data sheet and installation information - eversys · data sheet and installation information 600...

2
Eversys AG I Rue du Biais 19 I 1957 Ardon I Switzerland +41 27 305 25 50 [email protected] www.eversys.com 151210_Data_sheet_and_installation_e2_4002_EN Page_1_of_2 12.2015 / V2 1. Machine configuration and overall dimensions Data sheet and installation information 600 (23.6) 70 (2.7) 125 (4.92) 556 (21.89) 713 (28.07) 65 (2.56) 165 (6.49) 840 (33) 560 (22) 157 (6.45) Dimensions: mm (inch) e'2 / e'2m e'2 e'2m e'2m cup heater e'2m fridge w/h/d mm w/h/d (inch) 560/713/600 (22 / 27.9 / 23.6) 560/713/600 (22 / 27.9 / 23.6) 840/713/600 (33 / 27.9 / 23.6) 840/713/600 (33 / 27.9 / 23.6) weight kg weight (lb) 83 183 87 191 112 246 117 257 e'2 / e'2m / cup heater e'2m / fridge Capacity Coffee 175 Espresso / hour at 23s extraction time 2 Espresso at the same time Steam Manual steam, continuous steam supply Autosteam, temperature controlled Everfoam, fully automatic frothing (option) Hot Water 150 hot water units / hour, 200ml (6.8 oz US) Milk system 175 Cappuccino / hour Technical data Brew chamber 1 x up to 24g Grinding 2 x super drive ceramic grinder disk User Interface 1 x 8" color touch screen Bean hoppers 2 x 1.5kg (3.3 lb) Coffee spout hgt 65mm to165mm (2.55 to 6.49 inch) Interface USB, SD-Card, Ethernet, Serial, RS-232, CCI Standby mode less than 2W Steam boiler size e'2: 8 litre (2.11 gal US) e'2m: 5.6 litre (1.48 gal US) Coffee boiler size 1.5 litre (0.39 gal US) Lighting concept Front panel full color LED Power requirement Single-phase 1/N/PE, 220-240V~, 50/60Hz, 25A, 5.8kW Two-phases (US, JP) 2/PE, 200-210V~, 50/60Hz, 30A, 4.9kW Three-phases 3/N/PE, 380-420V~, 50/60Hz, 16A, 9.6kW Tree-phases (Triangle) 3/PE, Δ 220-230V~, 50/60Hz, 20A, 5.8kW Water Connection Water G3/8" female, 2.5 - 4 bar Water hose 2 m length (78.7 inch) Drain Self priming (see drawing rear side) Water quality Total hardness: 5 - 8°dGH (89-142 ppm) Carbonate hardness: max. 6°dKH (107 ppm) pH value: ideal 7.0 - 7.2 Fridge 4 litre container (1.05 gal US) Milk tube length max 1.5m (59 inch)

Upload: others

Post on 13-Jun-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Data sheet and installation information - Eversys · Data sheet and installation information 600 (23.6) 70 (2.7) 125 (4.92) 556 (21.89) 713 (28.07) 165 (6.49) 65 (2.56) 840 (33) 560

Eversys AG I Rue du Biais 19 I 1957 Ardon I Switzerland +41 27 305 25 50 [email protected] www.eversys.com 151210_Data_sheet_and_installation_e2_4002_EN Page_1_of_2 12.2015 / V2

1. Machine configuration and overall dimensions

Data sheet and installation information

600 (23.6)

70 (2

.7)

125

(4.9

2)55

6 (2

1.89

) 713

(28.

