despatch status of commissioning procedures1

Upload: sudhirkumar99

Post on 04-Jun-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    1/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    2/93

    Raichur, 1 x 250 MW, Unit 8

    Nalco CPP Exp, 2x 210MW, Unit 9 & 10

    Rayalseema, Stage III, 210MW, Unit 5

    Neyveli, CFBC, 2x 250MW Unit 1 & 2

    Vallur, 3x 500MW, Unit 1, 2 & 3

    Kothagudam, 1x 500MW

    Simhadri,Stage II , 2x 500MW, Unit 3& 4

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    3/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    4/93

    0 T / HR

    USTRIAL PROJECTS

    US

    TPH &1X67.5MW STG UNIT

    US

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    5/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    6/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    7/93

    S . No Description Document no Document Date

    1Procedure for Boiler Hydraulic

    test and preservationPS:TSX:

    2 Procedure for EDTA cleaning PS:TSX:

    3

    Procedure for steam blowing

    and oil flushing of fuel oil

    system

    4Procedure for lube oil flushing of

    rotating machinesPS:TSX:

    5

    Procedure for air and gas

    tightness test of furnace and

    ducts for pulverised coal firing

    boilers

    PS:TSX:

    6Procedure for commissioning of

    CC pumpsPS:TSX:

    7Procedure for air in leak test of

    ESPPS:TSX:

    8Procedure for commissioning of

    HPBP systemPS:TSX:327:00:12 21.07.2012

    9

    Procedure for steam blowing of

    boiler and associated steam

    lines including aux. steam lines

    PS:TSX:

    RAYALASEEMA - 600 MW

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    8/93

    10Procedure for clean air flow test

    of coal pipesPS:TSX:

    11

    Procedure for detergent flushing

    of preboiler system PS:TSX:

    12Procedure for lube oil flushinng

    of MDBFPPS:TSX:

    13

    Procedure for hydraulic test and

    fushinng of Turbine lube oil and

    jacking oil system

    PS:TSX:

    14Procedure for hydraulic test and

    fushinng of Control Fluid systemPS:TSX:

    15Procedure for condenser flood

    test/ Vacuum tightness testPS:TSX:

    16Procedure for lube oil flushinng

    of TDBFPPS:TSX:

    17

    Procedure for hydraulic test and

    flushing of Generator seal oil

    system

    PS:TSX:

    18Procedure for hydraulic test and

    flushing of Generator PW system

    PS:TSX:

    19Procedure for Generator air

    tightness testPS:TSX:

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    9/93

    20Procedure for commissioning of

    LPBP systemPS:TSX:

    RETURN TO COMMISSIONING PROCEDURES MAIN PA

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    10/93

    Despatch date

    26.07.2012

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    11/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    12/93

    E

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    13/93

    S . No Description Document noDocument

    Date

    1Procedure for Boiler Hydraulic test and

    preservation

    PS:TSX:262:00:11

    2 Procedure for EDTA cleaning PS:TSX:265:00:11/00 03.01.2012

    3Procedure for steam blowing and oil

    flushing of fuel oil system

    4Procedure for lube oil flushing of

    rotating machinesPS:TSX:264:00:11/00 03.01.2012

    5Procedure for air and gas tightness testof furnace and ducts for pulverised coal

    firing boilers

    PS:TSX:268:00:12 05.01.2012

    6Procedure for commissioning of CC

    pumpsPS:TSX:

    7 Procedure for air in leak test of ESP PS:TSX:

    8Procedure for commissioning of HPBP

    systemPS:TSX:326:00:12 21.07.2012

    9

    Procedure for steam blowing of boiler

    and associated steam lines including

    aux. steam lines

    PS:TSX:

    10Procedure for clean air flow test of coal

    pipesPS:TSX:182:00:10 23.06.2010

    11Procedure for detergent flushing of

    preboiler system

    PS:TSX:

    12Procedure for lube oil flushinng of

    MDBFPPS:TSX:

    KAKATIYA.

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    14/93

    13

    Procedure for hydraulic test and

    fushinng of Turbine lube oil and jacking

    oil system

    PS:TSX:

    14 Procedure for hydraulic test andfushinng of Control Fluid system

    PS:TSX:

    15Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:

    16Procedure for lube oil flushinng of

    TDBFPPS:TSX:

    17Procedure for hydraulic test and flushing

    of Generator seal oil system PS:TSX:

    18Procedure for hydraulic test and flushing

    of Generator PW systemPS:TSX:

    19Procedure for Generator air tightness

    testPS:TSX:

    20Procedure for commissioning of LPBP

    systemPS:TSX:

    RETURN TO COMMISSIONING PROCEDURES MAIN PA

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    15/93

    Despatch date

    26.12.2011

    12.01.2012

    12.01.2012

    12.01.2012

    26.07.2012

    12.01.2012

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    16/93

    E

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    17/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservation

    PS:TSX:267:00:12

    2 Procedure for EDTA cleaning PS:TSX:266:00:12

    3Procedure for steam blowing and oil

    flushing of fuel oil system

    4Procedure for lube oil flushing of rotating

    machinesPS:TSX:

    5

    Procedure for air and gas tightness test of

    furnace and ducts for pulverised coal firingboilers

    PS:TSX:268:00:12

    6 Procedure for commissioning of CC pumps PS:TSX:

    7 Procedure for air in leak test of ESP PS:TSX:

    8Procedure for commissioning of HPBP

    systemPS:TSX:298:00:12

    9

    Procedure for steam blowing of boiler and

    associated steam lines including aux.steam lines

    PS:TSX:

    10Procedure for clean air flow test of coal

    pipesPS:TSX:182:00:10

    11Procedure for detergent flushing of

    preboiler systemPS:TSX:317:00:12

    12 Procedure for lube oil flushinng of MDBFP PS:TSX:

    13 Procedure for hydraulic test and fushinngof Turbine lube oil and jacking oil system

    PS:TSX:

    14Procedure for hydraulic test and fushinng

    of Control Fluid systemPS:TSX:

    15Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:

    NTPL 2X500 MW, TUTICORIN

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    18/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    19/93

    Document

    Date

    Despatch

    date

    04.01.2012 24.01.2012

    04.01.2012 12.01.2012

    05.01.2012 12.01.2012

    07.06.2012 11.06.2012

    23.06.2010 12.01.2012

    12.07.2012 17.07.2012

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    20/93

    AIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    21/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservationPS:TSX:259:00:11

