Topic Preventing Freeze-Related Unavailability & Safety Hazards Presenter Bob Burchfield Plant Manager, MMPA Facilities in Minnesota Division 6 Rusty Whitely & Jeff Kremer 1 COLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE A10 STG)

Upload: dangtruc

Post on 07-Feb-2018

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Topic

Preventing

Freeze-Related

Unavailability &

Safety HazardsPresenter

Bob Burchfield

Plant Manager, MMPA

Facilities in Minnesota

Division 6

Rusty Whitely & Jeff Kremer

1

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Faribault Energy Park, Faribault Minnesota

265 MW (GE Frame 7F GT/ CMI HRSG / GE A10 STG)

Page 2: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Projects – Past and Present

o MINNESOTA / FEP & MRS / PM / 2007 – Present / 7F CC & Siemens SC

o OKLAHOMA / Redbud Energy OM / 2002-2007 / 1200 MW 7F CC

o TEXAS / Guadalupe Power Partners / Ops / 2000-2002 / 1000 MW 7F CC

o NEW YORK / Independence Station / I&E / 1992-2000 / 1000 MW 7F CC

o NEW YORK / Nine Mile Point / Training / 1990-1992

o VIRGINIA / NN SHIPBLDG / 1988 - 1990

o MICHIGAN / DC Cook / Maint / I&C / 1987

o SUBMARINER 1980-1986

2

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 3: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Challenges:

• Warm Locations

• Out of Sight Out of Mind

• Taken by Surprise

• Cold Locations

• Same Challenges!

3

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 4: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

4

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Challenges:

Everybody Wants to Enjoy Summer and Forget

About Last Winter!

Page 5: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Common Challenges

• Southern and Northern Plants:

• Addressing Issues Soon Enough

• Insufficient Detail in Procedures

• Insufficient Accountability

• Lacking a Triggering Mechanism / Reminder Tool

5

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 6: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

6

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Winter!

50 days below zero

Page 7: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Building a Robust Defense:

Multi-Phased Approach

• Checklist - Pre-Season

• Checklist - Pre-Storm

• Checklist - Daily - Valve Stroke / Pump Start / Instrument

• PM Tasks in CMMS Database

• Converting Temporary Solutions to Permanent Solutions

• Changing Conditions (Plant and Weather)

7

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 8: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Planning:

• Use CMMS PM as a triggering tool

• “Pre-Season” Checklist/Procedure

• Content Example:

• “Begin use of daily 32 degree action log”

• “Order Salt and Sand, Stage shovels”

• “Test Snow Blower, Torpedo Heaters

• “Buy #2 Fuel or Propane” for heaters

• “Set up Plowing Contractor”

8

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 9: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Planning:

• Daily “32 Degree Action Log”

• Daily checks for CRO and Outside Operators

• Avoid Ambiguity

Poor:

“Start Circ water Pump’

Better:

“Start Circ Water Pump

“Verify Flow on XMTR xxx-xx-xx”

“Verify Pressure on XMTR xxx-xx-xx”

9

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 10: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

10

COLD WEATHER PREPARATIONS AND BEST PRACTICES

CRO

System<32º F

#/shiftAction

Operable

Y/N

Date/Time

CompletedInitial

Demin 1

Start/Cycle STG Demin Water Pump 513PP-103A and

513PP-1003B and CTG Demin Water Pumps 1001 and

1002

Demin 1Stroke Hotwell Level Control Valve 513LCV-042A + B and

ensure that Hotwell Level 452LIT-042B increases

BFP 1Run Boiler Feed Pump 480PP-1001A + B (alternate pumps

each start)

BFP 1

Verify Min Flow Recirc Transmitter responds to changes in

Min Flow Recirc valve positions 480FIT-162 and 172

respectively

Off-Line 32 Degree Action Log

Page 11: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Best Practice:

• “Winter Storm” Checklist

• Formal procedure - Initiated by a designated

“Weather Watcher”

• Procedure Example Next Slide

• “Make It Formal Professional”

11

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 12: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

12

COLD WEATHER PREPARATIONS AND BEST PRACTICES

OPERATIONS MANUAL

FARIBAULT ENERGY PARK - FARIBAULT, MN VOLUME II – OPERATING PROCEDURES

Number:

OP-109

Subject:

Winter Storm Checklist

Approved for use by:

Current Issue:

R0

Issue Date:

09 Mar 11

Page 1 of 1 Prepared by NAES Corporation

TABLE OF CONTENTS

SECTION TITLE PAGE

1. Introduction .............................................................................................................. 2

2. Operating Precautions and Limitations ..................................................................... 2

3. Snow Storm Checklist .............................................................................................. 2 A. 72 Hours Prior to: ............................................................................................ 2 B. 48 Hours Prior to: ............................................................................................ 2 C. 24 Hours Prior to: ............................................................................................ 3 D. During & Immediately After Snow Storm ......................................................... 3 E. After Snow Storm ............................................................................................ 4

Page 13: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Best Practices

Use CMMS program to trigger Tasks:

Winter Lay-up:

Evaporative Cooler

Chiller Systems

Lawn Sprinklers

Prepare:

Energize and Test Heat Trace Circuits

Roll down Cooling Tower Tarps

13

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 14: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

• LEDs to

Monitor

Heat Trace

• Annual Amp

Draw

Survey

14

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 15: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

• XMTR Obrien Box / Temps Routed To DCS

• With “HART” Comms - No additional wiring needed

15

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 16: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

• Valve

Blankets

16

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 17: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

• Permanent

Solutions Like

the Enclosure

on the Right

17

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 18: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

• Perform Walk-

Arounds

• Temporary Solutions

• Write Work Orders

18

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Page 19: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

• Perform Walk-

Arounds

• Assess & Correct

Safety Hazards

19

COLD WEATHER PREPARATIONS AND BEST PRACTICES

Roof Snow Guard

Fencing

Page 20: COLD WEATHER PREPARATIONS AND BEST PRACTICES · PDF fileCOLD WEATHER PREPARATIONS AND BEST PRACTICES Faribault Energy Park, Faribault Minnesota 265 MW (GE Frame 7F GT/ CMI HRSG / GE

Summary:

• Procedure & Checklist - Pre-Season

• Procedure & Checklist - Daily Valve Stroking / Pump Start /

Instrument Response Verifications

• Procedure & Checklist - Winter Storm

• Enter PM Tasks in CMMS Database

• Convert Temporary Solutions to Permanent Solutions

• Conduct Surveys for Personnel Safety and Equipment Hazards

NAES Can Help. For Additional Information or Technical Support

Contact NAES Technical Services for Professionally Developed Documents and

Support Tailored to Meet Your Specific Needs.

[email protected] or call 425 - 270- 6448

20

COLD WEATHER PREPARATIONS AND BEST PRACTICES