construction e-zone

62
C ontractor’s Z one weekly newspaper December 10, 2012 Vol. 6, No. 49 Placer County Contractors Association & Builders Exchange We’ve Saved Your Spot Details inside this issue

Upload: placer-county-contractors-association

Post on 16-Mar-2016

251 views

Category:

Documents


11 download

DESCRIPTION

Weekly publication for contractors to find bidding projects, education, networking opportunities and group discounts.

TRANSCRIPT

Page 1: Construction E-zone

Contractor’s Zone

Contractor’s Zoneweekly newspaper

December 10, 2012Vol. 6, No. 49Placer County Contractors Association & Builders Exchange

We’ve Saved Your SpotDetails inside this issue

Page 2: Construction E-zone

December 10, 2012Page 2 Contractor’s Zone• .Contractor’s Zone

Page 3: Construction E-zone

Contractor’s ZoneContractor’s Zone

Inside This Issue

This table of contents is linked to make it easy for you to get to the information you want. If it looks like a link (blue & underlined) then it is! Just click on it to go directly to the page you want. Use the navigation bar at the bottom of the right-hand pages to return to this page.

InspirationfortheWeek Page2

YourWeeklySmile Page2

IndustryLinks Page2

TheWeek’sWeatherForecast Page3

PCCACalendarofEvents Pages4-5

ContractorYellowPages Page6

NewsBriefs Pages7-9

IndustryNews Pages10-14

WeeklySafetyMeeting Page15

ClassifiedAds Pages16-17

NewPlanArrivals Pages18-19

WeekAtAGlance Pages19-21

CalTransProjects Pages22-23

PlansOnFile Pages24-55

LegalAds Pages56-57

BidResults Page58

BottomlineLawyers Page6 WebsiteBozzutoInsurance Page28 WebsiteDiamondPacific Page9 WebsiteHansenBros.Enterprises PageIFC WebsiteInlandBusinesSystems Page10 WebsiteJensenMasonry Page6 WebsitePhiladelphiaInsurance Page55SmithChiropracticandMassage Page6 WebsiteTheCappsGroup Page6 WebsiteTrePazziTrattoria Page6 WebsiteStateFundInsurance Page21 Website

SUPPORT OUR ADVERTISERS!They support the PCCA

and deserve your business!

Don’t let the money ship

sail without you!A recent study confirmed that Internet sales accounted for a whopping 5% of all US sales in 2010 — and it’s growing yearly. Don’t be left behind. Run your affordable ad in this modern, digital newspaper, published weekly. Call Steve Berlin at 916.729.5432 for advertising rates. PCCA members get 15% off published ad rates!

Page 4: Construction E-zone

December 10, 2012Page 2 Contractor’s Zone• .Contractor’s Zone

Association Links CSLB Contractor’s State License Board OSHA Occupational Safety & Health Administration GSBE Golden State Builders Exchange AIA American Institute of Architects AGC Associated general Contractors BIA Building Industry Association SCIF State Compensation Insurance Fund Employers Guardian Human Resources American Subcontractors Association

Projects Online DGS Contracts DOT DOT District 3 SMUD CSI Code List Fed Biz Opps

Safety OSHA Hazard Communication OSHA Safety & Health Topics Click SafetyOnline OSHA Safety Classes Employer Records of Occupational Injury & Illness Governor’s Office of Emergency Services Injury & Illness Prevention Program Risk Management – IIPP

State & Federal Links California Building Standards California Prevailing Wage Rates Federal Prevailing Wage Rates California Dept. of Industrial Relations California Environmental Protection Agency Mechanics Lien Law Information Mechanics Lien Guide

Local Government Links California Chamber of Commerce City of Auburn City of Rocklin City of Roseville City of Lincoln County of Placer

Construction Industry Links

And then one day you find ten years have got behind you. No one told you when to run, you missed the starting gun.

— Time lyrics, Pink Floyd

Who makes toy guitars and sings, “Blue Christmas?”

- Elfis

Page 5: Construction E-zone

Contractor’s ZoneContractor’s Zone

PCCA:

Patrick Remington - PresidentRemington Construction

Chris Harris - Vice PresidentJames L. Harris Painting

George Henley – TreasurerHenley Homes, Inc

Mike Garman – SecretaryCalifornia construction and Renovation Inc.

Michelle Strange – DirectorTriCounties Bank

Cheryl Gibson – DirectorVon Jac Developments, Inc.

Cyndi Cook – DirectorCook Design Company

Tim Busk – Public Relations DirectorHeritage Painting

Jack Remington – VP of Governmental Af-fairsAndregg Geomatics

PBX:John Brun – PresidentJohn Brun Masonry, 530-269-2044

Michael Bennett Bennett Tile Company, 916-773-8453

Chad Twardus – SecretaryTwardus Construction, 530-878-1790

Nick ForestiereGurnee & Daniels LLP, 916-797-3100

Ed Simpson

Staff:Chae Gale-Director of [email protected]

Jeff Henry-Director of Business [email protected]

Kellie Russell-Auburn Planroom [email protected]

Dianne Barnao-Roseville Planroom [email protected]

Jim Couk - Scan Technician

Placer County Contractors Association10656 Industrial Ave., Ste.160, Roseville, CA 95678

916-771-7229231 Cherry Ave., Ste.101, Auburn, CA 95603

530-889-3953Open Monday-Friday: 8am-5pm

www.placerbx.com

Board of Directors

RosevilleToday60oCloudy60o-35o

58o

39o

Tuesday Wednesday Thursday Friday

52o

34o51o

34o51o

41o

AuburnToday63oCloudy63o-42o

60o

40o

Tuesday Wednesday Thursday Friday

50o

34o49o

36o51o

41o

Page 6: Construction E-zone

December 10, 2012Page 4 Contractor’s Zone• .Contractor’s Zone

D e c e m b e r

11 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

12 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

13 QSP/QSDTrainingSeminarhosted byBTConsulting8:30amto4:30pm Roseville

20 HolidayPotluck

24 MerryChristmasEve!ThePCCA RosevilleandAuburnOfficesare closedtoday.

25 MerryChristmas!ThePCCA RosevilleandAuburnOffices areclosedtoday.

J a n u a r y

18 PCCAAnnualDinnerand ContractorOfTheYearAwards. 5:00pmto9:00pmatTheRidge!

Annual DinnerFriday, January 18th 2013

at the

Contractor Of The Year AwardsCocktails at 5pm

Presentation & Dinner at 6pm

Dinner $50.00 Per Ticket

Meals purchased in advance ~ No Refunds

Reserve the date on your calendar, so you don’t miss this great event. Dinner, Networking, Raffle Prizes,

Sponsorships, Opportunities and more.Tri-Tip, Grilled Salmon, Salad, Potatoes, Green Beans, Chocolate Dessert

Meet the PCCA and PBX Leadership, as well as our Contractor and Project and Volunteers of the year awards.

2020 Golf Course Rd, Auburn, California

Company Phone Number No. Dinners Names of Guest 1. 3. 2. 4.If you have more guest please call 916-771-7229 Final Dinner Sales Jan. 18th 2011- No Refunds You must send check to: 10656 Industrial Ave., Ste 160 Roseville, Ca 95678Pay Online by Credit Card: http://www.placerbx.com/Payment.htm

How to send your adto C&S Publishing:

If you have your information ready, just email it to:

[email protected]

If you need a little helpputting the ad together,

use the handy online form.

Once we have your information, we will typeset the ad and send back a

proof and a price.

Ads are published here, posted online at www.TheDailyReporter.net

Page 7: Construction E-zone

Contractor’s ZoneContractor’s Zone

DecemberSUNDAY MONDAY TUESDAY WED. THURSDAY FRIDAY SAT.

3 0 2 5 4

17

11

1 9 20

14 15

24

18

26 27

21

5

16

3 1

2 5

3

2 8

Dec. 9

2 3

12

29

10 13

QSP/QSD Training Seminar hosted by BT Consulting 8:30am to 4:30pm Roseville

Holiday Potluck

22

Jan. 1

Page 8: Construction E-zone

December 10, 2012Page 6 Contractor’s Zone• .Contractor’s Zone

Contractor Yellow Pages

MasonryJensen

Full Service Masonry ContractorLicense # 804650

Mark Jensen916.663.3429

[email protected]

Smith Chiropractic and MassageAuburn

13136LincolnWayAuburn,CA95603-4114

[email protected]

http://www.smithchiropractic.net

Family runand family friendlyhealthcarefor all ages. Includes chiropractic careandmassagetherapy.ServingtheAuburnregion formore than49years.Call (530) 885-8205foranappointment.

928 Lincoln Way, AuburnOpen 11:30 am - 9:00 pm M-F

Open at 4:30 Saturday & Sunday

530.823.2994

Traditional Italian Cuisinein Downtown Auburn

www.trepazzi.net Outdoor dining!

The Capps GroupA Professional Real Estate Team

Kevin Capps - Managing [email protected] (DRE 01705659)

Carolyn Hearn - [email protected] (DRE 01483632)

530-823-2111 Office www.cappsgroup.com856 Lincoln Way, Auburn, CA 95603

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com985LincolnWay,Auburn,CA95603

Located in the heart of Downtown Auburn, serving Buyers & Sellers since 1987 Residential, Commercial & Investment

The Capps GroupA Professional Real Estate Team 530-823-2111 Office

www.cappsgroup.com

856 Lincoln Way, Auburn, CA 95603

Kevin Capps - Managing [email protected] (DRE # 01705659)

Carolyn Hearn - [email protected] (DRE # 01483632)

Page 9: Construction E-zone

Contractor’s ZoneContractor’s Zone

Porterville Will Build $70 Million Jail

Tulare County Supervisors have ap-proved contracts to build a new jailin Porterville. The facility will houseover500inmates.Buildingitwillcostalmost $70 million. Most of that willbepaidbythestate.Although,TulareCounty ison thehook foralmost$8million.

Officialssaybuilding thenewjailwillcreate savings in the long run. Cur-rently, Tulare county spends about$500,000ayearforjail-relatedtrans-portation. The new facility will alsocreate construction jobs and morepermanentpositions.Staffing the jailwilllikelyrequireupwardsof100newpersonnel.

McCarthy Building Companies Food Drive

Almost150yearsago,an Irish im-migrant named Timothy McCarthybegan a lumber business in AnnArbor, Michigan, building farm-housesandbarns.Thecompanyhefoundedin1864,McCarthyBuildingCompanies, is now a multi-billiondollar construction firm and oneof the largest andmost diversifiedcommercial construction compa-niesinAmerica.

This holiday season, McCarthy em-ployees are once again giving backto the community by sponsoringand supporting a holiday food drive.Canned food can be dropped off atanyMcCarthyofficeor jobsite trailer.Food collected by December 20 willbenefitthePlacerFoodBanklocatedinRoseville.

For more information about the Mc-Carthyfooddrive,pleasecontactLisaRitcheyat916-784-0628orErinReedat916-784-0648.

News Briefs

Continued on next page

About the Placer Food Bank: ThePlacer Food Bank is a vital linkbetween food and the peoplewhoneed it. They serve thousands ofpeople through two primary chan-nels–localfooddonorsandournet-workoffeedingagencies.Fromthelargest community meal programstothesmallestgrassrootsfoodclos-ets, thePlacerFoodBankreachespeople in need throughout Placerandsurroundingcounties.To learnmoreaboutPlacerFoodBank, theworktheydoandhowyoucanhelp,please call (916) 783-0481. Theyareonlineat:http://placerfoodbank.org/

New Construction Report Available For Free From

Gilbane Buildng Company

GilbaneBuildingCompanyhasan-nouncedthepublicationoftheWin-ter 2012 edition of ConstructionEconomics –Market Conditions inConstruction.Basedonanarrayofeconomicdata,constructionstarts,and material cost trends, this freereportindicatesanincreaseincon-structionspending.

“Supported by overall positivegrowth trends for year 2013, I ex-pectmarginsandoverallescalationto climb more than we’ve seen infiveyears,particularlyintherapidlyexpanding residential side of con-struction.,”saysEdZarenski,there-port’sauthoranda40-yearveteranoftheconstructionindustry.

The U.S. Census Bureau reportedlastweekthatconstructionspendinginOctoberwasestimatedat$872.1milliononaseasonallyadjustedan-nualbasisandupfromSeptember’s$860.4 billion. The October figure,9.6percentaboveyear-ago levels,waslargelyboostedbymorehous-ingconstruction.

According to the report, marginsareup1%to2%yearoveryearfor2012. Once 2013 growth in non-residentialwork picks up and bothresidential and nonresidential areactive, the industry may begin toseesomelaborshortagesandpro-ductivity losses,whichwillpushupescalation.Also, as it did in 2012,even moderate growth in activitywillallowcontractorstopassalongmore material costs and increasemargins.

Potentialimpactofrecentevents:

•AccordingtotheAssociatedGen-eral Contractors (AGC), HurricaneSandymay not add any economicimpact to theconstruction industry.Forthemostpart,anyfundsdirect-edtoreconstructionwillbedivertedfromsomeotherpotentialorprevi-ously planned construction projectandwillbespreadoveralongtimespan.

• Bond issues considered in therecentelectionsamounttojustoverhalf ($30+billion) ofwhatwas ap-proved in2008elections($60+bil-lion), signaling a reduction in pub-liclyfundedwork.

Don’t get thrown out on your way home!

DVBE/UDBE Good Faith ads are

often required. This newspaper

is state-certified. Email your ad to:

[email protected]

Page 10: Construction E-zone

December 10, 2012Page 8 Contractor’s Zone• .Contractor’s Zone

Among the topics covered in thiscomprehensivereportare:

•ConstructionStarts,Spending,&Costs•MaterialPriceMovement•TrendsandCostsforStructuralSteel,RecyclingSteel,&Copper•ArchitecturalBillingsIndex•CurrentInflationForecast•ENRIndex–BCIHistory

Thisfreereportisavailablefordown-load at http://info.gilbaneco.com/construction-economics-winter-2012

Construction Predicted To Be A “Growth Driver” in 2013

In a quarterly report released lastweek, UCLA forecasters predictmoderate U.S. economic growthnextyear,presuminga“benignreso-lution”tothesetoftaxincreasesandlargeautomaticspendingreductionsthatkickinbeginningJan.1,knownasthe“fiscalcliff.”

Housingwillbeasteadydriveroftheeconomy,thereportsays,achangefromthelastthreeyears,whenbusi-ness investment and exports grewand housing and consumer spend-ing lagged behind.Although late tothe recovery, housinghas “becomethe leadingsourceof strength,” thereportsaid.

“Manufacturing had been leadingtherecoveryduetostrongbusinessinvestment,exportsandanimprove-ment in vehicle sales,” the reportsaid.“Manufacturingwillcontinuetoexpandinthenearterm,butthein-dustry hasmoved from leading theoverall recovery to keeping pacewith it. However, construction willbemoreofagrowthdriverin2013.Homebuildingisinrecovery.”

Firms Sought For Elk Grove Aquatics Project

Elk Grove city officials are seekingcompanies interested in designing,building, and operating an aquaticscomplexattheproposedciviccentersitebeforeaformalrequestforpro-posalsisissuednextyear.

Theproposedciviccentersiteon76acresislocatedonthesouthsideofElk Grove Boulevard between BigHornBoulevardandLagunaSpringsDrive.Theaquaticscomplex,whichwillcoverabout20acres,isplannedtoincludeacompetitionandtrainingfacility with an Olympic-size swim-mingpool,anda10-meterDiveTow-er.

Elk Grove officials recently issueda request forqualifications inwhichcompanies would partner and sub-mitabidtodesign,build,andoper-atetheaquaticscomplexattheciviccentersiteinMadeira.

AssistantCityManagerBeckyCraigsaid at a recent Elk Grove CityCouncilmeetingthatcitystaffseeksateamthatcouldhandleallthreeas-pectsoftheaquaticscomplex.

A statement of qualifications fromeach team is dueDec. 21.The listofteamsisscheduledforcouncilap-proval in January with the requestforproposals issued inFebruaryorMarch.

HSR Adopts Disadvantaged Workers Hiring Policy

TheCaliforniaHigh-SpeedRailAu-thority says it hopes togiveprefer-ence inhiring toCalifornia commu-nitybusinessesandresidentsduringconstruction of the California High-SpeedRailProject,especiallythose

wholiveinso-called“disadvantagedareas”andthosedesignatedas“dis-advantagedworkers,” includingvet-eransreturningfrommilitaryservice.

It says its newly-adopted policiesalso help remove potential barrierstosmallbusinesses,disadvantagedbusiness enterprises, disabled vet-eran business enterprises, women-owned businesses, and microbusi-nesses that want to participate inbuildingtheHigh-SpeedRailsystem.

“ThispolicyisintendedtohelpCen-tralValleycommunitieswhereHigh-SpeedRailissettobeginandunem-ploymentisstillveryhigh,”saysDanRichard,chairmanoftheAuthority’sBoardofDirectors.“Theprojectwillbring thousandsof jobs to theareaandourpolicywillmakesurecom-munities havea fair shot at gettingthese good paying jobs and ca-reer opportunities. High-SpeedRailwill help build and strengthen theeconomyalongtheHigh-SpeedRailalignment,andthroughouttheentireregion, as working people pay taxdollars thataredesperatelyneededforcommunitycoffers.”

$350 Million Casino Gets Approval

Thefinalmajorhurdle for theNorthForkRancheriaofMonoIndianshasbeenclearedthatwillallowthetribetobuild its$350millionoff-reserva-tioncasinoonHighway99,northofMadera.

TheassistantsecretaryoftheBureauofIndianAffairsmadeafinalagencydetermination to acquire about 305acresoflandintrustforgamingpur-poses for the tribe onNov. 26.As-sistantSecretaryKevinWashburn’sdecisionrepresentsthefinalfederalapprovalstepinthelengthyprocess

News BriefsContinued from last page

Page 11: Construction E-zone

Contractor’s ZoneContractor’s Zone

http://designcenters.paccoast.com

established by Congress to qualifynewlyacquired trust lands for tribalgaming.Thenextstepisforthestatelegislature,thatreconvenesinJanu-ary,toratifythecompactthegover-norhasalreadyagreedto.

The North Fork tribe has negoti-ated binding agreements with thecountyandCityofMaderaaswellasthe localwaterdistrict,promisingtomitigate potential impacts and pro-vide more than $5 million annuallyin community funding for schools,roads,parks,publicsafety,econom-icdevelopment, and local charities,among other public programs andservices.The tribe has also signedlaboragreementsandagreedtopro-videsubstantialfundingtonon-gam-ingtribesthroughoutthestate.

Roseville To Build Bridge

Rosevillehaslaunchedadesigncom-petition for two new pedestrian andbikebridgesoverDryCreekbetweendowntownandRoyerPark.Thenewbridges, along with a Town SquarenowunderconstructioninfrontofCityHall,willcreateamorewalkableandlivelydowntown,officialssay.

There are two design finalists. BothincludeanelegantcrossingnearCityHall. City officials are inviting resi-dents to vote on which design theyprefer.YoucanvoteonlineuntilDec.6.Clickhereformoreinformation.

Sacramento Light Rail Gets Expansion Grant

SacramentoLightRailtransitofficialswere ionformed last week that thefederal government will grant them$135millionto launchfullconstruc-tion of a light-rail line from Mead-owviewtoCosumnesRiverCollege.

RTofficialssaytheywillbeginlayingtrackinApril,andhavethefour-milelinerunningbytheendof2015.

Amazon To Build In Tracy

Amazon.comhasannouncedthatitwillbuildadistributioncenterinTracy.CityManagerRodButlerandMayorLuisMolinasaidtheyknewtheonlineretailgiantwaslookingforathirdCal-iforniasite.Amazonrecentlyopenedadistributioncenter in theSouthernCaliforniacityofSanBernardino,anda 1million-square-foot center is un-derconstructioninPatterson.

TheAmazonfulfillmentcenterinTra-cyisexpectedtoemploy1,000peo-ple. It’splannedon70acres in thecity’snortheastindustrialarea.Ama-zonwon’tsayhowmanypeoplewillbeemployedatthePattersoncenterwhen itopens in thespring,puttingthenumberonlyinthehundreds.Ininformation provided to Gov. JerryBrown’sofficeofbusinessandeco-nomic development, the online re-tailerestimated350 jobsat itsPat-terson site, although officials notedthatAmazonoftenexpandsdistribu-tioncentersonceitopensthem.

TracyMayorBrentIvessaidthatthePatterson center will focus on bulk

distribution, while the one in Tracywilluseadvancedroboticsandofferbetter-payingjobs.

$5.4 Million Lakeport Housing Project Saved

TheLakeportCityCouncilhasvotedtosupportaproposedaffordablese-niorhousingcomplexduringaspe-cialmeetinglastweek.

“When redevelopment went away,I figured we’d lose the whole proj-ect,”MayorStaceyMattinasaid.“Sowhentheywerestillinterestedinfin-ishingit,Ithoughtitwassuchanex-cellentthingforus.”

Constructioncostsareestimatedatalmost$5.4million.LEEDPlatinumstatus is a requirement of federalfundingtheprojectreceived.

The approved agreement requiredLakeport Pacific Associates to reporttothecouncilmonthlyaboutitseffortstohire locally andprovide contact in-formation for the person whom pro-spectivesubcontractorsshouldcontactaboutworkavailableontheproject.

Page 12: Construction E-zone

December 10, 2012Page 10 Contractor’s Zone• .Contractor’s Zone

Industry News

In today’s age of smartphones, tablets and lightning-fast 4G LTE wireless networks, you might not hear the push-to-talk (PTT) chirp often while strolling down the street or browsing a store. Consumer PTT has quieted over the last several years, as many people now use texting for short, quick messages.

But PTT technology is far from obsolete. In business, when workers or supervisors need to get in touch immediately, there’s no substitute for it.

Think about how long it takes to type and send a text message. Then consider how much faster you could speak those same

The Rebirth Of Push-to-Talkwords. Placing a phone call, however, has its limitations. You can call only one per-son at a time unless you’ve set up a con-ference bridge. You have to wait while the phone rings, and you have no way of knowing whether the person you’re call-ing is available.

Because PTT offers instant calling and group conversations, it’s been the de fac-to communications standard for years in a number of industries, especially construc-tion. The technology employed by these businesses varies. Some use PTT over cellular, and some still have traditional two-way radios. What ties them together is the fact that communicating quickly

over PTT networks is deeply ingrained in and essential to their operations. At the same time, the technology land-scape has changed dramatically in the past decade. Business owners who carry smartphones and tablets are starting to see legacy PTT services as clunky and outdated. Because of this perception, wireless carriers and service providers have been investing time and energy into modernizing PTT technology for the 21st-century workforce. The resulting so-lutions have the potential to propel PTT communications for years to come.

Smarter Ways to Work In the U.S., smartphones have officially

1500 North Market Boulevard, Sacramento, CA 95834Sacramento Area (916) 928-0770 • Grass Valley Area (530) 272-1801

At Inland, we don’t just sell copiers, we provide digital printing solutions. Our account representatives will assess your printing needs and develop an individualized plan of products and services that will serve your company best.

&Dealer

Your Authorizedwww.igoinland.com

PCCA member since 2004

Instant communications for mobile workforces join forces with modern technology.

Page 13: Construction E-zone

Contractor’s ZoneContractor’s Zone

outpaced feature phones as the preferred type of device. A recent Nielsen study revealed that 55 percent of mobile sub-scribers now carry smartphones, up from 41 percent a year earlier.

Feature phones, lacking access to appli-cations and email, were once the only op-tion for PTT users. As more people have transitioned to smartphones in their work and personal lives, however, the need to support instant communications on more advanced devices has become clear.

Today, wireless service providers offer PTT as an application that businesses can download to various types of smart-phones. The next generation of PTT solu-tions can even work on phones without dedicated PTT buttons. On touch-screen devices, for instance, users can open up the PTT application, and then just tap an icon to begin talking.

The extension of PTT services to a wide range of devices, not just traditional PTT phones, opens new possibilities for the technology. There’s no “one size fits all” when it comes to selecting devices for a business. In any given firm, employees have different needs.

Consider the variety of workers in an av-erage construction company. First, you have tradesmen responsible for physical labor such as framers, plumbers and elec-tricians. This kind of occupation calls for a sturdy phone that can be dropped with-out breaking and can withstand exposure to dust, dirt, water and extreme tempera-tures.