07)

65 (2

.56)

165

(6.4

9)

840 (33)

560 (22)

157

(6.4

5)

Dimensions: mm (inch)

e'2 / e'2m

e'2 e'2m e'2m cup heater e'2m fridge

w/h/d mmw/h/d (inch)

560/713/600(22 / 27.9 / 23.6)

560/713/600(22 / 27.9 / 23.6)

840/713/600(33 / 27.9 / 23.6)

840/713/600(33 / 27.9 / 23.6)

weight kg weight (lb)

83183

87191

112246

117257

e'2 / e'2m / cup heater e'2m / fridge

Capacity Coffee 175 Espresso / hour at 23s extraction time 2 Espresso at the same time Steam Manual steam, continuous steam supply Autosteam, temperature controlled Everfoam, fully automatic frothing (option) Hot Water 150 hot water units / hour, 200ml (6.8 oz US) Milk system 175 Cappuccino / hour

Technical data Brew chamber 1 x up to 24g Grinding 2 x super drive ceramic grinder disk User Interface 1 x 8" color touch screen Bean hoppers 2 x 1.5kg (3.3 lb) Coffee spout hgt 65mm to165mm (2.55 to 6.49 inch) Interface USB, SD-Card, Ethernet, Serial, RS-232, CCI Standby mode less than 2W Steam boiler size e'2: 8 litre (2.11 gal US) e'2m: 5.6 litre (1.48 gal US) Coffee boiler size 1.5 litre (0.39 gal US) Lighting concept Front panel full color LED

Power requirement Single-phase 1/N/PE, 220-240V~, 50/60Hz, 25A, 5.8kW Two-phases (US, JP) 2/PE, 200-210V~, 50/60Hz, 30A, 4.9kW Three-phases 3/N/PE, 380-420V~, 50/60Hz, 16A, 9.6kW Tree-phases (Triangle) 3/PE, Δ 220-230V~, 50/60Hz, 20A, 5.8kW Water Connection Water G3/8" female, 2.5 - 4 bar Water hose 2 m length (78.7 inch) Drain Self priming (see drawing rear side)

Water quality Total hardness: 5 - 8°dGH (89-142 ppm) Carbonate hardness: max. 6°dKH (107 ppm) pH value: ideal 7.0 - 7.2

Fridge 4 litre container (1.05 gal US) Milk tube length max 1.5m (59 inch)

Page 2: Data sheet and installation information - Eversys · Data sheet and installation information 600 (23.6) 70 (2.7) 125 (4.92) 556 (21.89) 713 (28.07) 165 (6.49) 65 (2.56) 840 (33) 560

Eversys AG I Rue du Biais 19 I 1957 Ardon I Switzerland +41 27 305 25 50 [email protected] www.eversys.com 151210_Data_sheet_and_installation_e2_4002_EN Page_2_of_2 12.2015 / V2

6

420(16,54)

141,2(5,56)

54(2,13)

63(2

,48)

356

(14,

02)

180,

8(7

,12)

153(6,02)

93(3

,66)

348

(13,

7)

()

158

(6,2

2)

R 26,5(1,04)

()

400

800

31,5

15,7

5

Ø

800

31,5

()

1

5

2

34

80(3,15)Ø

Drain hose 23 mm(inner ø0.6 inch)

Cut out on desk forGround chute(optional)

Drill hole according to instructionof refrigerator manufacturer

Place fridge as close as possible to machineCut milk tubes as short as possible

Grounds chute through the desk

Required space for bean hopper refilling

Cut out on desk for:- Power cord- Water hose- Serial port- Ethernet

Foot positionWater inlet 3/8"

1. Main water inlet2. Pressure reducer output 3 bar (43,5 psi)3. Check valve4. Descaling cartridge or carbon filter as minimum 5. Electrical socket according to local standard6. Drain with syphon, top end min. 56mm diameter (2.2 inch)

Groundscontainer

Execution according toEN 61770

Fridgeexample

Dimensions: mm (inch)

• Check water quality• Define filter type and size and check space inside counter • If no descaling cartridge is used, install carbon filter as minimum• Check required desk for machine• Check counter cut out • Check water supply installation

• Check power supply installation• Check all with customer on site• Make sure original coffee is available• Make sure cold milk is available• Check drinks recipes and cup sizes• Organize milk pitcher

2. Prior to the installation, READ SAFETY INSTRUCTIONS

4. Desk preparation mm (inch)

3. After installation

• Instruct staff using Quick reference card • Fill in installation warranty sheet and send it back to Eversys