    2 Procedure for EDTA cleaning PS:TSX:258:00:11/00

    3Procedure for steam blowing and oil flushing

    of fuel oil system

    4Procedure for lube oil flushing of rotating

    machinesPS:TSX:287:00:12

    5

    Procedure for air and gas tightness test of

    furnace and ducts for pulverised coal firing

    boilers

    PS:TSX:268:00:12

    PS:TSX:286:00:12

    6 Procedure for air in leak test of ESP PS:TSX:

    7 Procedure for commissioning of HPBP system PS:TSX:298:00:12

    8

    Procedure for steam blowing of boiler and

    associated steam lines including aux. steam

    lines

    PS:TSX:290:00:12

    9 Procedure for clean air flow test of coal pipes PS:TSX:182:00:10

    10 Procedure for ALKALI BOILOUT PS:TSX:271:00:12/00

    11 Procedure for lube oil flushinng of MDBFP PS:TSX:302:00:12

    12Procedure for hydraulic test and fushinng of

    Turbine lube oil and jacking oil systemPS:TSX:277:00:12

    13 Procedure for condenser flood test/ Vacuumtightness test

    PS:TSX:

    14Procedure for Detergent flushing of pre -boiler

    systemPS:TSX:288:00:12

    STERLITE (SIIL) 2X80 MW, TUTICORIN

    RETURN TO COMMISSIONING PROCEDURES M

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    22/93

    Document

    DateDespatch date

    03.12.2011 09.12.2011

    03.11.2011 09.12.2011

    05.05.2012 24.05.2012

    05.01.2012

    05.05.2012

    12.01.2012

    05.06.2012

    07.06.2012 11.06.2012

    18.05.2012 24.05.2012

    23.06.2010 12.01.2012

    17.01.2012 24.01.2012

    11.06.2012 14.06.2012

    10.04.2012 12.04.2012

    08.05.2012 24.05.2012

    .

    AIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    23/93

    S .

    NoDescription Document no

    1Procedure for Boiler Hydraulic test and

    preservation

    PS:TSX:256:00:11/REV

    00

    2Procedure for CHEMICAL CLEANING OF

    BOILER USING EDTAPS:TSX:253:00:11/00

    3Procedure for steam blowing and oil

    flushing of fuel oil system

    4Procedure for lube oil flushing of rotating

    machinesPS:TSX:

    5

    Procedure for air and gas tightness test

    of furnace and ducts for pulverised coal

    firing boilers

    PS:TSX:268:00:12

    6Procedure for steam blowing of boilerand associated steam lines including aux.

    steam lines

    PS:TSX:

    7Procedure for clean air flow test of coal

    pipesPS:TSX:182:00:10

    8Procedure for detergent flushing of

    preboiler systemPS:TSX:

    9Procedure for lube oil flushinng of

    MDBFPPS:TSX:

    10 Procedure for hydraulic test and flushingof Turbine lube oil and jacking oil system

    PS:TSX:

    11Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:

    12 Procedure for lube oil flushinng of TDBFP PS:TSX:

    13 procedure for ALKALI BOILOUT PS:TSX:272:00:12/00

    S .

    NoDescription Document no

    1 Procedure for Boiler Hydraulic test PS:TSX:

    2Procedure for STEAM FLUSHING OF

    PREBOILER SYSTEMPS:TSX:

    3 Procedure for ALKALI BOIL OUT PS:TSX:251:00:11/00

    MRPL, 4X270 T / HR, MANGALOR

    RETURN TO COMMISSIONING PROCEDURES

    MRPL 1X85 TPH HRSG .

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    24/93

    4Procedure for oil flushing of turbine oil

    systemPS:TSX:

    5 Procedure for HRSG GAS TIGHTNESS TEST PS:TSX:252:00:11/00

    6Procedure for CHEMICAL CLEANING USING

    EDTAPS:TSX:

    7 Procedure for clean air flow test of coal pipesfor pulvarised coal fired boilers

    PS:TSX:

    8Procedure for commissioning of HPBP

    systemPS:TSX:

    9

    Procedure for steam blowing of boiler and

    associated steam lines including aux. steam

    lines

    10 Procedure for clean air flow test of coal pipes PS:TSX:

    11Procedure for detergent flushing of preboiler

    system

    12 Procedure for lube oil flushinng of MDBFP PS:TSX:

    13Procedure for FLUSHING OF GT LUB OIL

    SYSTEM

    PS:TSX:260:00:11

    PS:TSX:328:00:12

    14Procedure for hydraulic test and fushinng of

    Control Fluid systemPS:TSX:

    15Procedure for condenser flood test/ Vacuum

    tightness testPS:TSX:

    16Procedure for lube oil flushinng of Turbine oil

    syatemPSTX

    17 Procedure for hydraulic test and flushing ofGenerator seal oil system

    PS:TSX:

    18Procedure for hydraulic test and flushing of

    Generator PW systemPS:TSX:

    19 Procedure for Generator air tightness test PS:TSX:

    20Procedure for commissioning of LPBP

    system

    RETURN TO COMMISSIONING PROCEDURES

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    25/93

    Document

    DateDespatch date

    11/30/2011 12/1/2011

    11/30/2011 12/23/2011

    05.01.2012 12.01.2012

    23.06.2010 12.01.2012

    19.01.2012 27.01.2012

    Document

    DateDespatch date

    28.11.2011 29.11.2011

    .

    MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    26/93

    29.11.2011 01.12.2011

    13.12.2011

    24.07.2012

    14.12.2011

    27.07.2012

    MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    27/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    28/93

    S . No Description Document noDocument

    Date

    1Procedure for Boiler Hydraulic test and

    preservationPS:TSX:269:00:12 1/13/2012

    2 Procedure for EDTA cleaning PS:TSX:270:00:12 1/13/2012

    3Procedure for steam blowing and oil

    flushing of fuel oil system

    4Procedure for lube oil flushing of

    rotating machines

    5

    Procedure for air and gas tightness test

    of furnace and ducts for pulverised coal

    firin boilers

    PS:TSX:268:00:12 05.01.2012

    6Procedure for commissioning of CC

    pumpsPS:TSX:

    7 Procedure for air in leak test of ESP PS:TSX:

    8Procedure for commissioning of HPBP

    systemPS:TSX:323:00:12 20.07.2012

    9

    Procedure for steam blowing of boiler

    and associated steam lines including

    aux. steam lines

    PS:TSX:

    10Procedure for clean air flow test of coal

    pipes

    PS:TSX:182:00:10 23.06.2010

    11Procedure for detergent flushing of

    preboiler systemPS:TSX:316:00:12 12.07.2012

    12Procedure for lube oil flushinng of

    MDBFPPS:TSX:

    13

    Procedure for hydraulic test and

    fushinng of Turbine lube oil and jacking

    oil system

    PS:TSX:

    14

    Procedure for hydraulic test and

    fushinng of Control Fluid system PS:TSX:

    15Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:

    16Procedure for lube oil flushinng of

    TDBFPPS:TSX:

    MONNET 2X525 MW, ORISSA .

