cv_awadhesh_singh lead project engineer

8
AWADHESH SINGH Mobile: +60123551701 +919987621610 E-Mail: [email protected] [email protected] ~ VISIONARY TECHNOLOGY PROFESSIONAL ~ Planning Construction Installation Pre-Commissioning & Commissioning PROFESSIONAL SNAPSHOT A highly competent and proactive Mechanical Engineering professional with an experience of 15 years managing Offshore Fabrication, Installation, hook-up & Comm. of Top Side CPP, CRP & Well Head, Jacket. Subsea Pipeline, Umbilical’s, Risers and Flow line (SURF) and Riser guard in major Oil and Gas platform for offshore Project. Maintenance & Host tie for Offshore Gas processing platforms. Currently associated with PETRONAS CARIGALI SDN BHD (PCSB), KUALA LUMPUR, MALAYSIA with Capacity of Senior Project Engineer with Hook Up and Commissioning Department of Project & Engineering Development Division. (P&E DD). Adept at planning operations including work force & equipment, materials, cost & quality limitations, safety standards, etc. Proficient in handling execution of engineering projects including Fabrication, Installation, Hook Up, Pre- Commissioning & Commissioning. Expertise in managing various Onshore/offshore projects as per the set parameters & standards as well as experience of developing procedures for operational excellence. An effective communicator with skills in managing & training the workforce as per the latest industry trends & technicalities. Objective: Seeking a challenging assignment as “LEAD PROJECT ENGINEER” with a reputed company, to integrate domain expertise & project management skills to achieve organizational objectives. Core Skills Project Execution Construction Management Project Planning Design Review Installation , Hook Up & Commissioning (Top side & Pipe Line) Site Coordination Maintenance & Troubleshooting Quality Assurance HSE Practices Team Management Project Proposals Profile Synopsis Extensive experience in providing technical direction to cross-cultural cross- functional teams throughout the project life cycle that included offshore platform Fabrication, installation, Host Tie-in, Pre-commissioning & commissioning, technical engineering support and quality assurance. Front End Engineering Design (FEED). HAZID, HAZOP, Project Risk Analysis (PRA), Schedule Risk Analysis (SRA), Cost Risk Analysis (CRA), Project Independent Review (PIR) and Constructability Review (CR) at each gate of Projects and Safety standards. The project experience in Subsea (Pipeline), Umbilical’s, Risers and Flow line (SURF) systems technology and management. Conversant with international standards and design codes like ASME B31.3, 31.4 & 31.8, API Code, PCSB Standard etc. Adept at identifying areas of improvement and taking necessary step to rectify and applying efficiently corrective methodologies to achieve projects schedule. Extensive knowledge in updated technology and its successful innovative implementation. Review & Approve Project Proposals and Cost estimation for Hook up & Commissioning Scope. Prompt decision maker with the capability to wade through crises with great objectivity. Good communication skills facilitating effective liaison with sub-contractors, designers, vendors to complete a project in stipulated timeframe. Technical Skills: Construction, Installation, Pre-commissioning & Commissioning (onshore / offshore) of facilities (CPP, CRP, WHP, Jacket & Subsea Pipeline, Umbilical’s, Risers and Flow line (SURF) and riser guard. Reviewed bids, conducted liability analysis, and prepared technical parts of tenders. Preparation and reviews of method statement, establishment of inspection & test plan, incoming material inspection, internal audits, preparation of inspection reports. Cost Estimation for Hook Up and Commissioning Scope of works. Storage, inspection, preservation controls for equipment and material. Mechanical completion and hand over procedure. Procedures of Offshore construction, installation, hook up & commissioning and operation. Safety aspects for working in green and brown field projects. Multidiscipline construction activities like mechanical, Fire & Gas, corrosion inhibitor and piping and structural. Installation engineering of submarine pipeline, including initiation, normal lay, laydown, abandon and recovery (A&R), above water tie-in, spool installation, riser Installation, etc.