A foreman on a jobsite might also want a device that’s resistant to the elements, but his responsibilities likely include record-ing information, clocking workers’ hours and responding to emails as well. In this case, a rugged smartphone, combining toughness and advanced capabilities, makes the most sense.

Employees that spend the majority of

their time away from the jobsite can select a standard smartphone without worry-ing about durability. Additionally, office-based personnel can access a PTT applica-tion from their personal computers to get in touch with on-the-go workers.

Integration of PTT and Apps Many construction firms have stuck by their PTT networks because they need the speed, efficiency and agility that fast communications enable. Any service that can improve productivity on the jobsite is worth a second look for construction companies. The widespread use of PTT in the industry indicates businesses’ will-ingness to embrace technology that can help them work smarter, and in recent years, mobile applications have started to catch on.

According to an Aberdeen Group study, 53 percent of organizations currently use mobile apps for field service. Field ser-vice applications help employees conduct an array of tasks, including filling out forms, submitting invoices, keeping track of hours worked on virtual time clocks and more.

When you bring mobile apps and PTT to-gether on a smartphone, the potential for efficient work multiplies.

The Evolution of PPT Despite the benefits of migrating to a more advanced PTT service, some busi-nesses have maintained the “If it isn’t broken, don’t fix it” attitude. They’ve been relatively satisfied with the decades-old PTT technology, and they see no need for change. But this approach won’t hold up much longer. The past year has ushered in a number of changes to PTT. One of the major net-works, once heralded as the gold standard for PTT, is shutting down in June 2013. The Federal Communications Commis-sion (FCC) has issued a narrowbanding mandate that requires licensees using channels in the 25KHZ band to deploy technology that achieves 12.5KHZ effi-

ciency by January 1, 2013. As a result, two-way radio users may be forced to re-place their existing systems.

Over the next several months, businesses that rely on PTT will need to make deci-sions. Companies with two-way radios have to choose either to narrowband or to switch to PTT over cellular. Those with legacy PTT networks must upgrade in order to avoid losing service entirely. For businesses selecting a new PTT so-lution, here are some considerations to keep in mind:

• Wireless networks’ speed and coverage impacts the performance of PTT over cellular. It’s important to take a look at how PTT works in the areas where you do business. Not all PTT networks are designed for 4G LTE. Find out whether you have access to fast 4G LTE net-works, and ask your service provider for a trial to determine whether the PTT so-lution meets your needs.

• As you evaluate PTT services, take a close look at where each one is going in

• the coming years. You don’t want to invest in new technology only to have it become outdated in a matter of months. Make sure your service provider has a plan in place for updates and enhance-ments to the technology.

• Also consider the mobile applications and solutions that can complement PTT. You’ll have an easier time integrating apps with PTT if your wireless carrier offers a broad portfolio of field force au-tomation solutions, mobile application development and device management tools and consulting services to help in the process. The next generation of the “walkie talkie” brings together advanced mobile technology and the long-standing re-quirement for instant communication. In an environment where everything moves quickly, modernized PTT solutions are sure to help your company stay ahead.

Page 14: Construction E-zone

December 10, 2012Page 12 Contractor’s Zone• .Contractor’s Zone

Industry News

By: Schiller CassellArchitect, CEPE, LEED APHERS I/Whole House RaterBPI Analyst/Envelope

As a PCCA member and architect specializ-ing in building performance, my primary role is helping contractors understand and apply the Title 24 Building Energy Efficiency Stan-dards, in this case to a specific project.

A contractor recently asked for help in pre-paring a bid proposal for a new residence-based on drawings from the late 1990s. Drawings were limited to plans, elevations and sections for a 2,300 SF single story with a slab-on-grade foundation. Notes and specifications were minimal with no HVAC information other than a condenser pad for a standard split system. He wanted to know the changes that would be needed to meet the 2008 Standards with the mini-mum number of HERS tests.

Despite three code cycles, we modeled the house based on the original drawings, sug-

PCCA Member Simplifies The Complex Energy Codes.

gested some design changes and achieved compliance with only two HERS tests, re-frigerant charge and duct leakage. In this case, the major change was a reduction in total glazed area to the maximum allowed without penalty (20% total and 5% west elevation of total conditioned floor area, Package D, Climate Zone 12).For example, we reduced window height from six feet to five feet (3060 to 3050) and an external French door (modeled as a window) from eight feet to seven feet (2680 to 2670). An alternative would be to maintain the origi-nal window areas with high performance Low-E, and more expensive, glazing (a U-factor/SHGC from .38/.37 to say .34/.19).

In addition to the T-24 Report (CF-1R) meeting his requirements, we provided a summary of results, recommendations, alternatives, and tools that allowed him to modify the design and window schedule consistent with T-24 compliance.

This approach allowed the contractor flex-ibility in resolving the final design and cost

with the owner without the cost and time of referring back to us for a compliance check until the design is finalized. Once we receive the final documents, we can re-vise the model and issue the final T-24 Re-port. In the absence of any major design change we expect minimal revision. We will also be able to check compliance for any construction changes, manage rebate applications, and minimize the potential risk of cost and delay of HERS testing.

With each code cycle, the complexity of energy efficiency standards will increas-ingly affect building design, construction cost and project delivery. For example, according to the CEC (CA Energy Com-mission) the new 2013 Standards due out in 2014 will require 25% less energy for new residential (30% less for new non-residential). Since the CEC relies primar-ily on the construction industry to achieve their energy efficiency goals, contractors should select their project teams carefully to minimize the risks of non-compliance throughout the project cycle.

We have created a menu consisting of Traditional Italian Cuisine. All of our dishes are made in house and prepared to order using local ingredients when available. Simplicity and freshness are the key to authentic Italian cooking. Our menu will change frequently depending on seasonality. All wines & beer imported from Italy.

Traditional Italian Cuisine in Auburn

928 Lincoln Way, Auburn530.823.2994www.trepazzi.net

Outdoor dining in downtown!

Page 15: Construction E-zone

Contractor’s ZoneContractor’s Zone

Page 16: Construction E-zone

December 10, 2012Page 14 Contractor’s Zone• .Contractor’s Zone

Safety News

With the onset of the winter months, State Fund would like to remind our policyhold-ers of the hazards involved when working in the cold. When you are exposed to cold temperatures for a prolonged period of time, your body begins to lose heat faster than it can be produced. Prolonged expo-sure could result in the onset of hypother-mia. However, hypothermia doesn’t occur immediately. How long it takes to set in depends on the type of exposure and your physical characteristics.

Cold, wind, and water are the major factors that cause hypothermia as they all draw heat from the body. Other risk factors include age, physical condition, use of alcohol or certain medicines, and fatigue. The effects of hypothermia can range from mild to severe. In severe cases it can cause permanent damage to your heart and other vital organs and can be fatal.

The most effective defense against hypo-thermia is prevention. Keep the following recommendations in mind if you work in conditions that are subject to extreme cold:

• Wear the proper clothing to provide ef-fective protection against hypothermia. The greatest loss of body heat occurs through the head; wear a cap and several layers of loose fitting clothing along with boots, or warm socks and shoes.

• Dress in such a manner that you avoid exposing your skin. In extreme cold, this may include gloves to protect your hands, a hooded jacket, and facemask/balaclava, or a scarf to protect your neck and face.• Stay dry when clothing gets wet. Wet clothing loses 90 percent of its insulating effectiveness. Put on rain gear before you

Hypothermia Preventionget wet and if you do get wet, put on wool clothing before you start shivering.

• Be attentive to changes in the weather and stay alert for cold and wind—even a slight breeze carries heat away from the body.

• Stop the exposure if you are unable to stay warm or dry, and leave the cold or wet environment.

• If you are required to travel in extreme cold, particularly in remote locations, make arrangements with others so that they are aware of your travel schedule and route, and when to expect you.

Recognize the early warning signs of hy-pothermia by looking for the “umbles”, which are stumbles, mumbles, fumbles, and grumbles. “Umbles” will help you to identify changes in motor coordina-tion and levels of consciousness. Notice if your skin and lips turn blue-gray or

if your fingers, ears, and other extremi-ties turn white. Other symptoms to be aware of are uncontrollable shivering, confusion, weakness, drowsiness, pain in your extremities, weak pulse, or shallow breathing.

If symptoms are left untreated, your mus-cles may become rigid, your heartbeat becomes irregular, and you could lose consciousness. Coronary or respiratory failure will eventually set in resulting in death. If hypothermia does occur, get to a warm, dry shelter, remove wet cloth-ing (replacing it with warm dry cloth-ing), and keep warm with blankets. Drink warm liquids to raise your core tempera-ture. Seek medical attention as soon as possible.

Hypothermia is a life-threatening conse-quence of inadequate preparation for cold conditions. But it doesn’t have to happen to you if you dress properly and watch for early warning signs.

Page 17: Construction E-zone

Contractor’s ZoneContractor’s Zone

Acleanjobisasafejob’isanoldsayingthathasbeenaroundformanyyears.Youmayormaynotagreecom-pletelywiththesaying,butifyouhaveeverworkedataconstructionprojectthatwasclutteredwithscrapmaterial,youdoknowthatgoodhousekeepingplaysabigpartinmaintainingasafeworksite.

OSHA Regulation 29 CFR 1926.25 Housekeep-ingrequiresthat‘Duringthecourseofconstruction,alteration, or repairs, form and scrap lumber withprotrudingnails,andall otherdebris, shall bekeptcleared fromwork areas, passageways, and stairsin and around buildings or other structures. Com-bustiblescrapanddebrisshallberemovedatregu-lar intervalsduringthecourseofconstruction.Safemeansshallbeprovidedto facilitatesuchremoval.Containers shall beprovided for thecollectionandseparationofwaste, trash,oilyandusedrags,andotherrefuse.Containersusedforgarbageandotheroily,flammable,orhazardouswastes,suchascaus-tics,acids,harmfuldusts,etc.shallbeequippedwith

Housekeeping

Company Name: Job Name: Date:

Special topics for your project:

Employee Safety Recommendations:

Reviewed MSDS # Subject

Meeting attended by:

Supervisor’s Signature: Date:

Weekly Safety Meeting

No doubt about it - if everyone does their share, good housekeeping will make Your Job a Safer Job!:::::: ::::::

covers.Garbageandotherwasteshallbedisposedofatfrequentandregularintervals.

Housekeepingstartsatthebeginningoftheshiftandneedstocontinuethroughouttheentireworkday.Don’tletscrapmaterialsbuildup;disposeof themdaily.Anothercom-monhousekeepingproblemariseswiththeuseofweld-ingleads,aircompressorhoses,andextensioncords.Ifplaced improperly they become tripping hazards. Keepwalkwaysfreeforpassage.Whenstrippingformsremem-bertopullthenailsoutorbendthemover.Aprotrudingnailcancauseanastypuncturewound.

Scrap cardboard andpackingmaterials left lying aroundprovideexcellentfuelforfires.Popcans,lunchbagsandfoodscrapsorwrapperswillattractrodents.Avoidpotentialfireandhealthhazardsbydisposingoftheseitemsproperly.

Housekeepingisaneverendingprocess.Doyourpartbykeepingyourworkareaandadjacentwalkwaysandstairscleanandorderly.

Page 18: Construction E-zone

December 10, 2012Page 16 Contractor’s Zone• .Contractor’s Zone

Classified Ads2003ChevroletSilverado3500ExtendedCab$75kmilesNewtiresUtilitybedw/rackDualrearwheelsNew100gallonfueltransfertank&pump$15,000orbestoffer

ContactGaryat(530)886-3100duringbusinesshoursor(916)826-8931afterhours.Picturesbelow.

Evolvedecks Building Enterprises isseekingContractorsexperiencedinLightGaugeMetalFramingtoassistinongoingshorttermprojectsCallRodgerat263-5854And/orsendresponseto:[email protected]

Page 19: Construction E-zone

Contractor’s ZoneContractor’s Zone

Page 20: Construction E-zone

December 10, 2012Page 18 Contractor’s Zone• .Contractor’s Zone

All published entries in this report are obtained from sources deemed reliable. Placer County Contractors Association and Builders Exchange assumes no responsibility for any inaccuracies listed in this report. It is up to the individual to verify all information.

Sacramento GLASS & WINDOW REPAIR AND REPLACE 217083Mountain View ROOF REPAIRS AT (2) PUMP STATIONS 235093Livingston WIRELESS LIGHTED CROSSWALK WARNING SYSTEM F STREET @ HILLTOP 0Soledad FORKLIFT MAINTENANCE AND REPAIR SERVICES 228091Concord ORGANIC CHEMISTRY LABORATORY CONCORD CAMPUS PREQUALIFICATION 312006Pacific Grove RECONSTRUCTION OF WASTEWATER PUMP 11/OCEANVIEW BLVD & URBAN 268044Vacaville WALMART - 1704 106091Mountain View MOUNTAIN VIEW COHOUSING COMMUNITY BP1 167065Roseville RFQ - DUMPSTER REPAIR 198096Ukiah MANOR OAKS AND GOBBI STREET ELECTRIC SUBSTRUCTURE PROJECT 200091Roseville RFQ -12K DPU REPLACEMENT PANELS 209004Kentfield FA BUILDING WEATHERIZATION 126071Monterey D-FIBER OPTIC INFRASTRUCTURE REPLACEMENT SERVICES 255055Redwood City CITY OF REDWOOD CITY - FIBER OPTIC UPGRADE PROJECT 9024Berkeley REQUEST FOR STATEMENTS OF QUALIFICAITON ARCHITECTURAL SERVICES 220077Kentfield NAC HAZMAT PROJECT 40012Roseville CHARLOTTE RUSSE TENANT IMPROVEMENTS 105084Marina JOINT INTEGRATED VA/DA HEALTH CARE CENTER 129065Berkeley FY 2013 PROACTIVE SIDEWALK PROJECT 232084Monterey THE MONTEREY REGIONAL AIRPORT TOILET ROOM ADDITION 286046Lodi ARCO AM / PM NEW CONSTRUCTION 8008Nevada Co. NEW KVMR/NTC BUILDING 146060Oakland ON-CALL CONSTRUCTION SERVICES FOR VARIOUS PROJECTS 285044Davis FAMILY DOLLAR STORE 102088Roseville RFQ -WOODCREEK NORTH WELL AND STONERIDGE TANK SECURITY SYSTEM 221045Los Angeles VALENCIA WATER RECLAMATION PLANT RETURN ACTIVATED SLUDGE PIPING 142053Marin/Contra REFRIGERATION PERVENTATIVE MAINTENANCE (BAY AREA COUNTIES) 267042Santa Maria WEST BATTLES ROAD RIGHT TURN LANE CONSTRUCTION 299045Concord KIDS FOOTLOCKER - TI 26090Tracy WAREHOUSE IMPROVEMENTS 258049Capitola VANS -169 271047Modesto FIRE ALARM UPGRADE FOR EISENHUT ELEMENTARY SCHOOL 29012San Mateo DELAWARE STREET BIKE LANE AND STREETSCAPE IMPROVEMENT PROJECT 73067Sacramento RIZAL COMMUNITY CENTER FACADE REPAIRS 185096San Jose 115 KV CIRCUIT BREAKER REPLACEMENT 195096Sacramento ELEVATOR PROGRAM CONSULTING SERVICES 225083Oakland CHAPMAN AND LANCASTER STREETS SIDEWALK IMPROVEMENTS - RE-BID 306013Elk Grove REQUEST FOR DESIGN/BUILD/OPERATE TEAM QUALIFICATIONS - CIVIC CENTER 197094Los Altos Hills LA CRESTA TANK NO. 2 INTERIOR RECOATING PROJECT 298027Sacramento COMPLETE ENERGY SOLUTIONS 240091Santa Cruz SANTA CRUZ CITY SCHOOLS 174002Healdsburg DRY CREEK BRIDGE CROSSING PROJECT 7019Fresno FRESNO CITY HALL HVAC CONTROLS UPGRADE PROJECT 205003San TEMPORARY ROCK BARRIERS - 2013, 2014 AND 2015 230093Fresno SEWER REHABILITATION IN MCKINLEY AVENUE, FROM CLOVIS AVENUE TO 277037Visalia ANNUAL CONTRACT FOR LANDSCAPE MAINTENANCE FOR DISTRICT D 208080

New Plans

Page 21: Construction E-zone

Contractor’s ZoneContractor’s Zone

Monday, December 10, 2012

DAVITT AVENUE IMPROVEMENT PROJECT - PHASE I Oakdale Plan # 22011O’REILLY AUTO PARTS - NO GC OPENINGS Ceres Plan # 58010EL DORADO COUNTY DOT EQUIPMENT I VEHICLE WASH FACILITY Placerville Plan # 89070WALMART - 1704 Vacaville Plan # 106091MOUNTAIN VIEW COHOUSING COMMUNITY BP1 Mountain View Plan # 167065RFQ - DUMPSTER REPAIR Roseville Plan # 198096MANOR OAKS AND GOBBI STREET ELECTRIC SUBSTRUCTURE PROJECT Ukiah Plan # 200091RFQ -12K DPU REPLACEMENT PANELS Roseville Plan # 209004MOTOR AND GENERATOR REPAIR SERVICES San Jose Plan # 284044EMERGENCY GENERATOR MAINTENANCE CONTRACT (12/1/12 TO 11/30/13) Sacramento Plan # 290044MACARTHUR SENIOR APARTMENTS Oakland Plan # 303013

Tuesday, December 11, 2012

DANVILLE SOUTH PARK METAL RAIL FENCE REPLACEMENT PROJECT Danville Plan # 13019BLAKER WELL 32 IMPROVEMENTS PROJECT Ceres Plan # 14013MIND PSYCH SOUND PROOF ROOM 128 Sacramento Plan # 27018RUPERT AVENUE WIDENING PROJECT Yuba Co. Plan # 32013WINCHESTER BOULEVARD IMPROVEMENT PROJECT Campbell Plan # 59004LIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION Benicia Plan # 61077ROOF REPLACEMENTLIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION Benicia Plan # 62099LANDSCAPE & IRRIGATION UPGRADESLIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION Benicia Plan # 63092WINDOW REPLACEMENTLIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION Benicia Plan # 64090TOILET ROOM ALTERATIONUNION CITY INTERMODAL STATION PHASE 2 - BART STATION IMPROVEMENTS Union City Plan # 109082STATION AND TUNNEL EMERGENCY LIGHTING San Francisco & Oakland Plan # 110082PRIMARY OUTFALL REHABILITATION PROJECT - PHASE III - RE-BID Modesto Plan # 115085SAN JACINTO RESERVOIR RECYCLED WATER POND PUMP STATION San Jacinto Plan # 123081

Week At A Glance

Humboldt Co. REDWAY PEDESTRIAN SAFETY IMPROVEMENT PROJECT 20003Los Angeles FAWCETT AVENUE PUMPING PLANT SITE IMPROVEMENTS 139063Truckee NEW VISITOR CENTER ARTIFICIAL ROCK EXHIBIT 176009Galt RFP - TURN-KEY FIXED-NETWORK/ADVANCED METERING INFRASTRUCTURE 210001San Francisco RFQ - AS-NEEDED ARCHITECTURAL SERVICES 203001San Francisco 8-INCH DUCTILE IRON PIPE MAIN INSTALLATION IN JACKSON, WASHINGTON, 122079Orinda TILDEN CORPORATION YARD MAINTENANCE FACILITY 128067Sonoma Co. PORTER CREEK ROAD BRIDGE REPLACEMENT PROJECT 132067Berkeley RFQ - BLUE OAK RANCH RESERVE/ARCHITECTURAL SERVICES 235094Rancho Cordova NETWORK AND VOICE CABLING SERVICES 180002El Paso PASO ROBLES WASTEWATER TREATMENT PLANT UPGRADE 278041de RoblesSonoma SONOMA VALLEY COUNTY SANITATION DISTRICT - BIOSOLIDS MANAGEMENT 127063San Francisco RFP - PIER 38 BULKHEAD REHABILITATION PROJECT 215082

Page 22: Construction E-zone

December 10, 2012Page 20 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 11, 2012

FA BUILDING WEATHERIZATION Kentfield Plan # 126071FIRE ALARM PREVENTION MAINTENANCE AND CERTIFICATION SERVICES Sacramento Plan # 18307419 RHODES TERRACE ADA REMODEL Chico Plan # 189015RFQ -TEMPORARY FENCING RENTAL AND REPAIRS San Jose Plan # 204002SHELTERS FOR CHLORINATION EQUIPMENT Modesto Plan # 238090RFP - LABORATORY INFORMATION MANAGEMENT SYSTEM Modesto Plan # 242081D-FIBER OPTIC INFRASTRUCTURE REPLACEMENT SERVICES Monterey Plan # 255055DEL RIO NEW WELL Modesto Plan # 2750467-ELEVEN MARKET ST. San Diego Plan # 317007

Wednesday, December 12, 2012

CITY OF REDWOOD CITY - FIBER OPTIC UPGRADE PROJECT Redwood City Plan # 9024H/I ALLEY SEWER REPLACEMENT, 22ND TO 23RD ST. Sacramento Plan # 420102011-2012 SEWER REHABILITATION PROJECT Redwood City Plan # 48008KTD UTILITIES PROJECT - PHASE 1 Kentfield Plan # 52010CONSTRUCTION OF LARGE VEHICLE WASH RACK NORTH FIELD-OAKLAND Oakland Plan # 107086INTERNATIONAL AIRPORTRFQ-LEASE-LEASEBACK SERVICES FOR SOUTH CAMPUS DEVELOPMENT San Jose Plan # 118074AT EVERGREEN VALLEY COLLEGE SAN FRANCISCO GENERAL HOSPITAL BUILDING 5 - ELEVATOR San Francisco Plan # 144059MODERNIZATIONRFQ - CAMPBELL AVENUE PORTALS - BICYCLE/PEDESTRIAN FACILITIES Campbell Plan # 170095PROJECTREQUEST FOR STATEMENTS OF QUALIFICAITON ARCHITECTURAL Berkeley Plan # 220077SERVICES FOR BOALT HALL 2ND FLOOR OFFICE MODIFICATIONSRFP - FAIR OAKS PARK REHABILITATION PROJECT/DESIGN BUILD Oakdale Plan # 264044PA SYSTEM IMPROVEMENTS Martinez Plan # 270042

Thursday, December 13, 2012

VASONA GATE CROSSING MODIFICATION San Jose Plan # 5016LESHER CENTER FOR THE ARTS COUNTER REPLACEMENT Walnut Creek Plan # 23018WOODWARD PARK BRIDEWELL PARKING LOT PROJECT Manteca Plan # 24008IT SERVER ROOM HVAC & FIRE PROTECTION UPGRADES Mather Plan # 36007NAC HAZMAT PROJECT Kentfield Plan # 4001221ST STREET IMPROVEMENTS El Paso de Robles Plan # 84080CHARLOTTE RUSSE TENANT IMPROVEMENTS Roseville Plan # 105084JOINT INTEGRATED VA/DA HEALTH CARE CENTER Marina Plan # 129065WHITE ROCK ROAD AT SCOTT ROAD (NORTH) INTERSECTION Sacramento Co. Plan # 133064GEARY ROAD BRIDGE Sunol Plan # 143057AS-NEEDED MAIN SEWER REPLACEMENT (BSSR PAVING SPRING 2013) San Francisco Plan # 150057NORTH BAY WATER REUSE PROGRAM - NAPA SALT MARSH RESTORATION Sonoma Co. Plan # 162059PIPELINERESTROOM FLOOR REPLACEMENT - CIVIC CENTER, WING D Concord Plan # 171094

Week At A Glance

Page 23: Construction E-zone

Contractor’s ZoneContractor’s Zone

CONSTRUCTION, DEVELOPMENT AND TESTING OF THE SULLIVAN AVENUE Daly City Plan # 182097WELLASBESTOS MOLD & LEAD ASSESSMENT, TESTING & CONSULTATION Vacaville Plan # 193089SERVICES-RE-BIDREQUIREMENTS CONTRACT FOR AUTOMATIC FAREBOX COLLECTION Fresno Plan # 201089RFP - ANNUAL CONTRACT FOR BUILD-OUT SERVICES FOR POLICE Concord Plan # 219090VEHICLES ON AN AS-NEEDED BASISFY 2013 PROACTIVE SIDEWALK PROJECT Berkeley Plan # 232084DISTRICT NO. 5 SEWER REHABILITATION 2012 Los Angeles Co. Plan # 249059WING A & WING B COOLING SYSTEM UPGRADE Vacaville Plan # 254061THE MONTEREY REGIONAL AIRPORT TOILET ROOM ADDITION Monterey Plan # 286046FRESNO YOSEMITE INTERNATIONAL AIRPORT RUNWAY 11L-29R Fresno Plan # 292044EXTENSION (RSA COMPLIANCE)CHURCH AVENUE AND MLK BOULEVARD TRAFFIC SIGNAL Fresno Plan # 294035CHP OCEANSIDE AREA OFFICE REPLACEMENT FACILITY Vista Plan # 307010

Friday, December 14, 2012

ARCO AM / PM NEW CONSTRUCTION Lodi Plan # 8008ZIP LINE END POLE SUPPORT REPLACEMENT Redding Plan # 47010PLACER COUNTY CLINIC BEHAVIORAL HEALTH INTEGRATION Auburn Plan # 98067NEW KVMR/NTC BUILDING Nevada Co. Plan # 146060PARKS, TRAILS, AND RECREATION MASTER PLAN/SOUTH LAKE TAHOE South Lake Tahoe Plan # 168072SECURITY CAMERAS UPGRADE FOR THE SOLID WASTE AND RECYCLING Sacramento Plan # 272050DIVISIONON-CALL CONSTRUCTION SERVICES FOR VARIOUS PROJECTS Oakland Plan # 285044

Page 24: Construction E-zone

December 10, 2012Page 22 Contractor’s Zone• .Contractor’s Zone

CDOT 30

CDOT 30

CDOT 37

CDOT 51

CDOT 22

CDOT 22

CDOT 16

CDOT 9

CDOT 22

CDOT 16

CDOT 16

CDOT 9

CDOT 58

CDOT 22

CDOT 16

CDOT 9

CDOT 9

12/11/2012

12/11/2012

12/12/2012

12/13/2012

12/13/2012

12/18/2012

12/18/2012

12/18/2012

12/19/2012

12/19/2012

12/19/2012

12/19/2012

12/20/2012

12/20/2012

12/20/2012

12/20/2012

12/20/2012

1

1

1

5

2

0 0 0

1

0

0

0

3 2 0

0

0

SISKIYOU COUNTY

FRESNO COUNTY

FRESNO, KERN, MADERA AND TULARE COUNTIES

LOS ANGELES COUNTY

LOS ANGELES COUNTY

ALAMEDA AND CONTRA COSTA

SHASTA COUNTY

AMADOR COUNTY

ALAMEDA COUNTY

SAN MATEO AND SANTA CLARA COUNTIES

KERN COUNTY

SAN JOAQUIN COUNTY

LOS ANGELES COUNTY

SAN DIEGO COUNTY

RIVERSIDE COUNTY

RIVERSIDE COUNTY

RIVERSIDE COUNTY

CalTransDOT 02-2E2914 POLYESTER OVERLAY ON BRIDGE DECKS, CLEAN AND PAINT STRUC-TURAL STEEL

DOT 06-0H1004 REPAIR FAILED AREAS, OVERLAY ROADWAY, AND RECONSTRUCT MBGR.

