Development of Inspections for ONRC using Pocket RAMM Lee Hautler – HEB Construction Ben Wong – Selwyn District Council 2017

Upload: others

Post on 25-Jun-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of Inspections for ONRC using Pocket RAMMLee Hautler – HEB ConstructionBen Wong – Selwyn District Council

2017

Page 2: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

Outline• The 5 ONRC categories measured with the application

• The Inspections module

• The workflow

• The feedback 

• Value Add

• Takeaways

Page 3: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

ONRC Categories

Page 4: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

The Inspections module• It’s a new application within RAMMs Suite.

Page 5: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

Inspections for assets

Page 6: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

ONRC front end

Page 7: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

The workflow (in Pocket)

Page 8: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

How it works

Page 9: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

Feedback• “Was relatively easy to adopt as it was an add on to our existing tools.”

• “Having it mapping as well as jobs, meant we could see inspections to do while doing other tasks”

• “Being able to zoom out further than normal with the icons still showing is great for planning our routes to inspect”

Page 10: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

Value Add• From Clients Perspective

• From Contractors PerspectiveUsing existing tools smarter makes senseWorking collaboratively means we can share the 

inspections (time)Overall the inspection functionality will be useful for other 

inspections, not just ONRC.

Page 11: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

Some Takeaways for you• Watch for Asset Condition rather than ONRCs Customer Outcomes approach.  The latter is the one.

• Align your inspectors, use the visual guidelines.

• Don’t get bogged in the detail, just do it.

• It’s a network measure, not a contract measure

Page 12: Development of Inspections for ONRC using Pocket RAMM · Development of ONRC inspections using Pocket RAMM Low Volume Roads Workshop 13‐15 September 2017 Feedback • “Was relatively

Development of ONRC inspections using Pocket RAMMLow Volume Roads Workshop 13‐15 September 2017

Cheers! Questions?