UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Perencanaan 4 A 2.2
Beban Dimana : Cb = 0.7
- Untuk Kapal L < 90 m Co = L/25+4.1
Co = 7.30 Co=
7.30
- Untuk Kapal L < 90 m (L/90)^(1/2)
Cl =
0.94 0.94
- f = 1 (untuk konstruksi luar)
Maka po = 20.23 kN/m^2 Po =
20.23
Tabel 4.1 kN/m^2
Range
1.2 - x/L 1.0 + 5/Cb [0.2 - x/L]A x/L = 0.19
x = 15 1.01 1.09
0.60
x= 48 1 1
1.0 + c/3 [x/L - 0.7]
x/L = 0.93 c = 0.15. L - 10
x= 74.4 2.51
F diambil L = 100 m
maka c = 5
1.38
lebarA pd Frame 25 = 12.73 mM pd Frame 60 = 13.03 mF pd Frame 124 = 6.5 m
po = 2.1 * (Cb + 0.7) *c0 * cL*f (kN/m2)
cL =
cL =
Factor cD Factor cF
0 < x/L < 0,2
0.2 < x/L < 0.7M x/L =
0.7 < x/L < 1 1.0+ 20/Cb [x/L - 0.7]2
Lmin = 100 m
Sehingga cD =
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASILBeban pada Geladak Cuaca (Weather Deck)
B' = Lebar Setempat
(10 +z - T ) H H= 6.25 mZ = H+(1/3*(B/50))
=6.25 + 1/3 * 1/50 * 12.73 = 7.285 m
= 6.25 + 1/3 * 1/50 * 13.03 = 7.287 m
= 6.25 + 1/3 * 1/50 *6.5 = 7.24 m
z doble hull = 6.284333 m
Sehingga
(10 +z - T ) H
(10 +7.285 - 5.3)6.25
= 28.99 28.99
kN/m2
(10 +z - T ) H
(10 +7.287 - 5.3)6.25
= 28.63 28.63
kN/m2
(10 +z - T ) H
(10 +7.24 - 5.3)6.25
= 39.75 39.75
p doble hull = = 31.24 kN/m2
B 2.1.1
Diambil pada frame no.60 * Rencana Lebar Plat
Z1 = 1500 mm
Z2 = 1500 mm
Z3 = 700 mm
Z4 = 1500 mm 100 mm untuk las
Dari pengukuran diapatkan harga-harga z sbb :1.92 m
3.40 m
4.50 m
5.60 m
pD = po 20.T cD
zA = H + 1/3 * 1/50 B ' (1/3 Camber)
zM = H + 1/3 * 1/50 B' (1/3 Camber)
zF = H + 1/3 * 1/50 B' (1/3 Camber)
pDA = po 20 * T cDA
=20.23 20 *5.3 1.01
pDA =
kN/m2
pDM = po 20 * T cDM
=20.23 20 *5.3 1
pDM =
kN/m2
pDF = po 20 * T cDF
=20.23 20 *5.3 1.33
pDF =
kN/m2
kN/m2
Beban pada Sisi Kapal *Untuk Daerah M
* z1 =
* z2 =
* z3 =
* z4 =
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
B 2.1.2
ps1M=(kN/m^2)
= 61.36 kN/m^2 61.36ps2M=(kN/m^2)
= 52.22 kN/m^2 52.22ps3M=(kN/m^2)
45.41 kN/m^2 45.41* Beban pada double hull
P= 39.290423
10 + z4 - T ps4M=(kN/m^2)
= 39.29 kN/m^2 39.29
Diambil pada Frame no.25
Z1 = 1500 mm
Z2 = 1500 mm
Z3 = 1100 mmZ4 = 1500 mm (100 mm untk las)
Dari pengukuran diapatkan harga-harga z sbb :2.05 m3.25 m4.34 m
5.60 m
* Beban dibawah Garis Air ps1A = 10 (T - z1) + po * cFA (1 + z1/T) ps1A=(Kn/M^2)
= 63.07 kN/m^2 63.07 ps2A = 10 (T - z2) + po. cFA (1 + z2/T) ps2A=(Kn/M^2)
= 56.06 kN/m^2 56.06 ps3A = 10 (T - z3) + po. cFA (1 + z3/T) ps3A=(Kn/M^2)
= 49.69 kN/m^2 49.69
* Beban dibawah Garis Air
ps1M = 10 (T - z1) + po * cFM (1 + z1/T)
ps2M = 10 (T - z2) + po * cFM (1 + z2/T)
ps3M = 10 (T - z3) + po * cFM (1 + z3/T)
* Beban diatas Garis air
ps4M = po . cFM . 20 =
* Untuk Daerah A
* z1 =
* z2 =
* z3 =
* z4 =
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL * Beban diatas Garis air
10 + z5 - T ps5A=(Kn/M^2)
= 42.80 kN/m^2 42.80
* Pada Daerah F
Diambil pada Frame no. 124
Z1= 1500 mm
Z2= 1500 mm
Z3= 700 mm
Z4= 1500 mm
Dari pengukuran diapatkan harga-harga z sbb :
* z1 = 1.89 m
* z2 = 3.39 m* z3 = 4.50 m
* z4 = 5.60 m
* Beban dibawah Garis air
ps1F = 10 (T - z1) + po. cFF (1 + z1/T) ps1F=(Kn/M^2)
= 103.04 kN/m^2 103.04
ps2F = 10 (T - z2) + po. cFF (1 + z2/T) ps2F=(Kn/M^2)
= 102.42 kN/m^2 102.42
* Beban diatas Garis air
ps3F=(Kn/M^2)10 + z4 - T 110.47
= 110.47 kN/m^2
ps4F=(Kn/M^2)10 + z4 - T 98.68
= 98.68 kN/m^2
ps4A = Po .Cfa 20
ps3F = Po .Cff 20
ps4F = Po .Cff 20
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Pada Main Deck
Tinggi Geladak = 2,4 m
- Plat 1 = 900 mm
Z1= 6.817 m
- Plat 2 =1500 mm ( 100 mm untuk las )
Z2 = 8.032 m
= 38.27598 kN/m^2 ps1 =
38.276
kN/m^2
= 34.623 kN/m^2 ps2 =
34.623
= kN/m^2
Pada Poop Deck
Tinggi Poop Deck = 2,4 m
- Plat 1 = 1000 mm
Z1= 9.15 m
- Plat 2 =1500 mm
Z2 = 10.4 m
= 31.828 kN/m^2 ps1 =
31.828
kN/m^2
29.194 kN/m^2 ps2 =
29.194
kN/m^2
* Beban sisi pada Bangunan Atas
Maka ps1 = po. cFA 20
10 + z1 - T
Maka ps2 = po. cFA 20
10 + z2 - T
Maka ps1 = po. cFA 20
10 + z1 - T
Maka ps2 = po. cFA 20 =
10 + z2 - T
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASILPada Boat Deck
Tinggi Boat Deck = 2,4 m
- Plat 1 = 900 mm
Z1= 11.6 m
- Plat 2 =1500 mm ( 100 mm untuk las )
Z2 = 12.8 m
= 27.044 kN/m^2 ps1 =
27.044
kN/m^2
25.190 kN/m^2 ps2 =
25.190
kN/m^2
Pada Bridge Deck
Tinggi Bridge Deck = 2,4 m
- Plat 1 = 900 mm
Z1= 14 m
- Plat 2 =1500 mm ( 100 mm untuk las )
Z2 = 15.2 m
= 23.574 kN/m^2 ps1 =
23.574
kN/m^2
22.152 kN/m^2 ps2 =
22.152
kN/m^2
Maka ps1 = po. cFA 20
10 + z1 - T
Maka ps2 = po. cFA 20 =
10 + z2 - T
Maka ps1 = po. cFA 20
10 + z1 - T
Maka ps2 = po. cFA 20 =
10 + z2 - T
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASILPada Navigation Deck
Tinggi Nav. Deck = 2,4 m
- Plat 1 = 1000 mm
Z1= 16.35 m
- Plat 2 =1500 mm ( 100 mm untuk las )
Z2 = 17.6 m
= 20.942 kN/m^2 ps1 =
20.942
kN/m^2
19.768 kN/m^2 ps2 =
19.768
kN/m^2
Beban pada Forecastle Deck
Tinggi Forecastle Deck = 2.4 m
- Plat 1 = 900 mm
Z1= 6.8 m
- Plat 2 =1500 mm ( 100 mm untuk las )
Z2 = 8 m
= 88.379 kN/m^2 ps1 =
88.379
kN/m^2
80.028 kN/m^2 ps2 =
80.028
kN/m^2
Maka ps1 = po. cFA 20
10 + z1 - T
Maka ps2 = po. cFA 20 =
10 + z2 - T
Maka ps1 = po. cFf 20
10 + z1 - T
Maka ps2 = po. cFf 20 =
10 + z2 - T
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASILB 2.2 Beban pada Struktur depan Kapal
Beban pada Struktur depan Kapal dibawah Sarat maksimum ialah :
c= 0.8 (umum)
45.80 kN/m^2 V0 = 11 Knot
√ L= 8.94 m 45.80
kN/m^2
B 3. Beban pada Dasar Kapal
Beban pada Alas Kapal dirumuskan sbb :
Sehingga :
= 10 * 5.3 + 28.99 .*1.09
75.04 kN/m^2 75.04
kN/m2
= 10 * 5.3 + 20.63.*1
73.23 kN/m^2 73.23
kN/m2
= 10 * 5.3 + 38.26*2.14
103.82 kN/m^2 103.82
kN/m2
B 5.1 Beban pada Geladak Bangunan Atas dan Rumah Geladak Untuk Bangunan Atas beban dirumuskan sbb:
10 n = 1 (untuk forecastle deck)
Untuk Rumah Geladak hasilnya dikalikan dengan faktor sbb :
[0,7 b'/B' + 0,3] (b' = Lebar rumah geladak)
- Lebar Poop Deck B' = 11.03 m (B' = lbr stmpat kapal )
- Tinggi Poop Deck = 2.4 m
- Rencana lebar plat : Plat 1 lebar = 1000 mm
Plat 2 lebar= 1500 mm (100mm untk las)
maka z = H + 2.4 = 8.65 m
0.76
10
22.03 kN/m^2 22.03
kN/m^2
pe =c [0,20 vo + 0,6 √ L ]2
pe = pe =
pB = 10 . T + po . cF
pBA = 10 . T + po . cFA
pBA =
pBM = 10 . T + po . cFM
pBM=
pBF = 10 . T + po .cFF
pBF =
pDA +pD . n (kN/m2)
Dimana : n = 1 - z - H nmin = 0,5
pD = Beban Geladak Cuaca
* Beban pada Poop Deck
Sehingga n = 1 - ( Z - H )
pDA = pD n pDA =
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
- Lebar Boat Deck b' = 11.03 m (b' = lbr stmpat kapal )
- Tinggi Boat Deck = 2.4 m
- Rencana lebar plat : Plat 1 lebar = 900 mm
Plat 2 lebar= 1500 mm (100mm untk las)
maka z = H + 2,4 +2,4 = 11.05 m
0.52
10
15.08 kN/m^2
15.08kN/m^2
- Lebar Bridge Deck b' = 11.03 m (b' = lbr stmpat kapal )
- Tinggi Bridge Deck = 2.4 m
- Rencana lebar plat : Plat 1 lebar = 800 mm
Plat 2 lebar= 1500 mm (100mm untk las)
maka z = H + 2,4 +2,4+2,4 = 13.45 m
0.28
10 dipkai n min = 0.5 14.50
kN/m^214.50 kN/m^2
- Lebar Navigation Deck b 8.23 m (b' = lbr stmpat kapal )
- Tinggi Navigation Deck = 2.4 m
- Rencana lebar plat : Plat 1 lebar = 900 mm
Plat 2 lebar= 1500 mm (100mm untk las)
maka z = H + 2,4 +2,4+2,4+2.4 = 15.85 m
0.04 11.92
10 dipkai n min = 0.5 kN/m^2
11.92 kN/m^2
- n = 1
39.75 kN/m^2
39.75 kN/m^2 11.92kN/m^2
b' = 8.23 m11.92 kN/m^2
*Beban pada Boat Deck
Sehingga n = 1 - ( Z - H ) =
pDA = pD * n ( 0,7 b'/B' + 0,3 )
pDA =
* Beban pada Bridge Deck
Sehingga n = 1 - ( Z - H ) = pDA =
pDA = pD * n ( 0,7 b'/B' + 0,3 )
* Beban pada Navigation Deck
pDA =
Sehingga n = 1 - ( Z - H ) =
pDA = pD * n ( 0,7 b'/B' + 0,3 )
* Beban pada Forecastle Deck
- pDF = pDF =
Sehingga beban pada Forecastle Deck :pDA =
* Beban pada Top Deck
pDA = pD * n ( 0,7 b'/B' + 0,3 )
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL Beban pada Pelat Alas Dalam (Inner Bottom Plate)
