage systems) • Spraying of kerb lines, rural shoulders and sumps (reduction in road damage and fire
risks)
2012-2013 Budget Overview by Work Area
Page 44 of 79
Department of Community Infrastructure – Neil Arbuthnot Fleet and Support Services – Scott Carroll
Responsibilities: • Ensuring the cost effective replacement and maintenance of the City’s fleet and plant
assets. • Ensuring the recovery of internal revenue for the plant replacement. • Ensuring the depot sites are operated in an efficient and effective manner.
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (892) Operating Expenditure 1,780 Capital Expenditure 5,179 Net amount appropriated to fund services
6,067
Significant Operating Projects: Nil Significant Capital /Works Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
4.3.3 Provide a safe place to work
Fleet and Plant Purchases
Renewal of fleet and plant
Provision of safe and efficient fleet and plant to provide effective operations
$3,088
Major Policy Initiatives: Nil Outcomes, Products or Services: • Consolidate fleet information to enable an efficient and effective fleet for the provision of
services to the community. Key Performance Indicators:
• Review/ report on Plant/ Vehicle efficiencies and provide recommendations • Complete Fleet Budget and Purchases by March 2013 • Review and recommend changes to vehicle operational policies yearly
Significant Issues for 2012-13:
The accumulation of internal charges revenue to fund the Plant and Equipment replacement schedule
2012-2013 Budget Overview by Work Area
Page 45 of 79
Department of Community Infrastructure – Neil Arbuthnot Parks Department – Kim Trotter
Responsibilities: • To maintain all recreational parks, gardens, sports grounds and facilities to a high safe
standard for all users to enjoy a healthy and safe environment.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (3,636) Operating Expenditure 7,530 Capital Expenditure 8,811 Net amount appropriated to fund services
12,705
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
1.2.4 Provide accessible active and passive recreational spaces
Verges
Tree pruning, weed control slashing/mowing
Tree planting and watering
Litter removal
Maintain safe, friendly and aesthetically pleasing streetscapes within the City
$1,842
1.2.4 Provide accessible active and passive recreational spaces
Beach Areas operations
Mowing, pruning, litter control, weed control, sweeping, graffiti control and utilities services
Provide a friendly healthy, safe and aesthetically pleasing and clean beach environment
$467
1.2.4 Provide accessible active and passive recreational spaces
Beach areas maintenance
Maintenance of coastal assets
Protect and enhance the environment of the City’s beach areas
$178
2012-2013 Budget Overview by Work Area
Page 46 of 79
Strategic Community Plan Reference
Project Name Project Description Outcome 2012-13 ‘000 Budget
1.2.4 Provide accessible active and passive recreational spaces
Gardens parks and ovals –operations
The mowing, turf management, pruning, and regular care of all parks, ovals and gardens. The cleaning and care of all park furnishings and play equipment. The daily operational care of all gardens and streetscapes
To maintain the high safe standard of all parks ovals and gardens.
$2,142
1.2.4 Provide accessible active and passive recreational spaces
Gardens, Parks and gardens –maintenance
To carry all renovations and repairs, replacement of parks reticulation, turfed areas, equipment and facilities
To maintain a functional and aesthetic network of gardens and landscaping within the City. To maintain safe high quality sporting and leisure parks within the City.
$491
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Nil Outcomes, Products or Services: To enhance the quality and standards of the City’s recreational facilities. Key Performance Indicators:
1. Change Management - Fully utilise and implement change management programs over the next financial year resulting in the improvement of efficiency and quality systems including HP TRIM, Project Management Framework, Peoplestreme and Interplan.
2. Financial Sustainability - Complete each project to the scope of work within specified time frame within or ahead of budget.
2012-2013 Budget Overview by Work Area
Page 47 of 79
3. Customer Service - Respond to all customer requests within a specified timeframe resulting in a satisfactory outcome of 85%.
Significant Issues for 2012-13:
• Restraints on staff and resource levels impact on being able to achieve required service levels in all areas.
• Significant reduction in capital/renewal program is likely to impact on labour and plant expenditure on operational budget.
2012-2013 Budget Overview by Work Area
Page 48 of 79
Department of Community Infrastructure – Neil Arbuthnot Aquarena – Jen Spriggs
Responsibilities: Manage the maintenance, development and continuous improvement of the Aquarena team and the functions/services the Aquatic Centre provides, in compliance with the WA Health Act (Swimming Pools) 1964 & 2007
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (998) Operating Expenditure 1,946 Capital Expenditure 2,761 Net amount appropriated to fund services
3,709
Significant Operating Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Strategy 4.4.1: Maintain efficient asset management by moving towards full asset renewal funding including depreciation
Sustainable Asset Management
Implement an asset management plan and preventative maintenance plan
Sustainable Asset management and renewal
Strategy 4.2.1: Support improved, integrated and alternative public and private transportation
Community Access program
To contact public transport providers to stop at the Aquarena
Increase access to the Aquarena for members of the Community
Strategy 1.2.3 Support sustainable sport,
recreation and leisure facilities
Winter Maintenance Project
Major maintenance closure Undertake mandatory maintenance work in a
$2,600
Strategy 4.3.4: Advocate and apply sustainable water and energy management
Sustainable Energy Program
Installation of Green sense to monitor power water and gas usage
Monitor and review the use of utilities as a basis for sustainable energy upgrades at the Aquarena
$50
Strategy 4.3.2: Support the development of renewable and clean energy technology and infrastructure
Sustainable Energy program
Solar panels to reduce power bills
Reduce cost of power to the centre
$50
2012-2013 Budget Overview by Work Area
Page 49 of 79
Significant Capital /Works Projects:
• Demolish outdoor ablution block and replace with a new ablution block • Major winter shutdown
Major Policy Initiatives:
• Continually monitor and progress the Aquarena compliance following LIWA aquatics, Health Department Code of Practice and other relevant industry governing bodies.
