FORTéCreating the world’s tallest Clt apartment building

© Lend Lease 2013

dICk dUsseLdORP, Lend Lease FOUndeR 1973

“ the time is not far off when companies will have to justify their worth to society, with greater emphasis being placed on environmental and societal impact than straight economics.”

The WORld’s TallesT TimbeR apaRTmenT building– a land mark innovative project by lend lease

– forté is another great example showcasing lend lease’s integrated business model with the project being conceived, designed, developed and constructed by lend lease.

– first Clt building in australia

– targeting first 5 star green star residential (as built)

– first lend lease australia project to incorporate pods

– High profile location

whaT Is CLT?

austrian spruce

whaT Is CLT?

– stable engineered product

– highly mechanised production process

– simplicity - basic assembly concepts

– scale - large panel dimensions that suit major commercial construction

– robust

CLT FROM a deVeLOPeRsPeRsPeCTIVeed prod

16m

3m

saFe

key beneFITs FROM OUR PeRsPeCTIVe

– reduced high risk work (eg work at heights). elimination of injuries associated with formwork and reinforcing

– better work environment with less dust, less vibration, noise and obstructions

– reduced impact of construction and disruption on local communities

– Fewer operatives on site and for a reduced period of time

sUsTaInabLe– Carbon neutral structural option – 1m³ of

timber stores 0.25t of carbon

– better thermal performance

– Generates zero waste

– reduces fresh water consumption

– enhances indoor environment Quality

– reduces the deliveries to site

key beneFITs FROM OUR PeRsPeCTIVe

x 90% Less

LIGhT weIGhT– 80% weight reduction

– less mass to support

– reduces foundations

– assists with poor ground conditions

– basic craneage

key beneFITs FROM OUR PeRsPeCTIVe

TIMe saVInGs & eFFICIenCIes– reduced preliminary & supervision costs

– savings in follow-on trades

– reduced holding costs for developer

– high precision quality

key beneFITs FROM OUR PeRsPeCTIVe

The ChaLLenGessome things developers aren’t fond of:

– products that are not used locally

– limited long term performance history

– making customers nervous

– solutions with added finance or insurance risk

– asking builders to change their habits

PReCedenT PROjeCTs

gROWTh OF clT usage in euROpe

Forté projEct uSEd 1,000m3 oF clt

0

100

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

200

300

400

500

600

700

800

,000 m3

gROWTh OF clT usage in euROpe

Forté projEct uSEd 1,000m3 oF clt

0

100

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

2013

2014

2015

200

300

400

500

600

700

800

,000 m3

2006 - kInGsdaLe sChOOL

10 weeks Clt construction4 skilled labourers 1 supervisor

architect: drmm | Clt supplier & installer: Klh uK

2008 - sTadThaUs MURRay GROVe

9 weeks Clt construction4 skilled labourers 1 supervisor

architect: waugh thistleton | Clt supplier & installer: Klh uK

2010 - OPen aCadeMy nORwICh GROVe

16 weeks Clt construction8 skilled labourers 1 supervisor

architect: sheppard robson | Clt supplier & installer: Klh

FORTé

– Scale: 9 stories, 23 apartments

– build Period: start on site: February 2012 begin Clt installation: June 2012 Clt structure complete: aug 2012 practical completion: december 2012

– architect: lend lease

– CLT supplier: Klh

FORTé VICTORIa haRbOUR MeLbOURne

Vic

to

ria

Ha

rb

ou

r

No

rt

H W

Ha

rf

fo

rt

é

WHere it Started

aRChITeCTURaL sOLUTIOn

aRChITeCTURaL sOLUTIOn

aRChITeCTURaL sOLUTIOn

sTRUCTURaL sOLUTIOn

CLT

Concrete Frame and Transfer slab

Retail

ap

artm

ents

deep driven Piles

sTRUCTURaL sOLUTIOn

sTRUCTURaL sOLUTIOn

sTRUCTURaL sOLUTIOn

bUILdInG seRVICes

Lifts in a Timber shaft

– lifts in timber shaft previously achieved at murray grove. same contractor used for Forté