5.25 m
- V = Volume Ruang Muat , dari Rencana Umum diketahui
= 3258.59 m3
- Harga G = V*Bj
Bj = Berat jenis muatan = 0.78
Jadi G = 2541.7002 ton
- Sehingga G/V = 0.78 ton/m3
- 0.14
L^(1/2)
= 1.04 = 1.64
= 0.14
= 45.82 kN/m2 45.82
kN/m2
m = 1
= 0.14
= 45.61 kN/m2 45.61
kN/m2
1.64
0.3
= 3.02
= 0.22
49.06
= 49.06 kN/m2 kN/m2
pi = 9,81 . G/V .h (1 + av)
Dimana : - h = H - hdb =
ton / m3
av = F. m , dimana F = 0,11 . Vo =
* Pada daerah A (0 < x/L< 0,2)
m = m0 - 5(m0 - 1) x/L m0 = ( 1,5 + F )
maka av = F. ma
Sehingga : piA = 9,81 . G/V .h (1 + av) piA =
* Pada daerah M (0,2 < x/L < 0,7)
maka av = F. mm
Sehingga : piM = 9,81 . G/V .h (1 + av) piM =
* Pada daerah F (07< x/L < 1)
m = 1 + m 0 +1 [x/L - 0,7] m0 =
maka av = F. mf
piF =
Sehingga : piF = 9,81 . G/V .h (1 + av)
Retna Ika P.S/6609040018DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASILC 3.1 Beban pada Geladak Akomodasi
= 3,5 (1 + 0,14) yaitu = 0.14 p =
= 3.99 kN/m2 3.99
kN/m2
C 3.2 Beban pada Geladak Mesin
p =
= 9.13 kN/m2 yaitu = 0.14 9.12
kN/m2
C 1.1 Beban pada Geladak 2nd Deck Kamar Mesin
Dimana : pc = 7. h ; h = Tinggi second deck = 3.85 m
= 26.95 kN/m2
av diambil pada daerah after maka :
av = 0.14
= 30.74 kN/m2 30.74
kN/m2
p = 3,5 (1 + av) Dimana av diambil pada daerah A
p = 8 ( 1 + av ) Dimana av diambil pada daerah A
pL = pc (1 + av)
Sehingga pL = pc (1 + av) pL =
Retna Ika P.S/6609040018DM-IV
L = 80 m Vo = 11 knotsB = 13.03 mH = 6.25 mT = 5.3 mCb = 0.7
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL Perhitungan 0.64 m (a0)
Tebal Plat 500
a diambil = 0.6 m
6 B1.1 * Tebal Plat Dasar (Bottom Plate)
untuk L < 90 m :
Dimana : nf = 0.83 (untuk konst. Memanjang)
1 (untuk konst. Melintang)
k = 0.91 (faktor bahan)
tk = 1.5 10
mm
9.2243457 ~ 10 mm
B1.2 Tebal Plat Dasar pada daerah 0.1 L dari AP dan 0.05 L
dari FP tidak boleh kurang dari :
# Haluan
= 7.0565587 + 1.50 = 8.56 9
= ~ 9 mm mm
# Buritan
= 5.9993925 + 1.50 = 7.50 8
= ~ 8 mm mm
B 4.1 * Lebar dan Tebal plat Bilga
lebar Bilga (b) = 800 +( 5 . L )
= 1203.2
maka diambil lebar Bilga maximal = 1800 mm b =
Tebal plat Bilga dipilih yang terbesar antara Plat sisi dan Plat 1800
Dasar , maka : mm
8 mm
Tebal plat dasar = 8 mm
Jadi dipilih t = 8 mm 8
9 mm
Tebal plat dasar = 10
Jadi dipilih t = 10 mm 10
9 mm
Tebal plat dasar = 9 Jadi dipilih t = 9 mm 9
mm
Jarak Gading Normal = L + 0.48 =
Tebal Plat Dasar pada daerah 0.4 L amidship, untuk
tB = 1.9 .nf. a . √ Pb*k + tk (mm)
tBM =
mm untuk t' ≤ 10 mm
maka tBM = 1.9 .nf. a . √ Pb*k + tk
tBF = 1.21 . a0 .√ pBF . k + tk (mm) pBF = 96.36 kN/m2 tBF =
tBA = 1.21 .a . √ pBA . k + tk (mm) pBA = 75.04 kN/m2 tBA =
Daerah A : Tebal plat sisi terbesar =
tA =
Daerah M : Tebal plat sisi terbesar =
tM =
Daerah F : Tebal plat sisi terbesar =
tF =
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL B 5.1
Untuk Daerah 0.7 L amidship 12
t = tebal plat alas = 10 mm mm
12 mm
Tebal Keel boleh dikurangi 10 % 11
mm
= 10.8 ~ 11 mm b =
Lebar Plat Lunas diambil b = 1800 mm 1800
mm
C 1.1 * Tebal Plat Sisi
Daerah 0.4 L tengah Kapal
Untuk Kapal dengan L < 90 m
9 = 8.570716 mm
~ 9 mm
= 8.0223223 9
~ 9 mm mm
= 7.5827874 8~ 8 mm mm
= 7.1577922 8~ 8 mm mm
Daerah 0.05 L dari FP (halauan)
= 8.53 9
~ 9 mm mm
= 8.51 9
~ 9 mm mm
* Tebal dan Lebar Plat Lunas (Keel) tfk =
tfk = t + 2 (mm)
Maka tfk =
Untuk Daerah 0.15 L dari AP dan FP tfk =
tfk = 12 - ( 12 x 10/100)
ts1M =
ts1 =1.9 . a0 . nf √ psM1. k + tk
ts2 =1.9 . a0 . nf √ psM2. k + tk ts2M =
ts3 =1.9 . a0 . nf √ psM3. k + tk ts3M =
ts4 =1.9 . a0 . nf √ psM4. k + tk ts4M =
ts1 = 1.21. a0 . √ psF1. k + tk ts1F =
ts2 = 1.21 . a0 . √ psF2. k + tk ts2F =
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL1.5
= 8.78 9
~ 9 mm mm
= 8.38 9
~ 9 mm mm
Daerah 0.1 L dari AP (buritan)
= 7.00 8
~ 8 mm mm
= 6.69 7~ 7 mm mm
= 6.38 7~ 7 mm mm
= 6.03 7~ 7 mm mm
ts3 = 1.21. a0 . √ psF3. k + tk ts3F =
ts4 = 1.21. a0 . √ psF4. k + tk ts4F =
ts1 = 1.21 . a0 . √ psA1. k + tk ts1A =
ts2 = 1.21. a0 . √ psA2. k + tk ts2A =
ts3 = 1.21. a0 . √ psA3. k + tk ts3A =
ts4 = 1.21 . a0 . √ psA5. k + tk ts4A =
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
7 A 6 * Tebal Plat Geladak
Pada Daerah 0.4 L amidship
tebal plat disini dipilih yang terbesar antara :
= 8.3462829 = 7.1128
~ 9 mm ~ 8 mm
= 6.3295948 9
~ 7 mm mm
9 mm
A 7.1 Pada Daerah 0.1 L dari AP
Dipilih yang terbesar antara :
= 7.1128 = 6.3600914 8 ~ 8 mm ~ 7 mm mm
8 mm
Pada Daerah 0.1 L dari FP
Dipilih yang terbesar antara :
= 7.1128 = 7.1906801 8
~ 8 mm ~ 8 mm mm
8 mm
6 C * Tebal dan Lebar Sheerstrake
C 3.1 Lebar Sheerstrake tidak boleh kurang dari :
b = 800 + 5. L
= min 1203.2 mm
b =
1500
C 3.2 Tebal dari Sheerstrake dipilih yang terbesar antara : mm
Pada daerah 0.4 L amidship
Tebal plat sisi terbesar = 9 mm
9 mm
= 9 mm ~ 9 mm
maka diambil t = ts = 9 mm
9
mm
tmin = (4.5 +0.05 L) √ k dan tEmin = (5.5 + 0.02 L) atau
tE1 = 1.21 . a √ pDM .k + tk
tmin = (4.5 +0.05 L) √ k tEmin = (5.5 + 0.02 L)
tE1 =1.9 . a0 . nf √ pDM .k + tk tDM =
Maka diambil tebal plat = tmin =
tEmin = (5.5 + 0.02 L) dan tE1 =1.9 . a0 . nf √ pDA .k + tk tDA =
Maka diambil tebal plat = tEmin =
tEmin = (5.5 + 0.02 L) dan tE1 =1.9 . a0 . nf √ pDF .k + tk tDF =
Maka diambil tebal plat = tEmin =
t = 0.5 (tD + tS) , atau
t = tS
tDM =
t = 0.5. (tDM + ts)
tM =
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Pada daerah 0.1 L dari AP
Tebal plat sisi terbesar = 8 mm
8 mm tA =
8
= 8 mm ~ 8 mm mm
maka diambil t = ts = 8 mm
Pada daerah 0.1 L dari FP
Tebal plat sisi terbesar = 9 mm
8 mm tF =
9
= 8.5 mm mm
~ 9 mm
maka diambil t = ts = 9 mm
16 B 1.1 * Tebal Plat Sisi pada Bangunan Atas
Semua bangunan atas terletak diluar daerah 0.4 L tengah
kapal = 0.4 . L = 32.256 m tengah Kapal.
Superstructures
Untuk non effective Superstructures tebal plat sisinya diambil
yang terbesar antara :
6.61 mm
dengan L = Lmak = 12 . Hdipakai = 9 mm = 75 mm
maka t2 = √L k
= 8.26 mm # Untuk Main Deck
Plat 1 → ps1 = 38.28 kN/mm2
= 5.78
~ 6 mm 7
6.61 mm mm
maka diambil tb = 7 mm
Plat 2 → ps2 = 34.62 kN/mm2
= 5.58
~ 6 mm
6.61 mm 7
maka diambil tb = 7 mm mm
tDA =
t = 0.5. (tDA + ts)
tDF =
t = 0.5. (tDF + ts)
Maka Bangunan Atas tersebut termasuk dalam Non Effective
ta = 1.21. a √ ps. k + tk atau
tb = 0.8 . t2 dimana t2 = t min = √ L k
Dimana t2 = tmin =4L. k
ta = 1.21. a √ ps1. k + tk
t1 =
tb =
ta = 1.21. a √ ps2. k + tk
t2 =
tb =
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
# Untuk Poop Deck
Plat 1 → ps1 = 31.83 kN/mm2
= 5.41
~ 6 mm 7
6.61 mm mm
maka diambil tb = 7 mm
Plat 2 → ps2 = 29.19 kN/mm2
= 5.24 t2 =
~ 6 mm 7
6.61 mm mm
maka diambil tb = 7 mm
# Untuk Boat dan Navigation Deck
Dengan memperhatikan kondisi diatas dimana :
maka hal yang sama juga akan terjadi pada plat-plat sisi yang be
rada diatasnya karena beban sisi makin keatas akan makin kecil
dan dengan sendirinya tebal plat sisinya juga akan makin kecil
- Karena selalu dipilih yang terbesar maka tebal plat sisi pada
baik pada plat 1 maupun pada plat 2. 7
mm16 B 2.1 * Tebal Plat Geladak Bangunan Atas
Tebal plat Geladak bangunan atas diambil yang terbesar dari :
atau
= ( 5.5 + 0.02.80.64) √ 0.91
= 7.04 ~ 8 mm
# Untuk Poop Deck
28.99
= 5.38
6 mm
8 mm 8
8 mm mm
ta = 1.21. a √ ps1. k + tk
t1 =
tb =
ta = 1.21. a √ ps2. k + tk
tb =
- Pada Poop Deck tebal ta sudah lebih kecil dari tb (6 mm < 8 mm)
Boat dan Nav. Deck akan selalu sama yaitu = tb = 7 mm t1 = t2 =
t1 = 1.21 .a √ pD. k + tk
t2 = (5.5 + 0.02 L) √ k
t1 = 1.21 .a √ pD. k + tk pDA =
= ~ tD =
t2 =
Maka diambil tD =
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
# Untuk Boat & Navigation
Akibat beban pada geladak Boat, Navigation dan Top Deck
( Pda ) lebih kecil dari Poop dan Boat Deck maka dengan
sendirinya tebal plat geladaknya ( t1) juga makin mengecil
( t1 < t2 ) sehingga plat geladak yang diambil t2 = 7 mm.