• Continue to assist the improvement of the health and wellbeing of the City of Greater Geraldton community
Outcomes, Products or Services: Swim school, Aquarobics, Hydrotherapy pool, Disability access, Crèche Facility, pro-shop to sell bathers, goggles etc. Key Performance Indicators:
1. 10% reduction in preventable incident 2. Increase in positive written customer comments through implementation of a visitors
book 3. Increase participation and income of centre based activities and programs through
new marketing initiatives
Significant Issues for 2012-13:
• Impact on the community of the City due to the closure of the Aquarena for maintenance
• Casual staff retention and morale over the 2 month closure period where they will have no income and need to find other work.
2012-2013 Budget Overview by Work Area
Page 50 of 79
Department of Community Infrastructure – Neil Arbuthnot Infrastructure Planning & Design – Mark Atkinson Responsibilities: Modelling (water & transport), Transport Planning, Behavioural Change, Recreational Planning, Design, Long Term Planning & Funding, Capital Works Program Development, Asset Management Plans, Asset Renewal Plans, Asset Maintenance Planning and GIS Mapping.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 1,078 Capital Expenditure 0 Net amount appropriated to fund services
1,078
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
4.2 Improved Transport and Accessibility
Sustainable Transport Advocacy
Educate and encourage the community to adopt sustainable travel behaviour
Increase the mode share of sustainable travel alternatives
4.4 Infrastructure that meets community growth needs and aspirations
Asset Management
Maintain and advance Asset Management Plans and systems
Improved long-term financial forecasting and asset oversight
Significant Capital /Works Projects:
• Beresford Foreshore Detailed Design • Southern Districts Sporting Facilities Detailed Design • Geraldton Strategic Transport and Land Use Model
Major Policy Initiatives: Construction over Easements Policy
2012-2013 Budget Overview by Work Area
Page 51 of 79
Outcomes, Products or Services: • Infrastructure-related customer services • GIS services
Key Performance Indicators:
1. 80% Capital Works Civil Designs complete 1yr in advance of construction 2. 80% Responses to Town Planning Team within 2 weeks 3. 70% Infrastructure-related Works Requests closed within 5 business days
Significant Issues for 2012-13:
• Staff development and retention • Lack of in-house design capacity (procurement delays) • Customer service system requires attention • Emergent tasks impacting on planned delivery • Potential increase in development activity
2012-2013 Budget Overview by Work Area
Page 52 of 79
Department of Community Infrastructure – Neil Arbuthnot Major Projects – Moneer Fates
Responsibilities: • Provide accurate cost estimates for capital works project budgets. • Provide civil, structural and construction engineering expertise from project inception
to completion to manage consultants and construction contractors. • Undertake full Project and Construction Management services as appropriate for
projects undertaken for the City including without limitation the nine competencies designed for project delivery.
• Ensure the City’s’ procurement policies and procedures are followed. • Ensure all projects are delivered in accordance with Australian Standards within
scope, quality, program and budget. • Ensure all projects are delivered in accordance with the City’s Safety policies and
procedures without loss or injury to City employees/ contractors and public.
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (9,932) Operating Expenditure 602 Capital Expenditure 22,265 Net amount appropriated to fund services
12,935
Significant Operating Projects: Nil
Significant Capital /Works Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome 2012-13 ‘000 Budget
Strategy 4.4.3 Infrastructure that meets community growth, needs and aspirations
Eastern Breakwater Project Implementation
Project Implementation
Provision of improved recreational facilities and amenity.
$4,540
Strategy 4.4.4 Infrastructure that meets community growth, needs and aspirations
Airport Depot
Completion of Designs and Documentation for Operations Depot and refurbishment of Existing Airport Depot
Provide a medium term Operational Depot for the Cities Operational staff and to facilitate the delivery of Works, Parks Fleet services for the City. Provide a safe work and depot environment. Design of long term depot to provide a facility to enable delivery of Operational Services efficiently, effectively and in a safe manner.