Upload: awadhesh-singh

Post on 18-Jul-2015

165 views

Category:

Documents


8 download

TRANSCRIPT

Page 1: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

AWADHESH SINGHMobile: +60123551701 +919987621610

E-Mail: [email protected][email protected]

~ VISIONARY TECHNOLOGY PROFESSIONAL ~Planning ConstructionInstallation Pre-Commissioning & Commissioning

PROFESSIONAL SNAPSHOT A highly competent and proactive Mechanical Engineering professional with an experience of 15 years managing

Offshore Fabrication, Installation, hook-up & Comm. of Top Side CPP, CRP & Well Head, Jacket. Subsea Pipeline,

Umbilical’s, Risers and Flow line (SURF) and Riser guard in major Oil and Gas platform for offshore Project.

Maintenance & Host tie for Offshore Gas processing platforms. Currently associated with PETRONAS CARIGALI SDN

BHD (PCSB), KUALA LUMPUR, MALAYSIA with Capacity of Senior Project Engineer with Hook Up and

Commissioning Department of Project & Engineering Development Division. (P&E DD).

Adept at planning operations including work force & equipment, materials, cost & quality limitations, safety standards,

etc. Proficient in handling execution of engineering projects including Fabrication, Installation, Hook Up, Pre-

Commissioning & Commissioning. Expertise in managing various Onshore/offshore projects as per the set

parameters & standards as well as experience of developing procedures for operational excellence. An effective

communicator with skills in managing & training the workforce as per the latest industry trends & technicalities.Objective: Seeking a challenging assignment as “LEAD PROJECT ENGINEER” with a reputed company, to integrate domain

expertise & project management skills to achieve organizational objectives.

Core Skills

Project Execution

Construction Management

Project Planning

Design Review

Installation , Hook Up &

Commissioning (Top side &

Pipe Line)

Site Coordination

Maintenance &

Troubleshooting

Quality Assurance

HSE Practices

Team Management

Project Proposals

Profile Synopsis

Extensive experience in providing technical direction to cross-cultural cross-

functional teams throughout the project life cycle that included offshore

platform Fabrication, installation, Host Tie-in, Pre-commissioning &

commissioning, technical engineering support and quality assurance. Front End Engineering Design (FEED). HAZID, HAZOP, Project Risk Analysis (PRA), Schedule Risk Analysis (SRA),

Cost Risk Analysis (CRA), Project Independent Review (PIR) and Constructability Review (CR) at each gate of Projects and Safety standards.

The project experience in Subsea (Pipeline), Umbilical’s, Risers and Flow line (SURF) systems technology and management.

Conversant with international standards and design codes like ASME B31.3,

31.4 & 31.8, API Code, PCSB Standard etc.

Adept at identifying areas of improvement and taking necessary step to

rectify and applying efficiently corrective methodologies to achieve projects

schedule.

Extensive knowledge in updated technology and its successful innovative

implementation.

Review & Approve Project Proposals and Cost estimation for Hook up &

Commissioning Scope.

Prompt decision maker with the capability to wade through crises with great

objectivity.

Good communication skills facilitating effective liaison with sub-contractors,

designers, vendors to complete a project in stipulated timeframe.

Technical Skills: Construction, Installation, Pre-commissioning & Commissioning (onshore / offshore) of facilities (CPP, CRP, WHP,

Jacket & Subsea Pipeline, Umbilical’s, Risers and Flow line (SURF) and riser guard. Reviewed bids, conducted liability analysis, and prepared technical parts of tenders. Preparation and reviews of method statement, establishment of inspection & test plan, incoming material

inspection, internal audits, preparation of inspection reports. Cost Estimation for Hook Up and Commissioning Scope of works. Storage, inspection, preservation controls for equipment and material. Mechanical completion and hand over procedure. Procedures of Offshore construction, installation, hook up & commissioning and operation. Safety aspects for working in green and brown field projects. Multidiscipline construction activities like mechanical, Fire & Gas, corrosion inhibitor and piping and structural. Installation engineering of submarine pipeline, including initiation, normal lay, laydown, abandon and recovery

(A&R), above water tie-in, spool installation, riser Installation, etc.