# Untuk Forecastle Deck
39.75
= 5.87
6 mm
8 mm 8
8 mm mm
6 F 1.1 * Tebal Plat pada Sternframe & Propeller Bracket
Tebal plat pada propeller bracket dan boss propeller sama t =
dengan tebal plat sisi terbesar pada 0.4 L tengah Kapal. 9
Jadi t = 9 mm mm
K 1 * Tebal Plat Bulwarks
Tebal plat Bulwark tidak boleh kurang dari :
t = [ 0.75 - L/1000] √ L atau
= 6.01 mm = 5.84 t =
7 mm = ~ 6mm 7
Maka diambil tebal Bulwark = 7 mm mm
8 B 4.1 * Tebal Plat Inner Bottom
Dimana p diambil yang terbesar antara :
= 10 ( 5.3 - 1)
= 43 kN/m2
→ h = jarak double bottom ke pipa limpah atas
6.25 m = 10. 6.25
= 62.5 kN/m2
45.82 kN/m2
45.61 kN/m2
49.06 kN/m2
Maka diambil p = 62.5 kN/m2
= 6.477424
7 mm7mm
t1 = 1.21 .a √ pD. k + tk pDF =
= ~ tD =
t2 =
Maka diambil tD =
t = 0.65. √ L
= ~
t = 1.1 . a √ p .k + tk
- p1 = 10 (T - hDB) hDB= 1 m
- P2 = 10. h
= H - hdb +1 =
- pi yang terdiri dari : piA =
piM =
piF =
sehingga ti = tA = tM = tF = 1.1 . a √ p .k + tk
= ~ ti =
Retna Ika P.S/6609040018 DM-IV
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
7 B 1.1 * Tebal Plat Geladak 2nd Deck Kamar Mesin
= 6.79
7 mm
mm atau
= 4.99 t=
6 mm 7
maka diambil t = 7 mm mm
16 B 1.1 * Tebal Plat Sisi untuk Forecastle Deck
Plat 1
= 8.01
8 mm
8
mm
Plat 2
= 7.695521
8 mm
8mm
tmin = (5.5 + 0.02 L) √ k
= ~
t = 1.1. a √ pL.k + tk
= ~
ta = 1.21. a √ ps1. k + tk
= ~ t1 =
tb = 7 mm
maka diambil t1 = 8 mm
ta = 1.21. a √ ps2. k + tk
= ~ t2 =
tb = 7 mm
maka diambil t2 = 8 mm
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASILPerhitungan
Konstruksi 8 B 2.2.1 Tinggi Double Bottom (Dasar Ganda)
Alas Tinggi Double Bottom tidak boleh kurang dari :
RUANG h = B/15 h =
MUAT = 0.87 dipakai 1 m 1000
mm
B 2.1.2 h =
= 1000 mm 1000
mm
adalah : t = [ h/100 + 1.0]. √ k t =
= 10.49 11
11 mm mm
Pada Daerah 0.15 L dari AP dan FP
Tebal Center Girder boleh dikurangi 10 % : t =
10 mm 10
mm
B 3.1 * Perhitungan Side Girder (Penumpu samping)
- Dalam satu bagian dari double bottom satu side girder dipasang
bila jarak antara sisi Kapal dan penumpu tengah > 4.5 m
- Dua side girder dipasang bila jarak antara sisi Kapal dan center
girder > 8 m
Diketahui jarak antara center girder dan sisi Kapal = B/2 = 6.515 m
Double bottom.
B 3.2.1 * Tebal Side Girder
tidak boleh kurang dari : t = h/120 .√ k 1000 t =
= 7.95 8
= 8 mm mm
Jarak side girder dari center line adalah 6 jarak penegar (stiffener) = 3.6 m
Perhitungan Wrang Plat
B 7.3.1 * Jarak Wrang alas penuh (Solid Floor)
Diambil jarak wrang plat :
B 7.3.2 Wrang Plat dipasang pada setiap gading- gading dibawah motor
induk, pada sekat melintang,dan pada Ruang Muat.
B 7.3.4 * Tebal Wrang Plat
Tebal Wrang Plat tidak boleh kurang dari :
t = [h/100 - 1.0] .√ k t=
= 8.59 9
9 mm mm
* Tinggi Center Girder = tinggi Double Bottom
* Tebal Center Girder ( untuk daerah 0.7 L tengah Kapal )
Untuk L < 1200 mm
= ~
t = 11 - [ 10/100 x 11] = 11 - 1.1 = 9.9 ~
Jadi direncanakan dipasang Satu Side Girder disetiap sisi dari
h = hDB =
= 4 a0 = 4. 0,6 = 2,4 m
Untuk h < 1200 mm
= ~
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASILB 6.2.2
2.4 m
l = B = 6.515 m (dengan 1 sekat memanjang)
y = 0.4 .l = 2.606 m
0.3 (untuk ruang muat) 4.74
4.74 cm2 cm2
* Lubang Peringan ( Lightening Hole)
- Berbentuk Bulat atau Elips.
- Lebar keseluruhan tidak boleh lebih dari setengah lebar Wrang
alas penuh.
- Tinggi lubang peringan tidak boleh lebih dari setengah tinggi
Wrang alas penuh.
Didisain tinggi Hole = 400 mm
9 B 3.1 Modulus Pembujur Alas ( Bottom Longitudinal )
W =(83.3/δpr)*m*a*l² *P
Dimana : δpr mak = 150/k = 164.84 N/mm^2
m mak = Mk^2/2 = 0.44
mk = 1-sigma(lk/l*sin^2 alpha) = 0.93854 Wm =
a = 0.6 m 120.04l = 2.4 m cm3P = PB = 73.23
W = 120.043472
Pd tabel BKI 2006 maka dipilih profil L ukuran : 130 x 65 x10
Modulus Pembujur Inner Bottom
W =(83.3/δpr)*m*a*l² *P
Dimana : δpr mak = 150/k = 164.84 N/mm^2
m mak = Mk^2/2 = 0.44
mk = 1-sigma(lk/l*sin^2 alpha) = 0.94271 Wm =
a = 0.6 m 75.09
l = 2.4 m cm3P = PB = 45.61
W = 75.09
Pd tabel BKI 2006 maka dipilih profil L ukuran : 100 x 65 x 9
* Penampang Bilah Wrang Plat tidak boleh kurang dari :
Aw = e. T. l. e (1 - 2y/l) k (cm2)
Dimana : e = 4. a0 =
Aw =
e = Maka Aw =
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Wrang Kedap (Watertight Floor)
12 B 2.1
Dipilih yang terbesar antara
1.75 m
b = lebar tanki = lebar double bottom
= 12.54 m
2.25 m
pv = 0.2 bar ( minimum )
56.73
= 56.73 kN/m2 kN/m2
diatas Tank top atau ke pipa limpah
Diambil pada plat 1( yang terbesar )
0.33 m
3.17 m
● (H + 1) - 0.33 = 6.92 m
6.92 m
67.85 kN/m2
6.24
7 mm
5.74 t =
6 mm 7
Sehingga diambil tebal Plat Wrang Kedap = 7 mm mm
B 3.1
Modulus Penegar dipilih yang terbesar antara :
1
W = = 17.04 cm3 17.04
cm3 = 16.30 cm3
profil L ukuran 60 x40x9
* Tebal Plat Wrang Kedap air tidak boleh kurang dari :
- t1 = 1.1. a. √ p. k + tk atau
- t2 = 0.9.a. √ p2. k + tk
Dimana : # p = pl = 9.81. r.[h1. Cosj + (0.3b + y) Sinj] + 100 pv
Sedangkan : r = berat jenis fluida = 1 t/m3
j = 20o (normal)
h1 = 1/3(H - hDB) =
y = h1 + 1/2. hDB =
pl =
maka : p = 9.81.1[ 1.75. Cos20o + (0.3. 12.54 +2.25). Sin 20o] +100. 0.2
# p2 = 9.81. h2
Dimana : h2 = Jarak pusat beban dari titik 2.5 m
pusat beban = 1/3 hDB = 1/3. 1 =
maka : h2 = ● (hDB + 2.5) - 0.33 =
Jadi diambil h2 =
Sehingga : p2 =
Maka : - t1 = 1.1. a. √ p. k + tk
= ~
- t2 = 0.9.a. √ p2. k + tk
= ~
* Modulus Penegar Wrang Kedap
W1 = 0.55. a. l2.p. k atau Dimana : l = hDB =
W2 = 0.44. a. l2.p2. k
maka : W1 = 0.55. a. l2.p. k
W2 = 0.44. a. l2.p2. k
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Untuk Simply Supported ditambah 50 % W =
W = 17.04 + ( 50/100 x 17.04) = 25.56 cm3 25.56
Berdasarkan Tabel pada BKI 2006 maka dipakai profil : cm3 L dengan ukuran 75 x 50 x 8
Perhitungan 8
Konstruksi A 1.2.3
Alas pada t = 0.035. L + 5 t =
Ujung-ujung = 7.82 8
Kapal 8 mm mm
h = 0.06 H + 0.7 h =
= 1.08 m 1000
~ dipakai 1 m mm
A 2.2.1
Pada Daerah 0.7 L amidship : t =
t = 0.07 L + 5.5 12
11.14 ~ 12 mm mm
tebal Center Girder pada ujung-ujung Kapal boleh dikurangi 10 %
t = 12 - [10/100 x 12] t =
11 mm 11mm
68.45 cm2 Af =
pada ujung- ujung Kapal boleh dikurangi 10 % 68.45
= 61.60 cm2 Af =
61.6032
A 2.2.2
Pada Daerah 0.7 L amidship :
t = 0.04 L + 5 t =
= 8.23 ~ 9 mm 9
tebal Center Girder pada ujung-ujung Kapal boleh dikurangi 10 % mm
t =9 - [10/100 x 9] t =
9 mm 9
mm
22.13 cm2 Af =
pada ujung- ujung Kapal boleh dikurangi 10 % 22.13