$1,500
2012-2013 Budget Overview by Work Area
Page 53 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 4.4.3 Infrastructure that meets community growth, needs and aspirations
Beresford Foreshore
Detailed design and documentation of Beresford Foreshore Coastal Protection plan
To provide a facility to protect the Beresford Foreshore and infrastructure services in Chapman Road
$625
Strategy 4.2.3 Develop Regional Air Services
Airport Car Park And General Aviation apron
Construction of Car Park and General Aviation Apron
Enable financial contribution toward airport upgrades by users of the facility. Provide sufficient parking for airport users. Facilitating the ongoing expansion and operation of the Geraldton Airport
Strategy 4.3.4 Opportunities for Sustainability.
Water Harvesting
Final design and implementation
To reduce the reliance on the use of scheme water for irrigation of playing fields, open spaces and landscaped areas.
$2,500
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs Strategy 4.3.1: Advocate and progress towards zero waste and carbon neutrality principles and practices and progress towards climate change mitigation and adaptation principles and practices
Meru Landfill Cell 3 and Meru Integrated Resource Recovery Facility Community Reuse and Recycling Centre
Final design and implementation of Cell 3 lining, transfer station and education centre .
New landfill cell constructed under best practice guidelines, HDPE lined, to accommodate disposal of the Region’s municipal solid waste. Develop drop-off and materials processing areas for the community Reuse and Recycling Centre
Strategy 4.2.2 Improved Transport and accessibility
Flores Road Construction of intersection Flores/ Place Road
Provide a controlled intersection and improve safety and amenity at intersection to facilitate transport movements to the industrial areas.
$4,500
2012-2013 Budget Overview by Work Area
Page 54 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 1.2.3 Support sustainable sport, recreation and leisure facilities
Aquarena Maintenance Project
Staged maintenance project
Undertake essential and required maintenance work to ensure the safe and effective operation of the Aquarena.
Strategy 4.4.3 Infrastructure that meets community growth, needs and aspirations
Derna Parade Complete implementation stage 2 Derna Parade park landscaping
Provide a safe and effective recreational area to complete Derna Pde Park development
$1,400
Strategy 4.4.3 Infrastructure that meets community growth, needs and aspirations
Civic Centre office accommodation
Completion of office refurbishment
Provide accommodation and amenities for City Administration Centre
$1,200
Strategy 4.2.2 Improved Transport and accessibility Strategy 4.2.2 Improved Transport and accessibility
Verita Road Design and documentation of Verita road and the connections over the Southern Transport corridor linking proposed land developments in association with the Department of Housing
Provide connectivity and access for north / south traffic movements and to connect residential areas to the workplace of Narngulu.
$6,000
Major Policy Initiatives: Nil Outcomes, Products or Services: Delivery of projects that meet City and Community expectations and standards. Key Performance Indicators:
1. Delivery of projects within Program, Budget, Scope and Quality. 2. Development of project team competencies through in house training.
Significant Issues for 2012-13:
Development of Project Team competencies in: -
1. Project Management and Construction methodologies. 2. Contract Management
Develop Project Management Framework and Reporting System
Improve City Contract Documentation
2012-2013 Budget Overview by Work Area
Page 55 of 79
Department of Community Infrastructure – Neil Arbuthnot Regional Energy and Waste – Mark Wong
Responsibilities: Provide an efficient, yet financially and environmentally sustainable complete waste management service to the Mid-West regional community.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (6,997) Operating Expenditure 5,565 Capital Expenditure 5,435 Net amount appropriated to fund services
-4,003
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs
Household Refuse Collection
Weekly Residential Mobile Garbage Bins ( MGB) Collection of Geraldton and Mullewa
Weekly collection of residential 240lt Wheelie Bins
$962
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs
Commercial Refuse Collection
Weekly Commercial MGB and Skip-bin Collection of Geraldton and Mullewa
Weekly collection of Commercial 240lt Wheelie and Skip Bins
$124
2012-2013 Budget Overview by Work Area
Page 56 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs
Household Refuse Collection
Annual Verge-side Collection
Annual collection of bulk refuse and green waste from the verge-side of residential premises
$200
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs
Meru Landfill
Landfill Operations, Mulching and Weighbridge Contract
Services relating to the Operation of the Weighbridge, Landfill Operations and green waste processing
$1,280
Significant Capital /Works Projects:
Strategic Community Plan Reference
Project Name Project Description Outcome
2012-13 ‘000 Budget
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs
Meru Landfill – Land & Buildings
New office building and weighbridge software upgrade
New office building and ablutions. Upgrade computing package for improved data capture, reporting and Landfill operations
$450
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs
Meru Landfill – Cell III Excavation
Excavation and lining of new putrescible waste cell.
New landfill cell constructed under best practice guidelines, HDPE lined, to accommodate disposal of the Region’s municipal solid waste.
$2,500
2012-2013 Budget Overview by Work Area
Page 57 of 79
Strategic Community Plan Reference
Project Name
Project Description Outcome
2012-13 ‘000 Budget
Strategy 4.4.2: Facilitate and advocate for the development of essential utility infrastructure and services such as power, water, sewerage, gas and communications to meet growth needs
Meru Landfill – Cell III Excavation
Excavation and lining of new putrescible waste cell.
New landfill cell constructed under best practice guidelines, HDPE lined, to accommodate disposal of the Region’s municipal solid waste.
