cycle highway ruhr (rs1): our way towards intermodal

21
Frank Joneit Cycle Highway Ruhr (RS1) 1 source: RVR, Machbarkeitsstudie Radschnellweg Ruhr June 15th, 2017 Cycle Highway Ruhr (RS1): Our way towards intermodal Mobility Frank Joneit M. A. Ruhr Regional Association Department for Regional Development

Upload: others

Post on 05-Jun-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cycle Highway Ruhr (RS1): Our way towards intermodal

Frank Joneit Cycle Highway Ruhr (RS1) 1

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Cycle Highway Ruhr (RS1):

Our way towards intermodal Mobility

Frank Joneit M. A.

Ruhr Regional Association

Department for Regional Development

Page 2: Cycle Highway Ruhr (RS1): Our way towards intermodal

Why are we doing it? By building the RS1 we achieve

• an increase in the share of cycling within transportation

• a reduction of traffic jams within the city centres and on

motorway A 40 (B1)

• a reduction of journey times

• a rise in intermodal transportation: Connection with the public

transport system

• the prevention of accidents

• noise reduction, reduction of emissions, climate protection

• an increase in quality of life

• health promotion

• an image benefit for the region (innovative profile)

Frank Joneit Cycle Highway Ruhr (RS1) 2 June 15th,

2017

Page 3: Cycle Highway Ruhr (RS1): Our way towards intermodal

10.05.2017 Frank Joneit Cycle Highway Ruhr (RS1) 3

• 1,650,000 inhabitants within the RS1 sector

• 430,000 employees

• 150,000 students

• More than 60 headquarters and head offices of

international companies

RS1 – Catchment Area

Page 4: Cycle Highway Ruhr (RS1): Our way towards intermodal

Potentials and Destinations

Frank Joneit Cycle Highway Ruhr (RS1) 4

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Page 5: Cycle Highway Ruhr (RS1): Our way towards intermodal

Estimated bike traffic on RS1

Frank Joneit Cycle Highway Ruhr (RS1) 5

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Page 6: Cycle Highway Ruhr (RS1): Our way towards intermodal

Quality standards and signs

• directly, if possible straight-lined

• separation of cyclists and pedestrians

• 3 m wide in one line, 4 m wide in two lane traffic, seperated travel direction

• different infrastructures usable

• on the Cycle Highway cycling is the only or at least dominating mode of

transport

• road layout meets the guidelines of German road traffic regulations (StVO)

• sign elements are standardized – only a few but elementary rules

• signage is part of the design of the cycle highway

Frank Joneit Cycle Highway Ruhr (RS1) 6 June 15th,

2017

Page 7: Cycle Highway Ruhr (RS1): Our way towards intermodal

Creation guidelines

● A Compendium for planning and creation

● related to different types of space

Frank Joneit Cycle Highway Ruhr (RS1) 7

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Page 8: Cycle Highway Ruhr (RS1): Our way towards intermodal

Creation guidelines

Frank Joneit Cycle Highway Ruhr (RS1) 8

Quelle: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Page 9: Cycle Highway Ruhr (RS1): Our way towards intermodal

Service areas for the cyclist

Frank Joneit Cycle Highway Ruhr (RS1) 9

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Page 10: Cycle Highway Ruhr (RS1): Our way towards intermodal

Illumination

Frank Joneit Cycle Highway Ruhr (RS1) 10

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Page 11: Cycle Highway Ruhr (RS1): Our way towards intermodal

Frank Joneit Cycle Highway Ruhr (RS1) 11

Quelle: RVR, Machbarkeitsstudie Radschnellweg Ruhr

June 15th,

2017

Page 12: Cycle Highway Ruhr (RS1): Our way towards intermodal

Essen

Frank Joneit Cycle Highway Ruhr (RS1) 12

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

• route presently built as mixed traffic area

• seperation of cyclists and pedestrians necessary

June 15th,

2017

Page 13: Cycle Highway Ruhr (RS1): Our way towards intermodal

Frank Joneit Cycle Highway Ruhr (RS1) 13

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

Bochum

June 15th,

2017

Page 14: Cycle Highway Ruhr (RS1): Our way towards intermodal

Frank Joneit Cycle Highway Ruhr (RS1) 14

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

Dortmund

June 15th,

2017

Page 15: Cycle Highway Ruhr (RS1): Our way towards intermodal

Bergkamen / Hamm

Frank Joneit Cycle Highway Ruhr (RS1) 15

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

• Participation of the federal administration of shipping (WSV)

• Illumination practicable, furthermore usable as business way

June 15th,

2017

Page 16: Cycle Highway Ruhr (RS1): Our way towards intermodal

Key data

Frank Joneit Cycle Highway Ruhr (RS1) 16

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

92.4 % route on existing infrastructure

7.6 % new construction of infrastructure

New construction: 7.7 km | 7.6 %

New construction on former railway lines: 32.2 km | 31.6 %

Rebuilding streets: 17.5 km | 17.3 %

Development of existing routes: 44.3 km | 43.5%

In total 101,7 km

June 15th,

2017

Page 17: Cycle Highway Ruhr (RS1): Our way towards intermodal

Costs

Frank Joneit Cycle Highway Ruhr (RS1) 17

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

Total 184 Mio. €

June 15th,

2017

Page 18: Cycle Highway Ruhr (RS1): Our way towards intermodal

Frank Joneit Cycle Highway Ruhr (RS1) 18

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

• total length: 101 km

• costs: 184 millionen Euro

• the benefit is 4.8 times higher than the costs

• daily decrease of car use: 400,000 km

• annual reduction CO2: 16,600 tons

The benefits of RS1

June 15th,

2017

Page 19: Cycle Highway Ruhr (RS1): Our way towards intermodal

The quickest way through Ruhr…

Frank Joneit Cycle Highway Ruhr (RS1) 19

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

Time savings for certain sections up to 50%

26 min

35 min

20 min

44 min

70 min

41 min

0 min 15 min 30 min 45 min 60 min 75 min

Unna, S-Bahnhof Königsborn - Bergkamen,Landwehrstraße

Essen, Bahnhof Kray - Gelsenkirchen, Rheinelbe -Bochum, Hauptbahnhof

Duisburg, Abzweigung Universität - Mülheim,Hauptbahnhof

derzeitige Verbindung Verbindung mit Radschnellweg

June 15th,

2017

Page 20: Cycle Highway Ruhr (RS1): Our way towards intermodal

RS1 – The 1st Cycle Highway within

a regional Network

June 15th,

2017 Frank Joneit Cycle Highway Ruhr (RS1) 20

source: RVR

Page 21: Cycle Highway Ruhr (RS1): Our way towards intermodal

Frank Joneit Cycle Highway Ruhr (RS1) 21

source: RVR, Machbarkeitsstudie Radschnellweg Ruhr

Many thanks for your attention!

More on the web: www.rs1.ruhr

June 15th,

2017