cm2
= 19.92 cm2 Af =
19.92
cm2
# Konstruksi pada Haluan dan Buritan adalah Single Bottom
* Tebal Wrang Plat
= ~
* Tinggi Wrang Plat pada Halauan (Plandes)
* Center Girder
= 10.8 ~
* Sectional Area Plat
Af = 0.7. L + 12 =
Af = 68.45 - [10/100 x 68.45]
* Side Girder
= 8.1 ~
* Sectional Area Plat
Af = 0.2. L + 6 =
Af = 22.13 - [10/100 x22.13]
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
8 B 5.31
Tebal plat untuk sea chest : t = 12. a. √ p. k + tk
Dimana : a = jarak penegar = 0.6 m
(dalam hal ini penegar pada ruang mesin dipasang tiap
jarak gading = 0.6 m)
p = Blow out pressure = 2 bar
Maka : t = 12. 0.6 √ 2. 0.91 + tk t =
12
mm
B 5.3.2
W =
Maka diperoleh profil L dengan ukuran : 80 x 65 x 10
Perhitungan
Konstruksi 8 C 1.1Alas
Kamar
Mesin Dimana : c = 7.5 (untuk kamar mesin)
l = 0.7 B (minimal) = 9.121 m W=
1984.14
= 1984.14 cm3 cm3
h min = 55. B - 45
= 671.65 mm h =
= dipkai 1235 mm 1235
mm
C 1.2
t = h/100 + 4 dimana h = tinggi wrang plat
t =
maka t = 16.35 mm 16.35
mm
C 1.3
t = ((P/15)^0.5) + 6 dimana :P = 1480 kw t =
= (1100 / 15)^0.5+ 6 16
15.933 ~ 16 mm mm
C 1.4
= 26.13 cm2 26.13
cm2
* Sea Chest
= 9.71 + 1.5 = 11.21 ~ 12 mm
* Modulus Penegar Sea Chest
W = 56 . a. p. l2. k l = hDB = 1 m
= 56. 0.6. 2. 12. 0.91
= 61,152 cm3 61.152 cm3
* Pada Kapal ini di Kamar Mesin dipakai Konstruksi Single Bottom
Modulus Wrang Plat :
W = c. T. a. l2
Maka : W = 7.5* 5.3* 0.6* ( 9.121 )2
* Tinggi Wrang Plat
* Tebal Web Wrang Plat
* Tebal Plat Bilah (longitudinal foundation girder)
* Luas Area Dok Intercostal
Aw = 10 + 0.2 L Aw =
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Catatan : Apabila sudah dipasang penumpu fondasi longitudinal
C 3.2.3 maka Center Girder tidak perlu dipasang lagi
Untuk P > 750 Kw 89.73
= 1480/ 75 + 70 cm2
= 89.73
Rencana Penempatan Mesin
- Diameter Propeller = 0.7. T = 3.71 m
- Letak poros dari Baseline = 1/2 D + 0.14 D (clearance)
= 1/2. 3.71 + 0.04. 3.71
= 2.00 m 2003 mm
- Dari Katalog Mesin diketahui : ~ Tebal Bed mesin = 40 mm
~ Tebal tempat baut = 265 mm
~ Diameter Baut pass = 45 mm
Dari Katalog Mesin diketahui jarak poros ke atas bed = 600 mm
Tinggi plat bilah = Tinggi poros -(600 + 20 ) h =
= 1383 mm 1383.4
mm
Tebal TopPlate = AT / t l=
= 22.43 cm 22.43
cm
* Luas Area Top Plate AT =
AT = P/75+ 70
* Tinggi Plat Bilah
* Lebar Top Plate
Lebar Top Plate = Luas Area Top Plate
L = 80 mB = 13.03 mH = 6.25 mT = 5.3 mCb = 0.7
Lc = 80.64 m
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Perhitungan 9 A 3.2.1
Konstruksi
Lambung l = 2.4 f min = 0.75
l = 2.4 m Ps1 = 31.83
W = 0.55. a. l2. ps. f. k W =
= 41.29 41.29
Diperoleh Ukuran Profil L : 90 x 60 x 6 cm3
Ukuran Bracket : 140 x 6.5
l = 2.4 m Ps1 = 31.83
W = 0.55. a. l2. ps. f. k W =
= 41.29 41.29
Diperoleh Ukuran Profil L : 90 x 60 x 6 cm3
Ukuran Bracket : 140 x 6.5
l = 2.4 m Ps1 = 31.83
W = 0.55. a. l2. ps. f. k W =
= 41.29 41.29
Diperoleh Ukuran Profil L : 90 x 60 x 6 cm3
Ukuran Bracket : 140 x 6.5
l = 2.4 m Ps1 = 11.92
W = 0.55. a. l2. ps. f. k W =
= 15.46 15.46
Diperoleh Ukuran Profil L : 60 x 40 x 6 cm3
Ukuran Bracket : 100 x 6.5
A. 4.1
Dimana : a = 0.6 m
l = 5.25 m
ps1 = 103.04 kN/mm2
f= 0.75
k= 0.91
Maka W = 639.64 W =
639.64
cm3
* Gading Utama untuk Bangunan Atas
W = 0.55. a. l2. ps. f. k
Untuk Poop Deck
Untuk Boat Deck
Untuk Navigation Deck
Untuk Forecastle Deck
* Gading Utama Untuk Daerah Peak (Ceruk Haluan)
W = 0.55. a. l2. ps.f. k
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Berdasrkan perhitungan :
Diperoleh ukuran profil L : 250 x 90 x 8
Bracket : 370 x 9.5
A. 4.2
Dimana : a = 0.6 m
l = tinggi tangki 5.25 m
ps1 = 63.07 kN/mm2
f= 0.75
k= 0.91
Maka W = 391.50 W = Berdasrkan perhitungan : 391.50
Diperoleh ukuran profil L : 200 x 100 x 9 cm3
Bracket : 320 x 8.5
9 A. 2.1 * Gading Utama di 1st Deck Ruang Mesin
Dimana : n =0.9 - 0.0035 L = 0.62
0.6
0.75
l = 2.4 m
63.07 kN/m2 Wr =
Maka Wr = 55.137476 cm3 55.137
Diperoleh Ukuran Profil L : 90 x 60 X 8
Ukuran Bracket : 150 x 6.5
A. 3.2.1 * Gading Utama pada 2nd Deck Ruang Mesin
Dimana : a = 0.6
0.75
l = 2.4 m Wr =
63.07 81.82
Maka W = 81.82 cm3 cm3
Diperoleh Ukuran Profil L = 100 x 75 x 9
Ukuran Bracket =190 x 8
* Gading Utama pada Daerah Stern (Ceruk Buritan)
W = 0.55. a. l2. ps.f. k
Wr = n. c. a. l2. ps. f. k
c = cmin =
f = fmin =
ps = ps1A =
cm3
W = 0.55. a. l2. ps. f. k
f = fmin =
ps = ps1A =
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
A. 5.3.1 * Gading Besar pada 1st Deck Ruang Mesin
Dimana : n = 1 (tanpa palang pengikat)
e = 4. a = 2.4 m
l = 2.4 m
63.07 W =
Maka W = 436.35 cm3 436.35
cm3
Perhitungan Profil T
Berdasrkan perhitungan :Diperoleh ukuran profil T : 250 x 9
160 x 9
A. 6.2.1 * Gading Besar pada 2nd Ruang Mesin
Daya Mesin = 1480 kW, maka gading besar dipasang pada ujung -
ujung Mesin dan satu ditengah - tengahnya. Panjang Mesin = 9 .a
Maka e = 4 . a = 4. 0.6 = 2.4 m
Dimana : k = 0.91
e = 2.4 m
l = 2.4 m
63.07 kN/m2 W =
Maka W = 634.69 cm3 634.69
cm3
Berdasrkan perhitungan :Diperoleh ukuran profil T : 140 x 7
80 x 7
PERHITUNGAN SEKAT-SEKAT KEDAP AIR
11 A. 1
Berdasarkan tabel 11.1 BKI 2006 Vol II Sec. 11 pembagian sekat melin-
tang adalah sbb :
- Sekat ceruk buritan (Stern tube bulkhead)
- Sekat Kamar Mesin
- Sekat Tubrukan ( Collision Bulkhead)
- Satu atau lebih Sekat Ruang Muat
Tabel penentuan Koefisien Cp & Cs :
Koefisien Cp & Cs S.Tubrukan S. Non T
Plating Cp 1.1 √f 0.9 √f
Penegar Cs = Constraint kedua ujung 0.33. f 0.265.f
dan Cs = Constraint salah satu ujung 0.45.f 0.36.f
CorrugatedCs = Simply Supported 0.66. f 0.53.f
Bulkhead
W = 0.55. e. l2. ps. n. k
ps = ps1A =
Modulus Gading Besar : W = 0.8 . e. l2. ps. k
ps = ps1A =
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. =80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Tinggi Sekat B' = 13.03
- Sekat R. Muat I = ( H - hDB) + 1/50 B' = 5.5106 m - Sekat R. Muat II = ( H - hDB) + 1/50 B' = 5.5106 m - Sekat R. Muat III = ( H - hDB) + 1/50 B' = 5.5106 m
- Sekat R. Mesin = ( H - hDB) + 1/50 B' B' = 12.95.508 m
- Sekat buritan = ( H - hDB) + 1/50 B' B' = 11.98
4.9896 m
- Sekat Tubrukan = ( H - hDB) + 1/50 B' B' = 6.655.383 m
* Rencana Lebar Plat Sekat
# Sekat RM I , RM II , RM III (m)
- Plat 1 lebar = 1500 mm 1.5
- Plat 2 lebar = 1500 mm 1.5
- Plat 3 lebar = 1500 mm 1.5
- Plat 4 lebar = 1000 mm 1
h = jarak dari pusat beban ke 1 m diatas deck.
