command/control workgroup st. john, new brunswick 5-6 november, 2008

8
Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

Upload: sherman-mcdaniel

Post on 04-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

Command/ControlWorkgroup

Command/ControlWorkgroup

St. John, New Brunswick5-6 November, 2008

Page 2: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

CANUSLANT 2009

Work ListWork List Decision tool finalization for establishing appropriate

command structure.

Possible ICP locations.

Liaison requirements.

Political outreach prior to an incident.

Determine training requirements.

Page 3: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

CANUSLANT 2009

Command StructuresCommand Structures Joint versus unified command AGA review. Reduce command structure options from three to two.

Joint command post.[Desired during emergency response phase]

Two command posts with extensive exchange of liaison personnel.[Desired during project management phase]

- Extensive liaison sharing - Joint Environmental Section (JES) in one location- Joint Information Center (JIC) in one location

Page 4: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

CANUSLANT 2009

Liaison RequirementsLiaison Requirements

Eight liaison minimum determined for a Level III-V response.– Safety Officer– Liaison Officer– Public Information Officer (Joint Information Center)– Operations Section– Logistics (2)

Includes Communication Unit Leader

– Planning Section (2) Includes RRT or REET representative

Page 5: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

CANUSLANT 2009

Trans-boundary ICP LocationsTrans-boundary ICP Locations United States:

– Washington County Community College (Calais)?

– Station Eastport

Canada:

– St. Andrews Community College?

– St. Andrews Biological Station

Page 6: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

CANUSLANT 2009

Political OutreachPolitical Outreach

Who: Canadian Coast Guard Assistant Commissioner

(Ms. Nancy Hulbert)

United States Coast Guard First District Commander (RADM Dale Gabel)

What:

List of their foreseen roles and responsibilities.

Page 7: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

CANUSLANT 2009

Training RequirementsTraining Requirements Incident Command System (ICS) 300

OSH/A (HAZWOPER)

OMSETT

Exercises

On-scene Commander’s Course

Response Management System (RMS)

Page 8: Command/Control Workgroup St. John, New Brunswick 5-6 November, 2008

CANUSLANT 2009

Open Action ItemsOpen Action Items Determine HAZMAT training equivalences. Develop command post determination matrix (one versus two). Volunteer coordination update to AGA. TWIC versus equivalent responder ID. ICS/RMS cross-training schedule. Update to JIC section of AGA. Coordination interface requirements between Assistant

Commissioner and First District Commander. Emergency phase ICP location determination for

command/control (1 each side of border area). Bio-fuels inclusion in future meeting. Provincial versus CCG response thresholds.