– standard lift doors and frames fitted to timber shaft with coach bolts

– Fire tests

MOdULaR baThROOMs

32.17mHiGH

485toNNeS of timber

759cLt PaNeLS

5 GreeN Star

tHe WorLd’S taLLeSt timber aPartmeNt buiLdiNG

exPected to be tHe firSt reSideNtiaL buiLdiNG to acHieVe tHiS

FORTé by The nUMbeRs

34,550ScreWS

5,500aNGLe bracketS

SaViNG1,451 toNNeS of carboN

SHiPPed iN

25coNtaiNerS

oN 2SHiPS

LeNd LeaSe aPPreNticeS uPSkiLLed iN NeW coNStructioN tecHNique

FORTé by The nUMbeRs

Klh Factory Koper slovenia suez canal shed at Victoria harbour – ll iKea

port melbourne – australian Customs

SHiPPiNG a buiLdiNG from euroPe to auStraLia

TyRanny OF dIsTanCe

ChaLLenGes

aUThORITy aPPROVaLs– planning entitlement

– building Codes

– structural Certification

– Fire protection of structural and services

bUILdInG COdes

codeS iN uk/euroPe aNd auStraLia

Uk/europe– building regulations: Clt is compliant– Codes of standard for design: eurocode 0 – basis of structural design eurocode 1 – actions on structures eurocode 5 – design of timber structures

australia– building Code of australia deemed to satisfy code does not consider a timber building above 3 stories– Codes of standard for design: as 1170 – structural design actions as 1720 – timber structures – design methods

Solution is therefore a fire engineered ‘Alternate solution’

FIRe PeRFORManCe technical

– highly predictable performance.

– layers char at 0.7mm / min.

– sacrificial layers and / or supplementary materials can be used.

– Forté uses a combination of protection and sacrificial.

FIRe PeRFORManCe OF CLT – FORTé (2012)

FIRe PeRFORManCe OF CLT – FORTé (2012)

aS1530 Part 4 (equivalent to bS 476 Part 21 determination of the fire resistance of loadbearing elements of construction)fr 90/90/90: 128mm wall panel with 13mm fire grade plasterboard direct fixedstructural adequacy integrity insulation

fr 90/90/90: 158mm wall panel - barestructural adequacy integrity insulation

fr 120/120/120: 146mm floor panel with 2 layers 16mm fire grade plasterboard direct fixedstructural adequacy integrity insulation

aCOUsTIC PeRFORManCe technical

– equal or higher than conventional concrete frame / masonry / plasterboard wall

– Focus on low frequency – need to add mass via floor build up

– australia has high code requirements

– lend lease has higher than code standards

dURabILITymoisture Protection

– rain screen facade

– moisture content should be around 12%.

– Controlled “by design”.

– Clt protected by sarking and cladding.

– Ventilation cavity draws heat away from the timber.

– moisture detector sensor rods strategically located within the Clt.

metal Cladding

Clt

plaster board

VeRMIn – whaT abOUT TeRMITes?

Vermin protection:

– Code requires timber structures to be protected from termites

– Clt structure sits on concrete podium for ground seperation

– physical termite barriers at perimeter and services penetrations (chemical free)

– annual inspection regime

desIGn PROCess & TeChnICaL deTaILInG

IT Is a dIFFeRenT desIGn / COnsTRUCTIOn PROCess

– all design completed up front– File to factory process– 3d modelling in auto-Cad– installation sequencing, crane calculations – minimises waste, reduces onsite decision

making and errors

whOLe bUILdInG PROTOTyPe ObjeCTIVes:

– Create a market facing product

– achieve 5 star green star (as built)

– achieve authority approvals

– resolve technical detailing

– achieve a fit-for-purpose product

– demonstrate Clt as viable alternative

– Constructibility – impact on design process – impact on other building tasks

– a base case to leverage step change improvements in future Clt projects

sUMMaRy LessOns

– whaT dOes OUR R&d TeLL Us ThUs FaR?

– design experience

– procurement

– Construction experience

– industry relations

– Consumer market reactions

FORTé sUCCess FaCTORs

– proven speed

– Clean and safe

– robust, high quality result

– potential to be cost competitive

– Contractors love it

– bankers and insurers get it

– Customers are

not afraid of it

The FUTURe

dock Square Library, meLbourNe

dock Square Library, meLbourNe

“If the 19th century was the century of steel, & the 20th the century of concrete, then the 21st century is about engineered timber”

alex de rijke, director of drmm