$2,500
Strategy 4.3.1: Advocate and progress towards zero waste and carbon neutrality principles and practices and progress towards climate change mitigation and adaptation principles and practices
Meru Integrated Resource Recovery Facility
Community Reuse and Recycling Centre
Develop drop-off and materials processing areas for the community Reuse and Recycling Centre
$2,050
Major Policy Initiatives:
• Clean Energy Legislative Package; • National Greenhouse Gas Emissions Reporting (NGER) Act 2007; • National Product Stewardship Scheme 2011; • Environmental Protection Act 1986; • Waste Avoidance and Resource Recovery Act 2007; • Waste Avoidance and Resource Recovery Levy Act 2007; • State Waste Strategy Diversion Targets of 30% from Landfill by 2015 (50% by 2020)
for MSW alone in Regional Centres; • WA Container Deposit Legislation – 2012/13 (Mooted); • Amendments to Meru License under Re-Engineering For Industry and Environment
(REFIRE);
Outcomes, Products or Services:
• Waste Volumes at the Meru Waste Disposal Facility in Tonnes per Annum (TPA): • 2009 – 56,320 TPA • 2010 – 56,390 TPA • 2011 – 60,270 TPA
Key Performance Indicators:
• Implement recommendations of the Meru Waste Disposal and Resource Recovery Site Master Plan
2012-2013 Budget Overview by Work Area
Page 58 of 79
• Actively pursue the recommendations in that report, with progress through Clusters 1 and 2 within 5 years, aiming to reduce waste to landfill by at least 50%;
• Target the reduction of Waste to Landfill by 75% or better, if practicable and affordable to the community by 2029.
Significant Issues for 2012-13:
The City of Geraldton-Greenough Council, at its Ordinary Meeting On April 19, 2011 resolved to:
• Develop new Contractual documents for the green waste and landfill management contractor, as well as the weighbridge contractor
• Finalise the new landfill cell classification at the landfill and begin its construction • Amend/Update the BROC Strategic Waste Management Plan’s recommendations for
City of Greater Geraldton, with specific objectives to include Mullewa • Mitigate any potential impacts of the mooted ETS on the City, with particular
emphasis on the Meru Waste Disposal and Resource Recovery site and the decommissioned Flores Rd. Landfill site
• Direct the CEO to include cost estimates for particular initiatives in submissions to Council, for deliberation during the 2012-13 Budget setting process, and to include cost estimates for major waste management initiatives in the Forward Estimates and the Ten Year Capital Plan.
2012-2013 Budget Overview by Work Area
Page 59 of 79
Department of Creative Communities – Director Andrea Selvey
Responsibilities: • As Departmental Head the role is responsible for all executive functions, strategic
policy and development and the efficient and effective operations of the Department. • Complete responsibility for ensuring all relevant statutory compliance obligations
related to the Department are met. • This role is the Chief Officer in relation to Community Engagement and
Empowerment.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (45) Operating Expenditure 571 Capital Expenditure 0 Net amount appropriated to fund services
526
Significant Operating Projects: Nil
Significant Capital /Works Projects: Nil
Major Policy Initiatives:
• Sustainability Policy • 2029 and Beyond Community Charter • Heritage Policy • Public Art Policy
Outcomes, Products or Services:
• 2029 and Beyond – implementation of Designing our City forum outcomes • Oversight of the Community Action Plan that ensures buy in from other government
and non-government agencies, the not for profit and private sector and the community in general.
• Progressing a Community Engagement Framework to guide and inform all community engagement undertaken by the City to ensure consistency of high quality practice in this field.
• Develop and progress a Social Policy position for the City. • Continue to develop and further a strong and respectful relationship between the City
and the Aboriginal Community.
2012-2013 Budget Overview by Work Area
Page 60 of 79
• Develop and progress a framework for the prioritising of cultural/social/creative facilities capital works.
• Foster and support initiatives that build creativity and capacity within the community. • Securing a commitment to collaborative governance planning and service delivery
models.
Key Performance Indicators:
1. Leading the community engagement focus for the City by developing and implementing a comprehensive community engagement framework building off the 2029 & Beyond principles
2. Leading customer/constituent service focus for the organisation
Significant Issues for 2012-13:
• Lack of cohesion within government agencies resulting in a poor collaboration in planning and service delivery.
• Perth based decision making leaving local community disempowered and unable to fully commit to 2029 and Beyond implementation.
• Increasing demand on social/soft infrastructure as a result of gaps left by other tiers of government and increasing population and changing expectations.
• Finding creative ways of engaging with hard to engage communities.