Page 2: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

AREAS OF EXPERTISE

Project Management Overall planning & cost control monitoring and management of project including works scheduling, monitoring

overall progress of work to ensure timely completion without any cost and time impact. Participation with Project Risk Analysis (PRA), Schedule Risk Analysis (SRA), Cost Risk Analysis (CRA), Project

Independent Review (PIR) and Constructability Review (CR) at each of gate of Projects. Participation as technical expertise in review of engineering deliverables during FEED and Detail Engineering stage

of projects. Review and approval of General Project Procedure, Project Execution Plan, Project Quality Control Plan, Pre-

commissioning and Commissioning Procedures. Monitoring that Standards are strictly followed and implemented, reporting and clearance of non-conformance report.

Participation in project review meetings for tracking project progress and KPI targets. Monitoring the requirements of the project site & keep coordination with management & information exchange for

required action. Evaluating potential risk utilizing the project risk review and assessment tools and procedures.

Pre-Commissioning & Commissioning Pre-commissioning and commissioning as well as conducting tests & inspections to ensure operational

effectiveness of onshore/ offshore Oil & Gas CPP, CRP and WHP facilities & systems. Commissioning of equipment of Offshore Oil & Gas CPP, CRP and WHP facilities, systems as well as conducting

tests & inspections to ensure operational effectiveness of machinery, etc. Review plant layout, approving them and carrying out inspection tests for determining the effectiveness of the

offshore facilities project.

Operations / Troubleshooting Identifying areas of bottlenecks / breakdowns and taking steps to rectify the equipment through application of

Handling the routine preventive maintenance and troubleshooting activities to achieve high productivity by reducing breakdown time.

Conducting enquiries and investigations of failures, monitoring all the processes involved to take corrective action during SIPROD for Infill Drilling Projects.

Identifying areas and opportunities of improvement, recommendation of equipment / system modifications.

Team Management Leading, mentoring & monitoring the performance of the team members to ensure efficiency in process

operations and meeting of individual & group engineers. Creating and sustaining a dynamic environment that fosters development opportunities and motivates high

performance amongst team members.

Project Proposal Coordination Coordination of Technical Proposal Preparation. Hook-up and Commissioning Cost Estimation Project Proposals.

ORGANISATIONAL SCAN

MARCH 2013 – To - TILL NOW: PETRONAS CARIGALI SDN BHD, KUALA LUMPUR, MALAYSIA

CHIEF TASKS:

As “SR.ENGINEER” TECHNICAL ASSURANCE AND PROJECT PLANNING (PCSB SHABAH / SARAWAK / PMO MALAYSIA PROJECT)

Job Descriptions: Working for Concept Development of Enhance Oil Recovery Development SABAH Offshore projects (e.g.

SAMARANG EOR). Working for Concept Development of SEPAT Ph. 2 Oil & Gas Integrated Project in Peninsula of Malaysia Project. Review Project Risk Analysis (PRA), Schedule Risk Analysis (SRA), Cost Risk Analysis (CRA), Project Independent

Review (PIR) and Constructability Review (CR) at each of gate of Projects approval. Verify that all construction procedures, method statements and Inspection Test Plans for final approved. Monitor and manage inspection of the construction work performed by the EPC&I CONTRACTOR to verify that

such work is performed in compliance with the approved procedures and specifications, and that the workmanship is in accordance with appropriate standards of quality.

Review of Subsea, Umbilical’s, Risers and Flow line (SURF) systems technology and installation procedure. Monitor and ensure that the work is performed in strict compliance with the safety procedures and requirements. Coordinate and manage the witness of important tests on main equipment, including but not limited to detailed

inspection where it is considered necessary. Spot non-conformances reports to project requirements and bring to COMPANY's Construction Manager, Quality

Manager and Team Leader attention any non-conformance report from procedures and specifications and recommend actions for resolution/mitigation.

Monitor the progress of work at SITE against the PROJECT Schedule, report to PMT any delays and recommend actions to correct such delays.

Page 3: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

Monitor the progress and achievement of mechanical completion and commissioning of the INSTALLATIONS in accordance with the provisions of the EPC CONTRACT. Monitor the development of punch lists and endorse the same for COMPANY approval.

