di- duke m- energy® .@1`d cases/2014-00041...feb 11, 2014  · adjustment (tcra) and electric power...

46
di - DUKE M - ENERGY® Duke Energy 139 E. Fourth Street Cincinnati, OH 45202 February 11, 2014 Kentucky Public Service Commission Attn: Mr. Jeff Derouen, Executive Director 211 Sower Boulevard Frankfort, Kentucky 40602 .@1`"D FEB 1i 2014 PUBLIC SERVICE COMMISSION Dear Mr. Derouen: Enclosed for filing are an original and ten (10) conformed copies of Duke Energy Kentucky's ("Duke") "Monthly Report of Gas Cost Calculations and Tariff Schedules," for the month commencing with the March 2014 revenue month in accordance with KPSC order dated November 6, 2003 in Case No. 2003-00386. This filing is based on supplier tariff rates expected to be in effect on March 3, 2014 and the NYMEX close on February 6, 2014 for the month of March 2014. Also included is a 3 page section summarizing the calculation of the Prior Period Adjustment amount on Schedule III. The above described schedules and GCA are effective with the final meter readings of District 1, March 2014 revenue month (i.e., final meter readings on and after March 3, 2014). Duke's proposed GCA is $5.891 per Mcf. This rate represents an increase of $0.703 per Mcf from the rate currently in effect for February 2014. Very truly yours, : bita Susan Miller Enclosure cc: L. Schmidt R:/tariffs/gcr/ulhp/gca monthly filing.doc

Upload: others

Post on 25-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

di- DUKE M- ENERGY®

Duke Energy 139 E. Fourth Street

Cincinnati, OH 45202

February 11, 2014

Kentucky Public Service Commission Attn: Mr. Jeff Derouen, Executive Director 211 Sower Boulevard Frankfort, Kentucky 40602

.@1`"D

FEB 1i 2014 PUBLIC SERVICE

COMMISSION

Dear Mr. Derouen:

Enclosed for filing are an original and ten (10) conformed copies of Duke Energy Kentucky's ("Duke") "Monthly Report of Gas Cost Calculations and Tariff Schedules," for the month commencing with the March 2014 revenue month in accordance with KPSC order dated November 6, 2003 in Case No. 2003-00386. This filing is based on supplier tariff rates expected to be in effect on March 3, 2014 and the NYMEX close on February 6, 2014 for the month of March 2014. Also included is a 3 page section summarizing the calculation of the Prior Period Adjustment amount on Schedule III.

The above described schedules and GCA are effective with the final meter readings of District 1, March 2014 revenue month (i.e., final meter readings on and after March 3, 2014).

Duke's proposed GCA is $5.891 per Mcf. This rate represents an increase of $0.703 per Mcf from the rate currently in effect for February 2014.

Very truly yours,

: bita

Susan Miller

Enclosure

cc: L. Schmidt

R:/tariffs/gcr/ulhp/gca monthly filing.doc

Page 2: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

1st Quarter DUKE ENERGY KENTUCKY, INC

GAS COST ADJUSTMENT CLAUSE

QUARTERLY REPORT

GAS COST RECOVERY RATES EFFECTIVE FROM March 3 2014 THROUGH March 31, 2014

DESCRIPTION

UNIT AMOUNT

EXPECTED GAS COST (EGC) SUPPLIER REFUND ADJUSTMENT (RA) ACTUAL ADJUSTMENT (AA) BALANCE ADJUSTMENT (BA) GAS COST RECOVERY RATE (GCR) = EGC + RA + AA +BA

EXPECTED GAS COST CALCULATION

$/MCF

5.678 $/MCF

0.000 $/MCF

0.201 $/MCF

0.012 $/MCF

5.891

DESCRIPTION

UNIT AMOUNT

TOTAL EXPECTED GAS COST COMPONENT (EGC)