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    29/93

    17Procedure for hydraulic test and flushing

    of Generator seal oil systemPS:TSX:

    18Procedure for hydraulic test and flushing

    of Generator PW systemPS:TSX:

    19Procedure for Generator air tightness

    testPS:TSX:

    20Procedure for commissioning of LPBP

    systemPS:TSX:

    RETURN TO COMMISSIONING PROCEDURES MAIN PA

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    30/93

    Despatch date

    24.01.2012

    24.01.2012

    12.01.2012

    25.06.2012

    12.01.2012

    17.07.2012

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    31/93

    E

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    32/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    33/93

    Document Date Despatch date

    17.10.2011 22.10.2011

    03.01.2012 12.01.2012

    03.01.2012 12.01.2012

    05.01.2012 12.01.2012

    21.07.2012 26.07.2012

    23.06.2010 12.01.2012

    16.07.2012 31.07.2012

    16.07.2012 31.07.2012

    16.07.2012 31.07.2012

    L.

    AIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    34/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservationPS:TSX:262:00:12

    2 Procedure for EDTA cleaning PS:TSX:265:00:11/00

    3Procedure for steam blowing and oil flushing

    of fuel oil system:

    4Procedure for lube oil flushing of rotating

    machinesPS:TSX:264:00:11/00

    5

    Procedure for air and gas tightness test of

    furnace and ducts for pulverised coal firingboilers

    PS:TSX:268:00:12

    6 Procedure for commissioning of CC pumps PS:TSX:

    7 Procedure for air in leak test of ESP PS:TSX:

    8 Procedure for commissioning of HPBP system PS:TSX:324:00:12

    9

    Procedure for steam blowing of boiler and

    associated steam lines including aux. steamlines

    PS:TSX:

    10 Procedure for clean air flow test of coal pipes PS:TSX:182:00:10

    11Procedure for detergent flushing of preboiler

    systemPS:TSX:

    12 Procedure for lube oil flushinng of MDBFP PS:TSX:313:00:12

    13Procedure for hydraulic test and fushinng of

    Turbine lube oil and jacking oil system PS:TSX:315:00:12

    14Procedure for hydraulic test and fushinng of

    Control Fluid systemPS:TSX:

    15Procedure for condenser flood test/ Vacuum

    tightness testPS:TSX:314:00:12

    MALWA STAGE - 1, 2X600 MW.

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    35/93

    16 Procedure for lube oil flushinng of TDBFP PS:TSX:

    17Procedure for hydraulic test and flushing of

    Generator seal oil systemPS:TSX:

    18 Procedure for hydraulic test and flushing ofGenerator PW system

    PS:TSX:

    19 Procedure for Generator air tightness test PS:TSX:

    20 Procedure for commissioning of LPBP system PS:TSX:

    RETURN TO COMMISSIONING PROCEDURES

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    36/93

    Document Date Despatch date

    26.12.2012

    03.01.2012 12.01.2012

    03.01.2012 12.01.2012

    05.01.2012 12.01.2012

    21.07.2012 26.07.2012

    23.06.2010 12.01.2012

    11.07.2012 17.07.2012

    12.07.2012 17.07.2012

    12.07.2012 17.07.2012

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    37/93

    MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    38/93

    S . No Description Document no

    1

    Procedure for steam blowing of boiler and

    associated steam lines including aux.

    steam lines

    PS:TSX:

    2Procedure for hydraulic test and fushinng

    of Turbine lube oil and jacking oil systemPS:TSX:

    3Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:

    TNPL 40 MW, STG.

    RETURN TO COMMISSIONING PROCEDURES M

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    39/93

    Document

    Date

    Despatch

    date

    AIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    40/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservationPS:TSX:

    2 Procedure for EDTA cleaning PS:TSX:306:00:12

    3Procedure for steam blowing and oil flushing

    of fuel oil system

    4Procedure for lube oil flushing of rotating

    machinesPS:TSX:

    5

    Procedure for air and gas tightness test of

    furnace and ducts for pulverised coal firing

    boilers

    PS:TSX:268:00:12

    6 Procedure for commissioning of CC pumps PS:TSX:

    7 Procedure for air in leak test of ESP PS:TSX:

    8 Procedure for commissioning of HPBP system PS:TSX:298:00:12

    9

    Procedure for steam blowing of boiler and

    associated steam lines including aux. steam

    lines

    PS:TSX:

    10 Procedure for clean air flow test of coal pipes PS:TSX:182:00:10

    11Procedure for detergent flushing of preboiler

    systemPS:TSX:

    12 Procedure for lube oil flushinng of MDBFP PS:TSX:

    13Procedure for hydraulic test and fushinng of

    Turbine lube oil and jacking oil systemPS:TSX:

    14Procedure for hydraulic test and fushinng of

    Control Fluid systemPS:TSX:

    15Procedure for condenser flood test/ Vacuum

    tightness testPS:TSX:

    16 Procedure for lube oil flushinng of TDBFP PS:TSX:

    17Procedure for hydraulic test and flushing of

    Generator seal oil systemPS:TSX:

    18Procedure for hydraulic test and flushing of

    Generator PW systemPS:TSX:

    19 Procedure for Generator air tightness test PS:TSX:

    20 Procedure for commissioning of LPBP system PS:TSX:

    HINDALCO 6X150 MW, ORISSA.

