cte and performance-based...

69
April 23, 2014 1:00 p.m. – 4:00 p.m. Event #20983 Copyright © Texas Education Agency 2014. All rights reserved.

Upload: others

Post on 23-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

April 23, 20141:00 p.m. – 4:00 p.m.

Event #20983

Copyright © Texas Education Agency 2014. All rights reserved.

Page 2: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

PBM Product When are data submitted by LEAs?

When are data available for internal TEA use?

Date of 2013 release Projected date of 2014 release

2014 PBMAS

(Unmasked reports)

Throughout the year, depending on the indicator

Data for all indicators available by early August

LEA reports posted on TEASE ACCT 08/30/13

LEA reports posted on TEASE ACCT 08/13/14

2014 PBMAS

(Masked reports)

LEA reports posted on TEA web site 09/20/13

LEA reports posted on TEA web site 09/17/14

2014 PBMAS State and Region Reports

State and region reports posted on TEA web site 10/18/13

State and region reports posted on TEA web site 10/17/14

2014 Leaver Data Validation Indicators

PEIMS Data Fall/Submission 1

March (but cannot be officially released until after August)

LEA reports posted on TEASE ACCT 11/01/13

LEA reports posted on TEASE ACCT 10/31/14

2014 Discipline Data Validation Indicators

PEIMS Data

Summer/Submission 3

October/November LEA reports posted on TEASE ACCT 11/29/13

LEA reports posted on TEASE ACCT 11/21/14

2014 Student Assessment Data Validation Indicators

Spring Student Assessment Data

June LEA reports posted on TEASE ACCT 02/21/14

LEA reports posted on TEASE ACCT 12/19/14

Copyright © Texas Education Agency 2014. All rights reserved.

2

Note: PBM products always use the most current data available.

Page 3: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

The development of the 2014 PBMAS is currently underway.

There are important changes for this year. We will cover those in detail this afternoon.

2014 preview information is provided to give ESC PBM contacts a general sense of what the 2014 PBMAS will look like in order to facilitate ESC planning or training that may be appropriate in the upcoming months.

Copyright © Texas Education Agency 2014. All rights reserved.

3

Page 4: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

At this time, we cannot guarantee the preview information is final. There could be factors that may necessitate a change to what is being shared this early in the process.

As we’ve done in the past, we will always provide an update to any preview information that undergoes a change.

Copyright © Texas Education Agency 2014. All rights reserved.

4

Page 5: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Reminder on Acronyms◦ PL Performance Level◦ RI Required Improvement◦ SA Special Analysis◦ PJSA Professional Judgment Special Analysis◦ YAE Year-After-Exit◦ MSR Minimum Size Requirements

Copyright © Texas Education Agency 2014. All rights reserved.

5

Page 6: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #1 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

BE STAAR 3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

Add RI (except social studies).

No SA or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

6

Page 7: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #2 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

ESL STAAR 3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

Add RI (except social studies).

No SA or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

7

Page 8: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #3 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

LEP (Not Served in BE/ESL) STAAR 3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

Add RI (except social studies).

No SA or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

8

Page 9: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #4 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

LEP YAE STAAR

3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

No RI, SA, or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

9

Page 10: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #5 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

LEP STAAR EOC Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

Included math (A1& GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data.

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

10

Page 11: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #6 LEP Annual Dropout Rate (Grades 7-12)

PL was assigned with RI and SA.

Implement new standard and cut-points:PL 0 = 1.8% or lower

PL 1 = 1.9% to 3.8%

PL 2 = 3.9% to 5.8%

PL 3 = 5.9% or higher

(2013 State Rate = 3.1%)

Copyright © Texas Education Agency 2014. All rights reserved.

11

Page 12: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #7 LEP RHSP/DAP Diploma Rate

PL was assigned with RI and SA.

No changes.

BE/ESL #8 LEP Graduation Rate

PL was assigned with RI but no SA or PJSA.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

12

Page 13: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #9 TELPAS Reading Beginning Proficiency Level Rate

PL was assigned but no RI, SA, or PJSA.

One year of data.

Two years of data available for aggregation.

Add RI.

No SA or PJSA.

Copyright © Texas Education Agency 2014. All rights reserved.

13

Page 14: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

BE/ESL #10 TELPAS Composite Rating for Students in U.S. Schools Multiple Years

PL was assigned with RI but no SA or PJSA.

Add SA.

Implement new standard and cut-points:PL 0 = 7.5% or lower

PL 1 = 7.6% to 10.5%

PL 2 = 10.6% to 14.4%

PL 3 = 14.5% or higher

(2013 State Rate = 9.2%)

Copyright © Texas Education Agency 2014. All rights reserved.