$/MCF

5.678

SUPPLIER REFUND ADJUSTMENT CALCULATION

DESCRIPTION

UNIT AMOUNT

CURRENT QUARTER SUPPLIER REFUND ADJ. PREVIOUS QUARTER REPORTED SUPPLIER REFUND ADJ. SECOND PREVIOUS QUARTER REPORTED SUPPLIER REFUND ADJ. THIRD PREVIOUS QUARTER REPORTED SUPPLIER REFUND ADJ. SUPPLIER REFUND ADJUSTMENT (RA)

ACTUAL ADJUSTMENT CALCULATION

DESCRIPTION

UNIT AMOUNT

CURRENT QUARTER ACTUAL ADJUSTMENT PREVIOUS QUARTER REPORTED ACTUAL ADJUSTMENT SECOND PREVIOUS QUARTER REPORTED ACTUAL ADJUSTMENT THIRD PREVIOUS QUARTER REPORTED ACTUAL ADJUSTMENT ACTUAL ADJUSTMENT (AA)

BALANCE ADJUSTMENT CALCULATION

DESCRIPTION

UNIT AMOUNT

CURRENT QUARTER BALANCE ADJUSTMENT PREVIOUS QUARTER REPORTED BALANCE ADJUSTMENT SECOND PREVIOUS QUARTER REPORTED BALANCE ADJUSTMENT THIRD PREVIOUS QUARTER REPORTED BALANCE ADJUSTMENT BALANCE ADJUSTMENT (BA)

$/MCF

0.000 $/MCF

0.000 $/MCF

0.000 $/MCF

0.000 $/MCF

0.000

$/MCF

0.377 $/MCF

0.100 $/MCF

(0.277) $/MCF

0.001 $/MCF

0.201

$/MCF

0.002 $/MCF

(0.008) $/MCF

(0.008) $/MCF

0.026 $/MCF

0.012

THIS QUARTERLY REPORT FILED PURSUANT TO ORDER NO. 8373 OF THE KENTUCKY PUBLIC SERVICE COMMISSION DATED APRIL 16, 1982.

DATE FILED: February 11, 2014

BY: DON WATHEN

TITLE: DIRECTOR, Rates & Regulatory Strategy - OH/KY

Page 3: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Schedule I Page 1 of 4

GAS COST ADJUSTMENT DUKE ENERGY KENTUCKY

EXPECTED GAS COST RATE CALCULATION (EGC)

"SUMMARY" FOR THE EGC RATE IN EFFECT AS OF MARCH 3, 2014

DEMAND (FIXED) COSTS:

Columbia Gas Transmission Corp. 2,780,149 Columbia Gulf Transmission Corp. 1,940,261 KO Transmission Company 307,584 Gas Marketers 737,326

TOTAL DEMAND COST: 5,765,320

PROJECTED GAS SALES LESS SPECIAL CONTRACT IT PURCHASES: 9,684,230 MCF

DEMAND (FIXED) COMPONENT OF EGC RATE: $5,765,320 / 9,684,230 MCF $0.595 /MCF

COMMODITY COSTS:

Gas Marketers Gas Storage

Columbia Gas Transmission Propane

COMMODITY COMPONENT OF EGC RATE:

$4.509 /MCF

$0.554 /MCF $0.009 /MCF $5.072 /MCF

Other Costs: Net Charge Off (1)

$17,952 /

1,604,900 $0.011 /MCF

TOTAL EXPECTED GAS COST:

$5.678 /MCF

$

Page 4: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

SCHEDULE I PAGE 2 OF 4

GAS COST ADJUSTMENT DUKE ENERGY KENTUCKY

DETAILS FOR THE EGC RATE IN EFFECT AS OF : MARCH 3, 2014

CONTRACT NUMBER EXPECTED RATE VOLUME OF GAS COST

( $ DTH) (DTH) DAYS/MTHS ( $ )

INTERSTATE PIPELINE : COLUMBIA GAS TRANSMISSION, LLC TARIFF RATE EFFECTIVE DATE : FSS: 2/1/2013

SST: 2/1/2014

BILLING DEMAND - TARIFF RATE - FSS Max. Daily Withdrawl Quan. 1.5090 39,656 12 718,091 Seasonal Contract Quantity 0.0289 1,365,276 12 473,478