    RETURN TO COMMISSIONING PROCEDURES M

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    41/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    42/93

    S . No Description Document no Document Date Despatch date

    1Procedure for Boiler Hydraulic test and

    preservationPS:TSX:166:00:09 19/02/2010 Soft copy sent

    2 Procedure for EDTA cleaning PS:TSX:200:00:10 11/8/2010 Soft copy sent

    3Procedure for steam blowing and oil

    flushing of fuel oil system PS:TSX:202:00:10 13/8/2010 Soft copy sent

    4Procedure for lube oil flushing of rotating

    machinesPS:TSX:203:00:10 13/08/2010 Soft copy sent

    5

    Procedure for air and gas tightness test of

    furnace and ducts for pulverised coal firing

    boilers

    PS:TSX:167:00:09 19/02/2010 Soft copy sent

    6Procedure for commissioning of CC

    pumpsPS:TSX:201:00:10 13/08/2010 Soft copy sent

    7 Procedure for air in leak test of ESP PS:TSX:173:00:09 23/03/2010 24/03/2010

    8Procedure for commissioning of HPBP

    systemPS:TSX:210:00:10 13.08.2010

    SOFT COPY

    SENT

    9

    Procedure for steam blowing of boiler and

    associated steam lines including aux.

    steam lines

    PS:TSX:209:00:10 28/10/2010 Soft copy sent

    10Procedure for clean air flow test of coal

    pipesPS:TSX:199:00:10 11/8/2010 Soft copy sent

    11Procedure for detergent flushing of

    preboiler systemPS:TSX:216:00:10 3/6/2011 Soft copy sent

    VALLUR, 3x 500MW, Unit 1, 2 & 3

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    43/93

    S . No Description Document no Document Date Despatch date

    VALLUR, 3x 500MW, Unit 1, 2 & 3

    12 Procedure for lube oil flushinng of MDBFP PS:TSX:170:00:09 3/3/2010 Soft copy sent

    13Procedure for hydraulic test and fushinng

    of Turbine lube oil and jacking oil systemPS:TSX:169:00:09 3/3/2010 Soft copy sent

    14Procedure for hydraulic test and fushinng

    of Control Fluid systemPS:TSX:213:00:10 2/11/2010 Soft copy sent

    15Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:212:00:10 1/11/2010 Soft copy sent

    16 Procedure for lube oil flushinng of TDBFP

    17Procedure for hydraulic test and flushing

    of Generator seal oil systemPS:TSX:207:00:10 26/10/2010 soft copy sent

    18Procedure for hydraulic test and flushing

    of Generator PW systemPS:TSX:208:00:10 26/10/2010 Soft copy sent

    19 Procedure for Generator air tightness test PS:TSX:211:00:10 1/11/2010 soft copy sent

    20Procedure for commissioning of LPBP

    systemPS:TSX:223:00:11 18/04/11 Soft copy sent

    21generator testing procedure for first

    synchronisationPS:TSX:224:00:11 18.01.2012 Soft copy sent

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    44/93

    S . No Description Document no Document Date Despatch date

    VALLUR, 3x 500MW, Unit 1, 2 & 3

    22procedure for steam flushing of pre boiler

    systemPS:TSX:293:00:12 28.05.2012 Soft copy sent

    RETURN TO COMMISSIONING PROCEDURES MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    45/93

    S . No Description Document no

    1 Procedure for Boiler Hydraulic test andpreservation

    2 Procedure for EDTA cleaning PS:TSX:122:00:09

    3Procedure for lube oil flushing of rotating

    machines

    4

    Procedure for steam blowing of boiler and

    associated steam lines including aux.

    steam lines

    PS:TSX:140:00:09

    5Procedure for clean air flow test of coal

    pipesPS:TSX:103:00:08

    6Procedure for air and gas tightness test of

    furnace and ductsPS:TSX:104:00:08

    7 Procedure for lube oil flushinng of MDBFP PS:TSX:138:00:09

    8Procedure for steam flushing of preboiler

    systemPS:TSX:139:00:09

    9Procedure for hydraulic test and fushinng

    of Turbine lube oil and jacking oil systemPS:TSX:141:00:09

    10Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:149:00:09

    11 Procedure for hydraulic test and flushingof Generator seal oil system

    PS:TSX:146:00:09

    12 Procedure for Generator air tightness test PS:TSX:150:00:09

    Raichur, 1 x 250 MW, Unit 8

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    46/93

    RETURN TO COMMISSIONING PROCEDUR

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    47/93

    Document Date Despatch date

    28/8/2009 10/9/2009

    27/11/2009 5/12/2009

    15/10/2008 21/11/2008

    17/11/2008 20/11/2008

    26/11/2009 1/12/2009

    26/11/2009 1/12/2009

    27/11/2009 1/12/2009

    5/1/2010 11/1/2010

    4/1/2010 6/1/2010

    5/1/2010 6/1/2010

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    48/93

    S MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    49/93

    Sl no Description Document no

    1 Procedure for chemical cleaning by EDTA PS:TSX:092:00:08

    2Procedure for Steam flushing of preboiler

    systemPS:TSX:091:00:08

    3Procedure for oil flushing of Turbine oil

    systemPS:TSX:087:00:07

    4

    Procedure for Steam blowing of Boiler and

    associated steam lines including Aux

    Steam lines

    PS:TSX:090:00:08

    5

    Standard procedure for clean air flow test

    of coal pipes for pulverised coal fired

    boilers

    PS/TSX/103/00/08 REV 00

    6 Procedure for Turbine control oil flushing PS:TSX:108:00:08

    7Procedure for oil flushing of lub oil system

    of BFPPS:TSX:107:00:08

    8Procedure for Condensor Vacuum

    tightness test

    9Procedure for air and gas tightness test of

    furnace and ductsPS:TSX:104:00:08

    10Standard procedure for air and gas

    tightness test of steam generator

    Nalco Angul, Units 9 & 10, 2 X 120 M

    RETURN TO COMMISSIONING PROCEDURES

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    50/93

    Document date Despatch date

    2/7/2008

    16/05/2008 27/05/08

    21/03/2008 22/04/08

    10/4/2008 22/04/08

    15/10/2008 21/11/2008

    24/11/2008 1/12/2008

    20/11/2008 1/12/2008

    17/11/2008 20/11/2008

    AIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    51/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservation

    2 Procedure for EDTA cleaningPS:TSX:198A:00:10

    3Procedure for steam blowing and oil

    flushing of fuel oil system

    4Procedure for lube oil flushing of rotating

    machines

    PS:TSX:198:00:10

    PS:TSX:198:00:10

    5 Procedure for air in leak test of ESP

    6Procedure for commissioning of HPBP

    system

    7

    Procedure for steam blowing of boiler and

    associated steam lines including aux.

    steam lines

    PS:TSX:198B:00:10

    8Procedure for clean air flow test of coal

    pipes

    9Procedure for air and gas tightness test of

    furnace and ducts

    10Procedure for detergent flushing of

    preboiler system

    PS:TSX:142:01:09

    Rev-01

    11 Procedure for lube oil flushinng of MDBFPPS:TSX:175:01:10

    Rev-01

    12 Procedure for hydraulic test and fushinngof Turbine lube oil and jacking oil system

    PS:TSX:160:00:01Rev-01

    13Procedure for condenser flood test/

    Vacuum tightness test

    PS:TSX:177:01:10.

