![Page 1: COMMUNITY BASED TRANSPORTATION PLAN · In September 2015 the project team completed Phase 1 of public outreach and began Phase 2 in ... Below is a brief overview of the results from](https://reader034.vdocument.in/reader034/viewer/2022050120/5f506f0e440de6168c7a7513/html5/thumbnails/1.jpg)
In September 2015 the project team completed Phase 1 of public outreach and began Phase 2 in mid-November as a Design Game workshop. The Design Game workshop was created to further understand community transportation needs and concerns, including:
• Identifying specific priority improvement blocks and intersection locations
• Describing the transportation issues at these locations
• Diagnosing these issues with community members’ transportation solutions
The Design Game workshops were held throughout the Western Addition are as part of Phase 2.
Date Event Location
November 13, 2015 Rosa Parks Elementary Parent Hour Hollis + Ellis
November 19, 2015 Mo’MAGIC Service Provider Meeting Fulton + Webster Streets
January 27, 2016 Rosa Parks Senior Center Lunch Buchanan Street + Golden Gate Ave
January 29, 2016 Western Addition Senior Center Lunch Turk + Fillmore Streets
S F M T A . C O M
WESTERN ADDITION COMMUNITY BASED TRANSPORTATION PLAN
WWW.SFMTA.COM/WESTERNADDIT ION
Pedestrian
Transit
Automobile
Bicycle
57%
24%
11%
8%
Four improvements -including lighting, rapid flashing beacons, stop signs, and bus amenities,
comprised 31% of the transportation improvements requested by the community.
Failure of cars and bicycles
to yield to pedestrians
Lack of pedestrian visibility
High vehicle speeds
38%of reported issues
were related to pedestrian safety
Over half of the community responses related to pedestrian
travel.
PRIORITY TRANSPORTATION CORRIDORS Phase 2 Outreach Update | March 16, 2016
SUMMARY OF PHASE II RESULTSBelow is a brief overview of the results from the four Design Game workshops.
Four improvements comprised 31% of the transportation improvements requested by the community. Community preferred improvements included the following:• Lighting• Rapid flashing beacons• Stop signs• Bus amenities
38%of reported issues
were related to
pedestrian safety High vehicle speeds
Lack of pedestrian Visibility
Failure of cars and bicycles to yield to pedestrians
![Page 2: COMMUNITY BASED TRANSPORTATION PLAN · In September 2015 the project team completed Phase 1 of public outreach and began Phase 2 in ... Below is a brief overview of the results from](https://reader034.vdocument.in/reader034/viewer/2022050120/5f506f0e440de6168c7a7513/html5/thumbnails/2.jpg)