BILLING DEMAND - TARIFF RATE - SST Maximum Daily Quantity 4.4510 19,828 6 529,527 Maximum Daily Quantity 4.4510 39,656 6 1,059,053

CAPACITY RELEASE CREDIT 0

TOTAL COLUMBIA GAS TRANSMISSION, LLC - DEMAND CHARGES 2,780,149

Page 5: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Columbia Gas Transmission, LLC

V.9. FERC Tariff

Currently Effective Rates Fourth Revised Volume No. 1

FSS Rates

Version 3.0.0

Currently Effective Rates Applicable to Rate Schedule FSS Rate Per Dth

Base Transportation Cost Electric Power Annual Total Daily

Tariff Rate Adjustment Costs Adjustment Charge Effective Rate

Rate Current Surcharge Current Surcharge Adjustment Rate

Rate Schedule FSS 1/ 2/

Reservation Charge 3/ $ 1.509 1.509 0.0496 Capacity 3/ 0 2.89 - 2.89 2.89 Injection 0 1.53 1.53 1.53 Withdrawal 0 1.53 - - 1.53 1.53 Overrun 3/ 0 10.91 10.91 10.91

1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Rate Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively.

2/ ACA assessed where applicable pursuant to Section 154.402 of the Commission's Regulations. 3/ Shippers utilizing the Eastern Market Expansion (EME) facilities for FSS service will pay a total FSS MDSQ reservation charge of

$4.130 and a total FSS SCQ capacity rate of 6.80 cents. If EME customers incur an overrun for FSS services that is provided under their EME Project service agreements, they will pay a total FSS overrun rate of 23.44 cents. The additional EME demand charges and EME overrun charges can be added to the applicable surcharges above to develop the EME Total Effective Rate.

Issued On: December 28, 2012 Effective On: February 1, 2013

Page 6: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Rate Schedule SST Reservation Charge 3/4/

Base Tariff Rate 1/ 2/

$ 4.830

TCRA Rates

0.335

EPCA Rates

0.065

OTRA Rates

0.121

CCRM Rates

0.393 Commodity e0102-- 4- 0 /-- ,I,DIP?' 1̀" 0 .--. .017

Maximum 0 1.02 0.00 0.68 0.00 0.00 Minimum 0 1.02 0.00 0.68 0.00 0.00

Overrun 4/ Maximum 0 16.90 1.10 0.89 0.40 1.29 Minimum 0 1.02 0.00 0.68 0.00 0.00

56/6 Total Daily Effective Rate Rate 2/ 2/

0.1888

1.70 1.70

1.70 1.70

20.58 20.58

1.70 1.70

Columbia Gas Transmission, LLC

V.8. FERC Tariff

Currently Effective Rates Fourth Revised Volume No. 1

SST Rates

Version 22.0.0

Currently Effective Rates Applicable to Rate Schedule SST Rate Per Dth

1/ Excludes Account 858 expenses and Electric Power Costs which are recovered through Columbia's Transportation Costs Rate Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively.

2/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section 154.402 of the Commission's Regulations and in accordance with Section 34 of the GTC of Transporter's FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website (http://www.ferc.gov) is incorporated herein by reference.

3/ Minimum reservation charge is $0.00. 4/ Shippers utilizing the Eastern Market Expansion (EME) facilities for Rate Schedule SST service will pay a total SST reservation

charge of $17.625. If EME customers incur an overrun for SST services that is provided under their EME Project service agreements, they will pay a total overrun rate of 58.97 cents. The applicable EME demand charge and EME overrun charge can be added to the applicable surcharges above to calculate the EME Total Effective Rates.