14

Page 15: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

End of BE/ESL 2014 PBMAS Preview

Copyright © Texas Education Agency 2014. All rights reserved.

15

Page 16: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #1 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

CTE STAAR EOC Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

Included math (A1& GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data.

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

16

Page 17: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #2 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

CTE LEP STAAR EOC Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In I Level II performance.

Included math (A1 & GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data.

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

17

Page 18: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #3 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

CTE Economically Disadvantaged STAAR EOC Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

Included math (A1 & GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data.

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

18

Page 19: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #4 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

CTE SPED STAAR EOC Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

Included math (A1 & GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data.

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

19

Page 20: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #5 CTE Annual Dropout Rate (Grades 9-12)

PL was assigned with RI and SA.

Implement new standard and cut-points:PL 0 = 2.8% or lower

PL 1 = 2.9% to 4.8%

PL 2 = 4.9% to 6.8%

PL 3 = 6.9% or higher

(2013 State Rate = 1.3%)

Copyright © Texas Education Agency 2014. All rights reserved.

20

Page 21: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #6 CTE RHSP/DAP Diploma Rate

PL was assigned with RI and SA.

No changes.

CTE #7 CTE Graduation Rate

PL was assigned with RI but no SA or PJSA.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

21

Page 22: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #8 CTE Nontraditional Course Completion Rate-Males

PL was assigned but no RI, SA, or PJSA.

One year of data.

Two years of data available for aggregation.

Add RI.

No SA or PJSA.

Implement new standard and cut-points:PL 0 = 40.0% or higher

PL 1 = 23.0% to 39.9%

PL 2 = 15.0% to 22.9%

PL 3 = 14.9% or lower

(2013 State Rate = 37.8%)

Copyright © Texas Education Agency 2014. All rights reserved.

22

Page 23: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

CTE #9 CTE Nontraditional Course Completion Rate-Females

PL was assigned but no RI, SA, or PJSA.

One year of data.

Two years of data available for aggregation.

Add RI.

No SA or PJSA.

N1300251 (Agricultural Algebraic Exploration) deleted.

Copyright © Texas Education Agency 2014. All rights reserved.

23

Page 24: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

End of CTE 2014 PBMAS Preview

Copyright © Texas Education Agency 2014. All rights reserved.

24

Page 25: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #1 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

Title I, Part A STAAR 3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

Add RI (except social studies).

No SA or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

25

Page 26: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #2 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

Title I, Part A STAAR EOC Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

Included math (A1 & GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

26

Page 27: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #3 Title I, Part A Annual Dropout Rate

(Grades 7-12)

PL was assigned with RI and SA.

Implement new standard and cut-points:PL 0 = 1.8% or lower

PL 1 = 1.9% to 3.8%

PL 2 = 3.9% to 5.8%

PL 3 = 5.9% or higher

(2013 State Rate = 2.0%)

Copyright © Texas Education Agency 2014. All rights reserved.

27

Page 28: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #4 Title I, Part A RHSP/DAP Diploma Rate

PL was assigned with RI and SA.

No changes.

NCLB #5 Title I, Part A Graduation Rate

PL was assigned with RI but no SA or PJSA.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

28

Page 29: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #6 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

Migrant STAAR 3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

Add RI (except social studies).

No SA or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

29

Page 30: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #7 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

Migrant STAAR EOC Passing Rate

(M, R, S, SS, W)

PL assigned based on Phase-In 1 Level II performance.

Included math (A1 & GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data.

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

30

Page 31: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #8 Migrant Annual Dropout Rate (Grades 7-12)

PL was assigned with RI and SA.

Implement new standard and cut-points:PL 0 = 1.8% or lower

PL 1 = 1.9% to 3.8%

PL 2 = 3.9% to 5.8%

PL 3 = 5.9% or higher

(2013 State Rate = 2.7%)

Copyright © Texas Education Agency 2014. All rights reserved.

31

Page 32: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

NCLB #9 Migrant RHSP/DAP Diploma Rate

PL was assigned with RI and SA.

No changes.

NCLB #10 Migrant Graduation Rate

PL was assigned with RI but no SA or PJSA.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

32

Page 33: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

End of NCLB 2014 PBMAS Preview

Copyright © Texas Education Agency 2014. All rights reserved.

33

Page 34: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #1 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

SPED STAAR 3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

Add RI (except social studies).

No SA or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

34

Page 35: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #2 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

SPED YAE STAAR 3-8 Passing Rate

(M, R, S, SS, W)

PL was assigned based on Phase-In 1 Level II performance.