Planning and Co-ordination with vendors as per pre-commissioning and commissioning plan. Review Project Technical and Commercial Evaluation proposal for contractor. Project Cost Review Analysis check list. Review design documents deliverables of projects during LDR session. Coordinate the HAZID and HAZOP study meeting. Ensuring completion of pre-commissioning & commissioning activities such as system & subsystems boundary

limits definition, mark up of P&ID, generic documents, procedures preparation, material procurement, etc. Liaise with OIM, Marine Captain, Vendors, Contractor superintendent, other CSRs for COMPS activity

Installation/Drilling i.e. HUC Area Managers, TAPP engineers. Team members in process of developing the Generic Concept Design Documents. Focal person from DCHD in Development of Deep Water Institutional Capabilities (Initiatives) Focal Persons for Enhancement of CSP20 and CSP21 (Initiatives). Following Offshore Projects assigned as TP: SAMARANG EOR Ph2 Project-Concept, Feed & Execution, SEPAT WIM

& PH2 Project-Concept, FEED & Execution, SUMANDAK INFILL DRILLING Project, Taman go Infill Drilling Project and SAMARANG RISER GUARD Project.

Review Project specific procedure for construction & installation. Responsible for managing day-to-day site operations related to HSE, scope management, and work progress. Verify & approve Daily Progress Report & Keep track of project performance and resolve concerns that may arise. Communicate with relevant personnel and authorities during emergency as per Emergency Response Plan (ERP)

requirements.

As “SR. ENGINEER” (“CSR”) COMPANY SITE REPRESENTATIVE, (YATANGUN-D (PCML MAYANMAR PROJECT), MAYANMAR

Job Descriptions: WHP-D Jacket Installation in YETANGUN-C at costal sea of MAYANMAR BY (L&T, Sub-conn-HYUNDAI). Fabrication and installation of top side WHP module with gas scrubbier 2300 MT. by DB-101. Review General Project procedure approval. Witness of FAT and String Test at Vendor Workshop with graphic test & endured test. Took the responsibility for Project control, advance planning and interface between offshore and onshore to make

the operation run smoothly and meet installation schedule. Planning and Coordination of vendors as per commissioning plan. Monitor the progress and achievement of commissioning & mechanical completion of the INSTALLATIONS in

accordance with the provisions of the EPC CONTRACT. Monitor the development of punch lists and endorse the same for COMPANY approval.

Review Project Risk Analysis (PRA), Schedule Risk Analysis (SRA), Cost Risk Analysis (CRA), Project Independent Review (PIR) and Constructability Review (CR) at each of gate of Projects approval.

Complete the Host Tie-ins Shut down activity within tight schedule with hot work jobs including having lifting Keep track of project performance and resolve concerns that may arise & Verify that Job cards are updates. Communicate with relevant personnel and authorities during emergency as per Emergency Response Plan (ERP). Liaise with OIM, Marine Captain, Vendors, Contractor superintendent, other CSRs for SIMOP activity

Installation/Drilling, rigor’s/peers i.e. HUC Area Managers, TAPP engineers Responsible for managing day-to-day site operations related to HSE, scope management, and work progress. Commissioned utilities section viz., DM Water Plant, Cooling Water System, Nitrogen Plant, Instrument Air

Compressor and Effluent Treatment Plant. Took responsibility adherence to HES and QA procedures, JSA and Coordinate the HAZID and HAZOP study

For High risk job activities Provided assistance and support to Yard Installation Engineer during load out operation.

As “SR. ENGINEER” TECHNICAL ASSURANCE AND PROJECT PLANNING (PCSB MIRI SKO-BARAM-B INNFILL DRILLING MALAYSIA PROJECT)

Job Descriptions: Review General Project procedure & approval. Lead site administration such as chairing Daily Progress Meeting (DPM)/morning meeting, and attending to Site

Technical Query (STQ) and Area of Concerns (AOC). Pre-mobilization briefing & kick off meeting with contractor and operation team. Responsible for managing day-to-day site operations related to HSE, scope management, and work progress. Conduct the 80 MT Helideck removable from wellhead area at BARAM-A Platform for approaching the drill rig. Removal of 10 nos. conductor guide from well zone-two areas for conductor’s removal & SIPROD preparations. Monitor the progress of work at SITE against the PROJECT Schedule, report to PMT and recommend actions to

correct such delays. Removal of flow line from crrissmass tree to production header and test header & installation of DBB valves. Project Independent Review (PIR) of projects. Review of Commissioning and Execution planning. Review and approved procedure for well tie-in. Coordinate the HAZID and HAZOP study. Cost estimation and Cost analysis of Projects. Review and witness of sea fastening mob. Procedure & Plan.

