community based transportation plan · in september 2015 the project team completed phase 1 of...

2
In September 2015 the project team completed Phase 1 of public outreach and began Phase 2 in mid-November as a Design Game workshop. The Design Game workshop was created to further understand community transportation needs and concerns, including: Identifying specific priority improvement blocks and intersection locations • Describing the transportation issues at these locations Diagnosing these issues with community members’ transportation solutions The Design Game workshops were held throughout the Western Addition are as part of Phase 2. Date Event Location November 13, 2015 Rosa Parks Elementary Parent Hour Hollis + Ellis November 19, 2015 Mo’MAGIC Service Provider Meeting Fulton + Webster Streets January 27, 2016 Rosa Parks Senior Center Lunch Buchanan Street + Golden Gate Ave January 29, 2016 Western Addition Senior Center Lunch Turk + Fillmore Streets SFMTA. COM WESTERN ADDITION COMMUNITY BASED TRANSPORTATION PLAN WWW.SFMTA.COM/WESTERNADDITION Pedestrian Transit Automobile Bicycle 57% 24% 11% 8% Over half of the community responses related to pedestrian travel. PRIORITY TRANSPORTATION CORRIDORS Phase 2 Outreach Update | March 16, 2016 SUMMARY OF PHASE II RESULTS Below is a brief overview of the results from the four Design Game workshops. Four improvements comprised 31% of the transportation improvements requested by the community. Community preferred improvements included the following: Lighting Rapid flashing beacons Stop signs Bus amenities 38% of reported issues were related to pedestrian safety High vehicle speeds Lack of pedestrian Visibility Failure of cars and bicycles to yield to pedestrians

Upload: others

Post on 17-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: COMMUNITY BASED TRANSPORTATION PLAN · In September 2015 the project team completed Phase 1 of public outreach and began Phase 2 in ... Below is a brief overview of the results from

In September 2015 the project team completed Phase 1 of public outreach and began Phase 2 in mid-November as a Design Game workshop. The Design Game workshop was created to further understand community transportation needs and concerns, including:

• Identifying specific priority improvement blocks and intersection locations

• Describing the transportation issues at these locations

• Diagnosing these issues with community members’ transportation solutions

The Design Game workshops were held throughout the Western Addition are as part of Phase 2.

Date Event Location

November 13, 2015 Rosa Parks Elementary Parent Hour Hollis + Ellis

November 19, 2015 Mo’MAGIC Service Provider Meeting Fulton + Webster Streets

January 27, 2016 Rosa Parks Senior Center Lunch Buchanan Street + Golden Gate Ave

January 29, 2016 Western Addition Senior Center Lunch Turk + Fillmore Streets

S F M T A . C O M

WESTERN ADDITION COMMUNITY BASED TRANSPORTATION PLAN

WWW.SFMTA.COM/WESTERNADDIT ION

Pedestrian

Transit

Automobile

Bicycle

57%

24%

11%

8%

Four improvements -including lighting, rapid flashing beacons, stop signs, and bus amenities,

comprised 31% of the transportation improvements requested by the community.

Failure of cars and bicycles

to yield to pedestrians

Lack of pedestrian visibility

High vehicle speeds

38%of reported issues

were related to pedestrian safety

Over half of the community responses related to pedestrian

travel.

PRIORITY TRANSPORTATION CORRIDORS Phase 2 Outreach Update | March 16, 2016

SUMMARY OF PHASE II RESULTSBelow is a brief overview of the results from the four Design Game workshops.

Four improvements comprised 31% of the transportation improvements requested by the community. Community preferred improvements included the following:• Lighting• Rapid flashing beacons• Stop signs• Bus amenities

38%of reported issues

were related to

pedestrian safety High vehicle speeds

Lack of pedestrian Visibility

Failure of cars and bicycles to yield to pedestrians

Page 2: COMMUNITY BASED TRANSPORTATION PLAN · In September 2015 the project team completed Phase 1 of public outreach and began Phase 2 in ... Below is a brief overview of the results from

Goal of Phase 2 Outreach: Identifying specific improvement locations.1. Where are the transportation issues?2. What are the transportation issues?3. How should they be fixed?