2012-2013 Budget Overview by Work Area
Page 61 of 79
Department of Creative Communities- Andrea Selvey Community Empowerment & Development
Responsibilities: • 2029 and Beyond Community Charter • Sustainability Policy • City of Greater Geraldton Youth Strategic Plan 2010-2015 • City of Geraldton-Greenough Disability Access & Inclusion Plan 2008-2013 • Australia Day Awards Selection Policy (new)
Budget Summary:
2012-13 $ ’000 Budget
Operating Income -50 Operating Expenditure 801 Capital Expenditure 0 Net amount appropriated to fund services
751
Significant Operating Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
4.2.3 Ensure meaningful engagement and consultation with the community
2029 and Beyond Community Action Plan
Collaborative planning to create statutory planning documents and a Community Action Plan to cater for growth and changing environment
2029 and Beyond Community Action Plan
$23
4.2.3 Ensure meaningful engagement and consultation with the community
Civic Evolution Projects
To work closely with members of the community, who have registered ideas on Civic evolution, and assist them to develop proposals and undertake actions to make their ideas happen.
Civic Evolution Projects $50
2012-2013 Budget Overview by Work Area
Page 62 of 79
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
4.2.3 Ensure meaningful engagement and consultation with the community
Civic Evolution Projects
To work closely with members of the community, who have registered ideas on Civic evolution, and assist them to develop proposals and undertake actions to make their ideas happen.
Civic Evolution Projects $50
3.1.1 Create vibrant and diverse neighbourhoods that meet local and regional needs
Precinct Planning
Collaborative planning to create statutory planning documents and a Community Action Plan to cater for growth and changing environment
Precinct Planning $140
3.4.3 Investigate and develop innovative models for community engagement and empowerment
Big Ideas Festival
To hold a festival that engages the community in innovative thinking and visioning about the future of our City and Region and how we can make this future happen.
Big Ideas Festival $25
3.4.3 Investigate and develop innovative models for community engagement and empowerment
Community Arts Project
Run a community arts project to build the capacity of local artists within their own community and to promote local talent to the greater community.
Community Arts Project $35
4.2.3 Ensure meaningful engagement and consultation with the community 3.4.3 Investigate and develop innovative models for community engagement and empowerment
Social Media Policy and Tools
To develop a Social Media Policy to guide City Staff in the use of social media including Facebook, twitter and websites To redevelop the 2029 and Beyond website to reflect changes the project has undergone including the promotion and participation of the community in 2029 Flagship projects including One Million Trees and Bike Capital.
Social media Policy and Tools
$50
2012-2013 Budget Overview by Work Area
Page 63 of 79
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
1.1.4 Improve services and facilities that actively support youth, disability and seniors in the region
City of Geraldton-Greenough Disability Access & Inclusion Plan 2008-2013
Review of the City’s plan to ensure inclusiveness of the community and to incorporate the Mullewa location
Inclusive updated directional Plan
$22
1.1.4 Improve services and facilities that actively support youth, disability and seniors in the region
Youth Council
Establishment of a sustainable model for providing youth a voice on issues which affect them in line with 2029 & Beyond priorities for action
Sustainable Youth Council
$10
1.2.3 Support sustainable sport, recreation and leisure facilities
Midnight Basketball
Provision of two tournaments annually which cater for 60 plus youth aged 12 to 18yrs each tournament.
Provision of positive social and life skill development which touches up to 60 plus families in the community
$60
1.1.4 Improve services and facilities that actively support youth, disability and seniors in the region
Youth n Motion
Program to cater for teenagers 12 to 18years to assist in life skill development and to link to appropriate services for their individual needs.
Over 40 youth at risk teenagers in contact with the weekly service can be provided with some assistance
$40
1.1.4 Improve services and facilities that actively support youth, disability and seniors in the region
Club Development Officer
Assist clubs to improve their governance and management practices through development of club plans, policies and procedures. Network and provide relevant information
Increased capacity in sporting organisation
$50
Significant Capital /Works Projects: Nil
Major Policy Initiatives:
• Youth Policy • Development of Multicultural Policy • Development of Social Inclusion Policy
2012-2013 Budget Overview by Work Area
Page 64 of 79
• Development of the Social Media Policy
Outcomes, Products or Services:
• Develop the 2029 and beyond Community Action Plan • Develop strategic precinct plans to inform the development of the City of Greater
Geraldton Local Town Planning Scheme. • Creation of a City that fosters and supports community and community initiatives. • Reviewed Disability Access & Inclusion Plan • Progression and review of the Reconciliation Action Plan • Reviewed Youth Strategic Plan • Creation of a sustainable Youth Council model • Continuation of the Midnight Basketball program and Youth n Motion services to
youth at risk in the City which teaches life skills and encourages informed choices for our youth.
• Development of concept plans for Youth Resource Centre • Updated database of sporting clubs to be able to connect and provide relevant
sporting information and dates for workshops to enhance organisations sustainability
Key Performance Indicators:
1. Progress the development of the Community Action Plan. 2. Ensure the effective use of digital communication and community engagement tools. 3. Progress the implementation of the Community Engagement Framework. 4. Review and action the Disability Access and Inclusion Plan 5. Review Youth Strategic Plan, include Mullewa youth directions as part 3 of the
document 6. Actively promote and support recognition and celebration of cultural diversity in the
City by working with indigenous and multicultural organisations 7. Network youth service providers in the community to share resources 8. Assist sporting and community organisation to build capacity building by facilitating
relevant workshops
Significant Issues for 2012-13: • Increasing demand for social services – youth, seniors, multicultural. • Capacity within community (e.g. – neighbourhood/progress/community/sporting
associations) • Social inclusion • Disengaged Youth
2012-2013 Budget Overview by Work Area
Page 65 of 79
Department of Creative Communities – Andrea Selvey Library & Heritage Services – Susan Smith
Responsibilities: • To provide an innovative and equitable service to meet the needs of our community
and libraries in the Mid-West. • To recognise, protect, celebrate and enhance the rich and diverse heritage of the
area in all its forms and expressions.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (92) Operating Expenditure 1,481 Capital Expenditure 135 Net amount appropriated to fund services
1,524
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
3.1.4: Preserve and activate the heritage in our community
Heritage Strategy
A document which will provide direction for the recognition, identification, protection, commemoration and celebration of the City’s heritage.