Page 4: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

Review and approved of Anchor pattern installation barges & vessel. Reviewed bids, conducted liability analysis, and technical parts of tenders. Responsible for managing day-to-day site operations related to HSE, scope management, and work progress. Review and approved Hook-up and commissioning procedure. Review and approved procedure of Pipelines Replacement EPC Project.

MARCH 2010 – FAB. 2013 with ‘MOMENTUM ENGINEERING LLC DUBAI’ (UAE)

CHIEF TASKS:As "SR. PROJECT ENGINEER" MOMENTUM ENGINEERING LLC DUBAI’ (UAE)

Project Overview: P-508 & 545B BLOCK 4 AND ASSOCIATED SUBSEA PIPELINE & 18” & 20” SUBMARINE PIPE LINE & RISER INSTALLATION PROJECT CASPION SEA DRAGON OIL (TURKMENISTAN) LTD, (DOTL)

Job Descriptions: Fabrication, Sea Fastening & Installation procedure for subsea pipeline, riser & riser guard. Procedure for free span correction (As per CP & KP) & grout bag installation. Free span correction for new pipeline pre lay and post laid line. Coating procedure (3LPE & Concrete) for subsea line & flow line spools. Dead weight anchoring procedure for pipe laying. Responsible for managing day-to-day site operations related activity. Preparing of work pack for Hook-up, test pack carryover and punch list items offshore. Fabrication & Installation of pull head & pull-down spools. Procedure for Subsea, Umbilical’s, Risers, Flow line (SURF) Installation management. Installation Procedure for current cathodic protection system. Vacuum Drying and checking of the complete system are considered as pre commissioning activities. Hydro testing & Lick test for subsea pipeline & Riser spools. Hook-up, Pre-commissioning & commissioning of existing tapping point of subsea pipeline. Monitor the progress of work at SITE against the PROJECT Schedule.

June 2006 to March 2010: J. RAY McDermott INT.MIDDLE EAST DUBAI UAECHIEF TASKS:

As "SR. PROJECT ENGINEER" QG-3&4 TOP SIDE PROJECT DOHA QATAR

Project Overview: CONSTRUCTION, INSTALLATION, HOOK-UP & COMMISSIONING OF WHP-7, 8 & 9 OFFSHORE FIELD DOHA QATAR

Job Descriptions: Construction, hook-up and commissioning of WH-7, WH-8 and WH-9 for Qatar gas 3 & 4 supply 1.4 billion

standard cubic feet of wet natural gas per day each to onshore Trains 3 and 4 respectively. A total of 33 wells are shared between the three ventures.

Responsible for Project controls site operations related activity like yard fabrication & offshore installation. Preparation of General Project Procedures & project ITP. Preparing of work packages for Hook-up, carryover and punch list items offshore. Preparing of task sheet for Hook-up, carryover & punch list items offshore scope Ensure the mobilization of all Workers, materials and equipment are good conditions. Ensure the all hook up drawings, quality control inspections tools and approved ITP available with QC. Supervision and monitoring of installation WHP-7, 8 & 9 wellhead platform at offshore. Supervision and monitoring of 32” Dewatering tie-in pipe spools fabrication and installation. Interface Coordination with other associated Contractors like rig operation as well as operation team. Member of Project Management Team technical Evaluation of Vendor Quotations. Involve in from design phase of this project, review engineering deliverables, and provided my technical input for

improvement and correction. Coordinate HAZID, HAZOP & SIL study successfully and implemented outcome of HAZOP. Develop Hook-up and commissioning procedure. Planning and Coordination of vendors commissioning plan and required tools. Ensuring completion of pre-commissioning & commissioning activities such as system & subsystems boundary

limits definition; mark up of P&ID as per system & sub-systems. Generic documents for material procurement, CIPL for load out vessel etc.