DOT 06-0C1304 RETROFIT BRIDGES WITH COMPOSITE COLUMN CASING, IN-FILL WALLS, CIDH

DOT 07-274304 UPGRADE MBGR, CRASH CUSHIONS AND END TREATMENTS.

DOT 07-1W2004 REPLACE OVERHEAD SIGN PANELS.

DOT 04-0A7904 UPGRADE BARRIERS (MBGR AND CONCRETE)

DOT 02-4E9504 THIN BLANKET OVERLAY

DOT 10-0T1404 INSTALL TRAFFIC SIGNAL. 2

DOT 04-014084 CONSTRUCT THE SFOBB MAINTENANCE COMPLEX.

DOT 04-4A9254 INSTALL TRAFFIC SYSTEM INFRASTRUCTURE.

DOT 06-0N1504 OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE)

DOT 10-0K3304 INSTALL TRAFFIC MONI-TORING STATIONS (LOOP DETECTORS) ON FREEWAY RAMPS.

DOT 07-258704 PLACE HMA TEXURED PAV-ING AND SLOPE PAVING.

DOT 11-297104 PUMP REHABILITATION.

DOT 08-0C2104 REPLACE CULVERTS

DOT 08-0M2104 INSTALL TRAFFIC SIGNAL AND RECONSTRUCT CURB RAMPS. DOT 08-0N9104 INSTALL TRAFFIC SIGNAL AND REALIGN TWO LEFT TURN LANES.

Page 25: Construction E-zone

Contractor’s ZoneContractor’s Zone

CDOT 9

CDOT 30

CDOT 2

CDOT 9

CDOT 9

CDOT 9

CDOT 2

CDOT 2

CDOT 2

CDOT 22

CDOT 2

CDOT 22

CDOT 2

CDOT 2

CDOT 16

12/20/2012

01/08/2013

01/08/2013

01/10/2013

01/10/2013

01/10/2013

01/10/2013

01/10/2013

01/10/2013

01/15/2013

01/15/2013

01/16/2013

01/17/2013

01/17/2013

01/23/2013

IMPERIAL COUNTY

SONOMA COUNTY

TULARE AND MADERA COUNTIES

LOS ANGELES COUNTY

SAN BERNARDINOCOUNTY

RIVERSIDE COUNTY

LOS ANGELES COUNTY

SAN DIEGO COUNTY

ORANGE COUNTY

SANTA CLARA COUNTY

MODOC COUNTY

KERN COUNTY

LOS ANGELES COUNTY

SAN BERNARDINOCOUNTY

SANTA CRUZ COUNTY

0 0

0

0

0

0

0

0

0

0

0

0

0

0

0

DOT 11-410204 REMOVE AC STRUCTURAL SEC-TION ON RAMPS AND OVERLAY WITH HMA (TYPE C).

DOT 04-0A1854 RECONSTRUCT INTERCHANGE

DOT 06-0M8004 CONSTRUCT THRIE BEAM AND CONCRETE MEDIAN BARRIER

DOT 07-4T3904 INSTALL TRAFFIC SIGNAL, LEFT TURN POCKET, IMPROVE CURB RAMPS.

DOT 08-0Q2404 INSTALL PIPELINERS, CUL-VERT, ROCK SLOPE PROTECTION AND IM-PORTED BORROW

DOT 08-499804 CONSTRUCT STORAGE BUILD-ING, RETAINING WALL AND PAVEMENT.

DOT 07-274504 UPGRADE METAL BEAM GUARD RAILINGS AND INSTALL CRASH CUSHIONS.

DOT 11-2T2304 INSTALL HIGHWAY PLANTING AND IRRIGATION SYSTEMS.

DOT 12-0L3004 UPGRADE TRAFFIC SIGNAL AND ROADSIDE SIGN PANELS.

DOT 04-2A4404 PLACE & WIDEN HMA RDWY, CONST SOIL NAIL WALLS, RWS & LEFT TURN LANE.

DOT 02-3E6904 SHOULDER WIDENING WITH HMA OVER AB.

DOT 06-0G8404 CONSTRUCT INSIDE LANES, SHOULDERS, AND CONCRETE BARRIER.

DOT 07-266104 INSTALL MBGR, CRASH CUSH-IONS AND END TREATMENTS.

DOT 08-0M8804 INSTALL TRAFFIC SIGNAL AND CONSTRUCT CURB RAMPS.

DOT 05-0L7014 UPGRADE GUARDRAIL, CRASH CUSHIONS, END TREATMENT AND RETAINING WALLS

Click on the blue underline to go to the Online Planroom

Page 26: Construction E-zone

December 10, 2012Page 24 Contractor’s Zone• .Contractor’s Zone

Monday, December 10, 2012

DAVITT AVENUE IMPROVEMENT PROJECT - PHASE IPLAN #: 22011 Bid Date: 12/10/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakdale OWNER: City of Oakdale DESCR: Contact, Michael Renfrow, ([email protected]) 209-845-3614. Road improvements on Davitt Ave., in Oakdale Ca

O’REILLY AUTO PARTS - NO GC OPENINGSPLAN #: 58010 Bid Date: 12/10/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: CeresG.C.: California & Nevada Construction Ph: 209-536-6240 FAX: 209-536-6250DESCR: Contact, California & Nevada Construction Inc., Bill Canning, ([email protected]) Ground Up New Construction

EL DORADO COUNTY DOT EQUIPMENT I VEHICLE WASH FACILITYPLAN #: 89070 Bid Date: 12/10/2012 Bid Time: 2:00 PM PLANS AT: Print On DemandLocation: Placerville Online & Print On # OF ADDENDA: 2 DemandPREBID: MAND 11/16 @ 1 pm or 12/3 @ 1 pm. DESCR: Contact: County of El Dorado DOT, Janell Gifford (530) 621-5974.A. The Work will be bid as a LUMP SUM BASE BID, LUMP SUM BID ADDITIVE I, LUMP SUM BID ADDITIVE 2 and LUMP SUM BID ADDITIVE 3. B. LUMP SUM BASE BID: Total of LUMP SUM BID for Construction of a vehicle wash facility, including a prefabricated building with metal siding and roofing with a steel structure, foundation, CMU splash walls, a2-stage, 2-level wash bay, equipment room, sump pit and associated underground utility improvements PLUS LUMP SUM BID for Trench and Excavation Safety

for Trenches and Excavations five feet deep and greater. Other items or details not mentioned above, that are required by the plans or these Contract Documents shall be performed, constructed or installed. C. LUMP SUM BID ADDITIVE I: Construction and installation of the metal catwalks in the heavy solids I cold wash area” as shown on the plans along grid lines 1. I and 2, between Grids A to C, including stair sections at Grid A and four bollards at stair sections. Other items or details not mentioned above, that are required by the plans or these Contract Documents shall be performed, constructed or installed. D. LUMP SUM BID ADDITIVE 2: Construction and installation of the metal catwalks in the “hot water pressure wash area” as shown on plans along grid the lines l . I and 2, between Grids C to E, including stair sections at Grid E and four bollards at stair sections. Other items or details not mentioned above that are required by the plans or these Contract Documents shall be performed, constructed or installed. E. LUMP SUM BID ADDITIVE 3: Provide and install washing equipment, Refer to Contract Drawings A2.0, M2.l.P2.1 and E2.1. Refer to Specification section 11 14 00 Vehicle Service Equipment. Other items or BIDDERS LIST:General Contractor: Koch & Koch, Inc. 530-432-4000 530-432-4099 Diede Construction 209-369-8255 209-368-0600 S W Allen Construction 916-344-2098 916-344-0307 Tricon Construction 916-638-9866 916-638-9867 C & C Construction 916-434-5280 916-434-5288 Landmark Construction 916-663-1953 916-663-1867 Bobo Construction, Inc. 916-685-2285 916-714-4850 D.g. Granade, Inc. 530-677-7484 530-677-7550 American River Const 530-621-1785 530-621-0360 Ramcon Engr./enviro. 916-372-7535 916-372-4209 Pnp Construction, Inc. 530-885-9360 530-885-9365Sub Contractor: Sierra Asphalt, Inc. 916-635-9898 916-635-3509

Plans On File

WebSiteAboutUsOfficeInfoNewPatientsBulletinsProductsCouponSpecialsLife&ChiropracticHydroMassageAvailable

Smith Chiropractic and MassageAuburn

Back Pain? You don’t need to live with the pain.Chiropractic care can help. Call Dr. Keith Smith inAuburnforafreeconsultation.ServingtheAuburncommunityfor49years.Clickalink,attheright,formoreinformation.

Page 27: Construction E-zone

Contractor’s ZoneContractor’s Zone

Culbert Installs Doors 916-675-4050 916-992-0133 One Way Electric 916-302-6227 916-302-6227 Studebaker Brown Elect 530-333-3423 530-823-1341 Graham Concrete 530-993-4598 530-993-4758 Vanden Bros Electric 916-773-1500 916-773-1973Supplier: Sparhawk Metals 775-331-7444 775-331-7944

WALMART - 1704PLAN #: 106091 Bid Date: 12/10/2012

Bid Time: 9:30 AM PLANS AT: Roseville Office Location: Vacaville Online & Print On DemandG.C.: Moorefield Construction Ph: 916-614-7888 FAX: 916-614-7898DESCR: Contact, Moorefield Construction, 916-614-7888. SCOPE OF WORK INCL. CLEAN PREP, & PAINT EXTERIOR WALLS, POWERWASHING OF EXTERIOR SURFACES, REPLACE EXTERIOR SIGNAGE, FLOOR FINISHES (PIECE REPLACE), INSTALL NEW SECTIONAL O.H. DOOR (WITH STEEL FRAMING AT RECEIVING), ADD SINK. TRADES INCLUDE: DEMO & SAWCUTTING, CONCRETE SLAB PATCH BACK, MISC. ROUGH FRAMING, STRUCTURAL STEEL (INCL. NEW COLUMNS), FIN. CARPENTRY, CAULKING, MISC. SHEET METAL, O.H. DOOR (INSTALL), DOOR & HARDWARE, EIFS REPAIR & RESURFACING, PVC & RESILIENT FLOORING REPLACEMENT (INSTALL ONLY), PAINTING (INCL. REPAINTING OF EXTERIOR WALLS), RACK AND SHELVING (ANCHORAGE), FIRE SPRINKLERS, PLUMBING, AND ELECTRICAL.

MOUNTAIN VIEW COHOUSING COMMUNITY BP1PLAN #: 167065 Bid Date: 12/10/2012

Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Mountain View Online & Print On DemandG.C.: Barry Swenson Builders Ph: 408-287-0246 FAX: 408-988-1737DESCR: Contact, Steve Andrews, Barry Swenson Builders, 408-287-0246. Apartments, Fitness Lounge, Dwelling Units, Laundry, Lobby, Offices: Cast-in-Place Concrete, Foundation, Structural Steel Frame, Wood Structural Frame, Brick Exterior & Roof Structure.

RFQ - DUMPSTER REPAIRPLAN #: 198096 Bid Date: 12/10/2012

Bid Time: 3:00 PM PLANS AT: Roseville OfficeLocation: Roseville Online and PlanroomOWNER: City of Roseville DESCR: Contact, Sonia Orozco, 916-774-5720. City of Roseville requesting quotes for dumpster repair services.

MANOR OAKS AND GOBBI STREET ELECTRIC SUBSTRUCTURE PROJECTPLAN #: 200091 Bid Date: 12/10/2012

Bid Time: 1:30 PM PLANS AT: Roseville OfficeLocation: Ukiah Online & Print On Demand OWNER: City of Ukiah DESCR: Contact, Mary Horger, 707-463-6233. Treching approximately 40’ to install 3” Schedule 40 conduits; excavate, install, backfill and compact for one 504LA vault. Excavate, install, backfill and compact for 1 module enclosure box pad; including saw cut, remove and replace existing asphalt concrete (25’ lf) sidewalk (16’ lf)

RFQ -12K DPU REPLACEMENT PANELSPLAN #: 209004 Bid Date: 12/10/2012

Bid Time: 3:00 PM PLANS AT: Roseville OfficeLocation: Roseville Online and PlanroomOWNER: City of Roseville DESCR: Contact, City of Roseville, Sonia Orozco, 916-774-5720. City of Roseville is requesting quotes for 12k DPU Replacement Panels.

MOTOR AND GENERATOR REPAIR SERVICESPLAN #: 284044 Bid Date: 12/10/2012 Bid Time: 4:00 PM PLANS AT: Roseville OfficeLocation: San Jose Online & Print On # OF ADDENDA: 1 DemandOWNER: City of San Jose DESCR: Contact, Andrew Hitchcock, 408-535-7059. The City of San Jose (hereinafter “City”) is soliciting bids from qualified Contractors to provide labor, materials and equipment to the Environmental Services Department to repair or overhaul large electric motors and generators installed at the City’s Water Pollution Control Plant located at 700 Los Esteros Road, San Jose, CA 95134 on an as needed basis.

EMERGENCY GENERATOR MAINTENANCE CONTRACT (12/1/12 TO 11/30/13)PLAN #: 290044 Bid Date: 12/10/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento PlanroomPREBID: MAND 11/26 @ 11 AM OWNER: State of Ca/Adjutant General State Military Dept DESCR: Contact, CA Department of Adjutant General State Military Tom Clarke (916) 854-3690. Perform quarterly, semi and annutal maintenance service for an emergency generator system housed within a secure building.

Continued on next page

Click on the blue underline to go to the Online Planroom

Page 28: Construction E-zone

December 10, 2012Page 26 Contractor’s Zone• .Contractor’s Zone

Plans On File

Monday, December 10, 2012

MACARTHUR SENIOR APARTMENTSPLAN #: 303013 Bid Date: 12/10/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland # OF ADDENDA: 1DESCR: Contact, Midstate Construction, Elaine Fenton, ([email protected]). New ConstructionBIDDERS LIST:Sub Contractor: Performance Abatement 510-621-0435 000-000-0000

Tuesday, December 11, 2012

DANVILLE SOUTH PARK METAL RAIL FENCE REPLACEMENT PROJECTPLAN #: 13019 Bid Date: 12/11/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Danville Online & Print On Est Cost: $106,000.00 DemandOWNER: Town of Danville DESCR: Contact, Bob Russell, 925-314-3315. Removing existing wood fence, brick pilasters, ivy and concrete paving. The project also involves installing new metal rail and wood fencing, irrigation system components and concrete path and paving at Danville South Park located on Camino Ramon between Joaquin Drive and Franciscan Drive in the Town of BIDDERS LIST:Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000

BLAKER WELL 32 IMPROVEMENTS PROJECTPLAN #: 14013 Bid Date: 12/11/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office

Location: Ceres Est Cost: $1,260,000.00PREBID: 11/28 @ 10am OWNER: City of Ceres DESCR: Contact, Jason Chapman, P.E., 209-538-5791. Constructing a backwash recovery tank, constructing a drain pump station and pipeline to the wastewater treatment plant headworks, replacing the chemical feed system with new chemical facility, modifying the booster pump station HVAC system, replacing the booster pump station flowmeter, demolishing the existing propane tank, replacing the existing generator, modifying the plant site and fences, and performing related required BIDDERS LIST:General Contractor: Koch & Koch, Inc. 530-432-4000 530-432-4099Sub Contractor: Quality Erectors & 707-746-1233 707-751-3962 Mission City Rebar, Inc 925-449-6999 925-447-8797

MIND PSYCH SOUND PROOF ROOM 128PLAN #: 27018 Bid Date: 12/11/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Sacramento Online & Print On Est Cost: $103,000.00 DemandOWNER: University of California, Davis Health System DESCR: Contact, UC Davis Health System (916) 734-7024. Project consists of renovating exam room 1228 to accept a manufactured sound booth (installed by others) with internal booth finishes, remodel the adjacent observation room (1226) for utilities being relocated out of room 1228 and to provide an access closet for above booth utilities in room 1228. Work includes installing ceiling access doors in room 1265 (Staff Toilet) and room 1263 (Staff Toilet) and remodel of staff toilet room 1265 to have a shower and salon sink complete. Contractor shall provide complete dust and access controls for rooms 1226, 1228, 1263, and 1265 for the duration of the project and take particular care to color tone closures to mirror surrounding finishes to minimize patient disruption during

Continued from last page

INFO CENTER

CONTACT

WEB SITE

ABOUT

LegaloptionstoimproveyourfinancialfutureBankruptcy•Company&PersonalDebt•Foreclosure

CALL TODAY (530) 888-7100www.BottomLineLawyers.com 985 Lincoln Way, Auburn, CA 95603

Page 29: Construction E-zone

Contractor’s ZoneContractor’s Zone

business hours while maintaining secure access to construction crew during off hour work schedule.

RUPERT AVENUE WIDENING PROJECTPLAN #: 32013 Bid Date: 12/11/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Yuba Co. Est Cost: $909,263.00 # OF ADDENDA: 3 OWNER: County of Yuba DESCR: Contact, Yuba County Public Works Department, 530) 749-5420. General work description: The work in general consists of reconstructing and widening Rupert Avenue and re-align the northern end of Rupert Avenue with Avondale Avenue. This project will also provide bike lanes, on-street parking, curbs, gutters, sidewalks and drainage facilities. Other such items or details not mentioned above that are required by the standard specifications or these special provisions shall be performed, placed, constructed or installed. BIDDERS LIST:General Contractor: Lamon Construction Co. 530-671-1370 530-671-7482

WINCHESTER BOULEVARD IMPROVEMENT PROJECTPLAN #: 59004 Bid Date: 12/11/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Campbell Online & Print On Demand # OF ADDENDA: 1OWNER: City of Campbell DESCR: Contact, Lisa Petersen P. (408) 866-2190. Demolition of existing improvements, installation of new streetscape improvements, and traffic signal modifications. More specific items of work include, but are not limited to: removal of existing concrete improvements and installation of new pcc curb, gutter, sidewalk, driveways, accessibility ramps, decorative concrete sidewalks; ac pavement removal/replacement and conform work; PCC and AC sawcutting; relocation/modifications to existing traffic signal systems, and installation of new pedestrian push button signal poles; removal and replacement of pavement markings, legends, and symbols in thermoplastic and paint; trench restoration; tree and plant removal; tree and landscaping planting and installation; tree grate and structural soil installation; irrigation installation; fencing relocation; coordination with utility companies; adjusting utility and other appurtenances to grade; coordination with

LIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION ROOFPLAN #: 61077 Bid Date: 12/11/2012 Bid Time: 1:00 PM PLANS AT: Roseville OfficeLocation: Benicia Online & Print On # OF ADDENDA: 2 DemandPREBID: MAND 11/16 @ 10:30 OWNER: Benicia Unified School District Ph: 707-747-8300 DESCR: Contact, Benicia Unified School District Roy Owens ([email protected]) Remove and replace asphalt shingle roofing.

LIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION LANDSCAPE & IRRIGATION UPGRADESPLAN #: 62099 Bid Date: 12/11/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Benicia Online & Print On # OF ADDENDA: 2 DemandPREBID: MAND 11/16 @ 2:30pm OWNER: Benicia Unified School District Ph: 707-747-8300 DESCR: Contact, Benicia Unified School District Roy Owens ([email protected]). Install Ower-furnished smart controller irrigation system, repair and adjust existing irrigation at athletic fields, etc. LIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION WINDOW REPLACEMENTPLAN #: 63092 Bid Date: 12/11/2012 Bid Time: 1:00 PM PLANS AT: Roseville OfficeLocation: Benicia Online & Print On # OF ADDENDA: 2 DemandPREBID: MAND 11/16 @ 9am OWNER: Benicia Unified School District Ph: 707-747-8300 DESCR: Contact, Benicia Unified School District Roy Owens ([email protected]) Remove & replace 18 windows on the noth side of the building and 16 windows on the east side, including associated interior & exterior wood trim.