    Rev-01

    NEYVELI, CFBC, 2x 250MW Unit 1

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    52/93

    14Procedure for hydraulic test and flushing

    of Generator seal oil systemPS:TSX:161:00:09

    15 Procedure for Generator air tightness test PS:TSX:164:00:09

    16Procedure for commissioning of LPBP

    systemPS:TSX:178:00:10

    RETURN TO COMMISSIONING PROCEDUR

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    53/93

    Document Date Despatch date

    23/07/2011 25/07/2011

    23/07/2010

    23/07/201125/07/2011

    23/07/2011 25/07/2011

    25/08/2010 24/09/2010

    21/09/2010 24/09/2010

    21/09/2010 24/09/2010

    25/08/2010 24/09/2010

    & 2

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    54/93

    21/01/2010 8/2/2010

    1/2/2010 8/2/2010

    21/04/2010 10/5/2010

    S MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    55/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservation

    2 Procedure for EDTA cleaning PS:TSX:176:00:10

    3Procedure for lube oil flushing of rotating

    machinesPS:TSX:183:00:10

    4

    Procedure for steam blowing of boiler and

    associated steam lines including aux.

    steam lines

    PS:TSX:185:00:10

    5 Procedure for clean air flow test of coalpipes

    PS:TSX:182:00:10

    6Procedure for air and gas tightness test of

    furnace and ductsPS:TSX:051:00:06

    7 Procedure for lube oil flushinng of MDBFP

    8Procedure for steam flushing of preboiler

    system PS:TSX:038:00:06

    9Procedure for hydraulic test and fushinng

    of Turbine lube oil and jacking oil systemPS:TSX:055:00:06

    10Procedure for condenser flood test/

    Vacuum tightness test

    11Procedure for hydraulic test and flushing

    of Generator seal oil system

    PS:TSX:029:00:06

    12 Procedure for Generator air tightness test

    RAYALSEEMA, STAGE - III, 210MW,

    ** - Most of the Stage II procedures will be used for S

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    56/93

    RETURN TO COMMISSIONING PROCEDUR

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    57/93

    Document Date Despatch date

    20/04/2010 28/04/2010

    23/06/2010 24/06/2010

    23/06/2010 24/06/2010

    23/06/2010 24/06/2010

    17/07/2006 23/06/2010

    16/03/2006 23/06/2010

    23/06/2010 24/06/2010

    17/04/2006 23/06/2010

    Unit 5

    tage III, Unit 5

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    58/93

    S MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    59/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservation

    2 Procedure for EDTA cleaning PS:TSX:106 00 08

    3Procedure for commissioning of CC

    pumps

    4Procedure for steam blowing and oil

    flushing of fuel oil system

    5

    Procedure for lube oil flushing of rotating

    machines PS:TSX:101 00 08

    6

    Procedure for air and gas tightness test of

    furnace and ducts for pulverised coal firing

    boilers

    PS:TSX:104 00 08

    7 Procedure for air in leak test of ESP

    8Procedure for commissioning of HPBP

    system

    9Procedure for steam blowing of boiler andassociated steam lines including aux.

    steam lines

    PS:TSX:102 00 08

    10Procedure for clean air flow test of coal

    pipesPS:TSX:103 00 08

    11 Procedure for lube oil flushinng of MDBFP PS:TSX:188 00 10

    12 Procedure for steam flushing of preboilersystem

    PS:TSX:196 00 10

    13Procedure for hydraulic test and fushinng

    of Turbine lube oil and jacking oil systemPS:TSX:186 00 10

    14Procedure for hydraulic test and fushinng

    of Control Fluid systemPS:TSX:191 00 10

    KOTHAGUDEM, 1x 500MW

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    60/93

    15Procedure for condenser flood test/

    Vacuum tightness test PS:TSX:192 00 10

    16 Procedure for lube oil flushinng of TDBFP PS:TSX:194 00 10

    17Procedure for hydraulic test and flushing

    of Generator seal oil systemPS:TSX:189 00 10

    18Procedure for hydraulic test and flushing

    of Generator PW systemPS:TSX:190 00 10

    19 Procedure for Generator air tightness test PS:TSX:193 00 10

    20Procedure for commissioning of LPBP

    system

    RETURN TO COMMISSIONING PROCEDUR

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    61/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    62/93

    15/07/2010 16/07/2010

    8/10/2010 14/10/2010

    13/07/2010 15/07/2010

    13/07/2010 14/07/2010

    16/07/2010 20/07/2010

    S MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    63/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    64/93

    14Procedure for hydraulic test and fushinng

    of Control Fluid system

    15Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:301:00:12

    16 Procedure for lube oil flushinng of TDBFP PS:TSX:310:00:12

    17Procedure for hydraulic test and flushing

    of Generator seal oil systemPS:TSX:303:00:12

    18Procedure for hydraulic test and flushing

    of Generator PW systemPS:TSX:304:00:12

    19 Procedure for Generator air tightness test PS:TSX:305:00:12

    20Procedure for commissioning of LPBP

    systemPS:TSX:312:00:12

    21Generator testing procedure for first

    synchronisation

    RETURN TO COMMISSIONING PROCEDUR

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    65/93

    Document Date Despatch date

    23/12/2011 28/12/2011

    03.01.2012 10.01.2012

    23.05.2012 24.05.2012

    3/1/2012 10.01.2012

    5/1/2012 10.01.2012

    23.05.2012 24.05.2012

    Ranipet Ranipet

    16.07.2012 19.07.2012

    25.04.2012 04.05.2012

    23/06/2010 10.01.2012

    04.07.2012 04.07.2012

    08.06.2012 14.06.2012

    13.05.2012 24.05.2012

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    66/93

    08.06.2012 14.06.2012

    06.07.2012 07.07.2012

    15.06.2012 07.07.2012

    16.06.201207.07.2012

    16.06.2012 25.06.2012

    10.07.2012 12.07.2012

    S MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    67/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservationPS:TSX:129 00 09

    2 Procedure for EDTA cleaning PS:TSX:180 00 10

    3Procedure for steam blowing and oil

    flushing of fuel oil systemPS:TSX:159 00 09

    4Procedure for lube oil flushing of rotating

    machinesPS:TSX:148 00 09

    5

    Procedure for air and gas tightness test of

    furnace and ducts for pulverised coal firingboilers

    PS:TSX:130 00 09

    6 Procedure for air in leak test of ESP PS:TSX:143 00 09

    7Procedure for commissioning of HPBP

    systemPS:TSX:147 00 09

    8

    Procedure for steam blowing of boiler and

    associated steam lines including aux.