As "SR. PROJECT ENGINEER" RELIANCE INDUSTRIES BLOCK DEVELOPMENT PROJECT EAST COAST OF INDIAProject Overview: RIL CONTROL AND RISER PLATFORM (CRP) KG-D6 BLOCK FIELD DEVELOPMENT

Job Descriptions: Construction & Supervision of installation, hook-up & commissioning at offshore. Preparing and reviewing of work packages for Hook-up, carryover and punch list & Materials for offshore. Man-hours Estimation, Task sheet, reviewing MTO list & taking care of short fall materials. Commissioned utilities section viz., DM Water Plant, Cooling Water System, Nitrogen Plant, Instrument Air, fire

water, process gas, DG system etc. Providing technical assistance to engineering for offshore / onshore teams.

Page 5: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

Coordination with vessel/ engineering department/procurement department//welding department/asset department/Client in order to ensure the installation work can be executed smoothly.

Reviewing project progress and making strategy accordingly to finish the project in schedule time. To Manage & supervise all Project activities in the area by complying with HSE requirements. Interface Coordination with other associated Contractors & operation team members. Installation of 8 leg jacket with 4 no. 24” vertical riser & 2 no. J-Tube. Installation of Umbilical’s, and Flow line, Identifying & monitoring key performance indicators (KPIs). Installation of 4 no. parts of fabricated module like control room, helideck & accommodation facilities etc. Monitoring the key performance indicators (KPIs) of Project.

SEPT 2002 to JUN 2006 IRANIAN OFFSHORE ENGINEERING CONSTRUCTION & COMPANY

CHIEF TASKS:

As “SR. PROJECT ENGINEER” ‘IRANIAN OFFSHORE ENGINEERING CONSTRUCTION & COMPANY MUMBAI (INDIA)

Project Overview: D-1 DEVELOPMENT WELL PLATFORM PROJECT ONGC MUMBAI HIGH FIELD (D-1 B & D-1 C WITH 6 SLOTS PLATFORM, D-1 D WITH 12 SLOTS)

Job Descriptions: Interface Coordination with other associated Contractors. Review of ITB of Sub-contractors and Vendors. Technical Evaluation of Vendor Qualification & Quotations. Involve in from design phase of this project (FEED), review engineering deliverables, and provided my technical

input for improvement and correction. Member of Project Management Team. Coordinate HAZID, HAZOP & SIL study successfully and implemented outcome of HAZOP. Develop the fabrication, installation and commissioning procedure & deliverables list. Planning and Coordination with vendors & contractors as per project plan schedule. Ensuring of project completion & commissioning activities such as system & subsystems boundary limits

definition. Provided various installation engineering calculation, offshore heavy lifting calculations and spool metrology

calculations. Prepared installation aids, consumable and permanent materials to be used following approved working

procedures. Provided offshore engineering support and responsibility for any technical support required including the

development of engineering reports on operational activities as requested. Responsibility for materials control, advance planning and interface between offshore and onshore to make the

operation run smoothly and meet installation schedule. Identifying & monitoring key performance indicators (KPIs). Review documentations, subcontractor’s quality documentation (ITPs) and quality improvement techniques. Provided assistance and support to Yard Installation Engineer during load out operation. Responsibility adherence to HES and QA procedures, JSA and HAZID meeting for high risk job activities. Review Process of PRA, SRA and CRA of new projects to get project approval from Management. Review design documents deliverables of projects during LDR session.

As “PROJECT ENGINEER” REDEVELOPMENT OF SOUTH PIPELINE AND PLATFORM MODIFICATION PROJECT (RSPPM)

Project Overview: RSPPM (36 PLATFORM INTER CONECTED WITH PIPELINES, ASSOSIATED RISER, PIG LUNCHER & RICIVER) IN ONGC MUMBAI HIGH FIELD (INDIA)

Job Descriptions: Technical Bid Evaluation of the project. Pre-commissioning, Commissioning Technical Proposals Pre-commissioning & Commissioning Cost Estimation. Equipment’s Vendor Coordination and Cost Estimation for proposals. Direction coordination, performance of inspection and testing activities to ensure compliance with applicable

standards, specifications and approved design drawings. Installation procedure for subsea line, riser & riser guard. Procedure for free span correction (As per CP & KP) & grout bag installation. Formulation of Procurement engineering plan & Procurement strategies. Interaction with sub-contractor and vendors for effective work output. Daily meetings with group members to achieve daily targets and to resolve any issue which is retarding progress. Area and work distribution to subordinates as per their capabilities to get optimum output from whole team. To review documentations, subcontractors quality documentation and quality improvement techniques. Organizing project review meetings, identification of corrective actions as per site requirements. Providing technical assistance to engineering, offshore and onshore teams. Follow up with expediting department for deliverable materials. Engineering and Interface Monthly Report, Weekly Reports & daily reports. Participation in Barge and Tugboat logistic management during Offshore Installation. Ensures that the HSE and Quality Standards are implemented, followed and monitors performance.

