cv.james swearengin.3-2015
TRANSCRIPT
James Swearengin – Pilot Tech ISUMMARY EXPERIENCE
Military trained electrical technician. 8Years of experience withelectronic Control systems, 8 years of experience troubleshooting electrical, Mechanical, and hydraulic systems operations. Conduct dailysafety Meetings and construct Pre job JSEA’s. Maintain all logs and communications with supervisor, crewmembers, and client. Develop strong working relationship with crew members.
· 516 hours flying during pile installation, conductor installation, completions, drill support, P&A, and pipeline survey.
-105 hours Millennium Plus-411 hours Schilling UHD
· Conductor Installation· Template Installation· BOP and Marine Riser Installations· Pile and Conductor installation· Caisson inspection · Tendon installation· TLP installation· Current Monitoring and Logging · Manifold jumper installation· Subsea Trees Installation · Pipeline surveys · Exploratory well Drilling· Clients; HMC, BP, BHP Billiton, Marathon, Noble Energy· Operation of tooling including torque tools, high pressure hot stabs
and subsea rigging, BOP intervention skid, AX-ring tool· AX Ring gasket installation· Flex Joint inspection and Cleaning· Well Head inspection and cleanin· HFL/EFL installation and removal· Seabed and debris survey · Drill/Rig support Operations· Operation of manipulators including; Conan, Atlas, T4, and Rig
master· Operation and maintenance of LARS systems; Dynacon and Cetix· Pre and Post dive Checks· SEANET inspection and repair· Co-pilot Operations· Tether Retermination· Umbilical Retermination · Maintain ROV compensation system· Maintain Accurate dive record and Video Logs· Ensure all system maintenance is completed and up to date · Conduct repairs and troubleshooting
-ensure safe working environment-Maintain clear communications-Identify task and priorities
ROV SYSTEM EXPERIENCE· Millennium Plus Rov· Schilling UHD
TRAINING/CERTIFICATIONS
� BOSIET� SAFEGULF� SIMMS� FIRSTAID/CPR� WELL CONTROL
WORK HISTORY� C-Innovation: Sept.2014 – Present� Oceaneering.: May 2013 – Sept
2014� United States Coast Guard :2006 –
2011
Date ClientWorkin
g Project Project Job Task ROV VesselDepth Location
July-Aug 2013 BHP 3,500ft
SAKE Exploratory
well GOM Drill support, Seabed
Survey, Cement assist Mill23 DD1
SEP 2013 BHP 3,500ft
SAKE Exploratory
WellGOM
AX Ring installationDrill support,BOP install,
HFL/EFL Installation
Mill23 DD1
Nov2013 BHP 2,500ft Jumper
installation GOMHFL/EFL installation,
Jumper Survey/ Mill38 C.R.Luigs
Dec 2013- March 2014 BHP N/A
SD01 Plug and
Abandonment GOM
Torque tool operationsHFL/EFL installationBOP installation and
removal
Mill23 DD1
April-may2014 Nobel 3,000ft Drill Support GOM
Torque tool operationsHFL/EFL Installation
LMRP inspectionMill44
Ensco 8501
June2014 Marathon N/A Drill support GOM LMRP inspection,
Riser inspection Mill42 Ensco8503
July 2014 Nobel 6,000ft Drill support GOM
Seabed Survey, BOP installation
AX ring installationTorque tool Operations
Mill53 Atwood Advantage
August-sept 2014 Nobel 6000ft Completions GOM
Torque tool operationHFL/EFL installationLMRP install/removal
Mill53 Atwood Advantage
Oct-Nov2014 Williams 7,000ft-
500ftKCC pigging
Survey GOMPipeline inspectionJumper inspection
Pig trackingUHD59 Island
Intervention
Dec 2014-Jan 2015
HeeremaMarine
Constractors(HMC)
760meters MOHO NORD Pointe Noire,
Congo
Mooring line installationTemplate installation
Pile installation Conductor installation
UHD35 Thiaf
March 2015 BP 15ft- 200ft
BP Trinidad Caisson
InspectionTrinidad
Caisson inspectionPipeline inspection
Rig move assistanceUHD21 Max
Chouest
June 2015-July 2015
HeeremaMarine
ContractorsHMC
100M IVAR AASENJacket North Sea Jacket
installation UHD36 Thiaf
Aug 2015-Sept 2015
Heerema Marine
Contractors(HMC)
100MJohan Swered
Template Installation
North SeaTemplate
installation UHD35 Thiaf
Jan 2016
HeeremaMarine
Contractors(HMC)
15-760 Meters MOHO NORD Pointe Noire,
CongoTendon and TLP
Installation UHD38 Hermod