    steam lines

    PS:TSX:205:00:10

    9Procedure for clean air flow test of coal

    pipesPS:TSX:158 00 09/00

    10Procedure for detergent flushing of

    preboiler systemPS:TSX:165 00 09

    11 Procedure for lube oil flushinng of MDBFP PS:TSX: 135 00 09

    12Procedure for hydraulic test and fushinng

    of Turbine lube oil and jacking oil systemPS:TSX: 133 00 09

    13Procedure for hydraulic test and fushinng

    of Control Fluid system

    SIMHADRI

    http://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/129%2000%2009%20APPROVED%20PROCEDURE%20FOR%20BOILER%20HYDRAULIC%20TEST%20AND%20PRESERVATION..pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/180%2000%2010%20APPROVED%20procedure%20for%20edta%20chemical%20cleaning%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/159%2000%2009%20APPROVED%20procedure%20for%20steam%20blowing%20and%20oil%20flushing%20of%20fuel%20oil%20system.%20simhadri.ziphttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/148%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20&%20hydrotest%20of%20lub%20oil%20system%20of%20rotary%20equipments.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/130%2000%2009%20APPROVED%20procedure%20for%20air%20and%20gas%20tightness%20of%20furnace%20and%20ducts.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/143%2000%2009%20APPROVED%20procedure%20for%20air%20in%20leak%20test%20of%20esp.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/147%2000%2009%20Procedure%20for%20commissioning%20of%20HP%20BY%20PASS%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/165%2000%2009%20APPROVED%20procedure%20for%20detergent%20%20flushing%20of%20preboiler%20system%20-%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/135%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20of%20MDBFP%20LUB%20OIL%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/133%2000%2009%20APPROVED%20procedure%20for%20hydraulic%20test%20and%20flushing%20of%20turbine%20lub%20-%20oil%20and%20jacking%20oil%20system%20.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/133%2000%2009%20APPROVED%20procedure%20for%20hydraulic%20test%20and%20flushing%20of%20turbine%20lub%20-%20oil%20and%20jacking%20oil%20system%20.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/135%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20of%20MDBFP%20LUB%20OIL%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/165%2000%2009%20APPROVED%20procedure%20for%20detergent%20%20flushing%20of%20preboiler%20system%20-%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/147%2000%2009%20Procedure%20for%20commissioning%20of%20HP%20BY%20PASS%20SYSTEM.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/143%2000%2009%20APPROVED%20procedure%20for%20air%20in%20leak%20test%20of%20esp.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/130%2000%2009%20APPROVED%20procedure%20for%20air%20and%20gas%20tightness%20of%20furnace%20and%20ducts.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/148%2000%2009%20APPROVED%20procedure%20for%20oil%20flushing%20&%20hydrotest%20of%20lub%20oil%20system%20of%20rotary%20equipments.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/159%2000%2009%20APPROVED%20procedure%20for%20steam%20blowing%20and%20oil%20flushing%20of%20fuel%20oil%20system.%20simhadri.ziphttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/180%2000%2010%20APPROVED%20procedure%20for%20edta%20chemical%20cleaning%20simhadri.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/129%2000%2009%20APPROVED%20PROCEDURE%20FOR%20BOILER%20HYDRAULIC%20TEST%20AND%20PRESERVATION..pdf
  • 8/13/2019 Despatch Status of Commissioning Procedures1

    68/93

    14Procedure for condenser flood test/

    Vacuum tightness testPS:TSX:136 00 09

    15Procedure for flushing of Generator seal

    oil systemPS:TSX:153 00 09

    16Procedure for hydraulic test and flushing

    of Generator PW systemPS:TSX:157 00 09

    17 Procedure for Generator air tightness test PS:TSX:152 00 09

    18Generator testing procedure for first

    synchronisationPS:TSX:154 00 09

    RETURN TO COMMISSIONING PROCEDUR

    http://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/136%2000%2009%20APPROVED%20PROCEDURE%20FOR%20CONDENCER%20FLOOD%20TEST%20AND%20VACUUM%20TIGHTNESS%20TEST.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/153%2000%2009%20APPROVED%20procedure%20for%20flushing%20of%20generator%20seal%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/152%2000%2009%20APPROVED%20procedure%20for%20generator%20air%20tightness%20test.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/152%2000%2009%20APPROVED%20procedure%20for%20generator%20air%20tightness%20test.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/153%2000%2009%20APPROVED%20procedure%20for%20flushing%20of%20generator%20seal%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/SIMHADRI/136%2000%2009%20APPROVED%20PROCEDURE%20FOR%20CONDENCER%20FLOOD%20TEST%20AND%20VACUUM%20TIGHTNESS%20TEST.pdf
  • 8/13/2019 Despatch Status of Commissioning Procedures1