1 017 tth-thdirauJ/

Oo fic-44

Issued On: December 31, 2013 018. wjeci-lon Effective On: February 1, 2014

Page 7: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

NiSource Gas

TM Transmission & Storage 5151 San Felipe, Suite 2500

Houston, Texas 77056

ist 18, 2009

ames L. Turner ip Executive, President & COO East Fourth Street 25 innati, OH 45202

Revision 1 to SST Service Agreement No. 79977 Discount Letter Agreement

r Mr. Turner:

letter shall serve as an amendment to the. SST Service Agreement between Columbia Gas ismission, LLC (Transporter) and Duke Energy Kentucky, Inc. (Shipper) designated as isporter's Contract No. 79977.

A) Transporter and Shipper hereby agree that Section 3 of the above-referenced contract number shall be amended to include the following additional language:

1) The rate for service, for the period from 11/01/09 to 3/31/10, shall include a discounted demand rate, inclusive of the base rate and all demand surcharges, of $3.963 for deliveries to the primary delivery points: KOT DEK MLI (834696) and the following primary receipt points: MRTCO — Master Receipt TCO / RP Storage Point TCO. Shipper shall also provide the then-

existing Retainage and shall pay the then-existing maximum commodity charge plus commodity surcharges as set forth in Transporter's FERC Gas Tariff from time to time.

2) The rate for service, for the period from 4/01/10 to 3/31/15, shall include a discounted demand rate, inclusive of the base rate and all demand surcharges, of $4.451 for , deliveries to the primary delivery points: KOT DEK MLI (834696) and the following primary receipt points: MRTCO — Master Receipt TOO / RP Storage Point TCO. Shipper shall also provide the then-existing Retainage and shall pay the then-existing maximum commodity charge plus commodity surcharges as set forth in Transporter's FERC Gas Tariff from time to time.

COLUMBIA GAS TRANSMISSION • COLUMBIA GULF TRANSMISSION • CROSSROADS PIPELINE •

CENTRAL KENTUCKY TIRANSMISSION • GRANITE STATE • HARDY STORAGE • MILLENNIUM PIPELINE

Page 8: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

3) The discounted rate provided in paragraph one and, two above is limited to the primary receipt/delivery point combinations set forth in Appendix A of the above-referenced service agreement. Except to the extent Federal Energy Regulatory Commission ("FERC") policies, rules and/or regulations, and/or Transporter's FERC Gas Tariff provide otherwise, for service under the above-referenced Service Agreement from secondary receipt points or to secondary delivery points, in lieu of the rates set forth in Paragraph 1 above, Transporter shall charge and Shipper shall pay the then existing maximum Recourse Rate set forth in Transporter's FERC Gas Tariff from time to time.

4) Notwithstanding the foregoing, the charge to be paid by Shipper and Transporter shall be no lower than the applicable total effective minimum charges or higher than the applicable total effective maximum charges as set for in Transporter's FERC Gas Tariff from time to time. Rates provided for in this Discount Letter Agreement will be adjusted as necessary so that the rate will be no lower than the total effective minimum charges nor higher than the applicable total effective maximum charges as set forth in Transporter's FERC Gas Tariff from time to time. In the event that a rate component which was at or below the applicable maximum rate at the time this Discount Letter Agreement was executed subsequently exceeds the applicable maximum rate due to a change in Transporter's maximum rate so that such rate component must be adjusted downward to equal the new applicable maximum rate, then other rate components may be adjusted upward to achieve the agreed overall rate, so long as none of the resulting rate components exceed the maximum rate applicable to that rate component. In the event the monthly Recourse Rate applicable to SST service is reduced to a level beloW $3.963 or $4.451 per Dth of Transportation Demand during the term of the above-referenced individual Service Agreement, the rates under the SST Service Agreement referenced above will be adjusted to the new monthly Recourse Rate.

5) This discounted transportation rate shall be apportioned in accordance with Section 20 of the General Terms and Conditions of Transporter's FERC Gas Tariff.

6) Shipper shall pay all then existing maximum overrun charges, if incurred, as set forth in Transporter's FERC Gas Tariff from time to time.

Page 9: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

y:

s: Dir ctor Co mercial Services

Duke Energy Inc.