A more structured, informed approach to manage and monitor the City’s heritage assets
$40
3.3: Enhanced community capacity for learning
Big Sky Readers and Writers Festival
A weekend which celebrates the written and spoken word
A unique cultural event which promotes and develops the love of reading and writing
$65
Significant Capital /Works Projects:
• Installation of the Railway Carriage Display shed at Walkaway Museum. • Mullewa District: Masonic Lodge – renewal per conservation plan.
Major Policy Initiatives: Heritage Policy
2012-2013 Budget Overview by Work Area
Page 66 of 79
Outcomes, Products or Services:
• Community Hub • Heritage Services • Library Information and Lending Services • Lifelong learning and Literacy Programs • Regional Support Services • Virtual Library Services
Key Performance Indicators:
1. Develop a community needs analysis framework for the Library. 2. Maintain and expand key programs and projects in Heritage Service. 3. Expand and enhance lifelong learning and literacy programs.
Significant Issues for 2012-13:
• Developing a framework for the good governance of volunteer run museums operating from City owned buildings.
• Implementing Heritage Strategy. • Advances in telecommunications technologies and the National Broadband Network. • Continuing to integrate services at the Mullewa Branch Library. • Growing membership/use of the Library.
2012-2013 Budget Overview by Work Area
Page 67 of 79
Department of Creative Communities – Andrea Selvey Arts Culture & Events – Chris Budhan
Responsibilities: Arts & Culture
• To build the capacity of Greater Geraldton’s artists and arts presenters; • To deliver public art projects; • To effectively manage the Queens Park Theatre, and the development and delivery
of its annual program of performances and exhibitions; and • To manage the assets of the Geraldton Regional Art Gallery.
Events
• To manage the development and delivery of the City’s annual calendar of events, including Australia Day celebrations;
• To review internal and supported events; and • To effectively manage the Queen Elizabeth II Seniors & Community Centre
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (886) Operating Expenditure 2,345 Capital Expenditure 1,837 Net amount appropriated to fund services
3,296
Significant Operating Projects:
Strategic Community Plan Reference
Project Name
Project Description
Outcome
2012-13 ‘000 Budget
Strategy 3.1.2: Develop and promote services, facilities, events and activities that support our cultural diversity
Australia Day Celebrations
Day-long entertainment at the foreshore including bands and fireworks, attracting tens of thousands of attendees.
Celebration of Australia Day and Greater Geraldton’s cultural diversity.
$100
Strategy 3.1.2: Develop and promote services, facilities, events and activities that support our cultural diversity
Social & Creative City Plan
A document that will provide direction for the social and creative development of Greater Geraldton.
A more structured and informed approach to social and creative development.
$20
2012-2013 Budget Overview by Work Area
Page 68 of 79
Significant Capital /Works Projects:
Redevelopment of the Geraldton Regional Art Gallery New initiatives in the proposed master plan include upgrades of interior spaces and hardware which will provide opportunities to showcase the diversity present within the arts community in the Mid-West and across WA. The improvements made will allow the Gallery to access exhibitions of a National standing, conduct community educational workshops and to better care for the City Art Collection. Major Policy Initiatives: Updating of the Public Art Policy The City of Geraldton-Greenough’s Public Art Policy is being updated in accordance with the interests of the Greater Geraldton community. This Policy will be presented to the Public Art Advisory Committee and then to Council. Updating of the Social and Creative City Plan Updating and finalising the Draft Social and Creative City Plan. This document will provide direction for the social and creative development of Greater Geraldton. Outcomes, Products or Services:
• Support of local artists and arts presenters • Delivery of public art • Delivery of an annual program of performances and exhibitions at Queens Park
Theatre • Queens Park Theatre services • Maintenance and development of assets of the Geraldton Regional Art Gallery • Development and delivery of the City’s annual calendar of events, including Australia
Day celebrations • Queens Elizabeth II Seniors & Community Centre services
Key Performance Indicators:
1. Progress the development of the Social and Creative City plan ensuring on budget and on time delivery of both internal and external documents.
2. Initiate a 10% increase of programming at Queens Park Theatre. 3. Initiate an increase in the number of cultural events within the City Centre. 4. Facilitate cultural sector collaboration.