LIBERTY HIGH SCHOOL/DISTRICT OFFICE SUSTAINABILITY MODERNIZATION TOILET ROOM ALTERATIONPLAN #: 64090 Bid Date: 12/11/2012 Bid Time: 1:00 PM PLANS AT: Roseville Office Location: Benicia Online & Print On # OF ADDENDA: 2 DemandPREBID: MAND 11/16 @ 1pm OWNER: Benicia Unified School District Ph: 707-747-8300 DESCR: Contact, Benicia Unified School District Roy Owens ([email protected]). Construct toilet room improvements, including access compliance upgrades consisting of renovation of two existing toilet rooms resulting in three unisex single occupant toilet rooms and a lounge; site improvements consisting of new accessible concrete pedestrian path, new parking bumpers and accessible entry directional signage and removal of existing abandoned doors and framing infill with cement plaster exterior finish patch. BIDDERS LIST:General Contractor: R.l. Ziegenbein Const 925-820-9245 925-831-3093

Continued on next page

Page 30: Construction E-zone

December 10, 2012Page 28 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 11, 2012

UNION CITY INTERMODAL STATION PHASE 2 - BART STATION IMPROVEMENTSPLAN #: 109082 Bid Date: 12/11/2012Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Union City PlanroomPREBID: 11/8 @ 9am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, Sunni Gunawardena, 510-464-6550. Construction of a 2000 SF concourse addition on the east side of the Union City Station and a re-configuration of the existing station concourse, including finish surface upgrades to provide a free passage through the station for future connection to 11th St..etc

BIDDERS LIST:General Contractor: Arntz Builders, Inc. 415-382-1188 415-883-7529 C. Overaa And Co. 510-234-0926 510-237-2435Supplier: Lane-aire Manufacturing 916-732-2224 916-732-2227

STATION AND TUNNEL EMERGENCY LIGHTINGPLAN #: 110082 Bid Date: 12/11/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: San Francisco Online and PlanroomEst Cost: $2,000,000.00 # OF ADDENDA: 3PREBID: 10/03/12 @ 9:00 am OWNER: San Francisco Bay Area Rapid Transit District Ph: 510-464-6547 DESCR: Contact, San Francisco Bay Area Rapid Transit (510) 464-6088. The work includes, but is not limited to, the following work at Civic Center Station, San Francisco and 19th Street Station, Oakland. Work such as providing battery rooms, battery room ventilation system, eye wash stations, batteries and battery racks, UPS and UPS maintenance Bypass cabinets, 480 VAC circuit breakers, distribution panels, DC battery disconnect switches, junction boxes, pull boxes, conduits, wires, fittings, and accessories needed to complete the installation. Work also includes disconnecting and recircuiting existing light fixtures from existing and new panels, start-up, commissioning and maintenance. BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437

PRIMARY OUTFALL REHABILITATION PROJECT - PHASE III - RE-BIDPLAN #: 115085 Bid Date: 12/11/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Online & Print On Est Cost: $1,782,000.00 # OF ADDENDA: 3Demand PREBID: 11/14 @ 10am OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto, (209) 577-5462. New structural lining for the Primary Outfall Line utilizing Cured in Place Pipe (CIPP) technology. The lining transforms the existing gravity pipeline to one that can accommodate projected wastewater flows and force main pressures. Additional work will include the removal of one cross connection between the Primary Outfall and Cannery Segregation Line, a new manhole, modifications to an existing meter vault, replacement of an existing diversion box and appurtenances, modification of a junction box, and a new overflow structure. BIDDERS LIST:

Continued from last page

Plans On File

Page 31: Construction E-zone

Contractor’s ZoneContractor’s Zone

to provide service tests, equipment certification, maintenance inspections and standardization of all fire alarm system point description within the fire alarm system, on each device, and on as-built plan sets of the Fire Life Safety Systems for the DMV Headquarters.

19 RHODES TERRACE ADA REMODELPLAN #: 189015 Bid Date: 12/11/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Chico Online and PlanroomPREBID: 11/29 @ 11am OWNER: Housing Authority of the County of Butte DESCR: Contact, County of Butte, 530-895-4474 x237. Construct ADA upgrades for 19 Rhodes Terrace and the laundry facilities.

RFQ -TEMPORARY FENCING RENTAL AND REPAIRSPLAN #: 204002 Bid Date: 12/11/2012 Bid Time: 3:00 PM PLANS AT: Roseville OfficeLocation: San Jose Online and PlanroomOWNER: City of San Jose DESCR: Contact, Priscilla Louangrath, 408-535-7058. The City of San Jose is seeking a contractor to provide all labor, equipment and materials for rental of temporary post driven and panel chain link fencing

SHELTERS FOR CHLORINATION EQUIPMENTPLAN #: 238090 Bid Date: 12/11/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Planroom# OF ADDENDA: 1OWNER: City of Modesto, Public Works Dept. DESCR: Contact, Meagan Torres, 209-571-5839. City of Modesto is requestting bids for the purchase of Shelters for Chlorination Equipment.

RFP - LABORATORY INFORMATION MANAGEMENT SYSTEMPLAN #: 242081 Bid Date: 12/11/2012 Bid Time: 11:00 AM PLANS AT: Roseville OfficeLocation: Modesto PlanroomPREBID: 11/13 @ 2pm # OF ADDENDA: 2 OWNER: City of Modesto, Public Works Dept. DESCR: Contact, Mark L. Averell, ([email protected]) 209-577-5412. City of Modesto is requesting proposals for Laboratory Information Management System for the Public Workds Department, Water and Wastewater Divisions.

Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

SAN JACINTO RESERVOIR RECYCLED WATER POND PUMP STATIONPLAN #: 123081 Bid Date: 12/11/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: San Jacinto Est Cost: $2,000,000.00# OF ADDENDA: 3 PREBID: MAND 11/15 @ 9am OWNER: Eastern Municipal Water District Ph: 951-928-3777 FAX: 951-928-6111DESCR: Contact, Fermin Balv aneda and Lynda Stanley; email to: ([email protected] aand [email protected]) or Fax: 951-928-6111.The project is located the District’s San Jacinto Reservoir Recycled Water storage ponds within the City of San Jacinto, Riverside County. The project consists of the construction of a new Recycled Water Pump Station and Pipeline. The work shall comprise the installation and construction of one (1) complete and useable Recycled Water Pond Pump Station at the San Jacinto Reservoir site. The pump station shall have an operating capacity of 4,000 gallons per minute (gpm) with total of two vertical turbine pumps installed (lead and lag). The total length of 18-inch Cement Mortar Lined and Wrapped (CML&W) with rock shield steel recycled water discharge pipeline is approximately 425 linear feet.

FA BUILDING WEATHERIZATIONPLAN #: 126071 Bid Date: 12/11/2012

Bid Time: 2:00 PM PLANS AT: Auburn Office Location: Kentfield Online and PlanroomPREBID: MAND 12/4 @ 10 am DESCR: Contact:Marin Community College District 415-884-3192. Demolition of the existing metal infill panels and structure on the south side of the building, save the existing structure for the reinstallation on the new canopy, construct new glass cantilevered canopy, construct new vertical glazed facade on the south side of the building, construct new roof canopy over the stairwell on the third floor, new roof ladder and roof hatch, associated fire protection and lighting and electrical modifications to the area under the roof canopy. CLASS B OR C-17 LICENSE REQUIRED.

FIRE ALARM PREVENTION MAINTENANCE AND CERTIFICATION SERVICESPLAN #: 183074 Bid Date: 12/11/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Sacramento Planroom Est Cost: $90,000.00 PREBID: MAND 11/27 @ 9am OWNER: Department of Motor Vehicles Ph: 916-657-7822 DESCR: Contact, DMV, Anne Mearlon, 916-657-0997. The Contractor is to provide the Department of Motor Vehicles (DMV) all labor, tools, materials, and equipment necessary Continued on next page

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Page 32: Construction E-zone

December 10, 2012Page 30 Contractor’s Zone• .Contractor’s Zone

The purpose of this combined Sources Sought / Request forInformation (RFI) is to seek information from industry.

DEL RIO NEW WELLPLAN #: 275046 Bid Date: 12/11/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Modesto Online & Print On Est Cost: $587,710.00 DemandPREBID: 11/27 @ 11am # OF ADDENDA: 1 OWNER: City of Modesto, Public Works Dept. DESCR: Contact, City of Modesto, 209-577-5462. This project will construct the below-ground portion of a proposed new domestic well at 718 Ladd Road, Modesto CA. An onsite basin will also be excavated as part of this contract, which will be used for storage and percolation of test water from the well sampling and development. BIDDERS LIST:General Contractor: Taylor Backhoe Service, 209-384-8424 209-384-7629

7-ELEVEN MARKET ST.PLAN #: 317007 Bid Date: 12/11/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San DiegoG.C.: Frans Construction, Inc. Ph: 208-863-9149 FAX: 858-348-3212DESCR: Contact, Frans Construction, ([email protected]) 208-941-0483. This is a ground up project. Two buildings. One will be a 7-11 the other will be a building for a future tenant.

Wednesday, December 12, 2012

CITY OF REDWOOD CITY - FIBER OPTIC UPGRADE PROJECTPLAN #: 9024 Bid Date: 12/12/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Redwood City Online & Print On Demand PREBID: MAND 12/5 @ 9am OWNER: City of Redwood City DESCR: Contact, Mary Jo Coash Lee, 650-780-5916. The Fiber Optic Network Upgrade; replace the current multi-mode 12 strand fiber with a single-mode (yellow) 24 strand fiber, utilizing the existing conduits and providing end point termination etc.

H/I ALLEY SEWER REPLACEMENT, 22ND TO 23RD ST.PLAN #: 42010 Bid Date: 12/12/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom

Tuesday, December 11, 2012

D-FIBER OPTIC INFRASTRUCTURE REPLACEMENT SERVICES

PLAN #: 255055 Bid Date: 12/11/2012 Bid Time: 9:00 AM PLANS AT: Roseville Office Location: Monterey Online & Print On DemandOWNER: Department of the Navy DESCR: Completed request forms are due to KO [email protected] and KO [email protected], by 9:00 AM, Eastern, 11 December 2012.Fleet Numerical Meteorological and Oceanography Center, located inMonterey, CA., has a requirement for fiber optic infrastructure replacementservices.

Continued from last page

Plans On File

[email protected]

www.Jensen-Masonry.com

Mark Jensen, Master Mason

• BBQ’s • Fireplaces • Brick • Rock • Etc.

JensenMasonry

916.663.3429

CCL#:804650

Page 33: Construction E-zone

Contractor’s ZoneContractor’s Zone

Est Cost: $136,000.00 OWNER: City of Sacramento - Dept of Utilities DESCR: Contact, Melissa Marshall, 916-808-1437. Replace 360 LF of combined sewer pipeline, manholes, drains, sewer services, etc. 2011-2012 SEWER REHABILITATION PROJECTPLAN #: 48008 Bid Date: 12/12/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Redwood City Plans on DiskOWNER: City of Redwood City DESCR: Contact, City of Redwood City, (650) 780-7380. Rehabilitation of existing VCP sanitary sewer mains using a tight fitting liner system, cured-in-place pipe (CIPP) lining method. It includes traffic controls, mobilization and demobilization; locating and potholing all existing utilities; locate house laterals and clean outs; removal of existing VCP sewer laterals; site investigations; cleaning and closed circuit television (CCTV) inspection of sewer main pipes and laterals; verification of the exact location and size of each lateral for each property prior to installation of new lateral; furnishing and installing new tight fitting liner system, cured- in- place pipe (CIPP) inside existing VCP sewer mains; furnishing and installing new HOPE SDR 17 sewer laterals by pipebursting method; furnishing all pipes and fittings to install lateral connection; furnishing and installing new lateral clean outs; point repairs; installation of concrete cap; provision of controlled density fill (CDF) for trenches 30” deep or less from existing ground; provision of controlled density fill (CDF) at sewer lateral point of connection to provide concrete support for strap on wye saddle connection; provision of root barrier when installing sewer laterals near tree roots; installation and removal of temporary sewer by-pass system for both mains and laterals; perform all necessary testing of newly rehabilitated/installed sanitary sewer pipes; sawcutting; pavement removal and trenching; sheeting, shoring and bracing; dewatering; backfill; base compaction; AC pavement restoration; sidewalk restoration; driveway restoration; immediate restoration of lateral trenches in order to be flushed to existing ground; landscape restoration including but not limited to grass lawn, plants, pavers, bricks, decorative stones, washed stones, wood headers etc.; removal and replacement of all property fences including concrete footings as required to properly install the laterals and cleanouts; connection work; vehicular and pedestrian safety and onvenience and other related work.

KTD UTILITIES PROJECT - PHASE 1PLAN #: 52010 Bid Date: 12/12/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Kentfield PlanroomPREBID: MAND 12/6 @ 10AM at 700 College Ave, Bldg PE-8, DESCR: Contact: Marin Community College District (415) 883-2211.Installation of four segments of 4 inch communications conduit piping between two existing underground communications boxesBIDDERS LIST:

General Contractor: Murray Building Inc 707-939-9001 707-939-9048

CONST. OF LARGE VEHICLE WASH RACK NORTH FIELD-OAKLAND INTERNATIONAL AIRPORTPLAN #: 107086 Bid Date: 12/12/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland Est Cost: $200,000.00PREBID: 11/28 @ 9:30am OWNER: Port Of Oakland DESCR: Contact, Connie Ng-Wong @ 510-627-1390. The work of this 75 calendar day project consists generally of cosntructing a large vehicle wash rack including, but not limited to, constructing a gravel roadbed, concrete pad; a drainage system with valves, pipes, oil/water separator; a new city water line with backflow prevention, meter & hose/hose-reel & performing all associated work. BIDDERS LIST:General Contractor: Tricon Construction 916-638-9866 916-638-9867

RFQ-LEASE-LEASEBACK SERVICES FOR SOUTH CAMPUS DEVELOPMENT AT EVERGREEN VALLEY COLLEGEPLAN #: 118074 Bid Date: 12/12/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose # OF ADDENDA: 1PREBID: MAND 11/27 @ 2PM OWNER: San Jose/Evergreen Community College District DESCR: Contact, Gilbane Building Co., Heidi Rank, 408-270-6407. The San Jose/Evergreen Community College Dist is requesting Statements of Qualifications from contractors qualified to provide the District with Lease-Leaseback Services for the construction of the South Campus Development at Evergreen Valley College.

SAN FRANCISCO GENERAL HOSPITAL BUILDING 5 - ELEVATOR MODERNIZATIONPLAN #: 144059 Bid Date: 12/12/2012 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco Online & Print On Est Cost: $5,300,000.00 # OF ADDENDA: 3Demand PREBID: 11/15 @ 1:30PM OWNER: City & County of San Francisco DESCR: Contact, Marilyn Thompson, Proj Mgr, @ 415-557-4681. Removal and modernization of 13 elevator systems in three elevator banks in Building 5 for the five phases of construction. Phase 1A Work for the purchase of 13 elevator assemblies; make ready work; selective demolition and related hazardous abatement work; and elevator modernization work: Phases 1Bthrough 4 Work for the selective demolition and related hazardous

Continued on next page

Page 34: Construction E-zone

December 10, 2012Page 32 Contractor’s Zone• .Contractor’s Zone

Wednesday, December 12, 2012

RFQ - CAMPBELL AVENUE PORTALS - BICYCLE/PEDESTRIAN FACILITIES PROJECTPLAN #: 170095 Bid Date: 12/12/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Campbell PlanroomOWNER: City of Campbell DESCR: Contact, Lisa Petersen, 408-866-2190. City of Campbell is requesting qualifications from public artists for design development and installation of public art on the East Campbell Ave Portals Project.

REQUEST FOR STATEMENTS OF QUALIFICAITON ARCHITECTURAL SERVICES FOR BOALT HALL 2ND FLOOR

OFFICE MODIFICATIONSPLAN #: 220077 Bid Date: 12/12/2012 Bid Time: 12:30 PM PLANS AT: Roseville Office Location: Berkeley Online and PlanroomOWNER: University of California - Berkeley DESCR: Contact, David Hunsberger, Capital Projects, ([email protected]) Reconfiguration of approx 4,000 GSF of former library reading room areas into offices and open office cubicles.

RFP - FAIR OAKS PARK REHABILITATION PROJECT/DESIGN BUILDPLAN #: 264044 Bid Date: 12/12/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakdale Online and PlanroomPREBID: MAND 11/28 @ 10am OWNER: City of Oakdale DESCR: Contact, City of Oakdale, Engineering Division, 209-845-3600. Requesting consultants that have the ability to provide complet park rehabilitation and upgrades that include; design, engineering, improvement plans, specifications, preliminary and final cost estimates, construction, materials, supplies and labor, and construction management of Fair Oaks Park.

PA SYSTEM IMPROVEMENTSPLAN #: 270042 Bid Date: 12/12/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Martinez Est Cost: $95,000.00PREBID: 12/4 @ 10AM OWNER: Central Contra Costa Sanitary Dist.

DESCR: Contact, Nate Morales @ 925-229-7126. Replacement of approximately 75 public address speakers & installation of new wireless public address system with approximately 25 speakers.

Thursday, December 13, 2012

VASONA GATE CROSSING MODIFICATIONPLAN #: 5016 Bid Date: 12/13/2012 Bid Time: 1:30 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomPREBID: 11/29 @ 11AM OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: Del Sabeti via fax 408-955-9729Improving the safety of automated gate crossing by relocating, shortening & replacing the crossing gate arms on the existing CTA Light Rail System. The contractor shall design, furnish, install/modify & test the two gate crossing at Bascom Ave & Auzerais Ave, including striping, pavement markings, markers, concrete work, sidewalk, electrical work, gate crossing foundations, conduits, shortening crossing gate arms,

WOODWARD PARK BRIDEWELL PARKING LOTPLAN #: 24008 Bid Date: 12/13/2012Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Manteca Online & Print On Demand OWNER: City of Manteca DESCR: City of Manteca, Koosun Kim, 209-456-8460. Construct Bridgewell Parking lot including ADA ramps, parking lot lighting, landscaping and irrigation & storm drain system. BIDDERS LIST:General Contractor: Rodgers Construction & 209-464-5780 209-464-5782

IT SERVER ROOM HVAC & FIRE PROTECTIONPLAN #: 36007 Bid Date: 12/13/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Mather Online & Print On Demand PREBID: MAND 11/26 @ 9am OWNER: Sacramento County Office of Education DESCR: Sacramento County Office of Education, (916) 228-2268. Install new HVAC and fire protection measures. BIDDERS LIST:General Contractor: Hometown 916-991-2486 916-991-2881 United Building Contrac 530-345-8455 530-345-8885 Division 5-15, Inc. 916-638-1520 916-638-1521 Anderson Construction 530-367-2948 530-367-2948

Continued from last page

Plans On File

Page 35: Construction E-zone

Contractor’s ZoneContractor’s Zone

NAC HAZMAT PROJECTPLAN #: 40012 Bid Date: 12/13/2012

Bid Time: 2:00 PM PLANS AT: Auburn Office Location: Kentfield Online and PlanroomPREBID: 12/4 @ 10AM at 700 College Ave, Bldg PE-8, Kentfield DESCR: Contact: Marin Community College District 415-883-2211.Phased removal of hazardous materials from 5 campus buildings scheduled to be demolished. The buildings are: Olney Hall, Business Management Center, Harlan Center, Administration Building and the Taqueria. The work will involve the removal of the following identified materials: Taping mud/wallboard (ACCM); Green 9”x9” VFT Flooring; Black mastic associated with flooring; Leveling compound; Transite paneling; roof penetration mastic; and lead based paint. CLASS B OR C WITH ABS AND HAZ CERT REQUIRED.

21ST STREET IMPROVEMENTSPLAN #: 84080 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Paso de Online and PlanroomPREBID: 11/20 @ 2pm # OF ADDENDA: 1 OWNER: City of El Paso de Robles DESCR: Contact, City of El Paso de Robles, 805-237-3861. Remove existing & install new road, curb, gutter, drain lines, sewer, water, streetlights, underground utilities, striping, landscaping, & minor grading.

CHARLOTTE RUSSE TENANT IMPROVEMENTSPLAN #: 105084 Bid Date: 12/13/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: RosevilleG.C.: Tri-North Builders Ph: 760-804-1838 FAX: 760-804-1878DESCR: Contact, Tri-North Builders, 760-804-1838. Construct tenant improvements in a 5,568 SF space with no existing storefront, including a new storefront, sales area, ceiling, fitting rooms, restrooms and break & storage area. BIDDERS LIST:Sub Contractor: Coast Casework Inc. 530-889-2859 530-889-2851Supplier: Sunbelt Rentals 916-789-1234 916-789-7077

JOINT INTEGRATED VA/DA HEALTH CARE CENTER

PLAN #: 129065 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Marina Online & Print On Demand

G.C.: Swinerton Construction Ph: 916-388-9158 FAX: 916-388-9197DESCR: Contact, John Hoeppner [[email protected]], Swinerton Builders. Swinerton Construction is seeking sub-bids for the Joint Integrated VA/DA Health Care Center in Marina. This is a new 150,000 sf medical office building located in Marina, Ca

WHITE ROCK ROAD AT SCOTT ROAD (NORTH) INTERSECTION IMPROVEMENTSPLAN #: 133064 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom Est Cost: $300,000.00OWNER: County of Sacramento - Municipal Services Agency Ph: 916-875-6789 DESCR: Contact, County of Sacramento, Scott Werth ([email protected]) (916) 874-5259. Reconstruct the intersection, including roadway widening, removal and installation of barbed wire fence, relocation of metal gates, earthwork, drainge, placement of asphalt concrete, placement of aggregate base, striping, etc.

GEARY ROAD BRIDGEPLAN #: 143057 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sunol Online & Print On Est Cost: $3,500,000.00 # OF ADDENDA: 4Demand PREBID: 11/14 @ 9:30am DESCR: Contact, SFPUC, 415-551-4603. Remove an existing bridge, construct a 155 feet long by 20 ft wide steel bridge, approach roadways, 60 inch reinforce concrete pipe culvert and a steel entry gate.BIDDERS LIST:Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

AS-NEEDED MAIN SEWER REPLACEMENT (BSSR PAVING SPRING 2013)PLAN #: 150057 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: San Francisco Online & Print On Est Cost: $3,300,000.00 Demand# OF ADDENDA: 1 PREBID: 11/20 @ 10am OWNER: San Francisco Public Utilities Commission DESCR: Contact, SFPUC, 415-551-4603. Provide as-needed main sewer replacement at locations to be determined within the City and County of San Francisco.

Continued on next page

Click on the blue underline to go to the Online Planroom

Page 36: Construction E-zone

December 10, 2012Page 34 Contractor’s Zone• .Contractor’s Zone

Thursday, December 13, 2012

NORTH BAY WATER REUSE PROGRAM - NAPA SALT MARSH RESTORATION PIPELINEPLAN #: 162059 Bid Date: 12/13/2012 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Sonoma Co. Planroom Est Cost: $5,500,000.00 # OF ADDENDA: 2PREBID: MAND 11/27/12 @ 10:00 am and 11/29/12 @ 2:00 pm at the Site. OWNER: Sonoma Valley County Sanitation District Ph: 707-547-1900 DESCR: Contact, Sonoma Valley County Sanitation District (707) 547-1900. The work includes, but is not limited to, the installatinof approximately 18,200 lineal feetof 18-inch diameter recycled water transmissionpipeline by means of direct bury, horizontal directional drilling or bore and jack; pipe appurtenances; and incidental relalated work. BIDDERS LIST:General Contractor: Preston Pipelines 408-262-1418 408-262-1870 Argonaut Constructors 707-542-4862 707-542-4897 RESTROOM FLOOR REPLACEMENT - CIVIC CENTER, WING DPLAN #: 171094 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Concord PlanroomPREBID: 11/29/12 @ 2:00 pm OWNER: City of Concord DESCR: Contact, Alton Baxley, Facilities Mgr, @ 925-671-3025. Restroom Floor Replacement - Civic Center, Wing D.BIDDERS LIST:General Contractor: Wickman Development 415-215-3473 415-341-0155

CONSTRUCTION, DEVELOPMENT AND TESTING OF THE SULLIVAN AVENUE WELLPLAN #: 182097 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Print OnDemand Location: Daly City Online & Print On Demand OWNER: City of Daly City DESCR: Contact, City of Daly City, (650) 991-8200. Construction, Development and Testing of the Sullivan Avenue Well. ASBESTOS MOLD & LEAD ASSESSMENT, TESTING & CONSULTATION SERVICES-RE-BIDPLAN #: 193089 Bid Date: 12/13/2012

Continued from last page

Plans On FileBid Time: 2:00 PM PLANS AT: Roseville Office Location: Vacaville Online and PlanroomOWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Suzanne Livingston, 916-255-6136. Asbestos Mold & Lead Assessment, Testing and Constultation Services at the California Medical Facility in Vacaville.

REQUIREMENTS CONTRACT FOR AUTOMATIC FAREBOX COLLECTION SYSTEMPLAN #: 201089 Bid Date: 12/13/2012 Bid Time: 3:00 PM PLANS AT: Print On Demand Location: Fresno Online & Print On # OF ADDENDA: 3Demand PREBID: 11 /7 @ 10am OWNER: City of Fresno DESCR: Contact, Jean Runnels, Phone: (559) 621-1163 OR 621-1332. New AFC system that is based on open system architecture, modular, and flexible to adapt to and accept any commonly used fare media, such as paper-based or limited-use ticket, magnetic stripe card, or smart card, over the service life of the system. The AFC system should conform to technological and environmental Open Standards and Guidelines, including, but not limited to the following applicable industry standards, as required to provide the levels of service required by this bid:. This request is for a one -year contract with one (1) one-year extensions. RFP - ANNUAL CONTRACT FOR BUILD-OUT SERVICES FOR POLICE VEHICLES ON AN AS-NEEDEDPLAN #: 219090 Bid Date: 12/13/2012 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Concord PlanroomOWNER: City of Concord DESCR: Contact Anita Bell-Karno, 925-671-3219. City of Concord is seeking bids to furnish all necessary toos and equipment, materials, labor and supervision to remove various equipment from existing police vehicles in preparation for auction and to install various equipment and prepare new police vehicles.