Goal of Phase 2 Outreach: Identifying specific improvement locations.1. Where are the transportation issues?2. What are the transportation issues?3. How should they be fixed?
WESTERN ADDITION COMMUNITY BASED TRANSPORTATION PLAN
S F M T A . C O M
WWW.SFMTA.COM/WESTERNADDIT IONLAU
REL ST
ASHBU
RY ST
DUBOCE AVE
POST ST
POST ST
POST ST
LAGU
NA ST
HOWARD ST
HOW
ARD
ST
MASO
NIC
AVE
MA
SON
ICAVE
GROVE ST
GOLDEN GATE AVE
GOLDEN GATE AVE
EDDY ST
EDDY ST
HERMANN ST
14TH ST
PIERC
E ST
LEAVENW
OR
TH ST
LYON
ST
BRO
DER
ICK ST
BAKER ST
WALLERST
PRESID
IO AVE
SUTTER ST
WEBSTER
ST
DO
LOR
ES S
T
CH
UR
CH
ST
OFARRELL ST
FULTON ST
FULTON ST
GROVE ST
FULTON STMCALLISTER ST
MCALLISTER ST
GOLDEN GATE AVE
FULTON ST
TURK ST
PAGE ST
PAGE ST
OAK ST
OAK ST
HAYES ST
HAYES ST
HAYES ST
OAK ST
OAK ST
FELL ST
FELL ST
FELL ST
FELL ST
GROVE ST
WASHINGTON ST
JACKSON ST
ASHBU
RY ST
PIERC
E ST
CLAYTO
N ST
PRESID
IO AVE
BAKER ST
CEN
TRAL AVE
LAGU
NA ST
BUC
HAN
AN ST
BRO
DER
ICK ST
FILLMO
RE ST
WALN
UT ST
BAKER ST
CLAYTO
N ST
SCO
TT ST
GOLDEN GATE AVE
CO
LE ST
ELLIS ST
MCALLISTER ST
MCALLISTER ST
PINE ST
PINE ST
GEARY ST
WALLER STCEN
TRAL AVE
LYON
ST
TURK BLVD
12TH ST
BUSH STFILLM
OR
E ST
FILLMO
RE ST
SCO
TT ST
SCO
TT ST
STEINER
ST
STEINER
ST
STEINER
ST
LAGU
NA ST
OC
TAVIA ST
WEBSTER
ST
OC
TAVIA ST
BUC
HAN
AN ST
GO
UG
H ST
GO
UG
H ST
FRAN
KLIN ST
FRAN
KLIN ST
POLK ST
POLK ST
LARKIN
ST
LARKIN
ST
TURK ST
EDDY ST
PIERC
E ST
08TH ST
PINE ST
10TH ST
10TH ST
09TH ST
ANZA ST
11TH ST
POST ST
HYD
E ST
HYD
E ST
CLAY ST
CLAY ST
SACRAMENTO ST
SACRAMENTO ST
SACRAMENTO ST
TURK ST
OFARRELL ST
ELLIS ST
ELLIS ST
SUTTER ST
SUTTER ST
HAIGHT ST
HAIGHT ST
LAGU
NA ST
FOLSOM ST
FOLS
OM
ST
VAN N
ESS AVE
VAN N
ESS AVE
DIVISAD
ERO
ST
MASO
NIC
AVE
DIVISAD
ERO
ST
GEARY BLVD
GEARY BLVD
GEARY BLVD
GEARY BLVD
CLINTON PARKRO
SE
MO
NT P
L
BROSNAN ST
CALIFORNIA ST
CALIFORNIA ST
CALIFORNIA ST
CALIFORNIA ST
BUSH ST
BUSH ST
JON
ES ST
JON
ES ST
WO
OD
STBELVED
ERE ST
AVE
CO
LLINS ST
MASO
NIC
AVE
BUE
NA V
ISTA TER
ANZAVISTA AVE
SACRAMENTO ST
LUPINE AVE
CLEARY CT
ENCANTOAVE
FORTUNAAVE
STARRKINGW AY
BARCE LONAAVE
ST JOSEPH
S AVE
OFARRELLST
MCCOPPIN ST
NID
O AVE
OC
TAVIA BLVD
T
AV E
UEN
AVI
STA
WEST AVE
SOU
TH VAN
NESS AVE
PET ERYORKEWAY
MARKET ST
MARKET ST13TH ST
13TH ST
PLUM ST
MIS
SIO
N S
T
VALE
NC
IA ST
NO
E ST
OTIS ST
WEBSTER
ST
Legend
Areas of ConcernBicycle Enforcement
Bicycle Infrastructure
Pedestrian Safety
Transit Service
Street Conditions
Traffic Congestion
Traffic Enforcement
Security0 0.085 0.17 0.255 0.34 0.425
MilesOutreach location
Project Boundary
LAUR
EL ST
ASHBU
RY ST
DUBOCE AVE
POST ST
POST ST
POST ST
LAGU
NA ST
HOWARD ST
HOW
ARD
ST
MASO
NIC
AVE
MA
SON
ICAVE
GROVE ST
GOLDEN GATE AVE
GOLDEN GATE AVE
EDDY ST
EDDY ST
HERMANN ST
14TH ST
PIERC
E ST