Significant Issues for 2012-13:
• Implementing the Social & Creative City Plan • Opportunities arising from the National Broadband Network • Continued development and delivery of program at Queens Park Theatre • Additional role managing Events portfolio • Review of events • Development of new events
2012-2013 Budget Overview by Work Area
Page 69 of 79
Department of Creative Communities – Andrea Selvey Bright Stars Family Day Care – Karen McDowell
Responsibilities: • To provide high quality Family Day Care service to the Greater Geraldton area and in
the Midwest, Gascoyne and Pilbara regions.
• To provide effective and efficient compliance to relevant child care industry Legislation
Budget Summary:
Significant Operating Projects: Nil
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Working with the relevant Commonwealth and State departments to gain approval to operate a pilot project to establish 3 Indigenous In Venue Care services in Geraldton. Outcomes, Products or Services:
• Recruit, train, support and monitor educators • Process payments to educators fortnightly and acquit through the Child Care
Management System • Submission of quarterly Utilisation Reports to the Department of Education,
employment and workplace Relations (DEEWR) • Submission of biannual Activity Reports to DEEWR • Developing and implementing a Quality Improvement Plan for the service
Key Performance Indicators:
1. Support all educators, especially those in the region, by providing increased access through E support
2. Write Policies and train Educators to meet the new requirements of the National Quality Framework (NQF)
3. Ensure the service meets the National Quality Standards
2012-13 $ ’000 Budget
Operating Income (1,440) Operating Expenditure 1,362 Capital Expenditure 40 Net amount appropriated to fund services
(38)
2012-2013 Budget Overview by Work Area
Page 70 of 79
Significant Issues for 2012-13:
The implementation of the NQF is being transitioned across Australia. The City of Greater Geraldton, as the Approved Provider, will become the Licensee and the Educators will be registered to Bright Stars Family Day Care.
2012-2013 Budget Overview by Work Area
Page 71 of 79
Department of Creative Communities – Andrea Selvey Customer Service and Tourism– Jenny Rolston
Responsibilities:
• Provision of timely, accurate and consistent high quality internal and external customer service.
• Facilitation of complaints handling. • Facilitation of the day to day running of the Geraldton Visitor Centre and Geraldton
Rest Centre. • Support and facilitation of tourism development including cruise ship visitation to
Geraldton.
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 1,125 Capital Expenditure 0 Net amount appropriated to fund services
-1,125
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 5.21 Ensure economical, efficient and effective delivery of services
Customer Service Telephone Benchmarking Survey
Measurement of customer service scores and benchmarking with other LGA’S
Delivery of Citizen and stakeholder focused services
$12
Strategy 5.21 Ensure economical, efficient and effective delivery of services
Customer Service Strategy for CGG including customer service charter, complaints framework and organisation wide customer service training for all staff
Customer Service Strategy for the organisation including digital applications
Delivery of Citizen and stakeholder focused services
$112
2012-2013 Budget Overview by Work Area
Page 72 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
Strategy 5.2.2 Maintain meaningful engagement, consultation and deliberative processes with the community
City of Greater Geraldton Community Survey
Measurement of community satisfaction levels with the facilities and services provided by CGG
Delivery of Citizen and stakeholder focused services
$100
Strategy 2.2.2 Promote tourism and investment opportunities including cultural tourism
Review of Tourism and Destination Marketing Strategy and development of implementation plan and measurement mechanisms
Measurement of the effectiveness of the implementation plan and the performance of tactical tourism marketing activities
Recognition of Greater Geraldton as a leading regional and rural destination
$80
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Customer Service Charter Outcomes, Products or Services:
• Development and implementation of a customer service strategy for the City of Greater Geraldton.
• Development of an easy to follow complaints management and measurement process.
• Delivery of the annual community satisfaction survey. • Delivery of the customer service telephone benchmark survey. • Broader tourism exposure of the Greater Geraldton Region. • Review of “The Cruising Future” report (2010) and development of a cruise ship
tourism strategy for Geraldton. • Review of Tourism and Destination Marketing Strategy (2011) and development of
an implementation plan and measurement mechanisms. Key Performance Indicators:
1. Improved percentage of the community satisfied with the facilities and services of the City of Greater Geraldton as measured through the annual community satisfaction survey
2012-2013 Budget Overview by Work Area
Page 73 of 79
2. Improved customer service scores achieved as measured through the six monthly customer service telephone benchmark surveys .
3. Customer complaints resolved within timeframes as per the Customer Service Charter of the City of Greater Geraldton.
4. Measurement of the effectiveness of the tourism branding “take a fresh look.
Significant Issues for 2012-13:
• Advances in telecommunications technologies and the impact of digital influences upon the delivery of customer service (NBN and Digital Local Government Strategies).
• Level of understanding of customer service principles across the organisation. • Integration and support of customer service at the Mullewa District Office. • Impacts upon tourism and related industries and businesses in Geraldton as a result
of recent changes within Cruise Ship numbers destined for Geraldton. • Investigate potential future site of the Geraldton Visitors Centre.