    69/93

    Document Date Despatch date

    9/11/2009 21/11/2009

    21/06/2010 1/7/2010

    13/01/2010 25/03/2010

    4/1/2010 6/5/2010

    19/02/2010 12/3/2010

    31/12/2009 27/01/2010

    17/07/2010

    22/10/2010 3/11/2010

    13/08/2010 13/09/2010

    1/3/2010 7/5/2010

    14/11/2009 13/01/2010

    14/12/2009 27/01/2010

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    70/93

    3/6/2010 22/06/2010

    24/02/2010

    18/09/2010

    23/02/2010 16/03/2010

    3/3/2011 10/3/2011

    S MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    71/93

    S . No Description Document noDocument

    Date

    1Procedure for Boiler Hydraulic

    testPS:TSX:215:00:10 23/11/2010

    2Procedure for STEAM FLUSHING

    OF PREBOILER SYSTEMPS:TSX:219:00:11 3/11/2011

    3Procedure for steam blowing of

    main steam linesPS:TSX:222:00:10 15/03/2011

    4Procedure for oil flushing of

    turbine oil systemPS:TSX:221:00:10 11/3/2011

    5

    Procedure for air and gas

    tightness test of furnace, ducts

    and ESPs boilers

    PS:TSX:214:00:10 23/11/2010

    6Procedure for CHEMICAL

    CLEANING USING EDTAPS:TSX:230:00:11 18/07/2011

    7

    Procedure for clean air flow test

    of coal pipes for pulvarised coal

    fired boilers

    PS:TSX:247:00:11 21/11/2011

    8Procedure for detergent flushing

    of preboiler system

    RINL 1X330 TPH & 1X67.5 MW STG UNIT.f

    http://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/PS%20TSX%20215%2000%2010%20RINL%20BOILER%20HYDRAULIC%20TEST%20(REV).pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/procedure%20for%20sream%20flushing%20of%20preboiler%20system%20219.00.11%20rinl%20tba.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/222%2000%2010%20RINL%20procedure%20for%20steam%20blowing%20of%20main%20steam%20lines.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/221%2000%2010%20RINL%20procedure%20for%20oil%20flushing%20of%20turbine%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/RINL%20PS%20TSX%20214%2000%2010%2023112010%20AIR%20AND%20GAS%20TIGHTNESS%20TEST%20OF%20FURNACE%20&%20DUCTS%20OF%20BOILER.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/RINL%20PS%20TSX%20214%2000%2010%2023112010%20AIR%20AND%20GAS%20TIGHTNESS%20TEST%20OF%20FURNACE%20&%20DUCTS%20OF%20BOILER.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/221%2000%2010%20RINL%20procedure%20for%20oil%20flushing%20of%20turbine%20oil%20system.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/222%2000%2010%20RINL%20procedure%20for%20steam%20blowing%20of%20main%20steam%20lines.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/procedure%20for%20sream%20flushing%20of%20preboiler%20system%20219.00.11%20rinl%20tba.pdfhttp://localhost/var/www/apps/conversion/tmp/scratch_8/RINL330TPH%20&%2017.5%20MW%20STG/PS%20TSX%20215%2000%2010%20RINL%20BOILER%20HYDRAULIC%20TEST%20(REV).pdf
  • 8/13/2019 Despatch Status of Commissioning Procedures1

    72/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    73/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    74/93

    PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    75/93

    S . No Description Document no

    1Procedure for Boiler Hydraulic test and

    preservation

    2 Procedure for EDTA cleaning PS:TSX:

    3Procedure for lube oil flushing of rotating

    machinesPS:TSX:

    4

    Procedure for steam blowing of boiler and

    associated steam lines including aux.

    steam lines

    PS:TSX:273:00:12/00

    5 Procedure for clean air flow test of coalpipes

    PS:TSX:

    6Procedure for air and gas tightness test of

    furnace and ductsPS:TSX:

    7 Procedure for lube oil flushinng of MDBFP

    8Procedure for steam flushing of preboiler

    system PS:TSX:

    9Procedure for hydraulic test and fushinng

    of Turbine lube oil and jacking oil systemPS:TSX:

    10Procedure for condenser flood test/

    Vacuum tightness test

    11Procedure for hydraulic test and flushing

    of Generator seal oil system

    PS:TSX:

    12 Procedure for Generator air tightness test PS:TSX:

    13Standard Procedure for commissioning of

    HP BypassPS:TSX:298:00:12

    SURANA, TPP -2 X 210MW, RAIC

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    76/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    77/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    78/93

    S MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    79/93

    S . No Description Document no Document Date

    1Procedure for Boiler Hydraulic test

    and preservation

    2 Procedure for EDTA cleaning PS:TSX:

    3Procedure for commissioning of CC

    pumps

    4Procedure for steam blowing and oil

    flushing of fuel oil system

    5Procedure for lube oil flushing of

    rotating machinesPS:TSX:

    6

    Procedure for air and gas tightness

    test of furnace and ducts for

    pulverised coal firing boilers

    PS:TSX:

    7 Procedure for air in leak test of ESP

    8Procedure for commissioning of

    HPBP system

    9

    Procedure for steam blowing of

    boiler and associated steam lines

    including aux. steam lines

    PS:TSX:

    10Procedure for clean air flow test of

    coal pipesPS:TSX:

    11Procedure for lube oil flushinng of

    MDBFPPS:TSX:

    BELLARY - 2, 1x 500MW

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    80/93

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    81/93

    Despatch date

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    82/93

    E

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    83/93

    SL.NO. TITLE OF THE PROCEDURE

    VALLUR

    3X500MW

    2X80MW JINDAL

    600MW

    N.CHENNAI

    2X600MW

    1 Procedure for Boiler Hydraulic test and

    preservation 19.02.10 09.12.11 22.10.11 28.12.11

    2 Procedure for EDTA cleaning 08.11.10 24.01.12 12.01.12 10.01.12

    3 Procedure forsteam blowing and oil flushing of fuel

    oil system

    13.08.10

    DOC. NA PENDING PENDING 24.05.12

    4 Procedure for lube oil flushing of rotating machines 13.08.10 24.05.12 12.01.12 10.01.12

    5 Procedure for air and gas tightness test of furnace

    and ducts for pulverised coal firing boilers 19.02.10 05.06.12 12.01.12 10.01.12

    6 Procedure for commissioning of CC pumps 13.08.10 NA PENDING 24.05.12

    7 Procedure for air in leak test of ESP 24.03.10 PENDING PENDING ranipet

    8 Procedure for commissioning of HPBP system 29.10.10 11.06.12 PENDING 19.07.12

    9 Procedure for steam blowing of boiler and

    associated steam lines including aux. steam lines 28.10.10 24.05.12 PENDING 04.05.12

