Project NamePeak 10 Data Center Chilled Water Plant and Distribution System

Project LocationAlpharetta, Georgia

Project Team

Mission CriticalMarkets

Specializations

Owner: Peak 10, Inc.

Pipe Shop Prefab

General Contractor: Balfour BeattyArchitect: Reynolds, Smith & Hills, Inc.Engineer: Reynolds, Smith & Hills, Inc.Subcontractor: McKenney’s, Inc.

Plumbing Shop PrefabBuilding Information Modeling

McKenney’s installed a 900-ton air-cooled chilled water plantand associated distribution system for a new 1.5MW data center inAlpharetta, Georgia.

The ChallengeTurning an abandoned warehouse into a 20,000-square-foot data center was no simple task given the aggressive schedule. The McKenney’s team had to contend with limited space under the raised floor throughout thefacility. Careful planning and coordination was essential to avoid losing capacity from reduced airflow to the computer room air handler(CRAH) units.

The SolutionLeveraging BIM capabilities, the team coordinated mechanical and electrical services to maximize heat rejection capacity at the servers.McKenney’s prefabricated most of the chilled water plant, connections to the major pieces of equipment and distribution piping. Concurrent operation ensured the piping systems were installed as soon as the structure was ready, minimizing field installation time to meet the compressed construction schedule.

The content of this document is not intended as an endorsement.

The ResultsA seamless start-up, and commissioning accelerated the turnover of the Peak 10 data center to the owner.

1056 Moreland Industrial BoulevardAtlanta, Georgia 30316P: 404-622-5000

[email protected]

3601 Performance RoadCharlotte, North Carolina 28214P: 704-357-1200

Atlanta Office:

Charlotte Office:

www.mckenneys.com