2012-2013 Budget Overview by Work Area
Page 74 of 79
Department of Organisational Performance – Director Cheryl Wood
Responsibilities: Management of HR, ICT and Governance and Risk activities
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 696 Capital Expenditure 1,020 Net amount appropriated to fund services
1,716
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
5.1.3 Implementing business, governance legislative compliance
Audit Committee
Development of new committee
Open and transparent governance
5.1.3 Implementing business, governance legislative compliance
Internal Audit Projects for 12-13
Improvements to processes
$50
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Integrated planning and reporting framework Outcomes, Products or Services: Best practice Governance and Compliance Key Performance Indicators:
1. Implement Integrated Planning & Reporting by 30 June 2013 2. Development of Audit Committee by 30 September 2012
Significant Issues for 2012-13: Nil
2012-2013 Budget Overview by Work Area
Page 75 of 79
Department of Organisational Performance – Cheryl Wood Human Resources & Organisational Development – Delwen Granville
Responsibilities: • Recruitment and Selection • Performance Management • Injury Management and Workers Compensation • HR Statutory Compliance • Industrial Relations • Inductions • Learning and Development • Annual Reporting • Corporate Strategic Planning • Employee Engagement & Reviews • Workforce Planning
Budget Summary:
2012-13 $ ’000 Budget
Operating Income 0 Operating Expenditure 1,318 Capital Expenditure 0 Net amount appropriated to fund services
1,318
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
5.1.3 Implementing business, governance legislative compliance
Strategic Plan Development of the Strategic Plan
Compliance with Legislation
$30
5.1.3 Implementing business, governance legislative compliance
Inductions Implementation of organisational wide inductions to all staff
Induction Program
2012-2013 Budget Overview by Work Area
Page 76 of 79
Strategic Community Plan Reference
Project Name Project Description
Outcome 2012-13 ‘000 Budget
5.1.3 Implementing business, governance legislative compliance
Workforce Development Plan
Workforce development plan
Compliance with legislation
$30
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Nil Outcomes, Products or Services:
• Development of the long term strategic plan to be completed an adopted by Council by June 2013
• Implementation of mechanisms to monitor key organisational data • Implementation of an employee induction program by 30 September 2012 • Implementation and training to all managers and supervisors in respect of the
changes to the negotiated Enterprise Agreement • Facilitation of Employee Opinion Survey Focus Groups to continue to work towards
developing a more engaged workforce • Development of a workforce development plan • Completion of the employee opinion survey and subsequent action plan
Key Performance Indicators:
1. Implement integrated planning and reporting framework 2. Completion of a workforce development plan by 31 December 2012. 3. Implementation of a quality induction program for all new employees by September
2012.
Significant Issues for 2012-13: • Implementation of a New Enterprise Agreement
2012-2013 Budget Overview by Work Area
Page 77 of 79
Department of Organisational Performance – Cheryl Wood Governance and Risk – Towela Mutale
Responsibilities: • Compliance to legislation • Tendering, contract management and purchasing • FOI (Freedom of Information) • Implement best practice governance • OH&S culture and framework • Risk management
Budget Summary:
2012-13 $ ’000 Budget
Operating Income (269) Operating Expenditure 1,815 Capital Expenditure 0 Net amount appropriated to fund services
1,546
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
5.1.3 Implementing business, governance legislative compliance
Advent Manager Risk and Compliance
Risk and Compliance software
Compliance with legal requirements
$50
5.4.2 Provide effective and systematic financial management and risk management practices
Organisational Risk Management
Risk identification process review and treatment provision
Effective risk management policies
$25
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Ni Outcomes, Products or Services:
2012-2013 Budget Overview by Work Area
Page 78 of 79
• Purchasing, tendering and contract management processes • Development of and enhance the OHS culture and framework • Development of a risk management culture within the city’s operations • Development of and enhance best practice governance culture
Key Performance Indicators:
1. Achieve statutory compliance for all auditing procedures 2. Finalise procurement review and implement recommendations 3. Implement compliance software 4. Develop Business Continuity Plan for main administration building
Significant Issues for 2012-13: Nil
2012-2013 Budget Overview by Work Area
Page 79 of 79
Department of Organisational Performance – Cheryl Wood Information Services
Responsibilities: ICT • Information, Communication and Technology • Information Management • Mobile and Telecommunications
Budget Summary: 2012-13
$ ’000 Budget
Operating Income (477) Operating Expenditure 2,443 Capital Expenditure 947 Net amount appropriated to fund services
2,913
Significant Operating Projects:
Strategic Community Plan Reference
Project Name Project Description
Outcome
2012-13 ‘000 Budget
4.2.2 Efficient delivery of external and internal services
Digital Local Government
United communications and video conferencing
Smart City Digital economy
4.2.2 Efficient delivery of external and internal services
Program of Hardware
Development program for efficient software replacement
High quality ICT operations
$105
Significant Capital /Works Projects: Nil
Major Policy Initiatives: Outcomes, Products or Services:
• Speed and enhanced communications • Video conferencing and united communications
Key Performance Indicators:
1. Mullewa optical fibre rolled out 2. Program of hardware and software replacement
Significant Issues for 2012-13: Nil