    10 Procedure for clean air flow test of coal pipes 08.11.10 13.01.12 12.01.12 10.01.12

    11 Procedure for detergent flushing of preboiler

    system

    03.08.11

    DOC. NA 24.05.12 PENDING 07.07.12

    12 Procedure for lube oil flushinng of MDBFP 03.03.10 13.06.12 31.07.12 14.06.12

    13 Procedure for hydraulic test and flushing of Turbine

    lube oil and jacking oil system 02.12.11 PENDING 31.07.12 24.05.12

    14 Procedure for hydraulic test and fushinng of Control

    Fluid system 29.11.11 NA PENDING PENDING

    15 Procedure for condenser flood test/ Vacuum

    tightness test 29.11.11 PENDING 31.07.12 14.06.12

    16 Procedure for lube oil flushinng of TDBFP not

    applicable NA PENDING 07.07.12

    17 Procedure for hydraulic test and flushing of

    Generator seal oil system 02.12.11 NA PENDING 07.07.12

    18 Procedure forhydraulic test and flushing of

    Generator PW system 26.10.10 NA PENDING 07.07.12

    19 Procedure for Generator air tightness test 02.12.11 NA PENDING 25.06.12

    20 Procedure for commissioning of LPBP system 18.04.11 NA PENDING 11.07.12

    21 procedure for steam flushing of preboiler system 28.05.12

    ** DOCUMENT NOT AVAILABLE IN THE FILE

    2012 MAY COMPLEATION PLI

    COMMISSIONING PROCEDURES (PLANNED FOR 2

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    84/93

    RETURN TO COMMISSIONI

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    85/93

    TUTUCORIN

    500MW

    MALWA

    2X600 MW

    KAKATIYA

    600 MW

    MONNET

    525 MW

    HINDALCO

    6X150 MW

    TNPL 40MW

    STG

    MRPL 4X270

    T/HRBELLARY-2

    1X500MW SURANA

    PENDING 28.12.11 PENDING 24.01.012 PENDING NA 30.11.11 PENDING

    13.01.12 10.01.12 10.01.12 24.01.012 12.07.12 NA 23.12.11 PENDING

    PENDING PENDING PENDING PENDING PENDING NA PENDING PENDING

    PENDING 10.01.12 10.01.12 PENDING PENDING NA PENDING PENDING

    13.01.12 10.01.12 10.01.12 13.01.12 13.01.12 NA13.01.12

    PENDING

    PENDING PENDING PENDING PENDING PENDING NA NA PENDING

    PENDING PENDING PENDING PENDING PENDING NA NA PENDING

    11.06.12 PENDING PENDING 25.07.12 11.06.12 NA NA 11.06.12

    PENDING PENDING PENDING PENDING PENDING PENDING PENDING PENDING

    13.01.12 10.01.12 10.01.12 13.01.12 13.01.12 NA13.01.12

    PENDING

    17.07.12 PENDING PENDING 17.07.12 PENDING NA PENDING PENDING

    PENDING 17.07.12 PENDING PENDING PENDING NA PENDING PENDING

    PENDING 17.07.12 PENDING PENDING PENDING PENDING PENDING 04.01.12

    15.12.11 PENDING

    PENDING PENDING PENDING PENDING PENDING NA NA PENDING

    PENDING 17.07.12 PENDING PENDING PENDING PENDING PENDING PENDING

    PENDING PENDING PENDING PENDING PENDING NA PENDING PENDING

    PENDING PENDING PENDING PENDING PENDING NA NA PENDING

    PENDING PENDING PENDING PENDING PENDING NA NA PENDING

    PENDING PENDING PENDING PENDING PENDING NA NA PENDING

    PENDING PENDING PENDING PENDING PENDING NA NA PENDING

    12-13) PREPARED & PENDING - FOR COAL FIRED POWER PLANT

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    86/93

    NG PROCEDURES MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    87/93

    RAYAL-600

    PENDING

    PENDING

    PENDING

    PENDING

    26.07.12

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

    PENDING

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    88/93

    EDTA BHEL SOL

    1 Simhadri -4 30.11.11 10/15/2011

    R211140;

    dt:07.12.2011

    40,000 KGE;m/S

    a.v.msales

    corproation.

    R211135;

    Dt:03.12.2011

    690 litrs;m/s

    Arudra

    ENGINEERS

    PVT.LTD.

    2 Vallur-1 28.08.11

    R211012;Dt:

    03.05.11;

    40,000Kgs; M/s.

    Chemi-culture

    R210163;

    Dt:31.01.11;

    690 Ltrs; M/s.

    Chemicals(India

    ) company

    3 Neyveli - 2 30.01.12

    4North

    Chennai 1

    R211123

    dt:18.11.2011

    1500ltrs m/s

    arudra

    engineers

    PVT.ltd.

    5 Vallur 2

    R-211166dt;13.02.12 40

    000 kgs m/s a.v.m

    sales corproation

    CHEMIC

    SL.

    NOPROJECT

    BLU

    Date

    Deter

    Flushing

    Date

    Indenting

    date

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    89/93

    6North

    Chennai 2

    7 RINL

    R210118;

    dt:08.11.2010;

    14000kgs.m/s.a.v.m.sales

    corporation

    R210163;

    Dt:31.01.11;

    240 Ltrs; M/s.Chemicals(India

    ) company

    8 MRPL

    9BHAVINI

    Kalpakkam

    10JINDAL

    2X600 MW

    11JINDAL

    STEEL

    RETURN TO COMMISSI

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    90/93

    BHEL MAX AmmoniaHydrazine

    Hydrate

    Disodium

    phosphate

    Tri sodium

    Phosphate

    Rinopal

    R211135;

    Dt:03.12.2011

    690 litrs;m/s

    arudra

    ENGINEERS

    PVT.LTD.

    R211136;

    Dt:03.12.2011

    5600 litrs;m/s

    suchem

    international

    R211137;

    Dt:05.12.2011

    5900litrs;m/s

    chemi-culture,

    R03.12.2011;

    Dt:03 12 2011

    200kg;m/s

    suchem

    international

    R211136;

    Dt:03.12.2011

    900kg;m/s

    suchem

    international

    R210163;

    Dt:31.01.11; 690

    Ltrs; M/s.

    Chemicals(India)

    company

    R210166;Dt:31.01

    .11; 9800Ltrs;

    M/s. Chemi-

    culture

    R210165;Dt:31.

    01.2011;

    4800kgs;

    M/s.Bhanwaria

    l Jhanwar &

    sons

    R210165;Dt:31.0

    1.2011; 4800kgs;

    M/s.Bhanwarial

    Jhanwar & sons

    R210167;Dt:31.

    01.11; 1100Kgs;

    M/s. Suchem

    international

    R211100; Dt:

    03.10.11;

    1000Ltrs; M/s.

    Chemi-culture

    R211099; Dt:

    03.10.11; 1200

    Ltrs; M/s.

    A.V.M Sales

    corporation

    R211123 dt:18

    11 2011 1500 kgs

    m/s arudra

    engineers PVT.ltd

    R211128;

    DT:24.11.2011.11

    100 LTRS.M/S

    CHEMI-Culture

    R.211129;

    DT:24.11.2011

    1200ltrs.m/s

    suchem

    international

    R.211129

    dt:24.11.2011.

    1000kgs m/s

    suchem

    international

    R-211160DT;24/01/12 5600

    LTRS M/S

    SUCHEM

    INTNRNATION.

    LS REQUIREMENT

    PO No ,Date & Quantity

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    91/93

    R210163;

    Dt:31.01.11; 240

    Ltrs; M/s.Chemicals(India)

    company

    R2100119; dt

    08.11.2010; 1400

    ltrs; m/s.southernchemicals,hyd

    R210120;

    dt: 08.11.2010

    ;1200kgs.m/sbhanwarlal

    Jhanwar @

    sons

    ONING PROCEDURES MAIN PAGE

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    92/93

    Remarks

  • 8/13/2019 Despatch Status of Commissioning Procedures1

    93/93