No RI, SA, or PJSA.

One year of data.

Writing was reinstated.

Social studies was Report Only.

Two years of data available for aggregation (except social studies).

No RI, SA, or PJSA.

Reinstate social studies PL assignment with PL 0 = 65%.Reminder:

STAAR Modified and STAAR Alternate are not included in this indicator since the students evaluated are no longer receiving special education services.

Copyright © Texas Education Agency 2014. All rights reserved.

35

Page 36: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #3 (i-v)

Additional provisions pertaining to this indicator will be covered in the 2014 PBMAS Other System Components preview.

SPED STAAR EOC Passing Rate

(M, R, S, SS, W)

PL assigned based on Phase-In 1 Level II performance.

Included math (A1 & GE), reading (E1R & E2R), science (BI & CH), social studies (WG & WH), and writing (E1W & E2W).

One year of data.

No RI, SA, or PJSA.

New PL 4 added.

Remove GE from the math indicator.

Remove CH from the science indicator.

Add new Report Only ELA indicator.

Discontinue separate reading and writing indicators.

Replace the social studies indicator with a new Report Only U.S. History indicator.

One year of data.

No RI, SA, or PJSA.

Discontinue PL 4.

Copyright © Texas Education Agency 2014. All rights reserved.

36

Page 37: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #4 SPED STAAR Participation Rate

Grade 9 students were added to the indicator.

Adjustments were made to the PL 1 – PL 3 cut-points.

No RI, SA, or PJSA.

One year of data.

Two years of data available for aggregation.

Add RI.

No SA or PJSA.

Methodology revisions will be incorporated to reflect the changes HB 5 made to EOC assessments.

Copyright © Texas Education Agency 2014. All rights reserved.

37

Page 38: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #5 SPED STAAR Modified Participation Rate

Grade 9 students were added to the indicator.

Adjustments were made to the PL 1 – PL 3 cut-points.

No RI, SA, or PJSA.

One year of data.

Two years of data available for aggregation.

Add RI.

No SA or PJSA.

Methodology revisions will be incorporated to reflect the changes HB 5 made to EOC assessments.

Copyright © Texas Education Agency 2014. All rights reserved.

38

Page 39: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #6 SPED STAAR Alternate Participation Rate

Grade 9 students were added to the indicator.

No RI, SA, or PJSA.

One year of data.

Two years of data available for aggregation.

Add RI.

No SA or PJSA.

Replace AR (Agency Review) PL assignment with new PL 1, PL 2, and PL 3 cut-points:PL 0 = 10.0% or lower (no change)

PL 1 = 10.1% to 12.9%

PL 2 = 13.0% to 16.9%

PL 3 = 17.0% or higher

(2013 State Rate = 11.0%)

Copyright © Texas Education Agency 2014. All rights reserved.

39

Page 40: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #7 SPED Regular Early Childhood Program Rate

(Ages 3-5)

N/A. Implement a new Report Only indicator.

Copyright © Texas Education Agency 2014. All rights reserved.

40

Page 41: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Copyright © Texas Education Agency 2014. All rights reserved.

41

SPED Regular Early Childhood Program Rate (Ages 3-5)

Calculation:

number of students ages 3-5 served in special education reported with PPCD service

location code 1 or 4 and placed in instructional settings 00, 40, 41, 81, 82, 91, and 92

number of students ages 3-5 served in special education

Page 42: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #8 SPED Placements in Instructional Setting 40/41 Rate (Ages 3-5)

PL was assigned with RI and SA.

Indicator was renamed.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

42

Page 43: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #9 SPED Placements in Instructional Settings 40/41 Rate (Ages 6-11)

PL was assigned with RI and SA.

Minor revisions were made to the PL 1, PL2, and PL 3 cut-points.

Indicator was renamed.

Discontinue this indicator.

Copyright © Texas Education Agency 2014. All rights reserved.

43

Page 44: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #10 SPED Placements in Instructional Settings 40/41 Rate (Ages 12-21)

PL was assigned with RI and SA.

Indicator was renamed.

Discontinue this indicator.

Copyright © Texas Education Agency 2014. All rights reserved.

44

Page 45: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #11 SPED Regular Class ≥80% Rate

(Ages 6-11)

Implemented as a new Report Only indicator.

Assign performance levels:PL 0 = 70.0% or higherPL 1 = 57.0% to 69.9%PL 2 = 45.1% to 56.9%PL 3 = 45.0% or lower(2013 State Rate = 68.5%)

No RI, SA, or PJSA.

One year of data.

Copyright © Texas Education Agency 2014. All rights reserved.