Page 6: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

To review documentations, subcontractors quality documentation and quality improvement techniques. Managed and scheduled all pipeline related scopes of works. Liaised between manager of RSPPM project and project subcontractors and client Supervised Pipeline Pre-lay Survey and As-laid Survey, Free Span Rectification and Crossing Construction, Pigging

(FCG) and Hydrotesting Acted as Pipe Laying Field Engineer on-board DP3 PLB C-Master (ex Jascon-5) Assisted and supervised saturation diving to install riser and J-tube clamps, correct riser base, and rectify free

spans and crossings on-board DP DSV SEAMEC-I and DP DSV SEAMEC-III. Successful laying of 26 rigid and 7 flexible subsea pipelines (4inch – 16inch), 50 stalk-on risers, 2 subsea flanged

risers and 14 J-tubes installations including relevant clamps, rectifications of their free spans, crossings and riser base, as pipeline scope of RSPPM EPCI project, located in Mumbai High Filed, India.

MAY 1999 to JULY 2002 DAS OFFSHORE ENGINEERING PVT LTD. MUMBAI (INDIA)CHIEF TASKS:

As “PROJECT ENGINEER” 3 PIPE LINE PROJECT (3NO.12” INTER CONECTION PIPE LINE WITH NM, WIS & WIN PLATFORM)

Project Overview: 3 PIPE LINE PROJECT (3NO.12” INTER CONECTION PIPE LINE WITH NM, WIS & WIN PLATFORM)

Job Descriptions: Follow up with expediting department for deliverable materials. Engineering and Interface. Prepared of work schedule according to scope Identified, Study of P&ID’s, GADs Pipe line lay out. Riser installation at end site. Checked revised ISOs and issue for site fabrication, Fit-up Inspection and generating reports, Visual inspection of welds and generating reporting, Preparing of suit at site isometric drawings and make as mark-ups built drawing and take the approval for same. Final check of pipe lines according to isometrics. Painting and sandblasting inspection, Prepared of loops files for lick test, hydro testing, mechanical clearance and box-up, Periodic meeting with clients and consultants for close monitoring of projects. Prepared MTO for fabrication for complete project. Independently handled above projects. Verifying all Mechanical, Instrumentation & piping etc. are mechanically complete and in accordance with

approved drawings and specifications Involved in client and consultants discussion / meetings including Project offshore planning activities To Manage & supervise all Project activities in the area by complying with HSE requirements. Commissioning of Water Injection system Commissioning of MEG Injection System. Interface Coordination with other associated Contractors.

As “PROJECT ENGINEER” HYUNDAI HEAVY INDUSTRIES CO.LTD MUMBAI (INDIA)

Project Overview: MUMBAI SOUTH PROCCECING PLATFORM (MSP) IN ONGC MUMBAI HIGH FIELD (INDIA)

Job Descriptions: Construction and Commissioning coordination. Developing bar charts, progress reports of the project. Interface Coordination with other associated Contractors. To Manage & supervise all Project activities in the area by complying with HSE requirements. Fabrication of top side riser, pig barrel and related piping spool. Reporting and troubleshooting. New module fabrication of Structural decks. Progress reporting on daily, weekly and Monthly basis. Third Party and Client Inspection Coordination for Quality assurance. Involved in client and consultants discussion / meetings including Offshore activity Planning activities. Commissioning of Pig receiver and Launcher.