LEAVENW
OR
TH ST
LYON
ST
BRO
DER
ICK ST
BAKER ST
WALLERST
PRESID
IO AVE
SUTTER ST
WEBSTER
ST
DO
LOR
ES S
T
CH
UR
CH
ST
OFARRELL ST
FULTON ST
FULTON ST
GROVE ST
FULTON STMCALLISTER ST
MCALLISTER ST
GOLDEN GATE AVE
FULTON ST
TURK ST
PAGE ST
PAGE ST
OAK ST
OAK ST
HAYES ST
HAYES ST
HAYES ST
OAK ST
OAK ST
FELL ST
FELL ST
FELL ST
FELL ST
GROVE ST
WASHINGTON ST
JACKSON ST
ASHBU
RY ST
PIERC
E ST
CLAYTO
N ST
PRESID
IO AVE
BAKER ST
CEN
TRAL AVE
LAGU
NA ST
BUC
HAN
AN ST
BRO
DER
ICK ST
FILLMO
RE ST
WALN
UT ST
BAKER ST
CLAYTO
N ST
SCO
TT ST
GOLDEN GATE AVE
CO
LE ST
ELLIS ST
MCALLISTER ST
MCALLISTER ST
PINE ST
PINE ST
GEARY ST
WALLER STCEN
TRAL AVE
LYON
ST
TURK BLVD
12TH ST
BUSH ST
FILLMO
RE ST
FILLMO
RE ST
SCO
TT ST
SCO
TT ST
STEINER
ST
STEINER
ST
STEINER
ST
LAGU
NA ST
OC
TAVIA ST
WEBSTER
ST
OC
TAVIA ST
BUC
HAN
AN ST
GO
UG
H ST
GO
UG
H ST
FRAN
KLIN ST
FRAN
KLIN ST
POLK ST
POLK ST
LARKIN
ST
LARKIN
ST
TURK ST
EDDY ST
PIERC
E ST
08TH ST
PINE ST
10TH ST
10TH ST
09TH ST
ANZA ST
11TH ST
POST ST
HYD
E ST
HYD
E ST
CLAY ST
CLAY ST
SACRAMENTO ST
SACRAMENTO ST
SACRAMENTO ST
TURK ST
OFARRELL ST
ELLIS ST
ELLIS ST
SUTTER ST
SUTTER ST
HAIGHT ST
HAIGHT ST
LAGU
NA ST
FOLSOM ST
FOLS
OM
ST
VAN N
ESS AVE
VAN N
ESS AVE
DIVISAD
ERO
ST
MASO
NIC
AVE
DIVISAD
ERO
ST
GEARY BLVD
GEARY BLVD
GEARY BLVD
GEARY BLVD
CLINTON PARKRO
SE
MO
NT P
L
BROSNAN ST
CALIFORNIA ST
CALIFORNIA ST
CALIFORNIA ST
CALIFORNIA ST
BUSH ST
BUSH ST
JON
ES ST
JON
ES ST
WO
OD
STBELVED
ERE ST
AVE
CO
LLINS ST
MASO
NIC
AVE
BUE
NA V
ISTA TER
ANZAVISTA AVE
SACRAMENTO ST
LUPINE AVE
CLEARY CT
ENCANTOAVE
FORTUNAAVE
STARRKINGW AY
BARCE LONAAVE
ST JOSEPH
S AVE
OFARRELLST
MCCOPPIN ST
NID
O AVE
OC
TAVIA BLVD
T
AV E
UEN
AVI
STA
WEST AVE
SOU
TH VAN
NESS AVE
PET ERYORKEWAY
MARKET ST
MARKET ST13TH ST
13TH ST
PLUM ST
MIS
SIO
N S
T
VALE
NC
IA ST
NO
E ST
OTIS ST
WEBSTER
ST
Legend
Areas of ConcernBicycle Enforcement
Bicycle Infrastructure
Pedestrian Safety
Transit Service
Street Conditions
Traffic Congestion
Traffic Enforcement
Security0 0.085 0.17 0.255 0.34 0.425
MilesOutreach location
Project Boundary
COMMUNITY IDENTIFIED PRIORITY IMPROVEMENT LOCATIONSThe following map displays the community priority locations selected during Phase 2 outreach. These locations were compared with existing improvements planned for the Western Addition to identify new corridors to focus on and prioritize moving forward. The following corridors within the project area have been selected as a result of this analysis:
• Ellis Street
• Fulton Street
• Laguna Street
• Sutter Street• Buchanan Street
• Golden Gate Avenue
• Steiner Street
Figure 1: Map of Community Identified Priority Locations for Transportation Improvements.