45

Page 46: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #12 SPED Regular Class <40% Rate

(Ages 6-11)

Implemented as a new Report Only indicator.

Assign performance levels:PL 0 = 10.0% or lowerPL 1 = 10.1% to 18.9%PL 2 = 19.0% to 23.9%PL 3 = 24.0% or higher(2013 State Rate = 13.7%)

No RI, SA, or PJSA.

One year of data.

Copyright © Texas Education Agency 2014. All rights reserved.

46

Page 47: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #13 SPED Regular Class ≥80% Rate

(Ages 12-21)

Implemented as a new Report Only indicator.

Assign performance levels:PL 0 = 70.0% or higherPL 1 = 57.0% to 69.9%PL 2 = 45.1% to 56.9%PL 3 = 45.0% or lower(2013 State Rate = 65.0%)

No RI, SA, or PJSA.

One year of data.

Copyright © Texas Education Agency 2014. All rights reserved.

47

Page 48: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #14 SPED Regular Class <40% Rate

(Ages 12-21)

Implemented as a new Report Only indicator.

Assign performance levels:PL 0 = 10.0% or lowerPL 1 = 10.1% to 18.9%PL 2 = 19.0% to 23.9%PL 3 = 24.0% or higher(2013 State Rate = 13.5%)

No RI, SA, or PJSA.

One year of data.

Copyright © Texas Education Agency 2014. All rights reserved.

48

Page 49: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #15 SPED Annual Dropout Rate (Grades 7-12)

PL was assigned

with RI and SA.

Implement new standard and cut-points:PL 0 = 1.8% or lower

PL 1 = 1.9% to 3.8%

PL 2 = 3.9% to 5.8%

PL 3 = 5.9% or higher

(2013 State Rate = 2.4%)

Copyright © Texas Education Agency 2014. All rights reserved.

49

Page 50: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #16 SPED RHSP/DAP Diploma Rate

PL assigned with RI and SA.

Adjustments were made to the PL 1, PL 2, and PL 3 cut-points.

No changes.

SPED #17 SPED Graduation Rate

PL assigned with RI but no SA or PJSA.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

50

Page 51: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #18 SPED Representation

PL assigned with RI but no SA or PJSA.

No changes.

SPED #19 SPED African American (Not Hispanic/Latino) Representation

PL was assigned with RI and SA.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

51

Page 52: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #20 SPED Hispanic Representation

PL was assigned with RI and SA.

No changes.

SPED #21 SPED LEP Representation

PL was assigned with RI and SA.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

52

Page 53: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #22 SPED Discretionary DAEP Placements

PL assigned with RI, SA, and PJSA.

Adjustments were made to the PL 2 and PL 3 cut-points.

Delete Reason Codes 22, 51, and 52.Add Reason Code 02, if reported with Behavior Location Code 04 or 05.

Copyright © Texas Education Agency 2014. All rights reserved.

53

Page 54: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area and Indicator Number

Indicator Name 2013 PBMAS 2014 PBMAS

SPED #23 SPED Discretionary Placements to ISS

PL was assigned with RI, SA, and PJSA.

Adjustments were made to the PL 1, PL 2, and PL 3 cut-points.

No changes.

SPED #24 SPED Discretionary Placements to OSS

PL was assigned with RI, SA, and PJSA.

Adjustments were made to the PL 1, PL 2, and PL 3 cut-points.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

54

Page 55: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

End of SPED 2014 PBMAS Preview

Copyright © Texas Education Agency 2014. All rights reserved.

55

Page 56: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area Description 2013 PBMAS 2014 PBMAS

Other System Components

Minimum size requirements (MSR)

A minimum size requirement of 30 (denominator) was reinstated for all STAAR 3-8 performance indicators. The MSR for all other indicators did not change.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

56

Page 57: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area Description 2013 PBMAS 2014 PBMAS

Other System Components

Special analysis No changes were implemented.

No changes.

Other System Components

PL 0 standards for STAAR 3-8 Performance Indicators

No changes were made to the PL 0 standards, but social studies was Report Only.

Reinstate social studies performance level assignment with PL 0 = 65%.

Copyright © Texas Education Agency 2014. All rights reserved.

57

Page 58: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Mathematics 2013 = 70%

2014 = 70%

Reading/ELA 2013 = 70%

2014 = 70%

Science 2013 = 65%

2014 = 65%

Social Studies 2013 = 70% (All PLs were Report Only)

2014 = 65%

Writing 2013 = 70%

2014 = 70%

Copyright © Texas Education Agency 2014. All rights reserved.