FY 2013 PROACTIVE SIDEWALK PROJECTPLAN #: 232084 Bid Date: 12/13/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Berkeley Online and PlanroomOWNER: City of Berkeley DESCR: Contact, Vincent Chen, 510-981-6409. Reconstruction of damaged sidewalks, driveways, curb and gutters, planting strips, minor asphalt patching and possible city monument replacement.

Page 37: Construction E-zone

Contractor’s ZoneContractor’s Zone

OWNER: Monterey Peninsula Airport District ARCHITECT: Wald, Ruhnke & Dost Architects Ph: 831-649-4642 DESCR: Contact, Wald, Ruhnke & Dost Architects, 831-649-4642, Fax: 831-649-3530. Limited selective demolition & installation of new toilet room to include wall framing, wall & floor finishes, plumbing & electrical. Patch & repair walls to similar & like condition as needed from damage as result of toilet room addition.

FRESNO YOSEMITE INTERNATIONAL AIRPORT RUNWAY 11L-29R EXTENSION (RSA COMPLIANCE)PLAN #: 292044 Bid Date: 12/13/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Online & Print On # OF ADDENDA: 3 DemandPREBID: 11/27 @ 10AM OWNER: City of Fresno DESCR: Contact, City of Fresno (559) 621-1332. Demolition, storm drain installation, grading, subgrade preparation, soil cement, asphalt concrete paving, portland cement concrete paving, fencing, airfield lighting, airfield signs, electrical duct banls & airfield marking. BIDDERS LIST:Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000

CHURCH AVENUE AND MLK BOULEVARD TRAFFIC SIGNALPLAN #: 294035 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Fresno Online & Print On Demand OWNER: City of Fresno DESCR: Contact, City of Fresno, [email protected] . Installation of new traffic signal facilities, including standards, signals heads, controller, electrical service equipment, conduits, and wiring at the intersection of Church Avenue and Martin Luther King Jr. Boulevard. The work also includes clearing and grubbing, removing and salvaging existing street lighting equipment, construction of sidewalks, curb returns and ramps, widening the south side of Church Avenue west of Martin Luther King Jr. Boulevard, construction of AC dike, construction of a swale and berm, pavement markings and striping, and finishing roadway.

DISTRICT NO. 5 SEWER REHABILITATION 2012PLAN #: 249059 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Los Angeles Online and Planroom Est Cost: $124,000.00OWNER: County Sanitation Districts of LA County DESCR: Contact, L.A. County Sanitation District No. 22, Melissa Fischer (562) 908-4288, extension 6807. Rehabilitate approximately 414 linear feet of 15-inch diameter and 393 linear feet of 10-inch diameter vitrified clay pipe sewer with a cured-in-place pipe liner, a folded/reformed PVC pipe liner, or a deformed/reformed HDPE pipe liner, and remove two (2) Link-Pipe sleeves from the sewer.

PARKING LOT REPAIR @ STOCKTON STATE OFFICE BUILDINGPLAN #: 276045 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton Online and PlanroomEst Cost: $47,000.00 PREBID: MAND 11/29 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, CA Department of General Services Peter Flores, ([email protected]) (916) 375-4951 Provide parking lot repairs, sealing and striping.

WING A & WING B COOLING SYSTEM UPGRADEPLAN #: 254061 Bid Date: 12/13/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Vacaville Online and Planroom# OF ADDENDA: 3 PREBID: MAND 10/25 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Eric Waddell, 916-376-11768. Project comprises labor, material and services necessary for: Removal and demolition of existing cooling systems for wings A and B. Provide cooling system upgrade for wings A and B including electrical and structural work to support equipment. Remove and replace the chilled water coils at a number of existing units. Provide chillers including concrete pad, piping and electrical requirements. Provide structural strengthening required for mechanical equipment. Patch and repair roofing as required for mechanical changes and support system.BIDDERS LIST:General Contractor: Bell Products, Inc. 707-255-1811 707-255-1908 Bobo Construction, Inc. 916-685-2285 916-714-4850 Division 5-15, Inc. 916-638-1520 916-638-1521

THE MONTEREY REGIONAL AIRPORT TOILET ROOM ADDITIONPLAN #: 286046 Bid Date: 12/13/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Monterey PREBID: 12/6 @ 2pm Continued on next page

Run your DVBE/DBE/MBE/SBE/UDBEadvertisements in this State Certified paper

CLICK HERE to place your ad online

Page 38: Construction E-zone

December 10, 2012Page 36 Contractor’s Zone• .Contractor’s Zone

Thursday, December 13, 2012

CHP OCEANSIDE AREA OFFICE REPLACEMENTPLAN #: 307010 Bid Date: 12/13/2012Bid Time: 2:00 PM PLANS AT: Print On Demand Location: Vista Online & Print On Demand PREBID: MAND 11/5 @ 11am OWNER: State of CA - Dept of General Services DESCR: Contact, Department of General Services, (916) 376-1629. BIDDERS LIST:General Contractor: Soltek Pacific Construc 619-296-6247 619-296-4314 Augustine Company, The 619-670-4466 619-670-4411

Friday, December 14, 2012

ARCO AM / PM NEW CONSTRUCTIONPLAN #: 8008 Bid Date: 12/14/2012

Bid Time: 5:00 PM PLANS AT: Roseville Office Location: LodiG.C.: Town & Country Contractors Ph: 916-636-9500 FAX: 916-636-9507DESCR: Contact, Dave Frazier, Town & Country Contractors, Inc., 916-919-2626. Accepting Sub-Bids to Construct a new Arco AM / PM gas station, including sitework, landscaping, glass, storefront, stucco, framing, HVAC, masonry, ceramic tile, etc. **Plans are not to scale. BIDDERS LIST:Sub Contractor: On-site Engineering 916-652-0600 916-652-0610

ZIP LINE END POLE SUPPORT REPLACEMENTPLAN #: 47010 Bid Date: 12/14/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Redding Online & Print On Demand OWNER: USDA Forest Service DESCR: Contact, USDA Forest Service, 530-226-2702. Removing 3 existing zip line poles and replace with new steel columns, replacement of the existing deadman and guy wires may be added.

PLACER COUNTY CLINIC BEHAVIORAL HEALTH INTEGRATIONPLAN #: 98067 Bid Date: 12/14/2012

Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Auburn Online & Print On Est Cost: $800,000.00 # OF ADDENDA: 1

Demand PREBID: 11/20 @ 4pm OWNER: County of Placer Dept. of Facility Services DESCR: Contact, Lisa James, 530-889-6838. Includes renovation of the existing clinic space into six new exam rooms; new nurses station; relocate / expand the pharmacy; emergency power circuiting; additional public restroom; securing access system at selected doors; restroom upgrades for ADA compliance; minor alterations to the existing building, including minor demolition, interior paint, flooring, doors, electrical / mechanical upgrades, sitework improvements and concrete flat work. BIDDERS LIST:General Contractor: American River Const 530-621-1785 530-621-0360 Owens Construction 530-878-3905 530-878-3906 S W Allen Construction 916-344-2098 916-344-0307 Carter-kelly, Inc. 530-621-0950 530-621-2344 C & C Construction 916-434-5280 916-434-5288 Kaler/dobler Construction 916-631-7211 916-631-0936 Bobo Construction, Inc. 916-685-2285 916-714-4850 Geney Gassiot 775-747-2200 775-747-2227 A-zcon Builders 916-786-8003 916-786-8046 D.g. Granade, Inc. 530-677-7484 530-677-7550 Peterson Development 916-961-4756 916-966-0943 Robert D. Nichol 530-378-1131 530-378-1141 Hometown 916-991-2486 916-991-2881 Pnp Construction, Inc. 530-885-9360 530-885-9365 Clp Construction 916-344-6646 916-331-4335Sub Contractor: Sierra Nevada Electric, 530-887-9000 530-887-9005 Coast Casework Inc. 530-889-2859 530-889-2851 Graham Concrete 530-993-4598 530-993-4758 Vanden Bros Electric 916-773-1500 916-773-1973Supplier: Hansen Brothers 530-273-3381 530-272-5401

NEW KVMR/NTC BUILDINGPLAN #: 146060 Bid Date: 12/14/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Nevada Co. Online & Print On DemandG.C.: Landmark Construction Ph: 916-663-1953 FAX: 916-663-1867DESCR: Contact, Landmark Construction, 916-663-1953, fax: 916-663-1867. The project team is currently soliciting input from local subcontractors for the development of a preliminary cost estimate. We are asking interested local subcontractors and vendors to review the current plans and specifications and to provide a budget estimate for the scope of their trade. Along with

Continued from last page

Plans On File

Page 39: Construction E-zone

Contractor’s ZoneContractor’s Zone

this estimate we are seeking any input the subcontract community may have with regard to value engineering alternatives, use of local resources and sustainability.Abatement, Wood Framing, Hard Demolition, Finish Carpentry, Earthwork, Casework, Termite Control, FRP, Landscape and Irrigation, Membrane Waterproofing, Underground Utilities, Thermal Insulation and Sound ProofingSite Survey, Corrugated Metal Roofing, Concrete – Structural, Single Ply Roofing, Concrete – Site, rchitectural Sheet Metal, Concrete ReinforcingGutters and Downspouts, Brick Veneer Masonry, Joint Sealants, Misc Metals/Ornamental Handrails, Hollow Metal Doors and FramesSolid Wood Core Doors, Work Station Dividers, Hardware, Residential Appliances

PARKS, TRAILS, AND RECREATION MASTER PLAN/SOUTH LAKE TAHOEPLAN #: 168072 Bid Date: 12/14/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: South Lake PlanroomOWNER: County of El Dorado DESCR: Contact, County of El Dorado, Sue Hennike, 530-621-5577. The County of El Dorado Procurement & Contracts is soliciting proposals from qualifed professional consultants to prepare a comprehensive Parks, Trails and Recreation Master Plan for the eastern slope of El Dorado Co. know as the community of South Lake Tahoe.

SECURITY CAMERAS UPGRADE FOR THE SOLID WASTE AND RECYCLING DIVISIONPLAN #: 272050 Bid Date: 12/14/2012Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom # OF ADDENDA: 2 PREBID: 11/8 @ 10am OWNER: City of Sacramento DESCR: Contact, Melissa Mowry, 916-808-4931 ([email protected]) City of Sacramento are requesting proposals for Security Cameras Upgrade for the Solid Waste and Recycling Division.

ON-CALL CONSTRUCTION SERVICES FOR VARIOUS PROJECTSPLAN #: 285044 Bid Date: 12/14/2012

Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Oakland Online and PlanroomPREBID: 11/20/12 @ 11:00 AM OWNER: City of Oakland DESCR: Contact, City of Oakland, Calvin Hao at 510-238-7395. Services Required: The City of Oakland is requesting Statements of Qualifications from licensed general contractors interested in providing on-call construction services for various capital improvement projects within the City’s right-of-way and/or for its municipal facilities. As specific projects arise, bids will be solicited from on-call contractors. License(s) Required: A, B, C-7, C-8, C-10, C-12, C-20, C-21, C-27 or C-

Monday, December 17, 2012

WESTFIELD VILLAGE WATER MAIN REPLACEMENT AND WATER METER INSTALLATIONPLAN #: 55096 Bid Date: 12/17/2012 Bid Time: 2:00 PM PLANS AT: Print On Demand Location: West Online & Print On DemandDESCR: Contact: City of West Sacramento (916) 371-0845.Furnish and place new water main, water services, blow-off assemblies, valves, meters, MXUs, fire hydrant assemblies, grounding rod assemblies, etc. and perform abandonment of existing water mains,

FAMILY DOLLAR STOREPLAN #: 102088 Bid Date: 12/17/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Davis Online & Print On DemandG.C.: Sierra Contracting Ph: 760-745-8769 FAX: 760-745-5121DESCR: Contact, Bradley Curth, Sierra Contracting, 760-745-8769. Add new accessible drinking fountain, mop sink, accessible toilet rooms, receiving and office and install furniture, fixtures and equipment; including demolition, concrete, carpentry, doors, frames, hardware, drywall, ceilings, painting, flooring, toilet accessories, plumbing, fire sprinklers, HVAC and electrical. BIDDERS LIST:Supplier: Sunbelt Rentals 916-789-1234 916-789-7077

RFQ -WOODCREEK NORTH WELL AND STONERIDGE TANK SECURITY SYSTEM IMPROVEMENTS- (DESIGN/BUILD)

PLAN #: 221045 Bid Date: 12/17/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Roseville Online and Planroom# OF ADDENDA: 1 PREBID: 12/3 @ 10am OWNER: City of Roseville DESCR: Contact, City of Roseville, 916-774-5720. Work consists of the design, construct and integrate of a security system into an existing security system.

Continued on next page

Click on the plan title to go directly to that plan on the Online Planroom

Page 40: Construction E-zone

December 10, 2012Page 38 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 18, 2012

LANDMARK PLAZA PACKAGEPLAN #: 4011 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakley PlanroomOWNER: City of Oakley DESCR: Contact: City of Oakley (925) 625-7037.Curb & gutter, sidewalk, curb ramps, segmental concrete block retaining walls, landscaping, irrigation, pervious pavers, street lighting, storm drainage improvements & miscellaneous items required for public safety, traffic control, utility coordination & conformance with NPDES

SRTS FEDERAL CYCLE 3 FREMONT STREET SIGNALSPLAN #: 18024 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Colusa Online & Print On Demand OWNER: City of Colusa DESCR: Contact, Ponticello Enterprises, Alan Mitchell ([email protected]) (530) 662-5883. Includes installation of new traffic signals and lighting on Fremont Street at 7th Street and 3rd Street, slurry sealing, restriping of roadways and curb / gutter reconstruction. BIDDERS LIST:General Contractor: Cal Electro 530-223-5937 530-221-7038Sub Contractor: Studebaker Brown 530-333-3423 530-823-1341

GLEASON’S STOREFRONT GLASS DOOR REPLACEMENT AND INSTALLATIONPLAN #: 28018 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: StocktonOWNER: San Joaquin RTD Ph: 209-948-5566 FAX: 209-948-8516DESCR: Contact, San Joaquin Regional Transit District (209) 948-5566. Gleason’s Storefront Glass Door Replacement and Installation.

STEVENS CREEK TRAIL ACCESS POINT IMPROVEMENTS - NORTH OF EL CAMINO REALPLAN #: 46092 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Mountain View Plans on Disk

Est Cost: $80,000.00 OWNER: City of Mountain View DESCR: Contact, City of Mountain View (650) 903-6311. The project includes removal and replacement of curb and sidewalk, construction of asphalt concrete pavement, installation of fences, gates,striping and pavement markers, landscaping and irrigation system. BIDDERS LIST:Sub Contractor: Bennett Fencing 530-852-2618 000-000-0000

HOSPITAL DATA CLOSET UPGRADES CPPLAN #: 56064 Bid Date: 12/18/2012 Bid Time: 11:00 AM PLANS AT: Roseville Office Location: Davis Online & Print On Est Cost: $405,000.00 DemandPREBID: MAND 12/4 @ 10am OWNER: University of California, Davis Health System DESCR: Contact, University of California Davis (916) 734-7024. Work consists of the installation of University furnished UPS units, additional cooling capacity and electrical power upgrades in data rooms on the ground floor, 2nd floor, 7th floor, 8th floor, 11th floor, 12th floor, and 14th floor. BIDDERS LIST:General Contractor: American River Constr 530-621-1785 530-621-0360 Bobo Construction, Inc. 916-685-2285 916-714-4850

PYRITE CANYON TREATRMENT FACILITYPLAN #: 119081 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Jurupa Valley # OF ADDENDA: 1PREBID: MAND 11/15 @ 10a,m OWNER: State of CA - Dept of General Services DESCR: Contact, State of California, Dept of General Services, Steve Ellis, 949-809-5169. New prefabricated metal buildings w / interior improvements

VALENCIA WATER RECLAMATION PLANT RETURN ACTIVATED SLUDGE PIPING REPLACEMENT - 2012

PLAN #: 142053 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Los Angeles PlanroomPREBID: MAND 12/4 @ 10am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Joe Chang, 562-908-4288 ext. 3509. Valencia Water Reclamation Plant Return Activated Sludge Piping Replacement 2012: The work includes replacing

Continued from last page

Plans On File

Page 41: Construction E-zone

Contractor’s ZoneContractor’s Zone

approximately 200 feet of existing 16-inch carbon steel return activated sludge piping with new 16-inch fiberglass reinforced piping; installation of all associated equipment and piping; demolition and/or modification of existing piping and all associated equipment; and all appurtenant work as shown on Contract Drawings SC-g-0009 and as required in Specifications X-1736

BART EARTHQUAKE SAFETY PROGRAM FOUR STATIONS STRUCTURES -A LINEPLAN #: 159076 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San PlanroomPREBID: 11/29 @ 9am OWNER: San Francisco Bay Area Rapid Transit District DESCR: Contact, Sunni Gunawardena, 510-464-6550. Structural retrofit of pier foundations, columns, and pier caps; demolition of selected existing facilities; shoring for excavation support; excavation; steel and concrete structure retrofit at girders and stairs; drilling and bonding dowels in concrete; electrical work at piers and the main concourse, defined as the covered area between station entrances; architectural work at stairs, retrofit of escalator trusses, restoration of paving, striping, BIDDERS LIST:General Contractor: Arntz Builders, Inc. 415-382-1188 415-883-7529 C. Overaa And Co. 510-234-0926 510-237-2435 Diede Construction 209-369-8255 209-368-0600

!!CANCELLED!!RWQCP ADMIN. BLDG. SYSTEMS UPGRADEPLAN #: 169086 Bid Date: 12/18/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto Plans on Disk# OF ADDENDA: 1 PREBID: MAND 11/16 @ 10am OWNER: City of Palo Alto DESCR: Contact, Daisy Stark, 650-444-6352. Upgrades of Wastewater Treatment electrical facilities in the Administration. Building including construction of medium (15 KV), and low voltage electrical connections to existing wastewater treatment plant power grid, and construction of miscellaneous systems and accessories at the Regional Water Quality Control Plant, 2501 Embarcadero Way in Palo Alto.BIDDERS LIST:General Contractor: Cf Contracting 415-721-7160 415-296-6437Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797

WINDOW REPLACEMENTPLAN #: 178001 Bid Date: 12/18/2012 Bid Time: 2:15 PM PLANS AT: Roseville Office Location: Terminal PREBID: MAND 12/4 @ 10am

# OF ADDENDA: 2OWNER: Department of Transportation - Division Of Procurement and Contracts DESCR: Contact, Betty Graham, 916-227-6048. Bidder’s must have, at time of bid submittal and for the duration of the contract, a valid current Class 17 Glazing Contractors license issued by the California Contractors State License Board (CSLB). If, required by law, the lowest responsive responsible bidder must provide evidence, before contract award at a date speciied by Caltrans, that is possesses and maintains in good standing a Motor Carrier Permit (MCP) issued by the California Department of Motor Vehicle (DMV). If the successful bidder’s exceeds $25,0000 a Payment Bond is required. Disabled Veteran Business Enterprise (DVBE) Participation Program applies and a three (3%) goal

FIRE SPRINKLER MAINTENANCE AND REPAIRPLAN #: 181097 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Calipatria PlanroomPREBID: MAND 12/4 @ 10am OWNER: State of CA - Dept of Corrections & Rehabilitation DESCR: Contact, Suzanne Livingston, 916-255-6136([email protected]) Fire Sprinkler System Maintenance and Repair Services at Calipatria State Prison in Calipatria, CA.

MARIN COUNTY CIVIC CENTER BOILER EMMISSIONS MODIFICATIONSPLAN #: 190089 Bid Date: 12/18/2012 Bid Time: 3:00 PM PLANS AT: Roseville OfficLocation: Marin Co. PlanroomPREBID: 12/11 @ 10:30am OWNER: County of Marin DESCR: Contact, County of Marin, 415-473-7877. The design, engineering, construction, and installations required for the modification or replacement of a 150 HP Cleaver Brooks boiler natural gas burner assembly, as necessary to bring the boiler into full compliance with all statutory emissions requirements in effect at the time of installation.

MARIN COUNTY CIVIC CENTER BOILER EMMISSIONS MODIFICATIONSPLAN #: 190089 Bid Date: 12/18/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Marin Co. Online and PlanroomPREBID: 12/11 @ 10:30am OWNER: County of Marin DESCR: Contact, County of Marin, 415-473-7877. The design, engineering, construction, and installations required for the modification or replacement of a 150 HP Cleaver Brooks boiler natural gas burner assembly, as necessary to bring the boiler into full compliance with all statutory emissions requirements in effect at the time of installation.

Continued on next page

Page 42: Construction E-zone

December 10, 2012Page 40 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 18, 2012

REFRIGERATION PERVENTATIVE MAINTENANCE (BAY AREA COUNTIES)PLAN #: 267042 Bid Date: 12/18/2012

Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Marin/Contra Online & Print On Est Cost: $30,000.00 DemandOWNER: Department of Rehabilitation DESCR: Contact, Shari Cooley, AGPA, 916-558-5690. Refrigeration Preventative Maintenance for the Department of Rehabilitation’s Business Enterprise Program cafeterias, snack bars and vending

RFP - PROFESSIONAL SERVICES - LOS ALTO TREATMENT PLANT SITE REMEDIATION DESIGN AND PERMITTINGPLAN #: 269081 Bid Date: 12/18/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Palo Alto PlanroomPREBID: 12/4 @ 10am OWNER: City of Palo Alto DESCR: Contact, John Montenero, 650-329-2271. The City of Palo Alto is seeking proposals from qualified firms to provide professional services for site remediation design services and permitting for the former Los Altos Treatment Plant (LATP) site. The required services and performance conditions are described in the Scope of Work (or Services). The City has budgeted a maximum of $200,000 for these services in the 2012/2013 Fiscal Year.

SONOMA AVE. AND SHORTT RD SEWER AND WATER IMPROVEMENTSPLAN #: 295029 Bid Date: 12/18/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Rosa PREBID: 12/11 @ 10am OWNER: City of Santa Rosa DESCR: Contact, Tracy Duenas, 707-543-3952. Sewer and Water Improvements on Sonoma Ave and Shortt Rd.BIDDERS LIST:General Contractor: Ghilotti Construction Co 707-585-1221 707-585-1601

WEST BATTLES ROAD RIGHT TURN LANE CONSTRUCTION

PLAN #: 299045 Bid Date: 12/18/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Santa Maria Est Cost: $90,000.00OWNER: City of Santa Maria DESCR: Contact, City of Santa Maria, 805-925-0951, Fax: 805-928-4995. Consists of the addition of a right turn lane at the north east corner of Battles Road and Depot Street, and all work necessary to render the facility complete and operational.

Wednesday, December 19, 2012

DEMOLITION SERVICES, MOUNTAIN VIEW REVITALIZATION PROJECTPLAN #: 12004 Bid Date: 12/19/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton Online & Print On # OF ADDENDA: 1 DemandPREBID: 11/20 @ 10am OWNER: Housing Auithority of the County of San Joaquin Ph: 209-4160-5000 FAX: 209-460-5100DESCR: Contact, Brad Diemer ([email protected]) Demolition Contractors to perform demolition, removal and disposal services to completely demolish, remove and dispose of five (5) buildings (four (4) single-story duplexes and one (1) two-story townhome) within the communities of Conway Homes and Sierra Vista titled Phase 1 (or Model Phase) of the Mountain View Revitalization project. Four (4) single-story duplex buildings are located within the community of Conway Homes (at 717 & 719 Houston Ave., 2733 & 2735 Colorado Ave., 801 & 803 Houston Ave., and 2733 & 2735 Connecticut Ave.) and the remaining building is a 4-plex two-story townhome is located within the Sierra Vista Homes community at 1526, 1528, 1530, and 1532 Twelfth Street in Stockton, CA. Additionally, this bid shall include Phase 3A (the remaining 14 buildings along the south side of Twelfth Street east of Phelps Street within Sierra Vista). Phase 3A consists of ten (10) single-story duplex buildings and four (4) two-story 4-plex townhomesBIDDERS LIST:General Contractor: Diede Construction 209-369-8255 209-368-0600

KIDS FOOTLOCKER - TIPLAN #: 26090 Bid Date: 12/19/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: ConcordG.C.: Sierra Contracting Ph: 760-745-8769 FAX: 760-745-5121DESCR: Contact, Bradley Curth, Sierra Contracting, 760-745-8769. Construct tenant improvements, including demolition,

Continued from last page

Plans On File

Page 43: Construction E-zone

Contractor’s ZoneContractor’s Zone

carpentry, doors, frames, hardware, glazing, metal studs - drywall, ceilings, flooring, paint, fixtures, plumbing, HVAC and electrical.