Maka : h1 = H + 1 - (hDB + 1/2. 1.8) h1=
= 5.5 m 5.5
h2 = H + 1 - (hDB + 1.8 + 1/2. 1.8) h2=
= 4 m 4
h3 = H + 1 - (hDB + 1.8 + 1.8 + 1/2. 1.8) h3=
= 2.5 m 2.5
h4 = H + 1 - (hDB + 1.8 + 1.8 + 1.8 + 1/2. 1,069) h4=
= 2.00 2.00
Sehingga : p1 = 9.81.h1
= 53.955 kN/m2
p2 = 9.81.h2
= 39.24 kN/m2
p3 = 9.81.h3
= 24.525 kN/m2
p4 = 9.81.h4
= 19.620 kN/m2
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
#Sekat Tubrukan (m)
- Plat 1 lebar = 1500 mm 1.5
- Plat 2 lebar = 1500 mm 1.5
- Plat 3 lebar = 1500 mm 1.5
- Plat 4 lebar = 1000 mm 1
0
Maka : h1 = H + 1 - (hDB + 1/2. 1.5) h1=
= 5.5 m 5.5
h2 = H + 1 - (hDB + 1.5 + 1/2. 1.5) h2=
= 4 m 4
h3 = H + 1 - (hDB + 1.5 + 1.5 + 1/2. 1.5) h3=
= 2.5 m 2.5
h4 = H + 1 - (hDB + 1.5 + 1.5 + 1.5 + 1/2. 1.5) h4=
= 2.00 2.00
Sehingga : p1 = 9.81.h1
= 53.955 kN/m2
p2 = 9.81.h2
= 39.24 kN/m2
p3 = 9.81.h3
= 24.525 kN/m2
p4 = 9.81.h4
= 19.620 kN/m2
B 2.1 * Tebal Plat Sekat
t min = 6.0 * f^(1/2) = 5.7236352
= 6 mm
t = Cp. a.√p + tk
Dimana : f = 235/Reh = 235/265 = 0.89 Cp = 1.1√f = 1.04 Untuk S. Tubrukan
= 0.9.√f = 0.85 Untuk NonTubrukan
a = 0.6
untuk sekat ceruk buritan & sekat tubrukan
# Sekat RM I , RM II , RM III
t1 = Cp. a. √p1 + tk t4 = Cp. a. √p4 + tk t1 = 6 mm
= 5.235258 = 3.7524453
= ~ 6 mm = ~ 6 mm t2 = 5 mm
t2 = Cp. a. √p2 + tk
= 4.6854387 t3 = 5 mm
= ~ 6 mm
t3 = Cp. a. √p3 + tk t4 = 4 mm
= 4.0183104
= ~ 6 mm
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
# Sekat Tubrukan
t1 = Cp. a. √p1 + tk t4 = Cp. a. √p4 + tk t1 = 7 mm
= 6.0653153 = 4.2529887
= ~ 7 mm = ~ 6 mm t2 = 6 mm
t2 = Cp. a. √p2 + tk
= 5.393314 t3 =5 mm
= ~ 6 mm
t3 = Cp. a. √p3 + tk t4 = 5 mm
= 4.577935
= ~ 6 mm
B 3.1
Modulus Penegar Sekat tidak boleh kurang dari :
Dimana : cs = 0.45.f Untuk Sekat Tubrukan
= 0.40
cs = 0.36.f Untuk Sekat non Tubrukan
= 0.32
p = p1 (yang terbesar) = 53.955
l = 5.25 m
Untuk Sekat Tubrukan
W = cs.a. l2. p W =
= 356.07055 kN/m2 356.07
Diperoleh ukuran profil : L 200x100x8 kN/m2
Ukuran Bracket : 310x8.5
Untuk Sekat non Tubrukan
W = cs.a. l2. p W =
= 284.85644 kN/m2 284.86
Diperoleh ukuran profil : L 180x90x8 kN/m2
Ukuran Bracket : 290x8
PERHITUNGAN CANTILEVER
NV B .602 * Untuk Engine Chasing
13
f
Dimana : K = 0.08
ln direncanakan = 1.2 m
Sn = lebar chasing = 3.86 m
gn direncanakan = 0.9 m
un = jarak cantilever = 5.4 m
2.40
* Modulus Penegar Sekat
W = cs.a. l2. p
~ Modulus pada section N - N
ZNN = K. Pn.ln
hDN =
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
0.91
= 2851.9975 cm3 2852.00
Perhitungan Profil T cm3
Berdasrkan perhitungan :
Diperoleh ukuran profil T : 350 x 16
200x 16
an + cn
Dimana :an= 1 cn = 2 m
1 + 4.25
= 2661.864 cm3 2661.8643692
Perhitungan Profil T cm3
Berdasrkan perhitungan :
Diperoleh ukuran profil T : 350 x 15
200x 15
A. 6.1.1 * Gading Besar Bangunan atas
Gading besar pada bangunan atas dihitung pada Poop Deck
dan untuk gading besar lainnya sama dengan Poop Deck
Dimana : k = 0.91
e = 2.4 m
l = 2.4 m
ps = 31.828484 kN/m2
Maka W = 240.23835 cm3
Berdasarkan BKI 2006
Diperoleh Ukuran Profil L : 180 x 90 x 8
Ukuran Bracket : 270 x 7.5
Maka : ZNN = 0.08* 350 (3.86 + 1.3+ 0.9)*5.4*2.4*1.3
ZNN =
~ Modulus pada Section Q - Q
ZQN = (1 + gn/ln) (1 - 1.4 an ). ZNN
Maka ZQN = (1 +0.9/1.2) (1 - 1.4 . 1).2851.998
ZQN =
Modulus Gading Besar : W = 0.6 . e. l2. ps. k
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
* Rencana Lebar Plat Sekat
# Sekat Ruang Mesin (m)
- Plat 1 lebar = 1500 mm 1.5
- Plat 2 lebar = 1500 mm 1.5
- Plat 3 lebar = 1500 mm 1.5
- Plat 4 lebar = 1000 mm 1
h = jarak dari pusat beban ke 1 m diatas deck.
Maka : h1 = H + 1 - (hDB + 1/2. 1.8) h1=
= 5.5 m 5.5
h2 = H + 1 - (hDB + 1.8 + 1/2. 1.8) h2=
= 4 m 4
h3 = H + 1 - (hDB + 1.8 + 1.8 + 1/2. 1.8) h3=
= 2.5 m 2.5
h4 = H + 1 - (hDB + 1.8 + 1.8 + 1.8 + 1/2. 1,092) h4=
= 2.00 2.00
Sehingga : p1 = 9.81.h1
= 53.955 kN/m2
p2 = 9.81.h2
= 39.24 kN/m2
p3 = 9.81.h3
= 24.525 kN/m2
p4 = 9.81.h4
= 19.620 kN/m2
# Sekat buritan (m)
- Plat 1 lebar = 1500 mm 1.5
- Plat 2 lebar = 1500 mm 1.5
- Plat 3 lebar = 1500 mm 1.5
- Plat 4 lebar = 1000 mm 1
Maka : h1 = H + 1 - (hDB + 1/2. 1.8) h1=
= 5.5 m 5.5
h2 = H + 1 - (hDB + 1.8 + 1/2. 1.8) h2=
= 4 m 4
h3 = H + 1 - (hDB + 1.8 + 1.8 + 1/2. 1.5) h3=
= 2.5 m 2.5
h4 = H + 1 - (hDB + 1.8 + 1.8 + 1.5 + 1/2. 0.864) h4=
= 2.00 2.00
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
Sehingga : p1 = 9.81.h1
= 53.955 kN/m2
p2 = 9.81.h2
= 39.24 kN/m2
p3 = 9.81.h3
= 24.525 kN/m2
p4 = 9.81.h4
= 19.620 kN/m2
# Sekat Tubrukan
t1 = Cp. a. √p1 + tk t4 = Cp. a. √p4 + tk t1 = 7 mm
= 6.0653153 = 4.2529887
= ~ 7 mm = ~ 5 mm t2 = 6 mm
t2 = Cp. a. √p2 + tk
= 5.393314 t3 =5 mm
= ~ 6 mm
t3 = Cp. a. √p3 + tk t4 = 5 mm
= 4.577935
= ~ 5 mm
Perhitungan
Konstruksi 9 B 3.1 * Modulus pembujur sisi di Ruang Muat
Lambung W =(83.3/δpr)*m*a*l² *P
Dimana : δpr mak = 150/k = 164.84 N/mm^2
m mak = Mk^2/2 = 0.44
mk = 1-sigma(lk/l*sin^2 alpha) = 0.94271 Wm =
a = 0.6 m 101.03l = 2.4 m cm3P = Ps1M 61.36 kN/m^2
W = 101.03358
Pd tabel BKI 2006 maka dipilih profil L ukuran : 130 x 75 x 8
* Modulus pembujur sisi di Ruang Muat( double hull)
W =(83.3/δpr)*m*a*l² *P
Dimana : δpr mak = 150/k = 164.84 N/mm^2
m mak = Mk^2/2 = 0.44
mk = 1-sigma(lk/l*sin^2 alpha) = 0.94271 Wm =
a = 0.6 m 64.69l = 2.4 m cm3P = Ps1M 39.29 kN/m^2
W = 64.689369
Pd tabel BKI 2006 maka dipilih profil L ukuran : 100 x 75 x 7
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL
9 B 4.1 * Modulus Pelintang sisi
W =0.55*e*l² *P.k
Dimana : e = 2.4 m
l = H -hdb = 5.25 m
61.36 kN/m2
W =
2031.6713 cm3 2031.67
cm3
jadi di gunakan profil ukuran
440 x 9
320 x 9
ps = ps1m =
Maka W =
DESIGN CONSTRUCTION PPNS-ITS 38+37
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL*Pembujur Geladak
Perhitungan 10 B 1 W =(83.3/δpr)*m*a*l² *P
Konstruksi Dimana : δpr mak = 150/k = 164.84 N/mm^2
Geladak m mak = Mk^2/2 = 0.46
mk = 1-sigma(lk/l*sin^2 alpha) = 0.95625 Wm =
a = 0.6 m 47.81l = 2.4 m cm3P=PDM = 28.63
W = 47.813928
Pd tabel BKI 2006 maka dipilih profil L ukuran : 80 x 65 x 8*Pelintang GeladakW = 0.6*e*p*l^2*k = 0.6*13.03*28.63*2.4^2*0.91
= 1173.204 cm3Aw = 0.05*e*p*l*k = 40.73626 cm2Diperoleh ukuran profil T : 250 x 9
160 x 9Bracket : 130 x 7
* Balok geladak
Dimana : c = 0.75a = 0.6 m
l = jarak tidak ditumpu 4.74 m
W = 266.74 cm3 28.99 kN/m2 W = Berdasrkan perhitungan : 266.74
Pd tabel BKI 2006 maka dipilih profil L ukuran : 150 x 100 x 9 cm3
Bracket : 310 x 10
l = 0.5. B' = 3.25 m
W = 171.93 cm3 39.75 kN/m2 W =
171.93
Diperoleh Ukuran Profil : L 120 x 80 x 9 cm3
Ukuran Bracket : 240 x 10
*poop Deck
l = jarak tidak ditumpu 4.9 m
W = 216.64 cm3 22.03 kN/m2 W =
Pd tabel BKI 2006 maka dipilih profil L ukuran : 150 x 90 x 9 216.64
cm3
Bracket : 260 x 9.5
* Boat Deck
l = jarak tidak ditumpu 3.92 m
W = 94.87 cm3 15.08 kN/m2 W =
94.87
Pd tabel BKI 2006 maka dipilih profil L ukuran : 100 x 65 x 8 cm3
Ukuran Bracket : 190 x 6.5
W = c. a. p. l2. k
~ Untuk Daerah A
pDA =
~ Untuk Daerah F
pDF =
pD =
pD =
DESIGN CONSTRUCTION PPNS-ITS 39+37
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL* Bridge Deck l = jarak tidak ditumpu 3.921 m
W = 91.26 cm3 14.50 kN/m2 W =
91.26
Diperoleh Ukuran Profil : L 100 x 65 x 8 cm3
Ukuran Bracket : 190 x 6.5
* Navigation Deck
l = jarak tidak ditumpu 2.52 m
W = 31.00 cm3 11.92 kN/m2 W =
31.00
Diperoleh Ukuran Profil : L 75 x 50 x 7 cm3
Ukuran Bracket : 120 x 6.5
l = 0.5. B' = 6.15 m
W = 184.62 cm3 11.92 kN/m2 W =
184.62
Diperoleh Ukuran Profil : L 150 x 90 x 10 cm3
Ukuran Bracket : 260 x 7.5
BULWARK
6 K .1 * Tebal
Rumus tebal bulwark plate L<100 m :
t = ( 0.75 - L / 1000 ) . √ L
= 6.01
7 mm
Untuk 0.25 L dari FP
t = 7 - 0.5 t =
7
mm
* Tinggi
Tinggi Bulwark tidak boleh kurang dari 1 m h =
h diambil 1 m 1000
* Modulus Stay mm
e = 2 . 0.6 = 1.2 m
l = 1 m
Pada Forward
98.68 kN/m2 W =
Maka : W = 473.64 kN/m2 473.64
Diperoleh Ukuran Profil : L 250 x 90 x 10
Ukuran Bracket = 320 x 9
pD =
pD =
* Forecastle Deck
pD =
= ~
= 6.5 ~ 7 mm
W = 4. ps. e. l2
Ps = Ps5 F =
DESIGN CONSTRUCTION PPNS-ITS 40+37
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.3m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
BAGIAN BAB AYAT10 B 4.1 * Perhitungan Deck Center Girder
~ Pada Ruang Mesin
Dimana : c = 0.75 l = 2.4 m
e = 2.4 28.99 kN/m2 W = Maka W = 273.5382 273.538199
Perhitungan Profil T
Diperoleh ukuran profil T : 140 x 780 x 7
Bracket : 300 x 10
~ Pada Forecastle Deck
Dimana : c = 0.75 l = 2.4 m
e = 2.4 39.75 kN/m2 W =
Maka W = 375.02 375.02
Diperoleh ukuran profil T : 140 x 7
80x 7Bracket : 300 x 10
~ Pada Bangunan - ~ Pada Bangunan - bangunan Atas
Dalam hal ini dihitung pada Poop Deck,sedangkan bangunan atas yang lain bangunan atas yang lain
ukuran profilnya diambil sama dengan pada Poop Deck
Dimana : c = 0.75 Dimana : c = 0.75 l = 2.4 m
e = 2.4 22.03 kN/m2
Maka W = 207.88903
Perhitungan Profil T
Diperoleh ukuran profil T : 140 x 7
80x 7Bracket : 300 x 10
W = c. e. l2. p. k
p = pDA=
cm3
W = c. e. l2. p. k
p = pDF =
cm3
W = c. e. l2. p. k W = c. e. l2. p. k
p = pDA=
Maka W = 0.75. 6.35. ( 2.4 )
Andhika Runaditya 6607040001
Design and Manufacture PPNS-ITS
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.30m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL10 Tinggi Double Bottom h = 1000 mm
11 Jarak Gading Normal ao = 0.6 mm
12 Beban pada Geladak Cuaca 4B.1.1
~ po : 20.23 kN/m2
28.99 kN/m2
28.63 kN/m2
38.26 kN/m2
13 Beban Sisi 4 B2.1.1
* Daerah M
plat 1, lebar : 1500 mm ps1 = 63.97 kN/m2 plat 2, lebar : 1500 mm ps2 = 57.16 kN/m2 plat 3, lebar : 1500 mm ps3 = 47.89 kN/m2 plat 4, lebar : 1500 mm ps4 = 39.29 kN/m2
* Daerah A
plat 1, lebar : 1500 mm ps1 = 67.12 kN/m2 plat 2, lebar : 1500 mm ps2 = 60.05 kN/m2 plat 3, lebar : 1500 mm ps3 = 51.87 kN/m2 plat 4, lebar : 1500 mm ps4 = 42.97 kN/m2
* Daerah F
plat 1, lebar : 700 mm ps1 = 93.79 kN/m2 plat 2, lebar : 1500 mm ps2 = 91.71 kN/m2 plat 3, lebar : 1500 mm ps3 = 88.99 kN/m2 plat 4, lebar : 1500 mm ps4 = 84.74 kN/m2
14 Beban Sisi Bangunan Atas
* Main Deck
plat 1, lebar : 900 mm ps1 = 38.27598 kN/m2 plat 2, lebar : 1500 mm ps2 = 34.62335 kN/m2 * Poop Deck
plat 1, lebar : 1000 mm ps1 = 31.82848 kN/m2 plat 2, lebar : 1500 mm ps2 = 29.19368 kN/m2 * Boat Deck
plat 1, lebar : 900 mm ps1 = 27.04445 kN/m2 plat 2, lebar : 1500 mm ps2 = 25.18997 kN/m2 * Bridge Deck
plat 1, lebar : 800 mm ps1 = 23.637 kN/m2 plat 2, lebar : 1500 mm ps2 = 22.264 kN/m2 * Navigation Deck
plat 1, lebar : 900 mm ps1 = 20.992 kN/m2 plat 2, lebar : 1500 mm ps2 = 68.283 kN/m2 * Forecastle Deck
plat 1, lebar : 1500 mm ps1 = 88.37856 kN/m2 plat 2, lebar : 1400 mm ps2 = 80.02783 kN/m2
~ pDA :
~ pDM :
~ pDF :
Andhika Runaditya 6607040001
Design and Manufacture PPNS-ITS
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.30m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL15 Beban pada Dasar Kapal 4 B.3