As “PIPING ENGINEER” MUMBAI URAN TRUNK PIPELINE PROJECT (MUT) IN ONGC MUMBAI HIGH FIELD (INDIA)

Project Overview: MUMBAI URAN TRUNK PIPELINE PROJECT (MUT) IN ONGC MUMBAI HIGH FIELD (INDIA)

Job Descriptions:

Page 7: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

Piping & platform modification of various platforms of Mumbai high. Annual maintenance of Bombay High north & south fields. Installation of multiphase flow meters and other static equipment at various offshore platforms for ONGC. Fabrication, Erection as per ISO drawing and record of material, preparing Fit-up & weld reports, Radiography

offering, etc. Blasting painting and mechanical clearance of fabricated spools. Load out plan materials list and load out plan. Hook-up and installation of piping pre-fabricated spools and deck extension. Piping and fabrication works of INS Bombay at Mazzgaon docks ltd. Installation aids including Pull Head, Start-up Head, Temporary Pig Launcher/Receiver, Laydown Head, A&R Head,

Pipe Lifting Rigging Arrangement, etc. Provision of pipeline material take-off (MTO) Code checks including local buckling, concrete crushing, etc Prediction of free span and crossing profile, and on-bottom roughness analysis.

KNOWLEDGE PURVIEWPre-Commissioning and commissioning of: Slug Catchers Condensate Stabiliser Unit Turbo Expander and Re-compressor Unit (Cryoster). High Pressure (525 bar) Injection Compressors (Man Turbo). High Pressure water Injection Pump. Oil Export and Booster Pumps. Gas Turbine Compressors. Flare System (AP/LP/HP). Fuel Gas System and Heating Medium System. Utilities System. Instruments air system 4”, 8”, 10” & 12”-936 km Natural Gas Pipeline. Fire Water System (GRE & FRP Pipes) for Offshore.

TRAINING IN MALAYSIA:-SEQU OFFSHORE SAFETY SDN BHD. KUALA LAMPUR Helicopter Underwater Escape Training (HUET) Personal Survival Techniques (PST) Personal Safety and Social Responsibility (PSSR) Fire Prevention & Fire Fighting (FPFF) Elementary First Aid.

TRAINING WITH PCSB KUALA LAMPUR (MALAYSIA) PERMIT TO WORK (PTW) – PCSB (PETRONAS LEARNING CENTRE (PLC) COMPACT- HSE-1&2-PCSB (PETRONAS PLC) COST EFFECTIVE OF COMPLIANT DECOMMISSINING AND ABANDONMENT STRATEGY PROGRAM: - PETROSYNC

(SINGAPUR)

TRAINING IN UAE: Emirates Technical & Safety Development Centre (ETSDC) Abu Dhabi Helicopter Underwater Escape Training (HUET) Sea Survival Techniques (PST) Basic Fire Fighting (BFF) Basic First Aid (BFA)

TRAINING IN DOHA QATAR: VENTURE GULF TRAINING CENTRE DOHA H2S/BA Awareness

TRAINING IN INDIA: YAK INTERNATION MUMBAI Helicopter Underwater Escape Training (HUET) Personal Survival Techniques (PST) Personal Safety and Social Responsibility (PSSR) Fire Prevention & Fire Fighting (FPFF) Elementary First Aid.

SCHOLASTICS 2008 “MBA” in Project Managements with IMRS institute Mumbai. 1999 “Bachelor in Mechanical Engineering” (B.E.) with Technical Board of Karnataka. 1996 “Diploma in Mechanical Engineering” (D.M.E.) from Technical Board of Bangalore.

IT FORTE MS- Dos, MS-Window, MS-Excel, MS-Word, Lotus Note7, MCS, PIMS, Coordination of 3D modelling, AutoCAD-

2009,Set Route, procurement system, etc. Simulation Software - HYSIS, WINSIM Design II, PRO II 5.61, Pipesim, Pipe Phase, etc. Project planning Software – MS Project.

PERSONAL DOSSIERDate of Birth : 3rd. Fab, 1976Home Address : Vill: - Haraiya Bujurag, Post: - Horlapur, District: - Kushinagar, U.P. ‘Pin. Code: 274303.Nationality : IndianMarital Status : Married with three childPassport Details : L3120752 (Expiry: 07/04/2023)

Page 8: CV_Awadhesh_Singh LEAD PROJECT ENGINEER

Linguistic Abilities : English & Hindi