WESTERN ADDITION COMMUNITY BASED TRANSPORTATION PLAN

S F M T A . C O M

WWW.SFMTA.COM/WESTERNADDIT IONLAU

REL ST

ASHBU

RY ST

DUBOCE AVE

POST ST

POST ST

POST ST

LAGU

NA ST

HOWARD ST

HOW

ARD

ST

MASO

NIC

AVE

MA

SON

ICAVE

GROVE ST

GOLDEN GATE AVE

GOLDEN GATE AVE

EDDY ST

EDDY ST

HERMANN ST

14TH ST

PIERC

E ST

LEAVENW

OR

TH ST

LYON

ST

BRO

DER

ICK ST

BAKER ST

WALLERST

PRESID

IO AVE

SUTTER ST

WEBSTER

ST

DO

LOR

ES S

T

CH

UR

CH

ST

OFARRELL ST

FULTON ST

FULTON ST

GROVE ST

FULTON STMCALLISTER ST

MCALLISTER ST

GOLDEN GATE AVE

FULTON ST

TURK ST

PAGE ST

PAGE ST

OAK ST

OAK ST

HAYES ST

HAYES ST

HAYES ST

OAK ST

OAK ST

FELL ST

FELL ST

FELL ST

FELL ST

GROVE ST

WASHINGTON ST

JACKSON ST

ASHBU

RY ST

PIERC

E ST

CLAYTO

N ST

PRESID

IO AVE

BAKER ST

CEN

TRAL AVE

LAGU

NA ST

BUC

HAN

AN ST

BRO

DER

ICK ST

FILLMO

RE ST

WALN

UT ST

BAKER ST

CLAYTO

N ST

SCO

TT ST

GOLDEN GATE AVE

CO

LE ST

ELLIS ST

MCALLISTER ST

MCALLISTER ST

PINE ST

PINE ST

GEARY ST

WALLER STCEN

TRAL AVE

LYON

ST

TURK BLVD

12TH ST

BUSH STFILLM

OR

E ST

FILLMO

RE ST

SCO

TT ST

SCO

TT ST

STEINER

ST

STEINER

ST

STEINER

ST

LAGU

NA ST

OC

TAVIA ST

WEBSTER

ST

OC

TAVIA ST

BUC

HAN

AN ST

GO

UG

H ST

GO

UG

H ST

FRAN

KLIN ST

FRAN

KLIN ST

POLK ST

POLK ST

LARKIN

ST

LARKIN

ST

TURK ST

EDDY ST

PIERC

E ST

08TH ST

PINE ST

10TH ST

10TH ST

09TH ST

ANZA ST

11TH ST

POST ST

HYD

E ST

HYD

E ST

CLAY ST

CLAY ST

SACRAMENTO ST

SACRAMENTO ST

SACRAMENTO ST

TURK ST

OFARRELL ST

ELLIS ST

ELLIS ST

SUTTER ST

SUTTER ST

HAIGHT ST

HAIGHT ST

LAGU

NA ST

FOLSOM ST

FOLS

OM

ST

VAN N

ESS AVE

VAN N

ESS AVE

DIVISAD

ERO

ST

MASO

NIC

AVE

DIVISAD

ERO

ST

GEARY BLVD

GEARY BLVD

GEARY BLVD

GEARY BLVD

CLINTON PARKRO

SE

MO

NT P

L

BROSNAN ST

CALIFORNIA ST

CALIFORNIA ST

CALIFORNIA ST

CALIFORNIA ST

BUSH ST

BUSH ST

JON

ES ST

JON

ES ST

WO

OD

STBELVED

ERE ST

AVE

CO

LLINS ST

MASO

NIC

AVE

BUE

NA V

ISTA TER

ANZAVISTA AVE

SACRAMENTO ST

LUPINE AVE

CLEARY CT

ENCANTOAVE

FORTUNAAVE

STARRKINGW AY

BARCE LONAAVE

ST JOSEPH

S AVE

OFARRELLST

MCCOPPIN ST

NID

O AVE

OC

TAVIA BLVD

T

AV E

UEN

AVI

STA

WEST AVE

SOU

TH VAN

NESS AVE

PET ERYORKEWAY

MARKET ST

MARKET ST13TH ST

13TH ST

PLUM ST

MIS

SIO

N S

T

VALE

NC

IA ST

NO

E ST

OTIS ST

WEBSTER

ST

Legend

Areas of ConcernBicycle Enforcement

Bicycle Infrastructure

Pedestrian Safety

Transit Service

Street Conditions

Traffic Congestion

Traffic Enforcement

Security0 0.085 0.17 0.255 0.34 0.425

MilesOutreach location

Project Boundary

LAUR

EL ST

ASHBU

RY ST

DUBOCE AVE

POST ST

POST ST

POST ST

LAGU

NA ST

HOWARD ST

HOW

ARD

ST

MASO

NIC

AVE

MA

SON

ICAVE

GROVE ST

GOLDEN GATE AVE

GOLDEN GATE AVE

EDDY ST

EDDY ST

HERMANN ST

14TH ST

PIERC

E ST

LEAVENW

OR

TH ST

LYON