CAMPUS COMMON STREET LIGHTING REPLACEMENTPLAN #: 65097 Bid Date: 12/19/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento PlanroomOWNER: City of Sacramento FAX: 916-808-8266DESCR: Contact, Kaleb Haile, 916-808-7020. Installing all necessary equipment and material to replace the existing streetlight system on Campus Common St.

EASTRIDGE TRANSIT CENTER AND BUSPLAN #: 117074 Bid Date: 12/19/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: San Jose Online and Planroom# OF ADDENDA: 4 PREBID: 8/10 @ 10 am. OWNER: Santa Clara Valley Transportation Authority Ph: 408-321-7189 FAX: 408-955-9729DESCR: Contact: VTA (408) 321-7189 .The work generally includes clearing and grubbing, demolition, excavation, street improvements, AC paving, addition of curb and gutter and sidewalk, multiuse path, street and pedestrian lighting, landscaping new utilities, conduits, service connections, signing and striping and misc other work. BIDDERS LIST:Sub Contractor: Mission City Rebar, Inc 925-449-6999 925-447-8797 R.l. Ziegenbein Const 925-820-9245 925-831-3093 Monterey Bay Rebar 831-724-3013 831-724-3151Supplier: Reed & Graham Inc 916-381-9900 916-388-1486

SANITARY SEWER MAIN REPLACEMENT 2012-13PLAN #: 130068 Bid Date: 12/19/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Sunnyvale PlanroomOWNER: City of Sunnyvale DESCR: Contact, Dave Gakle, 408-730-7403. Replace approximately 14,368 feet of existing sanitary sewer by both pipe bursting, open cut excavation, and cured in-place pipe at 16 different locations within the City of Sunnyvale ready for use in accordance with these plans and specifications. The sewer replacement work will include HDPE and PVC pipe installation, sewer construction, pot holing of existing utilities, access pit construction, soil excavation, shoring, backfilling and soil compaction, sewer manhole installations and modifications, constructing new sewer lateral with cleanouts, exposing and connecting existing laterals to new laterals, abandonment of existing sewer, piping tie-in, wastewater bypass pumping,

quality control testing, final cleaning, and video inspection. Sewage flow within existing sewers shall be maintained at all times. Traffic control plans, and traffic control implementation is required.

RFQ - RELOCATION OF CORONER/PUBLIC ADMINISTRATION, VIDEO VISITATION & MEDICAL RECORDS (DESIGN/BUILD)PLAN #: 206091 Bid Date: 12/19/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Modesto Online and PlanroomEst Cost: $3,400,000.00 OWNER: City of Oakdale # OF ADDENDA: 1DESCR: Contact, Patricia Hill THomas, 209-525-74380. Stanislaus County requests proposals from design-build teams, pre-qualified thorugh this request for Statements of Qualifications, for the renovation of the Medical Arts Building at 700 17th St., Modesto for resuse as the Coroner/Public Administration, Video Visitation & Medical facilty.

WAREHOUSE IMPROVEMENTSPLAN #: 258049 Bid Date: 12/19/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: TracyOWNER: California Prison Industry Authority DESCR: Contact, Lisa Horrell, 916-358-2685 (CALPIA) Warehouse Improvements for the Dairy Located at Deuel Vocational Institution in

VANS -169PLAN #: 271047 Bid Date: 12/19/2012

Bid Time: 12:00 PM PLANS AT: Roseville Office Location: CapitolaG.C.: Warwick Construction Ph: 832-448-7000 FAX: 832-448-0143DESCR: Contact, Warwick Construction, Inc. F. 832-448-3000, Shane Elam @ selam@warwickconstruction .com. 3,068 sf tenant finish out Vans #169 project located at Capitola Mall - 1855 Forty First Avenue, Sp, J01 - Capitola, CA. PAVEMENT MANAGEMENT SYSTEM UPDATEPLAN #: 227077 Bid Date: 12/19/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Tracy Online and PlanroomOWNER: City of Tracy DESCR: Contact, Ripon Bhatia, 209-831-6400. The City’s primary objective for the consultant agreement is to obtain the professional assistance to update the Pavement Management System to reflect the current conditions.

Continued on next page

Page 44: Construction E-zone

December 10, 2012Page 42 Contractor’s Zone• .Contractor’s Zone

Wednesday, December 19, 2012

RFP-JUVENILE JUSTICE CENTER - ROOFING AND HVAC REPLACEMENTPLAN #: 282055 Bid Date: 12/19/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Modesto Online and Planroom Est Cost: $3,603,000.00 OWNER: County of Stanislaus DESCR: Contact, Gino Colacchia, Construction Mgr, @ 209-525-4380. The County of Stanislaus is seeking a highly qualified Design Professional Consultant (Bridging Consultant) to serve as the County’s Bridging Consultant to prepare Bridging Documents of the County’s Juvenile Justice Center Roofing & HVAC Replacement in Modesto prohect, which entails the replacement of the existing HVAC system, central plant & Juvenile Hall Detention roof & upgrades to the Probation

Thursday, December 20, 2012

FIRE ALARM UPGRADE FOR EISENHUT ELEMENTARY SCHOOL

PLAN #: 29012 Bid Date: 12/20/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Modesto Online & Print On Demand PREBID: MAND 12/12 @ 3pm OWNER: Stanislaus Union School District DESCR: Contact, Tim Huff, 209-571-2232. Fire Alarm Upgrade for Eisenhut Elementary School.

JENNY LIND WATER TREATMENT PLANT FLOOD PROTECTION PROJECTPLAN #: 35012 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Valley Springs Online and Planroom # OF ADDENDA: 1Est Cost: $500,000.00 PREBID: 12/7 @ 1:30Pm OWNER: Calaveras County Water District Ph: 209-754-3543 FAX: 209-754-1069DESCR: Contact, Calaveras County Water District, Tami Bennett-Kirby, 209-754-3181.The project will relocate raw water pumping facilities and electrical equipment vulnerable to river flooding and work includes construction of a 12-ft x 21-ft metal building, 100-ft masonry wall, and furnishing and installing motor controls, conduits, wiring, and two 50-hp pumps. This project is funded in part by FEMA.

BIDDERS LIST:General Contractor: Menghetti Construction 209-524-2465 209-524-2495 Auburn Constructors, Inc 916-924-0344 916-924-1800 Diede Construction 209-369-8255 209-368-0600 Mcfadden Construction, 209-478-7407 209-478-1516

FLEET SERVICES BUILDINGPLAN #: 37010 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sonora Online and Planroom # OF ADDENDA: 1 PREBID: MAND 11/8 @ 10am OWNER: County of Tuolumne DESCR: Contact, County of Tuolumne, phone 209-533-5660. Contractor to furnish all labor, materials, equipment, transportation, sitework, and services for the completion of the Fleet Services Building.

DELAWARE STREET BIKE LANE AND STREETSCAPE IMPROVEMENT PROJECTPLAN #: 73067 Bid Date: 12/20/2012

Bid Time: 2:00 PM PLANS AT: Auburn Office Location: San Mateo PlanroomDESCR: Contact: City of San Mateo 650-522-7300.Landscape planting, remove chain link fence, irrigation system, clearing & grubbing, ground surface preparation, embankment, watering, compaction, asphalt concrete, plane asphalt concrete pavement (grinding), concrete structures, reinforcement, roadway signs, HDPE, concrete curb & gutter, concrete sidewalk & wheelchair ramp, decorative metal fences & gates, metal fabrications, thermoplastic tarffic stripes & pavement markings, lighting & electrical systems.

RELOCATION OF (S-150) CENTER PARKWAY LIFT STATIONPLAN #: 80066 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento PlanroomPREBID: 12/4 @ 2 pm. # OF ADDENDA: 1 DESCR: Contact: Scott Hatala (916) 321-3845.Construct a new sewer pump station including abandoning / removing the existing pump station.BIDDERS LIST:General Contractor: Cal Electro 530-223-5937 530-221-7038Sub Contractor: Studebaker Brown Elect 530-333-3423 530-823-1341Supplier: Blain Stumpf Sand & 916-933-1555 916-933-2925 Groeniger & Company 916-455-3333 916-455-3402

Continued from last page

Plans On File

Page 45: Construction E-zone

Contractor’s ZoneContractor’s Zone

CONSTRUCTION OF LONG BEACH MAIN PUMPING PLANT INSTALLATION OF PUMPS -PHASE IPLAN #: 114083 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Long Beach PlanroomPREBID: MAND 12/5 @ 10am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Melissa Fischer, 562-908-4288, ext. 6807. Construction of Long Beach Main Pumping Plant Installation of Pumps.

DESIGN BUILD OF THE SAN JOAQUIN REGIONAL TRANSIT DISTRICT REGIONA TRANSPORTATIONPLAN #: 155062 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton PREBID: 10-17 @ 10am OWNER: San Joaquin RTD Ph: 209-948-5566 FAX: 209-948-8516DESCR: Contact, San Joaquin Regional Transit District (209) 948-5566. Design Build of the San Joaquin Regional Transit District Regional Transportation Center BIDDERS LIST:General Contractor: C. Overaa And Co. 510-234-0926 510-237-2435 Roebbelen Contracting, 916-939-1110 916-939-4027

48-INCH FORCE MAIN RELIABILITY IMPROVEMENT PROJECT UNIT 1 - MAPLE ST TO BAIR ISLANDPLAN #: 163073 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Auburn & Roseville Office Locat ion: Redwood Ci ty Online & Print On Demand PREBID: MAND 11/28 @ 10AM DESCR: Contact, Jill Chamberlain. Kennedy/Jenks Consultants, @ 650-852-2800. Div_02-environmental protection, decontamination, demolition, site preparation, earthwork, ground improvement, contact grouting, cellular grout backfill, microtunneling, shafts & near surface excavations, pilot tube, steel casing, carrier pipe installation in steel casing, secant pile shafts, geotechnical instrumentation, water system piping & accessories, sewer & storm drain piping & accessories, paving, resurfacing, pavement markings & appurtenances, concrete curb, gutters & sidewalk, site furnishings; Div_03-cast-in-place concrete; Div_05-metal & hardware; Div_06-carepentry; Div_09-painting; Div_10-signage; Div_13-prefabricated restroom building, fiber optic conduit system components; Div_16-site electrical system.

RIZAL COMMUNITY CENTER FACADE REPAIRS

PLAN #: 185096 Bid Date: 12/20/2012 Bid Time: 3:00 PM PLANS AT: Roseville Office

Location: Sacramento PlanroomPREBID: MAND 12/12@ 9AM OWNER: Southgate Recreation & Park District Ph: 916-428-1171 DESCR: Contact, Southgate Recreation & Park District - Maureen Casey, (916) 428-1171 Fax (916) 428-7334. Rizal Community Center Facade Repairs; this project Includes replacement of the existing· horizontal banda of brick veneer fascia with a new three coat stucco system. Demolition Is required to remove the remaining veneer on the fascia and the substrate should be ln.pected for dry rot or deterioration. Painting will be required for the replacement stucco on the fascias, the soffits adjoining the fascias and all the existing exterior stucco.

FIRE ALARM CONTROL UNIT REPLACEMENT, SOS BUILDINGPLAN #: 188090 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomPREBID: MAND 12/4 @ 9:30am OWNER: State of CA - Dept of General Services DESCR: Contact, Department of General Services (916) 376-1754 Work consists of the replacement of a complete operational fire alarm system including calibration, testing and engineering. BIDDERS LIST:General Contractor: Cal Electro 530-223-5937 530-221-7038

115 KV CIRCUIT BREAKER REPLACEMENTPLAN #: 195096 Bid Date: 12/20/2012

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomPREBID: 12/10 @ 10am OWNER: City of San Jose DESCR: Contact, City of San Jose, PWD., 408-535-8300. Electrical; and Substation/High Voltage (electrical) Maintenance and Repair.

ELEVATOR PROGRAM CONSULTING SERVICES

PLAN #: 225083 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento Online and Planroom # OF ADDENDA: 1OWNER: California State University, Sacramento Ph: 916-278-4895 DESCR: Contact, Suzanne Swartz, 916-278-5797. CSUS requesting proposals for Elevator Program Consulting Services.

Continued on next page

Page 46: Construction E-zone

December 10, 2012Page 44 Contractor’s Zone• .Contractor’s Zone

Thursday, December 20, 2012

DOOR REPLACEMENTPLAN #: 237089 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento PlanroomPREBID: MAND 12/6 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, George Soffos, 916-567-8028. Door Replacement DGS/Library & Courts, Annex, 900 N Street in Sacramento.

PLAYGROUND SHADE CANOPY ASSEMBLIES AT VARIOUS VISALIA CITY PARKSPLAN #: 241093 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Visalia Plans on DiskPREBID: 12/4 @ 10am OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, City of Visalia, 559-713-4334. Installation of eight (8) playground shade structures at various city parks.

JOB ORDER CONTRACT PHASE 19 AND 20PLAN #: 262036 Bid Date: 12/20/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Jose Online and PlanroomPREBID: MAND 11/6 @ 10am OWNER: San Jose State University Ph: 408-924-2246 FAX: 408-924-7243DESCR: Contact, San Jose State University, Sylvia Sosa-Galindo [[email protected]] JOC is a competitively bid, firm fixed priced, indefinite quantity contract. The scope of work includes a collection of detailed repair and construction tasks and specifications that have established unit prices. It is placed with the “Contractor” for the accomplishment of repair, alteration, modernization, maintenance, rehabilitation, demolition and construction of infrastructure, buildings, structures, or other real property. Work is accomplished by means of issuance of a purchase order against the JOC. Under the JOC concept, the Contractor furnishes all management, documentation, labor, materials, and equipment needed to perform the work. The JOC contract awarded under this solicitation will each have a minimum value of work of $50,000.00 and a maximum value of work of $1,000,000.00. The JOC Contracts will have the option to extend the maximum value up to $3,000,000.00. The term of the contract will be for 365 calendar days.

DOLLAR GENERALPLAN #: 279041 Bid Date: 12/20/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Colinga Online OnlyG.C.: R & O Construction Ph: 702-895-9322 FAX: 702-895-9388DESCR: Contact, R & O Construction, Don Mataya, 702-895-9322 x 1001.Project Description: New construction of 12,480 sq ft Metal Building with Drywall & Stucco Painted Finishes. Includes 1 Acre Grading, Paving, Utilities and Landscaping Onsite Improvements.

CHAPMAN AND LANCASTER STREETS SIDEWALK IMPROVEMENTS - RE-BIDPLAN #: 306013 Bid Date: 12/20/2012

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland PREBID: 12/4 @ 11am OWNER: City of Oakland DESCR: Contact, Jaime Heredia, 510-238-2293. Chapman and Lancaster Streets Sidewalk Improvements.

Friday, December 21, 2012

REQUEST FOR DESIGN/BUILD/OPERATE TEAM QUALIFICATIONS - CIVIC CENTER AQUATICS

PLAN #: 197094 Bid Date: 12/21/2012 Bid Time: 4:00 PM PLANS AT: Roseville Office Location: Elk Grove Online and PlanroomOWNER: City of Elk Grove DESCR: Contact, Submit your statement of qualification to the City which is looking for a team to design, build & operate the new Civic Center Aquatic Complex.

LA CRESTA TANK NO. 2 INTERIOR RECOATINGPLAN #: 298027 Bid Date: 12/21/2012

Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Los Altos Hills Online and PlanroomPREBID: MAND 12/10 @ 1pm OWNER: Purissima Hills Water District DESCR: Contact, Pakpour Consulting Group, Inc., 925-224-7717. Removal and disposal of the existing interior coating of the La Cresta Tank #2, followed by surface preparation and applying the specified coating to the interior surfaces in the tank. etc..

Continued from last page

Plans On File

Page 47: Construction E-zone

Contractor’s ZoneContractor’s Zone

Thursday, December 27, 2012

COMPLETE ENERGY SOLUTIONSPLAN #: 240091 Bid Date: 12/27/2012

Bid Time: 5:00 PM PLANS AT: Print On Demand Locat ion: Sac ramento Online & Print On # OF ADDENDA: 1 DemandPREBID: 12/17 @ 1:30pm (recommended) OWNER: Sacramento Municipal Utility District Ph: 888-742-7683 DESCR: Contact, Paul Bagley, 916-732-6536. ([email protected]) SMUD is seeking a third party contractor to administer a commercial direct-install Demand Site Management (DSM) program called Complete Energy Solutions (CES) that will deliver comprehensive energy efficiency and other DSM solutions for small and mid-sized business (SMB) customers with up to 499kW in demand. DSM solutions offered by the CES program will include but are not limited to: • Low cost/no cost conservation • Demand / TOU management • Lighting • Refrigeration • HVAC • Controls (ADR-capable controls where applicable) • Commercially available emerging technologies Incentives will be used to ensure that the measures are cost-effective for the customer.

Monday, December 31, 2012

PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORSPLAN #: 173079 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Auburn & RosevilleLocation: Placer County Online and PlanroomOWNER: Placer County Office of Education Ph: 916-415-4424 DESCR: The Placer County Office of Education (PCOE) is inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2012. You must resubmit to be included on the 2012 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2012 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board. Phone: 530-889-8020BIDDERS LIST:General Contractor: Steeltech Roofing 530-845-5681 530-367-5310

Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099 Brandon Thorp Electric 916-740-0479 916-000-0000

SANTA CRUZ CITY SCHOOLSPLAN #: 174002 Bid Date: 12/31/2012

Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Santa Cruz Online and PlanroomOWNER: Santa Cruz City Schools Ph: 831-427-4813 FAX: 831-429-3339DESCR: Contact, Cathy Braun, 831-427-4813. Santa Cruz City Schools is inviting all licensed contractors to submit information for the inclusion on the District’s List of Qualified bidders for the 2013 calendar year.

ARDEN PARK RECREATION AND PARK DISTRICT - QUALIFIED BIDDER LISTPLAN #: 179092 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Sacramento Online and PlanroomOWNER: Arden Park Recreation and Park District Ph: 916-483-6069 DESCR: Contact, Colin Miller, 916-483-6069 ([email protected]). The Arden Park Recreation and Park District recently adopted an ordinance to participate in the Uniform Public Construction Cost Accounting Act. (Contractors seeking to be included on qualified bidder lists)BIDDERS LIST:Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099

Continued on next page

How to send your adto C&S Publishing:

If you have your information ready, just email it to:

[email protected]

If you need a little helpputting the ad together,

use the handy online form.

Once we have your information, we will typeset the ad and send back a proof and a price.

Page 48: Construction E-zone

December 10, 2012Page 46 Contractor’s Zone• .Contractor’s Zone

Monday, December 31, 2012

RFQ COUNTY OF SACRAMENTO SMALL PROJECTSPLAN #: 187073 Bid Date: 12/31/2012 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Sacramento Planroom Est Cost: $100,000.00 OWNER: County of Sacto DESCR: Co of Sacramento, [email protected]. If you would like to have your firm added to a mailing list to receive our Notice to Contractors for projects $100,000 or less being bid under CUPCCAA, please provide the following information: 1. Name and address of the firm 2. Name of contact person 3. Firm’s telephone number (and fax number if available) 4. The type(s) of work (e.g. earthwork, pipelines, electrical, painting, general building, etc) in which you are interested and currently licensed to do 5. Class of California contractor’s license(s) held by firm 6. Contractors license number(s) 7. Other California State certifications held by firm (e.g. ASB, HAZ, etc) 8. Any Federal, State, DBE certifications SEND THIS INFORMATION TO: County of Sacramento CUPCCAA Project / Contract Services 827 7th Street, Room 101 Sacramento, CA 95814 Or email to: [email protected] THERE IS NO SUBMITTAL DEADLINE, NAMES WILL BE ADDED TO THE MAILING LIST AS THEY ARE RECEIVED. For this invitation, names will be retained on the list through December 31, 2012.

SIERRA COLLEGE QUALIFIED CONTRACTORS LISTPLAN #: 191080 Bid Date: 12/31/2012Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Rocklin Online and PlanroomOWNER: Sierra Joint Community College District DESCR: Contact: Purchasing Dept. 916-660-7626.Sierra Joint Community College District Informal Bidding for projects less than $125,000 For more information, contact Facilities Development & Construction at 916-660-7658. BIDDERS LIST:Sub Contractor: Presidential Fire Prot 916-379-9199 916-379-9099Supplier: Sunbelt Rentals 916-789-1234 916-789-7077 Jms Industries 916-348-1502 916-408-6609

2012 BUTTE COUNTY QUALIFIED BIDDERS LISTPLAN #: 213071 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Oroville Online and PlanroomOWNER: County of Butte FAX: 530-538-7171DESCR: Janet Woods, ([email protected]). All licensed contractors are invited to submit the name of their firm to the Co of Butte list of qualified bidders for calendar year 2012.BIDDERS LIST:Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693 NOTICE INVITING QUALIFIED CONTRACTORS - TAHOE TRUCKEE USDPLAN #: 252041 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Truckee/Tahoe Online and PlanroomOWNER: Tahoe Truckee Unified School District DESCR: Contact, Todd Rivera, 530-582-2541 ([email protected]). The Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2012BIDDERS LIST:Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693

FOLSOM CORDOVA UNIFIED SCHOOL DISTRICT - LIST OF CONTRACTORS 2012PLAN #: 251038 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Cordo Online and PlanroomOWNER: Folsom Cordova Unified School District Ph: 916-355-1111 DESCR: Contact: Peggy Beller 916-355-1111 ext. 139. All licensed contractors are invited to submit the name of their firm to the District for inclusion in the District’s list of qualified bidders for the Calendar Year 2012. BIDDERS LIST:Sub Contractor: Advanced Synthetic Wall 916-740-3693 916-740-2693

NOTICE INVITING QUALIFIED CONTRACTORS - TAHOE TRUCKEE USDPLAN #: 252041 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Truckee/Tahoe Online and PlanroomOWNER: Tahoe Truckee USD DESCR: Contact, Todd Rivera, 530-582-2541 (trivera@ttusd.

Continued from last page

Plans On File

Page 49: Construction E-zone

Contractor’s ZoneContractor’s Zone

org). The Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2012

OHLONE COMMUNITY COLLEGE DISTRICT- INCLUSION OF QUALIFIED CONTRACTORSPLAN #: 257065 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Alameda Co. Online and PlanroomOWNER: Ohlone CoCollege District Ph: 510-659-6000 DESCR: Send Information to ([email protected]) The Ohlone Community College District is inviting all licensed contractors to submit the information requested to the District for inclusion on the District’s list of qualified bidders for informal bidding for calendar year 2012.

NOTICE INVITING LICENSED CONTRACTORS - CITY OF GALTPLAN #: 265036 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Galt Online and PlanroomOWNER: City of Galt DESCR: Contact, City of Galt, 209-366-7130. City of Galt is inviting all licensed contractors to submit the name of their firm to the City for inclusion on the City’s list of qualified bidders for the current calendar BIDDERS LIST:Sub Contractor: Presidential Fire Protec 916-379-9199 916-379-9099

QUALIFIED CONTRACTORS LIST - NAPA COUNTYPLAN #: 281047 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Napa Co. Online and PlanroomOWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627DESCR: Contact, Ginny Leija, ([email protected]) County of Napa inviting qualified Contractors to be included on their Contractors list for the year 2013.