58

Page 59: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area Description 2013 PBMAS 2014 PBMAS

Other System Components

Performance Level Cut-Points for STAAR 3-8 Performance Indicators

No changes were implemented.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

59

Page 60: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area Description 2013 PBMAS 2014 PBMAS

Other System Components

PL 0 standards for STAAR EOC Performance Indicators

PL 0 standards were implemented for the new STAAR EOC indicators.

Changes are summarized on Slide 61.

Other System Components

Performance Level Cut-Points for STAAR EOC Performance Indicators

Cut-points were implemented for the new STAAR EOC indicators. A new PL 4 was added.

No changes for the indicators that will have PL assignment other than the PL 4 will be discontinued. See also Slide 62.

Copyright © Texas Education Agency 2014. All rights reserved.

60

Page 61: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Mathematics 2013 = 50%

2014 = 50%

Reading 2013 = 35%

2014 = Indicator Discontinued

Science 2013 = 50%

2014 = 50%

Social Studies 2013 = 50%

2014 = Report Only

Writing 2013 = 35%

2014 = Indicator Discontinued

English Language Arts 2013 = N/A

2014 = Report Only (spring 2014 administration only)

Copyright © Texas Education Agency 2014. All rights reserved.

61

Page 62: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

The cut-points for the STAAR EOC performance indicators in mathematics and science will continue to be based on 10 point increments.

The STAAR EOC performance level (PL) 4 will be discontinued.

Copyright © Texas Education Agency 2014. All rights reserved.

62

Mathematics and Science

PL 0 =≥50.0%

PL 1 = 40.0% -49.9%

PL 2 = 30.0% -39.9%

PL 3 = ≤29.9%

PL 4 = DISCONTINUED

Social Studies and EnglishLanguage Arts

Report Only

Report Only

Report Only

Report Only

PL 4 = DISCONTINUED

Page 63: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area Description 2013 PBMAS 2014 PBMAS

Other System Components

EOC Test Administrations

Results from the summer 2012, fall 2012, and spring 2013 administrations were included.

No changes, except the new English Language Arts indicator will only include results from the spring 2014 administration.

Other System Components

Format of Performance Levels

No changes were implemented.

Replace Agency Review (AR) with PL 1 – PL 3 cut-points.

Discontinue PL 4 assignment.

Copyright © Texas Education Agency 2014. All rights reserved.

63

Page 64: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Program Area Description 2013 PBMAS 2014 PBMAS

Other System Components

Required Improvement calculation

No changes were implemented.

No changes.

Copyright © Texas Education Agency 2014. All rights reserved.

64

Page 65: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

End of Other System Components 2014 PBMAS Preview

Copyright © Texas Education Agency 2014. All rights reserved.

65

Page 66: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

2014 PBMAS Manual rule adoption is underway. We are in the process of preparing the rule packet for adoption.◦ Proposed Amendment to 19 TAC Chapter 97,

Planning and Accountability, Subchapter AA,Accountability and Performance Monitoring, §97.1005, Performance-Based Monitoring Analysis System

◦ Summary: The proposed amendment would adopt the Performance-Based Monitoring Analysis System 2014 Manual.

Copyright © Texas Education Agency 2014. All rights reserved.

66

Page 67: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

◦ 30-Day Public Comment Period: Anticipate May 2, 2014 – June 2, 2014.

The rule will likely be effective in late July/early August.

For current information on the rule adoption process: ◦ Visit http://www.tea.state.tx.us/index4.aspx?id=2296

and/or

◦ Subscribe to the Rules Listserv at http://miller.tea.state.tx.us/list/

Copyright © Texas Education Agency 2014. All rights reserved.

67

Page 68: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

Once the rule becomes effective, the Manualwill be posted on our web site, followed by a listserv notification of the posting.

At that time, hard-copy versions will also be available from TEA’s Publications Office (see order form at the back of the posted Manual).

Copyright © Texas Education Agency 2014. All rights reserved.

68

Page 69: CTE and Performance-Based Monitoringp2cdn2static.sharpschool.com/UserFiles/Servers/Server_2954298/Fil… · Indicator Name 2013 PBMAS 2014 PBMAS BE/ESL #1 (i-v) Additional provisions

TETN Session #2: 2014 PBMAS Final Decisions and 2014 PBM Data Validation Preview

Thursday, July 24 (1:00 p.m. – 4:00 p.m.)

(Event #20984)

TETN Session #3: 2014 PBM Data ValidationThursday, September 25 (1:00 p.m.– 4:00 p.m.)

(Event #20985)

Copyright © Texas Education Agency 2014. All rights reserved.

69