ST

BRO

DER

ICK ST

BAKER ST

WALLERST

PRESID

IO AVE

SUTTER ST

WEBSTER

ST

DO

LOR

ES S

T

CH

UR

CH

ST

OFARRELL ST

FULTON ST

FULTON ST

GROVE ST

FULTON STMCALLISTER ST

MCALLISTER ST

GOLDEN GATE AVE

FULTON ST

TURK ST

PAGE ST

PAGE ST

OAK ST

OAK ST

HAYES ST

HAYES ST

HAYES ST

OAK ST

OAK ST

FELL ST

FELL ST

FELL ST

FELL ST

GROVE ST

WASHINGTON ST

JACKSON ST

ASHBU

RY ST

PIERC

E ST

CLAYTO

N ST

PRESID

IO AVE

BAKER ST

CEN

TRAL AVE

LAGU

NA ST

BUC

HAN

AN ST

BRO

DER

ICK ST

FILLMO

RE ST

WALN

UT ST

BAKER ST

CLAYTO

N ST

SCO

TT ST

GOLDEN GATE AVE

CO

LE ST

ELLIS ST

MCALLISTER ST

MCALLISTER ST

PINE ST

PINE ST

GEARY ST

WALLER STCEN

TRAL AVE

LYON

ST

TURK BLVD

12TH ST

BUSH ST

FILLMO

RE ST

FILLMO

RE ST

SCO

TT ST

SCO

TT ST

STEINER

ST

STEINER

ST

STEINER

ST

LAGU

NA ST

OC

TAVIA ST

WEBSTER

ST

OC

TAVIA ST

BUC

HAN

AN ST

GO

UG

H ST

GO

UG

H ST

FRAN

KLIN ST

FRAN

KLIN ST

POLK ST

POLK ST

LARKIN

ST

LARKIN

ST

TURK ST

EDDY ST

PIERC

E ST

08TH ST

PINE ST

10TH ST

10TH ST

09TH ST

ANZA ST

11TH ST

POST ST

HYD

E ST

HYD

E ST

CLAY ST

CLAY ST

SACRAMENTO ST

SACRAMENTO ST

SACRAMENTO ST

TURK ST

OFARRELL ST

ELLIS ST

ELLIS ST

SUTTER ST

SUTTER ST

HAIGHT ST

HAIGHT ST

LAGU

NA ST

FOLSOM ST

FOLS

OM

ST

VAN N

ESS AVE

VAN N

ESS AVE

DIVISAD

ERO

ST

MASO

NIC

AVE

DIVISAD

ERO

ST

GEARY BLVD

GEARY BLVD

GEARY BLVD

GEARY BLVD

CLINTON PARKRO

SE

MO

NT P

L

BROSNAN ST

CALIFORNIA ST

CALIFORNIA ST

CALIFORNIA ST

CALIFORNIA ST

BUSH ST

BUSH ST

JON

ES ST

JON

ES ST

WO

OD

STBELVED

ERE ST

AVE

CO

LLINS ST

MASO

NIC

AVE

BUE

NA V

ISTA TER

ANZAVISTA AVE

SACRAMENTO ST

LUPINE AVE

CLEARY CT

ENCANTOAVE

FORTUNAAVE

STARRKINGW AY

BARCE LONAAVE

ST JOSEPH

S AVE

OFARRELLST

MCCOPPIN ST

NID

O AVE

OC

TAVIA BLVD

T

AV E

UEN

AVI

STA

WEST AVE

SOU

TH VAN

NESS AVE

PET ERYORKEWAY

MARKET ST

MARKET ST13TH ST

13TH ST

PLUM ST

MIS

SIO

N S

T

VALE

NC

IA ST

NO

E ST

OTIS ST

WEBSTER

ST

Legend

Areas of ConcernBicycle Enforcement

Bicycle Infrastructure

Pedestrian Safety

Transit Service

Street Conditions

Traffic Congestion

Traffic Enforcement

Security0 0.085 0.17 0.255 0.34 0.425

MilesOutreach location

Project Boundary

COMMUNITY IDENTIFIED PRIORITY IMPROVEMENT LOCATIONSThe following map displays the community priority locations selected during Phase 2 outreach. These locations were compared with existing improvements planned for the Western Addition to identify new corridors to focus on and prioritize moving forward. The following corridors within the project area have been selected as a result of this analysis:

• Ellis Street

• Fulton Street

• Laguna Street

• Sutter Street• Buchanan Street

• Golden Gate Avenue

• Steiner Street

Figure 1: Map of Community Identified Priority Locations for Transportation Improvements.