75.04 kN/m2
73.23 kN/m2
96.36 kN/m2
16 Beban pada Geladak Bangunan Atas 4 B 5.1 .
~ Poop Deck 22.03 kN/m2
~ Boat Deck 15.08 kN/m2
~ Bridge Deck 14.50 kN/m2
~ Navigation Deck 11.92 kN/m2
~ Forecastle Deck 11.92 kN/m2
17 Beban pada Plat Inner Bottom 4 C.2.1
45.82 kN/m2
45.61 kN/m2
49.06 kN/m2
18 Beban pada Geladak Akomodasi 4 C.3.1 p = 3.99 kN/m2
19 Beban pada Geladak Mesin 4 C.3.2 p = 9.12 kN/m2
20 Beban pada Geladak 2nd Deck Ruang 4 C.1.1 30.74 kN/m2
Mesin
21 Tebal Plat Dasar 6 B.1.1
8 mm
10 mm
9 mm
22 Lebar dan Tebal Plat Bilga 6 B 4.1
Lebar : bmax= 1800 mm
~ Daerah A : 8 mm
~ Daerah M : 10 mm
~ Daerah F : 9 mm
23 Lebar dan Tebal Plat Lunas 6 B 5.1
Lebar : bmax = 1500 mm
~ Daerah M (0.7. L Midship) tfk = 12 mm
~ Daerah Ujung - ujung Kapal tfk = 11 mm
24 Tebal Plat Sisi 6 C.1.1
* Daerah 0.4.L Midship
~ ts1 = 9 mm
~ ts2 = 9 mm
~ ts3 = 8 mm
~ ts4 = 8 mm
* Daerah Halauan
~ ts1 = 9 mm
~ ts2 = 9 mm
~ ts3 = 9 mm
~ ts4 = 8 mm
~ pBA :
~ pBM :
~ pBF :
pDA =
pDA =
pDA =
pDA =
pDA =
~ piA :
~ piM :
~ piF :
pL =
~ tBA :
~ tBM :
~ tBF :
Andhika Runaditya 6607040001
Design and Manufacture PPNS-ITS
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.30m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL * Daerah Buritan
~ ts1 = 8 mm
~ ts2 = 7 mm
~ ts3 = 7 mm
~ ts4 = 7 mm
~ ts5 = 7 mm
25 Tebal Plat Geladak 7 A.6
~ Daerah A : 8 mm
~ Daerah M : 9 mm
~ Daerah F : 8 mm
26 Lebar dan Tebal Sheerstrake 6 C.3.1
~ Lebar : 6 C.3.2 b min= 1203.2 mm
~ Daerah A : 8 mm
~ Daerah M : 9 mm
~ Daerah F : 9 mm
27 Tebal Plat Sisi Bangunan Atas 16 B.1.1
* Main Deck ts1 = 7 mm
ts2 = 7 mm
* Poop Deck ts1 = 7 mm
ts2 = 7 mm
* Boat, Bridge and Navigation Deck
~ ts1 = 7 mm
~ ts2 = 7 mm
28 Tebal Plat Geladak Bangunan Atas 16 B.2.1
* Untuk poop, boat, navigation dan 8 mm
forecastle deck sama.
29 Tebal Plat Sternframe & Propeller bracket 6 F.1.1 t = 9 mm
30 T ebal Plat Bulwark 6 K.1 t = 7 mm
31 Tebal Plat Inner Bottom 8 B. 4.1 7 mm
32 Tebal Plat Geladak 2nd Deck Ruang Mesin 7 B 1.1 t = 7 mm
33 Center Girder 8 B 2.2.1
Tinggi : h = 1000 mm
Tebal : pada Daerah 0.7 L Midship : t = 11 mm
pada Daerah ujung-ujung Kapal t = 10 mm
34 Side Girder 8 B 3.2.1
Tinggi : h = 1000 mm
Tebal : t = 8 mm
35 Tebal Wrang Plat 8 B.7.3.4 t = 9 mm
Penampang blah Wrang plat 8 B. 6.2.2 Aw = 4.74 cm2
36 Modulus Pembujur Alas 9 B.3.1
~ Daerah M : W = 120.0435 cm3 L = 150x75x9
tD =
ti =
Andhika Runaditya 6607040001
Design and Manufacture PPNS-ITS
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.30m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL37 Modulus Pembujur Inner Bottom 9 B.3.1
~ Daerah M : W = 75.09 cm3 L =130 x 75 x 8
38 Tebal Plat Wrang Kedap 12 B.2.1 t = 7 mm
39 Modulus Penegar Wrang Kedap 12 B.3.1 W = 17.04 cm3 L = 60 x 40 x 6
40 Tebal Wrang Plat (single bottom) 8 A.1.2.3 t = 8 mm
41 Tinggi Wrang Plat pada halauan (plandes) h = 1 m
42 Center Girder 8 A.2.2.1
Tebal : t = 12 mm Sectional Area : Af = 68.45 cm2 Side Girder
Tebal : t = 9 mm Sectional Area : Af = 22.13 cm2
43 Sea Chest 8 B.5.3.2
~ Tebal Plat : t = 12 mm
~ Modulus Penegar : W = 61.152 cm3 cm3 L = 80 x 65 x 10
44 Wrang Plat di Kamar mesin 8 C 1.1
~ Modulus : W = 1984.14 cm 3
~ Tinggi : h = 1235 mm
~ Tebal Web : t = 16.35 mm
45 Tebal Plat Bilah (longitudinal foundation girder) 8 C1.3 t = 16 mm
46 Luas Area Dok Intercostal 8 C.1.3 Aw = 26.13 cm2
47 Luas Area Top Plate 8 C.3.2.3 AT = 89.73 cm2
Tebal Top Plate t = 45 mm
Lebar Top Plate l = 22.43 mm
48 Tinggi plat bilah max h = 1318 mm
49 Modulus Gading Utama Bangunan Atas 9 A.3.2.1
~ Main Deck W = 58.68 cm3 L = 100 x 50 x 8
~ Poop Deck W = 41.29 cm3 L = 90 x 60 x 6
~ Boat Deck W = 41.29 cm3 L = 90 x 60 x 6
~ Navigation Deck W = 41.29 cm3 L = 90 x 60 x 6
~ Forecastle Deck W = 15.46 cm3 L = 60 x 40 x 6
50 Modulus Gading Utama 1st deck Ruang Mesin 9. A.2.1 W = 58.68 cm3 L = 100 x 50 x 8
51 Modulus Gading Utama Ceruk Halauan 9 A4.1 W = 639.64 cm3 L = 250 x 90 x 8
52 Modulus Gading Utama Ceruk Buritan 9 A.4.2 W = 391.50 cm3 L = 250 x 90 x 9
53 Modulus Gading Utama 2nd Deck Ruang 9 A3.2.1 W = 81.82 cm3 L = 100 x 75 X 9
Mesin
54 Modulus Gading Besar di 1st Deck 9. A5.3.1 W = 436.35 cm3 T 140 x 7
Ruang Mesin 80x 755 Modulus Gading Besar di 2nd Deck 9. A 6.1.1 W = 634.69 cm3 T 140 x 7
Ruang Mesin 80x 7
Andhika Runaditya 6607040001
Design and Manufacture PPNS-ITS
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.30m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL56 Pelintang sisi pd Ruang Muat A.4.1 W = 2118.05 cm3 T 10 x 550
57 Sekat-sekat Kedap Air 250 x 10
* Sekat Ruang Muat I,II,III,IV
plat 1, lebar : 1800 mm t1 = 6 mm
plat 2, lebar : 1800 mm t2 = 6 mm
plat 3, lebar : 1800 mm t3 = 6 mm
plat 4, lebar : 1046 mm t3 = 6 mm
* Sekat Ceruk Buritan
plat 1, lebar : 1800 mm t1 = 7 mm
plat 2, lebar : 1800 mm t2 = 6 mm
plat 3, lebar : 1500 mm t3 = 6 mm
plat 4, lebar : 489 mm t3 = 6 mm
* Sekat Tubrukan
plat 1, lebar : 1800 mm t1 = 7 mm
plat 2, lebar : 1800 mm t2 = 6 mm
plat 3, lebar : 1800 mm t3 = 6 mm
plat 4, lebar : 883 mm t3 = 6 mm
58 Modulus Penegar Sekat 11 B. 3.1
~ Untuk sekat tubrukan : W = 362.89 cm3 L =250 x 90 x 10
~ Untuk sekat non Tubrukan W = 290.31 cm3 L =200 x 100 x 10
59 CANTILEVER NV B.602
Untuk Engine Casing
Section N-N W = 2852.00 cm3
320x 9
Section Q-Q W = 2661.8644 cm3
300 x 9
60 Pembujur Geladak 10 B 1
~ Daerah M : W = 47.81 cm3 L = 80 x 65 x 8
61 Pelintang Geladak
~ Daerah M : W = 40.73 cm3 T 250x9160 x 9
62 Balok Geladak
~ Daerah A : W = 266.74 cm3 L = 150 x 100 x 9
~ Daerah Ceruk halauan W = 325.04 cm3 L = 180 x 90 x 9
~ Poop Deck W = 216.64 cm3 L = 150 x 90 x 9
~ Boat Deck W = 94.87 cm3 L = 100 x 65 x 8
~ Bridge Deck W = 91.26 cm3 L = 100 x 65 x 8
~ Navigation Deck & Top Deck W = 31.00 cm3 L = 75 x 50 x 7
~ Forecastle Deck W = 184.62 cm3 L = 150 x 90 x 10
T 600 x 9
T 650 x 12
Andhika Runaditya 6607040001
Design and Manufacture PPNS-ITS
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 80 m Lkonst. = 80.64 m T = 5.30m Cp = 0.72
TANKER Lwl = 84 m B = 13.03 m Cb = 0.7 Vs = 11 knotNama Kapal H = 6.25 m Cm = 0.98
KM. RIPPLE Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL
63 Stays 6 K.4
~ Daerah F : 406.70 cm3 L =200 x 100 x 10
64 Side Coaming NV B.201
~ Engine Casing Ruang Mesin W = 312.98 cm3 T 7 x 250
120x 7
65 End Coaming
~ Engine Casing 2nd Deck Ruang Mesin W = 294.84 cm3 T 7 x 250
120x 7
~ Engine Casing Ruang Mesin W = 294.84 cm3 T 7 x 250
120x 7
66 Deck Center Girder 10 B.4.1
~ Pada 2nd deck ruang mesin W = 273.5382 cm3 T 7 x14080x 7
~ Pada Ruang Mesin W = 273.5382 cm3 T 7 x14080x 7
~ Pada Forecastle Deck W = 375.02 cm3 T 7 x14080x 7
~ pada bangunan - bangunan atas W = 207.889 cm3 T 7 x14080x 7
WF=
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 92 m Lkonst. = 93.219 T = 6 m
Container Lwl = 96.6 m B = 18.5 m Cb = 0.714Nama Kapal H = 8 m Vs = 13 knot
KM. Nanggala Sistem Konstruksi : Campuran
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL1 H 2.1 Length L
The length L is the distance in metres, on the summer load 96.6
waterline from the foreside of stem to the after side of the m
rudder post, or the centre of the rudder stock if there is no
rudder post. L is not to be less than 96% and need not be
greater than 97% of the extreme length of the summer loadwater line. In ships with unusual stern and bow arrangement,the length L will be specially considered.