NOTICE INVITING QUALIFIED CONTRACTORS/TAHOE TRUCKEE UNIFIED SCHOOL DISTRICTPLAN #: 283052 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Tahoe/Truckee Online and PlanroomOWNER: Tahoe Truckee Unified School District DESCR: Contact, Becca McGough, Facilities Department, 530-582-2540. Tahoe Truckee Unified School District invites all interested contractors to be included on the District’s List of Qualified Contractors for the 2013 calendar year.

DIXON UNIFIED SCHOOL DISTRICT - LIST OF CONTRACTORSPLAN #: 297033 Bid Date: 12/31/2012

Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Dixon Online and PlanroomOWNER: City of Dixon DESCR: Contact, Cecile L. Nunley, ([email protected]) Inviting interested contractors in performing public works projects for the Dixon Unified School District.

COUNTY OF EL DORADO - AGENCY BIDDERS LISTPLAN #: 300025 Bid Date: 12/31/2012 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Dorado Co. Online and PlanroomOWNER: County of El Dorado DESCR: Bonnie Rich, 530-621-5940 or by email at ([email protected])Register your firms information even if you have been previously listed or have recently bid on a public works project.BIDDERS LIST:Sub Contractor: Presidential Fire Prote 916-379-9199 916-379-9099

QUALIFIED CONTRACTORS LIST - TUOLUMNE COUNTYPLAN #: 319005 Bid Date: 12/31/2012Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne PlanroomOWNER: County of Tuolumne DESCR: Contact, County of Tuolumne Facilites Management, Jenny Watts, 209-533-5660. County of Tuolumne are inviting all licensed Contractors interested in bidding on projects submit the information for inclusion on the Qualified Contractor’s list for the upcoming year.

SONOMA COUNTY WATER AGENCY - QUALIFIED CONTRACTORS LISTPLAN #: 305010 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Santa Rosa PlanroomOWNER: Sonoma County Water Agency Ph: 707-526-5370 FAX: 707-544-6123DESCR: Contact, Sonoma County Water Agency, (707) 526-5370. Interested contractors are required to provide their information so they may be placed on the Qualified Contractors List for the Sonoma County

QUALIFIED CONTRACTOR LIST - CITY OF TURLOCKPLAN #: 317008 Bid Date: 12/31/2012 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Turlock PlanroomOWNER: City of Turlock DESCR: Contact, Wayne York, 209-668-5599 x4439. Submit your request in writing to the City of Turlock to be on their list of Qualified Contractors.

Continued from last page

Page 50: Construction E-zone

December 10, 2012Page 48 Contractor’s Zone• .Contractor’s Zone

Thursday, January 03, 2013

DRY CREEK BRIDGE CROSSING PROJECTPLAN #: 7019 Bid Date: 1/3/2013

Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Healdsburg Est Cost: $761,000.00PREBID: 12/6 @ 10 AM OWNER: City of Healdsburg DESCR: Contact, City of Healdsburg, Mike Kirn (707) 431-3333. Includes the fabrication and placement of two support towers and associated suspension cables to support 500 LF of 12” steel recycled water line crossing over Dry Creek.

SULPHUR SPRINGS ROAD WATERLINEPLAN #: 57099 Bid Date: 1/3/2013Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: El Paso de OWNER: City of El Paso de Robles DESCR: Contact, Matt Thompson, P.E., 805-227-7200 ext. 771. Mobilizing; preparing and implementing traffic control plans; potholing and locating existing underground utilities; demolition; excavation; shoring and bracing; safety; dewatering; saw cutting; connecting to existing facilities; pavement replacement; horizontal directional drilling; pipe embedment; pipe and conduit laying; rough grading, backfill.

FRESNO CITY HALL HVAC CONTROLS UPGRADE PROJECTPLAN #: 205003 Bid Date: 1/3/2013

Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Est Cost: $850,000.00PREBID: 12/12 @ 2pm OWNER: City of Fresno DESCR: Contact, City of Fresno, 559-621-1332. The scope of work includes, but is not limited to replacing the existing main Direct Digital Control and Energy Management System (DDC/EMS) controller, the existing main air handler controls, the existing heating boiler controls, the controls of the two fan coils serving the Tele/Comm. rooms, connection to the new chiller system controls, and connection to the new computer room cooling system controls. Conduits shall be provided for the future expansion of the DDC/EMS to replace the existing Variable Air Volume (VAV) and fan terminal boxes controls, and other fan coils controls. The scope shall include a Base Bid and four Additive Alternates. See Specification 15900 and plans for specific scope items for each. TEMPORARY ROCK BARRIERS - 2013, 2014 ANDPLAN #: 230093 Bid Date: 1/3/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Online and PlanroomPREBID: 12/18 @ 2pm OWNER: Dept. of Water Resources Ph: 916-653-4867 FAX: 916-653-6166DESCR: Contact, Jim Veres, 916-653-4867. This project includes two tasks related to the Temporary Rock Barriers Program. 1. Task 1 includes providing, when directed by construction order, labor, materials and equipment or services, construction equipment, and hauling of construction equipment for construction and removal of temporary rock barriers and appurtenances at Middle River, Old River, and Grant Line Canal. Work includes placement and removal of Department furnished rock materials, culverts, docks, articulating concrete mats, and other accessories. Maintenance, refurbishment and/or replacement of appurtenances may also be required. Task 2 includes furnishing, installing, and removing a Non-Physical Barrier (NPB) at the head of Georgiana Slough, and/or other Delta divergence location.

CONGENERATION ENGINE OVERHAUL AND SOURCE TESTPLAN #: 263041 Bid Date: 1/3/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton Est Cost: $400,000.00PREBID: MAND 11/28 @ 10am, OWNER: City of Stockton DESCR: Contact, City of Stockton, 209-937-8753. Remove the Cogeneration Engine, perform major overhaul, reinstall the engine conduct an emissions source test and submit a report that shall demonstrate compliance with emission limits of the permit.

SEWER REHABILITATION IN MCKINLEY AVENUE, FROM CLOVIS AVENUE TO CLINTON WAY

PLAN #: 277037 Bid Date: 1/3/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Fresno Est Cost: $1,572,000.00PREBID: 12/12/12 @ 10:00 am OWNER: City of Fresno DESCR: Contact, City of Fresno, 559-621-1332. The scope of work includes the installation of cured-in-place pipe liners in existing sewer mains and the rehabilitation of manholes, including all associated facilities, appurtenances, and incidentals, as shownon the Plans, in comformance with the provisions in the Specification.

Continued from last page

Plans On File

Click on the blue underline to go to the Online Planroom

Page 51: Construction E-zone

Contractor’s ZoneContractor’s Zone

Friday, January 04, 2013

ANNUAL CONTRACT FOR LANDSCAPE MAINTENANCE FOR DISTRICT DPLAN #: 208080 Bid Date: 1/4/2013

Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Visalia PREBID: 12/12 @ 10am OWNER: City of Visalia Ph: 559-713-4334 FAX: 559-713-4802DESCR: Contact, City of Visalia, 559-713-4334. Annual Contract For Landscape Maintenance For District D.

DESIGN-BUILD OF OUTER HARBOR INTERMODAL TERMINAL RAILYARD, PHASE 1, AT THE FORMER OAKLAND ARMY BASEPLAN #: 293041 Bid Date: 1/4/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Oakland Planroom Est Cost: $60,000,000.00 OWNER: Port Of Oakland DESCR: Contact, Bill Russell, ([email protected]) The Port will select a qualified Design-Build entity (Design-Builder) to design and construct the Outer Harbor Intermodal Terminal (OHIT) Railyard, Phase 1 along the eastern half of the Port’s portion of the former Oakland Army Base (OAB) (the Project). BIDDERS LIST:Supplier: Modern Building System 916-985-9852 916-985-9865

Tuesday, January 08, 2013

REDWAY PEDESTRIAN SAFETY IMPROVEMENT

PLAN #: 20003 Bid Date: 1/8/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Humboldt Co. Est Cost: $361,000.00OWNER: County of Humboldt Ph: 707-445-7652 FAX: 707-445-7409DESCR: Contact, County of Humboldt, Department of Public Works (707) 445-7652. Includes traffic control, clearing, grubbing, removal, adjustment, reconstruction of existing facilities, earthwork required to construct new pedestrian facilities, construction traffic calming, pedestrian crossing, sidewalk facilities, installation of drainage facilities and placement of thermoplastic striping & pavement markings.

1701 DIVISADERO 1ST FLOOR - GI CLINICPLAN #: 111082 Bid Date: 1/8/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Francisco Est Cost: $500,000.00PREBID: MAND 12/4 @ 10AM OWNER: University of California, S.F. Medical Center

DESCR: Contact, Carol Shea, Proj Mgr, @ 415-353-4089. Standards for anchors & fasteners, cold-formed metal framing; high pressure decorative laminates, rough carpentry, custom casework, monolithic plastic; batt insulation, sprayed-on fireproofing, firestopping, joint sealer; interior aluminum door frames, flush wood doors, access doors & panels, aluminum entrance & storefront, door hardware, glazing; gypsumboard assemblies, suspended acoustical ceilings, resilient flooring, carpet, painting & coatings; cubicle curtain track, wall protection & corner guards; fire protection systems, plumbing, HVAC sustem; lighting & electrical systems.

FAWCETT AVENUE PUMPING PLANT SITE IMPROVEMENTSPLAN #: 139063 Bid Date: 1/8/2013

Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Los Angeles PlanroomPREBID: MAND 12/12 @ 10am OWNER: Sanitation Districts of Los Angeles County DESCR: Contact, Jenny Hsu, 562-908-4288 ext 2152. Fawcett Avenue Pumping Plant Site Improvements: The work includes construction of generator enclosure structure including masonry block wall, and wrought iron fence gate; modification of existing emergency standby generator; removal, and/or relocation of existing facilities; structural, mechanical, instrumentation and electrical work; sidewalk modifications; grading and paving; landscaping; and all appurtenant work.

FIRE ALARM CONTROL UNIT REPLACEMENT, BONDERSON BUILDINGPLAN #: 244094 Bid Date: 1/8/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento PlanroomPREBID: MAND 12/18 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Jennifer Maier, 916-376-1754. The Contractor shall provide all labor, materials, equipment and California State Fire Marshal (CSFM) approved shop drawings to provide Fire Alarm Control Unit Replacement (FACUR) of the existing Fire Alarm System (Simplex Time Record Co., Type 2001-8001, Serial #089548 KB), with a complete and operational Fire Alarm System. Contractor to replace approximately twenty (20) Horn/Strobes, fifteen (15) Manual Pull Stations, twenty (20) Smoke and Heat detectors and twenty (20) Smoke Duct Detectors.

Continued on next page

To Run Your Legal Ad, Please Visitwww.thedailyreporter.net

Or Give Us A Call 916-729-5432

Page 52: Construction E-zone

December 10, 2012Page 50 Contractor’s Zone• .Contractor’s Zone

Thursday, January 10, 2013

EXTENSION OF CLOSURE CAP CORRAL HOLLOW SANITARY LANDFILLPLAN #: 60092 Bid Date: 1/10/2013Bid Time: 1:30 PM PLANS AT: Roseville Office Location: San Joaquin PREBID: 12/11 @ 10 AM OWNER: County of San Joaquin DESCR: Contact, County of San Joaquin Najee Zarif ([email protected]). Includes clearing, grubbing, subgrade preparation, LLDPE geomembrane, excavation, earthfill, vegetative soil layer, geocomposite drainage layer, final grading, erosion control matting, hydroseeding, drainage / concret ditches, fencing, slope protection, disposal of materials, perimeter road, LFG excavation wells, abandoned borings, HDPE piping, header connections, LFG horizontal collectors, water pollution control, extra LLDPE geomembrane, etc.

DORSEY DRIVE INTERCHANGE PROJECTPLAN #: 166071 Bid Date: 1/10/2013 Bid Time: 3:30 PM PLANS AT: Roseville OfficeLocation: Grass Valley Online & Print On Est Cost: $14,000,000.00 DemandPREBID: MAND 12/5 @ 10am OWNER: City of Grass Valley Dept Of Public Works DESCR: Contact, City of Grass Valley, 530-274-4399. Construction of a full interchange at Dorsey Drive and State Route 20/49, bridge widening, construction of auxiliary lanes on State Route 20/49 and improvements on Dorsey and Joerschke Drives.BIDDERS LIST:General Contractor: Teichert Construction 916-386-5800 916-386-2392Sub Contractor: Deschaine Enterprises 530-274-9975 530-274-9975 Bennett Fencing 530-852-2618 000-000-0000Supplier: Hansen Brothers 530-273-3381 530-272-5401 Groeniger & Company 916-455-3333 916-455-3402 R.j. Miles Co. 530-346-2294 530-346-8277

NEW VISITOR CENTER ARTIFICIAL ROCK EXHIBIT

PLAN #: 176009 Bid Date: 1/10/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Truckee Online & Print On Demand PREBID: MAND 12/13 @ 11am OWNER: Department of Parks & Recreation

Ph: 916-808-1923 FAX: 916-808-8266DESCR: Contact, Denise Lorenz-Coelho, ([email protected]). Design / engineer / fabricate an artificial rock exhibit within the Donner Memorial State Park new Visitor Center Exhibit Hall.

FIRE ALARM CONTROL UNIT REPLACEMENT, CA ENERGY COMMISSIONPLAN #: 177094 Bid Date: 1/10/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Sacramento PREBID: MAND 12/20 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, Jennifer Maier, 916-376-1754. The Contractor shall provide all labor, materials, equipment and California State Fire Marshal (CSFM) approved shop drawings to provide Fire Alarm Control Unit Replacement (FACUR) of the existing “Gamewell-FCI” Fire Alarm System, with a complete and operational Fire Alarm System. Contractor to replace approximately sixty (60) Horn/Strobes, twenty five (25) Manual Pull Stations, ten (10) Smoke and Heat detectors and ten (10) Smoke Duct Detectors.

RFP - TURN-KEY FIXED-NETWORK/ADVANCED METERING INFRASTRUCTURE SYSTEM AND METER INSTALOL/RETRO-FIT

PLAN #: 210001 Bid Date: 1/10/2013 Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Galt PREBID: MAND 12/20 @ 10am OWNER: City of Galt DESCR: Contact, Richard Prima, ([email protected]) The City of Galt is soliciting proposals from experienced, qualified firms to design, install and finance an automated Fixed-Network Advanced Metering Infrastructure (AMI) System that has an expected reading accuracy of 99% or greater for all water meters in the system. The new AMI system must be geospatially focused, provide extensive analytics to enhance customer service and financial performance while improving efficiency and accuracy in our utility operations. The City must be able to access the system without significant increases in IT infrastructure or related costs. The City’s intent is to find the optimal fixed network Advanced Metering Infrastructure (AMI) system that meets the City’s long-term application needs along with being affordable for the City’s rate-payers.

MANAGEMENT AND OPERATION OF SPECIALIZED PARATRANSIT SERVICES IN WESTERN NEVADAPLAN #: 302011 Bid Date: 1/10/2013 Bid Time: 3:00 PM PLANS AT: Roseville Office Location: Nevada Co. Planroom

Continued from last page

Plans On File

Page 53: Construction E-zone

Contractor’s ZoneContractor’s Zone

OWNER: County of Nevada Ph: 530-265-1403 :DESCR: Contact, Pamela Mowry, ([email protected]) The Nevada County Purchasing Agent, on behalf of the Department of Public Works, Transit Services Division, hereinafter collectively referred to as “County,” is requesting for the contracted management and operation of specialized paratransit services in Western Nevada County.

Tuesday, January 15, 2013

RFQ - AS-NEEDED ARCHITECTURAL SERVICES

PLAN #: 203001 Bid Date: 1/15/2013 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: San Francisco PREBID: 12/12 @ 3:30pm OWNER: City & County of San Francisco DESCR: Contact, Selormey Dzikunu, 415-558-4059. City & County of San Francisco, DPW, Requesting qualifications for Architectural Services on an as-needed basis.

Thursday, January 17, 2013

REMOVE EXISTING ROOF AND INSTALL NEW ROOF AT THE OAKLAND-COLISEUM DMVPLAN #: 51094 Bid Date: 1/17/2013 Bid Time: 1:30 PM PLANS AT: Roseville OfficeLocation: Oakland # OF ADDENDA: 1PREBID: MAND 12/13 @ 11am OWNER: Department of Motor Vehicles Ph: 916-657-7822DESCR: Contact, Corey Hollowell ([email protected]) Successful contractor shall provide the Department of Motor Vehicles (DMV) all labor, tools, materials, and equipment necessary to remove the existing foam and built-up roof systems (foam over built-up roof) and install a new single-ply polyvinyl-chloride (PVC) roof system at the Oakland-Coliseum DMV field office.

8-INCH DUCTILE IRON PIPE MAIN INSTALLATION IN JACKSON, WASHINGTON, SACRAMENTO AND DAVIS STREETS

PLAN #: 122079 Bid Date: 1/17/2013 Bid Time: 2:00 PM PLANS AT: Roseville OfficeLocation: San Francisco Plans on Disk Est Cost: $1,900,000.00 PREBID: 12/17 @ 10:30am OWNER: San Francisco Public Utilities Commission DESCR: Contact, Pauline Lam, 415-551-4603. Install 8-inch main and renew services in Jackson, Washington, Sacramento, and Davis Streets, and renovate pavement and replace sewer on Sacramento Street.

TILDEN CORPORATION YARD MAINTENANCE FACILITYPLAN #: 128067 Bid Date: 1/17/2013

Bid Time: 2:00 PM PLANS AT: Roseville OfficLocation: Orinda PREBID: 12/10 @ 10am OWNER: East Bay Regional Park District DESCR: Contact, East Bay Regional Park District, 510-544-2300. Construction of an Equipment Maintenance Building within the existing Tilden Park Corporation yard. Approx. 5,700 SF CMU building,fully sprinklered, with 3 repair bays, shop, office and storage. Site work includes replacement paving and underground utility work.

PORTER CREEK ROAD BRIDGE REPLACEMENTPLAN #: 132067 Bid Date: 1/17/2013

id Time: 2:00 PM PLANS AT: Roseville Office Location: Sonoma Co. PlanroomOWNER: County of Sonoma DESCR: Contact, County of Sonoma Levi Gurule ([email protected]). Replace the existing bridge at Porter Creek with a 62’ wide by 160’ long single span concrete box girder bridge, along with widening of the approach roadways and construction of a left turn lane at Franz Valley Road.

Friday, January 18, 2013

RFQ - BLUE OAK RANCH RESERVE/ARCHITECTURAL SERVICES

PLAN #: 235094 Bid Date: 1/18/2013 id Time: 2:00 PM PLANS AT: Roseville OfficeLocation: Berkeley PlanroomOWNER: UC Berkeley Ph: 510-642-6273 FAX: 510-642-7271DESCR: Contact, Mr. Leony, ([email protected]) The University of California, Berkeley is seeking a full service architectural firm to provide designand development of construction documents for site improvements, renovation of existing structures and construction of new structures to support the Blue Oak Ranch Reserve’s program. Site improvements consist of new infrastructure, renovation of existing structures and new structures, improvement of existing site components including all supporting utilities, roads, gates and fences, water wells, fire suppression structures and septic systems. Renovation of structures consists of upgrading and adding square footage to an existing Cedar Barn. New construction consists of two residences, one maintenance building and five seasonal campground structures. Project details and submittal requirements are posted at

Continued on next page

Page 54: Construction E-zone

December 10, 2012Page 52 Contractor’s Zone• .Contractor’s Zone

Continued from last page

Tuesday, January 22, 2013

NETWORK AND VOICE CABLING SERVICESPLAN #: 180002 Bid Date: 1/22/2013

Bid Time: 5:00 PM PLANS AT: Roseville Office Location: Rancho Online and Planroom # OF ADDENDA: 1 PREBID: MAND 12/6 @ 10am OWNER: California Technology Agency Ph: 916-431-4699 DESCR: Contact, Cassandra Pickett, 916-431-5052. Provide the California Technology Agency, Network and Voice Cabling Services.

Wednesday, January 23, 2013

FURNISH 5 KV SWITCHGEAR - CITRUS, CRAFTON HILLS AND CHERRY VALLEY PUMP STATIONS/EAST BRANCH EXTENSION-PHASE IIPLAN #: 158063 Bid Date: 1/23/2013 Bid Time: 2:00 PM PLANS AT: Roseville Office Location: San Planroom# OF ADDENDA: 3 PREBID: 10/3 @ 10am OWNER: State of California, Dept of Water Resources Ph: 916-653-5791 :DESCR: Contact, Department of General Services, 916-375-4940, Jim Veres telephone (916) 653-4867, fax (916) 653-6166, or by e-mail at [email protected]. See specifications for details.

PASO ROBLES WASTEWATER TREATMENT PLANT UPGRADEPLAN #: 278041 Bid Date: 1/23/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: El Paso de Online & Print On Demand PREBID: MAND 12/18 @ 12pm OWNER: City of El Paso de Robles DESCR: Contact, City of Paso Robles (805) 237-3861. Site work, bldg construction, facility demo including minor lead and asbestos abatement, installation of major process equip, SCADA, and related system and facilities. Prevailing. Note that only general contractors and electrical subcontractors pre-qualified by the City of Paso Robles may bid on the

Plans On File

Thursday, January 24, 2013

JAIL SECURITY SYSTEM MAINTENANCE AND UPGRADES PHASE IPLAN #: 226092 Bid Date: 1/24/2013 Bid Time: 3:30 PM PLANS AT: Roseville Office Location: Napa Plans on DiskPREBID: MAND 1/10 @ 10am OWNER: County of Napa Ph: 707-253-4351 FAX: 707-253-4627DESCR: Contact, Frank Lucido ([email protected]) Demolition, construction of interior walls, installation of split HVAC systems, fire stopping, installation of a fire damper, electrical conduit, plumbing and other miscellaneous work. BIDDERS LIST:General Contractor: Bobo Construction, Inc. 916-685-2285 916-714-4850

Tuesday, January 29, 2013

SONOMA VALLEY COUNTY SANITATION DISTRICT - BIOSOLIDS MANAGEMENT UPGRADE

PLAN #: 127063 Bid Date: 1/29/2013 Bid Time: 10:00 AM PLANS AT: Roseville Office Location: Sonoma Planroom Est Cost: $2,500,000.00PREBID: MAND 1/8 @ 10 AM or 1/10 @ 2 PM OWNER: Sonoma Valley County Sanitation District Ph: 707-547-1900 DESCR: Contact, Sonoma County Water Agency, ([email protected])(707) 547-1900. Upgrade the biosolids handling facility, including installation of a new screw press, construction of new equipment and load-out building, removal of an existing belt press and conveyor, replacement of polymer blending unit, electrical, preparation / painting of pump room in the existing dewatering building, etc.

Friday, February 01, 2013

RFP - CROWS LANDING AIR FACILITPLAN #: 231087 Bid Date: 2/1/2013 Bid Time: 2:30 PM PLANS AT: Roseville Office Location: Stanislaus Co. Online and Planroom# OF ADDENDA: 1 PREBID: 11/16 @ 2pm OWNER: County of Stanislaus DESCR: Contact, City of Modesto, General Service Agency/

To Run Your Legal Ad, Please Visitwww.thedai l yrepor ter.netOr Give Us A Call 916-729-5432

Page 55: Construction E-zone

Contractor’s ZoneContractor’s Zone

Purchasing Division, 209-525-6319. Stanislaus County is seeking a Master Developer partner for a 1,531 acre former air facility development project.

Tuesday, February 05, 2013

CORNING COMMUNITY PARK PROJECT, PHASE 1PLAN #: 293044 Bid Date: 2/5/2013Bid Time: 1:30 PM PLANS AT: Roseville Office Location: Corning Online & Print On # OF ADDENDA: 1 DemandPREBID: 1/15 @ 1pm OWNER: City of Corning DESCR: Contact, Ed Anderson ([email protected]) (530) 570-3996. Construct a community park consisting of a skateboard / bicycle park, restroom / storage building, picnic areas, parking lots, access road and off-site improvements; work includes sitework, asphalt concrete, concrete, solar lighting, landscaping / irrigation, storm drains, chain link and rail fencing, etc. BIDDERS LIST:General Contractor: Donald F. Gallino, Inc. 530-246-7671 530-246-8714 Cal Electro 530-223-5937 530-221-7038 Bobo Construction, Inc. 916-685-2285 916-714-4850 Randy Hill Construction, 530-892-1918 530-892-1919

Friday, February 22, 2013

RFP - PIER 38 BULKHEAD REHABILITATION PROJECTPLAN #: 215082 Bid Date: 2/22/2013

Bid Time: 5:00 PM PLANS AT: Roseville Office Location: San Francisco Online & Print On Demand PREBID: 12/11 (contact, John Doll for time) OWNER: Port of San Francisco DESCR: Contact, John Doll, Port of San Francisco, (415) 274-0639, [email protected] Port of San Francisco is seeking submittals of proposals to rehabilitate the Pier 38 bulkhead structure and a limited portion of the Pier 38 shed (the “Pier 38 bulkhead building”). Respondents are invited, though not required, to also submit their qualifications for possible redevelopment of the entire or majority of the Pier 38.