2.2 Length Lc ( according to LLC 66, MARPOL73 / 78, IBC - Code and IGC - Code )The length Lc is to be taken as 96 % of the total length on 92a waterline at 85 % of the least moulded depth Hc measured mfrom the top of the keel, or as the length from the fore sideof the stem to the axis of the rudder stock on that waterline,if that be greater. In ships designed with a rake of keel thewaterline on which this length is measured shall be parallel
to the designed waterline.
For the definition of the least moulded depth Hc see LLC
66, Annex I, Chapter I, Regulation 3 (5).
2.3 Length L* (according to SOLAS 74 Chapter
II-1, Reg 2) 92
The length L* of the ship is the length measured between mperpendiculars taken at the extremities of the deepestsubdivision load line.
2.5 Forward perpendicular FP.
The forward perpendicular coincides with the foreside of
the stem on the waterline on which the respective length
L, Lc, or L* is measured.
2.6 Breadth B
The breadth B is the greatest moulded breadth of the ship. 18.5
m
2.7 Depth H
The depth H is the vertical distance, at the middle of the 8
length L, from the base line2) to top of the deck beam at m
side on the uppermost continuous deck.In way of effective superstructures the depth H is to bemeasured up to the superstructure deck for determining
the ship's scantlings.
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 92 m Lkonst. = 93.219 T = 6 m
Container Lwl = 96.6 m B = 18.5 m Cb = 0.714Nama Kapal H = 8 m Vs = 13 knot
KM. Nanggala Sistem Konstruksi : Campuran
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL1 2.8 Draught T
The draught T is the vertical distance at the middle of the 6
length L from base line to freeboard marking for summer m
load waterline. For ships with timber load line the draught
T is to be measured up to the freeboard mark for timber
load waterline
H 3 Frame spacing a
The frame spacing a will be measured from moulding edge 0.6to moulding edge of frame. m
H 4 Block coefficient CBMoulded block coefficient at load draught T, based on rule 0.7length L.
H 5 Ship's speed v0Maximum service speed [kn], which the ship is designed 13to maintain at the summer load line draught and at the knotpropeller RPM corresponding to MCR (maximum
continuous rating).
In case of controllable pitch propellers the speed v0 is to
be determined on the basis of maximum pitc
H 6.1 Bulkhead deckBulkhead deck is the deck up to which the watertightbulkheads are carried.
6.2 Freeboard deck
Freeboard deck is the deck upon which the freeboard
calculation is based
6.3 Strength deck
Strength deck is the deck or the parts of a deck which form
the upper flange of the effective longitudinal structure.
6.4 Weather deck
All free decks and parts of decks exposed to the sea are
defined as weather deck.
6.5 Lower decksStarting from the first deck below the uppermost continuous
deck, the lower decks are defined as 2nd, 3rd deck, etc.
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 92 m Lkonst. = 93.219 T = 6 m
Container Lwl = 96.6 m B = 18.5 m Cb = 0.714Nama Kapal H = 8 m Vs = 13 knot
KM. Nanggala Sistem Konstruksi : Campuran
BAGIAN BAB AYAT PERHITUNGAN DAN KOREKSI HASIL1 6.6 Superstructure decks
The superstructure decks situated immediately above the
uppermost continuous deck are termed forecastle deck,
bridge deck, and poop deck. Superstructure decks above
the bridge deck are termed 2nd, 3rd superstructure deck,
etc.
6.7 For the arrangement of hatches, doors and ventilators
the following areas are defined:
Pos. 1 S on exposed freeboard decks, S on raised quarter decks, 'S on exposed superstructure decks within the forward quarter of Lc.Pos. 2 S on exposed superstructure decks aft of the forward quarter of Lc.
* Gading Besar pada 1st Deck Ruang Mesin dan Pelintang Geladak
Perhitungan Modulus Penampang (W)
Bagian Nama Luas (F) Jarak (d) Momen Luas (F.d) Momen Inersia (F.d^2) Momen Inersia Individu (1/12 bh^3)
cm^2 cm cm^3
I Pelat Pengikut 54 26.35 1422.9 37493.415 3.645
60 x 0.9 cm
II Pelat Bilah 22.5 13.4 301.5 4040.1 1171.875
0.9 x 25 cm
III Pelat Hadap 14.4 0.45 6.48 2.916 0.972
16 x 0.9 cm
90.9 1730.88 41536.431 1176.492
Z1 = Momen luas/Luas = 19.0415841584158 cm
Z2= 7.75841584158416 cm
Ixx = 42712.923 cm4
I na = 9754.22581188118 cm4
W1 = I na/Z1 512.259155054076
W2 = I na/Z2 1257.24452143951
* Deck Center Girder dan Gading besar 2nd Ruang mesin
Perhitungan Modulus Penampang (W)
Bagian Nama Luas (F) Jarak (d) Momen Luas (F.d) Momen Inersia (F.d^2) Momen Inersia Individu (1/12 bh^3)
cm^2 cm cm^3
I Pelat Pengikut 42 15.05 632.1 9513.105 1.715
60 x 0.7 cm
II Pelat Bilah 9.8 7.7 75.46 581.042 911.458333333333
0.7 x 14 cm
III Pelat Hadap 5.6 0.45 2.52 1.134 0.228666666666667
8 x 0.7 cm
57.4 710.08 10095.281 913.402
cm⁴ cm⁴
cm⁴ cm⁴
Z1 = Momen luas/Luas = 12.3707317073171 cm
Z2= 3.02926829268293 cm
Ixx = 11008.683 cm4
I na = 2224.47382926829 cm4
W1 = I na/Z1 179.817482255521
W2 = I na/Z2 734.327109500806
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 86 m Lkonst. = 86.69 m T = 6 .2m Cp = 0.723
TANKER Lwl = 90.3 m B = 14.8 m Cb = 0.714 Vs = 11 knotNama Kapal H = 7.2 m Cm = 0.987
KM. MURAI BATU Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL10 Tinggi Double Bottom h = 1000 mm
11 Jarak Gading Normal ao = 0.6 mm
12 Beban pada Geladak Cuaca 4B.1.1
~ po : 20.23 kN/m2
28.99 kN/m2
28.63 kN/m2
39.75 kN/m2
13 Beban Sisi 4 B2.1.1
* Daerah M
plat 1, lebar : 1500 mm ps1 = 61.36 kN/m2 plat 2, lebar : 1500 mm ps2 = 52.22 kN/m2 plat 3, lebar : 1800 mm ps3 = 45.41 kN/m2 plat 4, lebar : 1400 mm ps4 = 39.29 kN/m2
* Daerah A
plat 1, lebar : 1500 mm ps1 = 63.07 kN/m2 plat 2, lebar : 1500 mm ps2 = 56.06 kN/m2 plat 3, lebar : 1500 mm ps3 = 49.69 kN/m2 plat 4, lebar : 1150 mm ps4 = 0.00 kN/m2 plat 5, lebar : 1500 mm ps5 = 42.80 kN/m2
* Daerah F
plat 1, lebar : 1800 mm ps1 = 103.04 kN/m2 plat 2, lebar : 1800 mm ps2 = 102.42 kN/m2 plat 3, lebar : 1730 mm ps3 = 110.47 kN/m2 plat 4, lebar : 1500 mm ps4 = 98.68 kN/m2
14 Beban Sisi Bangunan Atas
* Main Deck
plat 1, lebar : 1500 mm ps1 = 38.275984 kN/m2 plat 2, lebar : 900 mm ps2 = 34.623351 kN/m2 * Poop Deck
plat 1, lebar : 1500 mm ps1 = 31.828484 kN/m2 plat 2, lebar : 900 mm ps2 = 29.193676 kN/m2 * Boat Deck
plat 1, lebar : 1500 mm ps1 = 27.044448 kN/m2 plat 2, lebar : 900 mm ps2 = 25.189972 kN/m2 * Bridge Deck
plat 1, lebar : 1500 mm ps1 = 23.573503 kN/m2 plat 2, lebar : 900 mm ps2 = 22.151985 kN/m2 * Navigation Deck
plat 1, lebar : 1500 mm ps1 = 20.941782 kN/m2 plat 2, lebar : 900 mm ps2 = 19.767915 kN/m2 * Forecastle Deck
plat 1, lebar : 1500 mm ps1 = 88.378559 kN/m2
~ pDA :
~ pDM :
~ pDF :
plat 2, lebar : 1400 mm ps2 = 80.027829 kN/m2
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 86 m Lkonst. = 86.69 m T = 6 .2m Cp = 0.723
TANKER Lwl = 90.3 m B = 14.8 m Cb = 0.714 Vs = 11 knotNama Kapal H = 7.2 m Cm = 0.987
KM. MURAI BATU Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL1 Length L 1 H 2.1 96.6 m
2 Length Lc ( according to LLC 66, MARPOL 1 H 2.2 92 m
73 / 78, IBC - Code and IGC - Code )
3 Length L* (according to SOLAS 74 Chapter 1 H 2.3 92 m
II-1, Reg 2)
4 Breadth B 1 H 2.6 18.5 m
5 Depth H 1 H 2.7 8 m
6 Draught T 1 H 2.8 6 m
7 Frame spacing a 1 H 3 0.6 m
8 Block coefficient CB 1 H 4 0.7
9 Ship's speed v0 1 H 5 13 knot
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 86 m Lkonst. = 86.69 m T = 6 .2m Cp = 0.723
TANKER Lwl = 90.3 m B = 14.8 m Cb = 0.714 Vs = 11 knotNama Kapal H = 7.2 m Cm = 0.987
KM. MURAI BATU Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL15 Beban pada Dasar Kapal 4 B.3
75.04 kN/m2
73.23 kN/m2
103.82 kN/m2
16 Beban pada Geladak Bangunan Atas 4 B 5.1 .
~ Poop Deck 22.03 kN/m2
~ Boat Deck 15.08 kN/m2
~ Bridge Deck 14.50 kN/m2
~ Navigation Deck 11.92 kN/m2
~ Forecastle Deck 11.92 kN/m2
17 Beban pada Plat Inner Bottom 4 C.2.1
45.82 kN/m2
45.61 kN/m2
49.06 kN/m2
18 Beban pada Geladak Akomodasi 4 C.3.1 p = 3.99 kN/m2
19 Beban pada Geladak Mesin 4 C.3.2 p = 9.12 kN/m2
20 Beban pada Geladak 2nd Deck Ruang 4 C.1.1 30.74 kN/m2
Mesin
21 Tebal Plat Dasar 6 B.1.1
8 mm
10 mm
9 mm
22 Lebar dan Tebal Plat Bilga 6 B 4.1
Lebar : bmax= 1800 mm
~ Daerah A : 8 mm
~ Daerah M : 10 mm
~ Daerah F : 9 mm
23 Lebar dan Tebal Plat Lunas 6 B 5.1
Lebar : bmax = 1500 mm
~ Daerah M (0.7. L Midship) tfk = 12 mm
~ Daerah Ujung - ujung Kapal tfk = 11 mm
24 Tebal Plat Sisi 6 C.1.1
* Daerah 0.4.L Midship
~ ts1 = 9 mm
~ ts2 = 9 mm
~ ts3 = 8 mm
~ ts4 = 8 mm
* Daerah Halauan
~ ts1 = 9 mm
~ ts2 = 9 mm
~ ts3 = 9 mm
~ ts4 = 9 mm
~ pBA :
~ pBM :
~ pBF :
pDA =
pDA =
pDA =
pDA =
pDA =
~ piA :
~ piM :
~ piF :
pL =
~ tBA :
~ tBM :
~ tBF :
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 86 m Lkonst. = 86.69 m T = 6 .2m Cp = 0.723 Type Kapal
TANKER Lwl = 90.3 m B = 14.8 m Cb = 0.714 Vs = 11 knot TANKERNama Kapal H = 7.2 m Cm = 0.987 Nama Kapal
KM. MURAI BATU Sistem Konstruksi : MEMANJANG KM. MURAI BATU
NO NAMA SECTION HASIL PROFIL NO * Daerah Buritan 37
~ ts1 = 8 mm
~ ts2 = 7 mm
~ ts3 = 7 mm 38
~ ts4 = #REF! mm 39
~ ts5 = 7 mm 40
41
25 Tebal Plat Geladak 7 A.6 42
~ Daerah A : 8 mm
~ Daerah M : 9 mm
~ Daerah F : 8 mm
26 Lebar dan Tebal Sheerstrake 6 C.3.1
~ Lebar : 6 C.3.2 b min= 1203.2 mm
~ Daerah A : 8 mm 43
~ Daerah M : 9 mm
~ Daerah F : 9 mm
44
27 Tebal Plat Sisi Bangunan Atas 16 B.1.1
* Main Deck ts1 = 7 mm 45
ts2 = 7 mm 46
* Poop Deck ts1 = 7 mm 47
ts2 = 7 mm
* Boat, Bridge and Navigation Deck
~ ts1 = 7 mm 48
~ ts2 = 7 mm
28 Tebal Plat Geladak Bangunan Atas 16 B.2.1
* Untuk poop, boat, navigation dan 8 mm 49
forecastle deck sama.
29 Tebal Plat Sternframe & Propeller bracket 6 F.1.1 t = 9 mm
30 T ebal Plat Bulwark 6 K.1 t = 7 mm
31 Tebal Plat Inner Bottom 8 B. 4.1 7 mm
32 Tebal Plat Geladak 2nd Deck Ruang Mesin 7 B 1.1 t = 7 mm
33 Center Girder 8 B 2.2.1
Tinggi : h = 1000 mm 50
Tebal : pada Daerah 0.7 L Midship : t = 11 mm 51
pada Daerah ujung-ujung Kapal t = 10 mm 52
34 Side Girder 8 B 3.2.1 53
Tinggi : h = 1000 mm
Tebal : t = 8 mm 54
35 Tebal Wrang Plat 8 B.7.3.4 t = 9 mm
Penampang blah Wrang plat 8 B. 6.2.2 Aw = 4.74 cm2 55
36 Modulus Pembujur Alas 9 B.3.1
~ Daerah M : W = 120.0435 cm3 L = 150x75x9
tD =
ti =
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 86 m Lkonst. = 86.69 m T = 6 .2m Cp = 0.723 Type Kapal
TANKER Lwl = 90.3 m B = 14.8 m Cb = 0.714 Vs = 11 knot TANKERNama Kapal H = 7.2 m Cm = 0.987 Nama Kapal
KM. MURAI BATU Sistem Konstruksi : MEMANJANG KM. MURAI BATU
NAMA SECTION HASIL PROFIL NO Modulus Pembujur Inner Bottom 9 B.3.1 56
~ Daerah M : W = 75.09 cm3 L =130 x 75 x 8 57
Tebal Plat Wrang Kedap 12 B.2.1 t = 7 mm
Modulus Penegar Wrang Kedap 12 B.3.1 W = 17.04 cm3 L = 60 x 40 x 6
Tebal Wrang Plat (single bottom) 8 A.1.2.3 t = 8 mm
Tinggi Wrang Plat pada halauan (plandes) h = 1 m
Center Girder 8 A.2.2.1
Tebal : t = 12 mm Sectional Area : Af = 68.45 cm2 Side Girder
Tebal : t = 9 mm Sectional Area : Af = 22.13 cm2 Sea Chest 8 B.5.3.2
~ Tebal Plat : t = 12 mm
~ Modulus Penegar : W = 61.152 cm3 cm3 L = 80 x 65 x 10
Wrang Plat di Kamar mesin 8 C 1.1
~ Modulus : W = 1984.14 cm 3
~ Tinggi : h = 1235 mm 58
~ Tebal Web : t = 16.35 mm
Tebal Plat Bilah (longitudinal foundation girder) 8 C1.3 t = 16 mm
Luas Area Dok Intercostal 8 C.1.3 Aw = 26.13 cm2
Luas Area Top Plate 8 C.3.2.3 AT = 89.73 cm2
Tebal Top Plate t = 45 mm
Lebar Top Plate l = 22.43 mm 59
Tinggi plat bilah max h = 1383.4 mm
Modulus Gading Utama Bangunan Atas 9 A.3.2.1
~ Main Deck W = 0.00 cm3 L = 100 x 50 x 10
~ Poop Deck W = 41.29 cm3 L = 100 x 65 x 7
~ Boat Deck W = 41.29 cm3 L = 100 x 65 x 7 60
~ Navigation Deck W = 41.29 cm3 L = 100 x 65 x 7
~ Forecastle Deck W = 15.46 cm3 L = 60 x 40 x 6
61
Modulus Gading Utama 1st deck Ruang Mesin 9. A.2.1 W = 55.137476 cm3 L = 180 x 90 X 14
Modulus Gading Utama Ceruk Halauan 9 A4.1 W = 639.64 cm3 T = 9x210/100x9
Modulus Gading Utama Ceruk Buritan 9 A.4.2 W = 391.50 cm3 T = 8x108/80x8 62
Modulus Gading Utama 2nd Deck Ruang 9 A3.2.1 W = 81.82 cm3 L = 130 x 65 X 10
Mesin
Modulus Gading Besar di 1st Deck 9. A5.3.1 W = 436.35 cm3 T 10 x 480
Ruang Mesin 200x 10 Modulus Gading Besar di 2nd Deck 9. A 6.1.1 W = 634.69 cm3 T 6 x 220
Ruang Mesin 100x 6
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 86 m Lkonst. = 86.69 m T = 6 .2m Cp = 0.723
TANKER Lwl = 90.3 m B = 14.8 m Cb = 0.714 Vs = 11 knotNama Kapal H = 7.2 m Cm = 0.987
KM. MURAI BATU Sistem Konstruksi : MEMANJANG
NAMA SECTION HASIL PROFILPelintang sisi pd Ruang Muat A.4.1 W = #REF! cm3 T 10 x 550
Sekat-sekat Kedap Air 250 x 10
* Sekat Ruang Muat I,II,III,IV
plat 1, lebar : 1800 mm t1 = 6 mm
plat 2, lebar : 1800 mm t2 = 6 mm
plat 3, lebar : 1800 mm t3 = 6 mm
plat 4, lebar : 1069 mm t3 = 6 mm
* Sekat Ceruk Buritan
plat 1, lebar : 1800 mm t1 = 7 mm
plat 2, lebar : 1800 mm t2 = 6 mm
plat 3, lebar : 1500 mm t3 = 6 mm
plat 4, lebar : 864 mm t3 = 6 mm
* Sekat Tubrukan
plat 1, lebar : 1800 mm t1 = 7 mm
plat 2, lebar : 1800 mm t2 = 6 mm
plat 3, lebar : 1800 mm t3 = 6 mm
plat 4, lebar : 949 mm t3 = 6 mm
Modulus Penegar Sekat 11 B. 3.1
~ Untuk sekat tubrukan : W = 356.07 cm3 L =250 x 90 x 14
~ Untuk sekat non Tubrukan W = 284.86 cm3 L =250 x 90 x 12
CANTILEVER NV B.602
Untuk Engine Casing
Section N-N W = 2852.00 cm3
250x 10
Section Q-Q W = 2661.8644 cm3
300 x 12
Pembujur Geladak 10 B 1
~ Daerah M : W = 47.81 cm3 L = 90 x 60 x 8
Pelintang Geladak
~ Daerah M : W = 1173.20 cm3 T 9 x 320150 x 9
Balok Geladak
~ Daerah A : W = 266.74 cm3 L = 250 x 90 x 10
~ Daerah Ceruk halauan W = 171.93 cm3 L = 160 x 80 x 14
~ Poop Deck W = 216.64 cm3 L = 180 x 90 x 12
~ Boat Deck W = 94.87 cm3 L = 170 x 75 x 9
~ Bridge Deck W = 91.26 cm3 L = 100 x 65 x 9
~ Navigation Deck & Top Deck W = 31.00 cm3 L = 80 x 65 x 10
~ Forecastle Deck W = 184.62 cm3 L = 150 x 100 x 10
T 500 x 10
T 650 x 12
RESUME PERHITUNGAN STEEL PLAN
UKURAN -UKURAN UTAMA KAPALType Kapal Lpp = 86 m Lkonst. = 86.69 m T = 6 .2m Cp = 0.723
TANKER Lwl = 90.3 m B = 14.8 m Cb = 0.714 Vs = 11 knotNama Kapal H = 7.2 m Cm = 0.987
KM. MURAI BATU Sistem Konstruksi : MEMANJANG
NO NAMA SECTION HASIL PROFIL
63 Stays 6 K.4
~ Daerah F : 473.64 cm3 L =250 x 90 x 14
64 Side Coaming NV B.201
~ Engine Casing Ruang Mesin W = #REF! cm3 T 7 x 250
120x 7
65 End Coaming
~ Engine Casing 2nd Deck Ruang Mesin W = 0.00 cm3 T 7 x 250
120x 7
~ Engine Casing Ruang Mesin W = 0.00 cm3 T 7 x 250
120x 7
66 Deck Center Girder 10 B.4.1
~ Pada 2nd deck ruang mesin W = 273.5382 cm3 T 8 x16080x 8
~ Pada Ruang Mesin W = 273.5382 cm3 T 8 x16080x 8
~ Pada Forecastle Deck W = 375.02 cm3 T 8 x16080x 8
~ pada bangunan - bangunan atas W = 207.88903 cm3 T 8 x16080x 8
WF=