Monday, April 01, 2013

!!!POSTPONED!!PARKING LOT REPAIR @ STOCKTON STATE OFFICE BUILDINGPLAN #: 276045 Bid Date: 4/1/2013

Bid Time: 2:00 PM PLANS AT: Roseville Office Location: Stockton Online and Planroom

Est Cost: $47,000.00 # OF ADDENDA: 2PREBID: MAND 11/29 @ 10am OWNER: State of CA - Dept of General Services DESCR: Contact, CA Department of General Services Peter Flores, ([email protected]) (916) 375-4951 Provide parking lot repairs, sealing and striping.

Tuesday, December 31, 2013

LIST OF QUALIFIED CONTRACTORS/YUBA CITYPLAN #: 211098 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Yuba City PlanroomOWNER: City of Yuba City DESCR: Contact, ([email protected]) 530-822-4694. THe City of Yuba City invites all licensed contractors to submit their name for inclusion on the CIty’s list of qualified bidders for calendar year 2013.

PLACER COUNTY OFFICE OF EDUCATION - LIST OF QUALIFIED CONTRACTORSPLAN #: 223091 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Placer Co. Online and PlanroomOWNER: Placer County Office of Education Ph: 916-415-4424 DESCR: In accordance with the State of California Uniform Public Construction Cost Accounting Commission, The Placer County Office of Education (PCOE) is inviting all interested licensed contractors to submit their company for inclusion on the PCOE list of qualified bidders for the calendar year 2013. You must resubmit to be included on the 2013 list even if your company has submitted an application in prior years. Per California Public Contract Code 22032, any Public Works Project that is estimated to be below $175,000 is subject to the Contact, Matt Shawver, 530-889-8020. Informal Bidding Procedures set forth by the State of California Uniform Construction Cost Accounting Commission. All trade categories are subject to Informal Bidding Procedures. Contactors that are interested in being on the 2013 Informal Bidding Contractor List are required to have a current license and are subject to verification through the Contractors State License Board.

COUNTY OF TUOLUMNE - QUALIFIED BIDDERS LISTPLAN #: 247054 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Tuolumne Co. Online and PlanroomOWNER: County of Tuolumne DESCR: County of Tuolumne, Sharon Mikesell, ([email protected]) Inviting all licensed contractors to submit the name of their firm for inclusion on the Agency’s list of qualified bidders for 2013.

Continued on next page

Page 56: Construction E-zone

December 10, 2012Page 54 Contractor’s Zone• .Contractor’s Zone

Tuesday, December 31, 2013

SOLANO COUNTY WATER AGENCY - QUALIFIED CONTRACTORS LISTPLAN #: 248050 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Solano Online and PlanroomOWNER: Solano County Water Agency DESCR: Contact, Sandra McLean, 707-451-6090. Inviting contractors to submit their company’s information to be placed on the Agency’s list of qualified bidders for the following year.

QUALIFIED BIDDERS - CITY OF CUPERTINOPLAN #: 253057 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Cupertino Online and PlanroomOWNER: City of Cupertino Ph: 408-777-3354 DESCR: Contact, City of Cupertino, 408-777-3354. City of Cupertino is in the process of updating their Contractors List to establish and maintain a list of qualified contractors to receive future public projects.

APPLICATION - CALIFORNIA UNIFORM PUBLIC CONSTRUCTION COST ACCOUNT ACT/2013 CALENDAR YEARPLAN #: 256052 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Carmichael Online and PlanroomOWNER: San Juan Unified School District DESCR: Contact, Aida Gonzales, ([email protected]) Complete form and return to San Juan Unified School District Purchasing Department if you wish to be included in the 2013 Calendar year California Uniform Public Construction Cost Accounting Program for San

FOLSOM-CORDOVA USD BIDDERS LISTPLAN #: 274042 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Folsom/Ranch Online and PlanroomOWNER: Folsom Cordova Unified School District Ph: 916-355-1111 DESCR: Contact, Folsom Cordova Unified School District, 916-294-9000. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013.

SUMMERVILLE UNION HIGH SCHOOL DISTRICTPLAN #: 291049 Bid Date: 12/31/2013

Continued from last page

Plans On FileBid Time: 12:00 PM PLANS AT: Roseville Office Location: Summerville Online and PlanroomOWNER: Summerville Union High School District Ph: 209-928-1955 FAX: 209-928-4454DESCR: Contact, ([email protected]) or 209-928-1955. Summerville Union H.S. District, Maintenance Dept. in Tuolumne Co., is requesting Contractors’s Pre-Qualification Applications for upcoming year.

TWIN RIVERS UNIFIED SCHOOL DISTRICT - QUALIFIED CONTRACTORSPLAN #: 301009 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: North Online and PlanroomOWNER: Twin River Unified School District Ph: 916-566-1600 FAX: 916-286-4959DESCR: Contact, Twin Rivers Unified School District, Facilities Planning & Construction. Requesting all licensed contractors to submit the name of their firm to the District’s list of qualified bidders for 2013.

SANTA CRUZ PORT DISTRICT’S/LIST OF QUALIFIED BIDDERSPLAN #: 304012 Bid Date: 12/31/2013Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Santa Cruz PlanroomOWNER: Santa Cruz Port District DESCR: Contact, Santa Cruz Port District, (831) 475-6161. Santa Cruz Port District is inviting licensed contractors to submit the name of their firm for inclusion on the Port Districts list of potential bidders. Provide the name and address to which a Notice to Contractors or proposal should be mailed, a phone number, the type of work in which you are interested and are currently licensed to do, the class of contractor’s licenses held and the contractor license numbers. Mail information to Santa Cruz Port District at [email protected] and reference “Contractor List” in the subject line.

CITY OF LINCOLN/CONTRACTOR’S PRE-PLAN #: 311007 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office Location: Lincoln Online and PlanroomOWNER: City of Lincoln DESCR: Contact, City of Lincoln, 916-434-2450. City of Lincoln inviting all qualified contractors to submit their name and company for inclusion on the qualified bidders list for the year 2013.

SIERRA COLLEGE - LIST OF QUALIFIEDPLAN #: 314007 Bid Date: 12/31/2013 Bid Time: 12:00 PM PLANS AT: Roseville Office

Page 57: Construction E-zone

Contractor’s ZoneContractor’s Zone

Location: Rocklin Online and PlanroomOWNER: Sierra Community College DESCR: Contact, Kerri Hester, 916-624-3333. Sierra Joint Community College District is updating its list of Qualified Contractors for the 2013 calendar year.

Wednesday, December 31, 2014

ARDEN PARK RECREATION AND PARK DISTRICT’S CONTRACT BID LISTPLAN #: 315005 Bid Date: 12/31/2014

Bid Time: 12:00 PM PLANS AT: Roseville OfficeLocation: Sacramento Online and PlanroomOWNER: Arden Park Recreation and Park District Ph: 916-483-6069 DESCR: Contact, Colin Miller, ([email protected]) or 916-483-6069. Arden Park Recreation and Park District invite licensed contractors to submit their information to be included on their contract bid list.

CLICK HERE to place your Legal ad online

Page 58: Construction E-zone

December 10, 2012Page 56 Contractor’s Zone• .Contractor’s Zone

ANNOUNCEMENT TO PREQUALIFIED PROPOSERSSubjecttoconditionsprescribedbytheUniversityofCalifornia,Davis,sealedproposalsforadesignbuildcontractareinvitedfromprequali-fiedproposersforthefollowingwork:SOEFanCoilandHVACPipingReplacement,ProjectNumber:9521900.

Description of Work:ProvideallDesignWork,labor,material,tools,equipment,commissioning,insurance,transportationandallneces-sarygeneralconditionsthatmaybereasonablyinferredfromtheContractDocumentstoprovideallDesignWorkandConstructionWorkfor:comprehensiveremovalandreplacementoffancoilsandHVACpiping,gypsumboardwithacousticaltilecorridorceilingremovalandplacementofT-bargridacousticalceilingtile,necessaryremovalandreplacementofhardlidceilinginofficespacestoeffectremovalandinstallationofHVACpipingandfancoils,communicationsaboveceilingandsurfaceraceway,boxesandfaceplates,includingcat5ewiringandterminationsinandthroughouttheSchoolOfEducation(SOE)building.

TheSchoolofEducationisanexistingatwostorybuilding.Theroutingofthemainhydroniclinesshallbeabovethefirstfloorcorridorceilingwithlaterallinesbranchingtoservetheroomsoffofthecorridorandtheroomsonthesecondfloor.Thebuildingwillbeoccupiedduringtheentireproject.

Theinstallationoftheoftheworkassociatedwiththemainhydroniclinesincludingthedemolitionoftheexistingcorridorceilingwillbedoneinoffhoursbetween7pmand6amorweekends.Attheendofeachworkshiftthecorridorsshallbecleanedandvacuumed;andfreeofconstructionmaterialsanddebris.

Theinstallationoftheoftheworkassociatedwiththelaterallinesservingtheroomsoffofthecorridorandtheroomsonthesecondfloorshallbesequenced.Startingfromthesouthwestendofthebuildingandworkingbacktowardsthemechanicalroom.RefertoMechanicalDrawingsforconstructionsequencingorder.EachworksequenceshallbecompletedtestedandacceptedbytheUniversitypriortostartingthenextsequence.Priortoeachworksequencestartingroomsshallbevacatedduringthedurationoftheworksequenceandreoccupiedonceworksequenceiscompleted.

TargetContractAmount:$1,500,000.00MaximumAcceptanceCost:$1,575,000.00

Procedures:NOTE:OnlycreditcardordersfordocumentsareacceptedonourReprographicswebsiteathttp://reprographics.ucdavis.edu/store/DownloadableBiddingDocumentswillbeavailabletoBiddersonThursday,December6,2012.Anon-refundablefeewillberequiredintheamountof$50.00.AllpaymentsmustbereceivedatUCDReprographicsbeforedocumentscanbemadeavailablefordownload.

Prequalified contractors will be issued 1 set of documents at no charge.

Thefollowingdesignbuildershavebeenprequalifiedtosubmitproposalsonthisproject:

Contractors Name Phone Fax AircoMechanical,Inc (916)381-4523 (916)381-4925

MesaEnergySystems,Inc. (916)636-1825 (916)218-6307

PerrymanMechanical,Inc. (916)371-8888 (916)371-8990

PLEASE NOTE: Subcontractors wishing to bid on this project should contact the prequalified General Contractor directly at the numbers listed above.

AMANDATORYPre-BidConferenceandMANDATORYPre-BidJobWalkwillbeconductedonThursday,December13,2012beginningpromptlyat9:30a.m.ParticipantsshallmeetatDesignandConstructionManagement,255CousteauPlace,Davis,CA95618.BiddersmustbepresentatthePre-BidConferencenolaterthanthescheduledstarttime.OnlybidderswhoparticipateinboththeConferenceandtheJobWalkintheirentirety,willbeallowedtobidontheProjectasprimecontractors.Forfurtherinformation,contactChrisMcGuireat(530)754-1021or(530)754-1111.TheJobWalkwilllastapproximately2hours.TransportationwillbeprovidedtotheProjectSiteVisit.

Proposalswillbereceivedonlyat: DesignandConstructionManagement,UniversityofCalifornia 255CousteauPlace,Davis,California95616 (530)754-1111

Proposalsmustbereceivedonorbefore:2:00 P.M. Wednesday, January 9, 2013.

Proposalswillbeopenedat:2:01p.m.,orpromptlythereafter.

ProposalSecurityintheamountof10%oftheLumpSumBaseProposal,excludingalternates,shallaccompanyeachbid.ThesuretyissuingtheBidBondshallbe,onthebiddeadline,anadmittedsuretyinsurer(asdefinedintheCaliforniaCodeofCivilProcedureSection995.120)

AllinsurancepoliciesrequiredtobeobtainedbyDesignBuildershallbesubjecttoapprovalbyUniversityforformandsubstance.AllsuchpoliciesshallbeissuedbyacompanyratedbyBestasA-orbetterwithafinancialclassificationofVIIIorbetter,orhaveequivalentratingbyStandardandPoor’sorMoody’s.

Legal Ads

Page 59: Construction E-zone

Contractor’s ZoneContractor’s Zone

Thesuccessfulproposeranditssubcontractorswillberequiredtofollowthenondiscriminationrequirementssetforthintheproposaldocumentsandtopayprevailingwageratesatthelocationofthework.

ThesuccessfulproposerwillberequiredtohavethefollowingCaliforniacontractor’slicenseatthetimeoftheproposalopening:“B”GeneralBuildingand“C36”Plumbing.

EveryeffortwillbemadetoensurethatallpersonshaveequalaccesstocontractsandotherbusinessopportunitieswiththeUniversitywithinthelimitsimposedbylaworUniversitypolicy.EachBiddermayberequiredtoshowevidenceofitsequalemploymentopportunitypolicy.Thesuc-cessfulBidderanditssubcontractorswillberequiredtofollowthenondiscriminationrequirementssetforthintheBiddingDocumentsandtopayprevailingwageatthelocationofthework.

THEREGENTSOFTHEUNIVERSITYOFCALIFORNIAUniversityofCalifornia,DavisDecember4,2012

INVITATION FOR BIDTheHousingAuthorityoftheCountyofSacramentoissolicitingsealedbidsforInvitationforBid(IFB)No.2012075-MPlgforPomegranateRehab2012,6601PomegranateAve.,Sacramento,CA95823.PossiblesubcontractingtradesareAsbestosRemoval;Concrete;ConstructionClean-up;Earthwork&Paving;Framing&RoughCarpentry;LeadRemoval;OrnamentalMetal;Painting&Decorating;Roofing;Scaffolding;Siding&Deck-ing;StructuralSteel;andWelding.Theestimatedbondingrangeisbetween$130,000-$140,000.

BidswillbereceivedattheProcurementServicesDivision,80112thStreet,2ndFloor,Sacramento,Californiauntil2:00p.m.onJanuary22,2013atwhichtimeandplaceallbidsreceivedwillbepubliclyopenedandreadaloud.

Interestedlicensed“B”GeneralBuildingContractorshouldplantoattendthefirstPre-BidConferencescheduledforDecember12,2012at9:00AM,at80112thStreet,2ndFloor,Sacramento,Californiawithasitevisit followingthePre-BidConference.AsecondPre-BidConferenceisscheduledforJanuary3,2013at1:30PM,at80112thStreet,2ndFloor,Sacramento,CaliforniawithasecondsitevisitfollowingthePre-BidConference.SitevisitswillonlybeconductedimmediatelyfollowingeachPreBidConference.AllcontractorsareurgedtoattendoneofthetwoPre-BidConferencesincludingthesiteinspection.PrimecontractorsareencouragedtobringanysubcontractorsinterestedinvisitingthesitetothePreBidConferenceandsitevisit.Althoughattendanceisnotmandatory,contractorswillberequiredtoverifythattheyareawareoftheexist-ingsiteconditions.

Abidpackage,planholderslist,andothercontractdocumentsrelatingtotheprojectmaybeobtainedbeginningDecember10,2012through:

SignatureReprographics620SunbeamAvenueSacramento,CA95814916-454-0800http://www.planroom.us/shra

Adepositof$100.00checkormoneyorderonlyisrequiredforthefirstsetofplansandanyadditionalplansmaybepurchasedthroughSignatureReprographics.Depositswillberefundedifplansarereturnedingoodcondition,toSignatureReprographics,nolaterthanthreeweeksafterbidopening.

PleasedirectallgeneralandcontractualquestionstoMikePeek,Buyer–ProcurementServices,at916-449-6277.ForanytechnicalquestionsregardingtheTechnicalPlansandSpecifications,pleasecontactLindaAdams,ProjectManager,at916-449-6280.Forinformationonothercon-structionprojects,visitourwebsiteathttp://www.shra.org.

ThiscontractissubjecttoFederallaborstandards,affirmativeactionrequirements,Section3RequirementsoftheHUDActof1968,MinorityandWomenOwnedBusinessEnterprisestandards.AllbidderswillberequiredtofurnishandpayforasatisfactoryBidBondintheamountofnotlessthan10%ofthetotalbidprice.ThesuccessfulbidderwillberequiredtofurnishandpayforasatisfactoryPerformanceBondandPaymentBondintheamountofnotlessthan100%ofthecontractprice.PursuanttotheCaliforniaPublicContractCodeSection22300theContractormayrequestthattheAgencysubstituteasecurityintheamountoftheperformanceretention.

TheSacramentoHousingandRedevelopmentAgencyreservestherighttorejectanyorallbidsandwaiveanyinformalitiesinthebidding.TheAgencyisanEqualOpportunityEmploymentemployer.

Page 60: Construction E-zone

December 10, 2012Page 58 Contractor’s Zone• .Contractor’s Zone

$684

billion

Tuesday, November 27, 2012 SCHEDULE I - CONSTRUCT APRON LIGHTING AND PAVEMENT MARKINGS - SCHEDULE II - CONSTRUCT AIRFIELD SIGNAGE, Auburn

Plan 19024 Number:

Royal Electric $85,953 Gray Electric $90,402 Studebaker Brown Electric $92,270 DRY CREEK TRAIL THROUGH COTTONWOOD PARK, Clovis

Plan 65096 Number:

Roger Cook $261,542.50 Seal Rite Paving & Grading $284,165 Taylor Backhoe $288,310 L-612 CHILDCARE ROOFTOP UNIT REPLACEMENT, Pittsburg

Plan 99072 Number:

Hometown $161,000 MARTIN LUTHER KING JR. ELEMENTARY SCHOOL - SITE DRAINAGE, Richmond

Plan 113070 Number:

Breneman $57,100 POLICE FIREARMS PRACTICE RANGE (FPR) - SEPTIC, Tracy

Plan 194094 Number:

Taylor Backhoe $16,445 Lawrence Backhoe Service $16,850 Roto Rooter $9,950 WATER DAMAGE REPAIRS - RICHLAND MI GRANT HOUSING CENTER, Yuba City

Plan 241092 Number:

Fletcher Plumbing, Inc. $32,980 Birdwell Bros. Painting & Refinishing $41,000

Wednesday, November 28, 2012 ZONE 1 WELL UPGRADE AND EXPANSION PROJECT TINKER ROAD TANK SITE PRODUCTION WELL DRILLING, Rocklin

Plan 149064 Number:

Nor Cal Pump & Well Service $166,939 Thursday, November 29, 2012 GAULT SCHOOL SIDEWALK INFILL PROJECT, Santa Cruz

Plan 132066 Number:

Pavex Construction $511,082 Monterey Penninsula Engineering $512,407 Friday, November 30, 2012 5822 PONDEROSA WAY REHABILATATION, Magalia

Plan 215081 Number:

Ken Paul $34,433 Monday, December 03, 2012 PIER 23 ELECTRICAL SERVICE UPGRADE FOR THE 34TH AMERICA’S CUP EVENT, San Francisco

Plan 258048 Number:

Anvil Builders, Inc. $428,499 Tuesday, December 04, 2012 COUNCIL CHAMBERS A/V SYSTEM RENOVTION RE-BID, Antioch

Plan 66083 Number:

Quality Sound $176,000 IMPROVEMENTS TO THE OTTER EXPRESS FOOD SERVICE BUILDING, Monterey

Plan 285043 Number:

Tombleson Inc $1,402,417.00 B Side, Inc. $1,565,950.00 Gonsalves & Stronck Construction $1,603,300.00

Bid Results

Page 61: Construction E-zone

Contractor’s ZoneContractor’s Zone

$684

billion

The Internet Accounts For 4.7%

of the U.S. Economy

Survey Says: 77% of Americans would be willing to give up chocolate for an entire year, rather than go without the Internet. Only 21% though would give up sex, and an even smaller 7% would go without a shower.

According to a recent survey conducted by CNN Money, the Internet contributes more to the American economy than the entire federal government, according to a new study by the Boston Consulting Group.

The Internet accounted for $684 billion, or 4.7% of all U.S. economic activity in 2010, Boston Consulting Group found. By way of comparison, the federal government, contributed $625 billion, or 4.3%, to the nation’s output. If it was considered its own separate industry, the Internet would also be larger than America’s education, construction or agricultural sectors.

In the retail sphere alone, e-commerce accounted for 5% of U.S. sales in 2010.

“All businesses are increasingly digital and need to think about how to take advantage of these opportunities,” said Dominic Field, a BCG partner and co-author of the report. Boston Consulting Group predicts the Internet will grow about 10% a year through 2016 in the Group of 20 nations.

Advertising HERE makes dollars, and sense!And this digital media will grow every year.

Call Steve today to get your powerfuldisplay ad started. 916.729.5432

Page 62: Construction E-zone

December 10, 2012Page 60 Contractor’s Zone• .Contractor’s Zone

PCCAPlacer County Contractors Association & Builders Exchange

Newspaper Rate Sheet

Ad Type Ad Size 1 run 6 runs 13 runs 26 runs 52 runs

Two Page Spread 17 1/4” wide by 11 1/4” tall $782 $639 $497 $355 $209

Full page (bleed) 8 5/8” wide by 11 1/4” tall $427 $355 $284 $213 $139

Full page (boxed) 8” wide by 9 3/4” tall $427 $355 $284 $213 $139

Half page 8” wide by 4 3/4” tall $229 $193 $158 $123 $87

One Third (V) 2 7/8” wide by 7 1/2” tall $171 $144 $118 $92 $63

One Third (H) 8” wide by 3 1/8” tall $171 $144 $118 $92 $63

Quarter Page 3 7/8” wide by 4 3/4” tall $97 $81 $64 $47

Contractor Yellow Pages (Business Card Sized Ad) $39 $32 $24 $19

Legal ads • 3 7/8” wide and up to 2 1/4” tall $50 • 3 7/8” wide and up to 3 1/2” tall $75

• 3 7/8” wide and up to 5” tall $95 • 3 7/8” wide and up to 6 1/2” tall $135

The Placer County Contractors Association (PCCA) weekly newspaper is published 52 times a year and distributed free of charge to building & construction firms in the greater Placer and Sacramento county area. PCCA reserves the right to determine position and placement of all advertising. Special positioning may be purchased for an additional 20% if space is available. The Inside Cover is our best position, and is available for an additional 20% on a long-term advertising ocntract only. 15% off these rates for PCCA members!

Upgraded format, larger ad sizes, lowered rates:

Rates above are for full color ads per insertion. Flash animation (.swf files), animations (.gif format) and video clips can be added to any ad. There is no extra charge for video clips or multi-media in ads unless “assembly” of the ad is required. Some file size limitations apply. For information call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected]. Email camera-ready ads in high resolution Adobe Acrobat (.pdf) format to: [email protected]. Ad creation and graphic design services are available through C&S Publishing at $75 an hour — FREE to PCCA members!

Reading the price chart: Each column shows the price per run based on the number of times the ad is run. For example, a 1/4 page ad, run 13 times (which is every week for 3 months or every other week for 6 months) is $81 per run. That same ad, run every week for a year, would only cost $47 per run. Ads are invoiced monthly after the last ad run of the month. Net 30 days is offered. Take 15% off the rates shown below if you are a member of the Placer County Contractors Asociation. Take another 3% off if you prepay your ad contract entirely. Multiple ads can be run on a rotation basis under one advertising contract.

For more information: Call Steve Berlin, at 916-729-5432, or email him at: mailto:[email protected] See the news-paper onlne at www.PCCAe-Zone.com

Publisher reserves the right to refuse any advertisement with or without reason or explaination including any ad that in the opinion of PCCA is unethical, makes extravagant claims, misrepresents, is unfair or harmful to other advertisers; violates postal, anti-trust or U.S. currency regulations; or is deemed inconsistent with the objectives of the Association.

Display Advertising Policy, Rates and InformationREVJULY2012

Our LOWEST rates