By:

Its:

Lis •ve. EX.0 C60

you are in agreement with Ma above amendment, please execute both originals of this letter and :turn them to the Transporter at the address above, Attention: Sandra Dibello.

arms agreed to this l tr, day of 2009.

OLUMBIA GAS RANSMISSION, L

Page 10: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Columbia Gas Transmission, LLC

V.17. FERC Tariff

Currently Effective Rates Fourth Revised Volume No. 1

Retainage Rates

Version 3.0.0

RETAINAGE PERCENTAGES

Transportation Retainage 1.957%

Gathering Retainage 1.234%

Storage Gas Loss Retainage 0.120%

Ohio Storage Gas Lost Retainage 0.110%

Columbia Processing Retainage/1 0.000%

SS /we (

-A5 741-e ( Cd

1/ The Columbia Processing Retainage shall be assessed separately from the processing retainage applicable to third party processing plants set forth in Section 25.3 (f) of the General Terms and Conditions.

Issued On: March 1, 2013 Effective On: April 1, 2013

Page 11: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

SCHEDULE I PAGE 3 OF 4

GAS COST ADJUSTMENT DUKE ENERGY KENTUCKY

DETAILS FOR THE EGC RATE IN EFFECT AS OF : MARCH 3, 2014

CONTRACT NUMBER EXPECTED RATE VOLUME OF GAS COST

( $ DTH) (DTH) DAYS/MTHS ( $ )

INTERSTATE PIPELINE : COLUMBIA GULF TRANSMISSION CORP. TARIFF RATE EFFECTIVE DATE : FTS-1: 10/1/2013

BILLING DEMAND - TARIFF RATE - FTS-1 Maximum Daily Quantity 4.2917 22,782 5 488,868 Maximum Daily Quantity 4.2917 17,598 7 528,677 Maximum Daily Quantity 4.2917 18,000 5 386,253 Maximum Daily Quantity 4.2917 25,000 5 536,463

CAPACITY RELEASE CREDIT FOR FTS-1 0

TOTAL COLUMBIA GULF TRANSMISSION CORP. DEMAND CHARGES 1,940,261

INTERSTATE PIPELINE : KO TRANSMISSION COMPANY TARIFF RATE EFFECTIVE DATE : 10/1/2013

BILLING DEMAND - TARIFF RATE - FT Maximum Daily Quantity 0.3560 72,000 12 307,584

CAPACITY RELEASE CREDIT 0

TOTAL KO TRANSMISSION CO. DEMAND CHARGES 307,584

VARIOUS GAS MARKETERS FIXED (RESERVATION) CHARGES :

November - March 0.0025 12,810,689 31,926 December - February 0.018 300,000 5,400

National Energy & Trade, LP (NET) November - March 1,000,000 700,000

TOTAL GAS MARKETERS FIXED CHARGES 737,326

Page 12: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Columbia Gulf Transmission, LLC

V.I. FERC Tariff

Currently Effective Rates Third Revised Volume No. 1

FTS-1 Rates

Version 11.0.0

Currently Effective Rates Applicable to Rate Schedule FTS-1 Rates in Dollars per Dth

Total Effective Rate Schedule FTS-1 Base Rate Rate Daily Rate

(1) (2) (3) 1/ 1/ 1/

Market Zone Reservation Charge

Maximum 4.2917 4.2917 0.1411 Minimum 0.000 0.000 0.000

Commodity Maximum 0.0109 0.0109 0.0109 Minimum 0.0109 0.0109 0.0109

Overrun Maximum 0.1520 0.1520 0.1520 Minimum 0.0109 0.0109 0.0109

1/ Excludes the Annual Charge Adjustment (ACA) Surcharge. An ACA Commodity surcharge per Dth shall be assessed where applicable pursuant to Section 154.402 of the Commission's Regulations and in accordance with Section 31 of the GTC of Transporter's FERC Gas Tariff. The ACA unit charge authorized for each fiscal year (commencing October 1) by the Commission and posted on its website (http://www.ferc.gov) is incorporated herein by reference.

0/0

= 001)- /4e-4

fOilt

Issued On: August 1, 2013 Effective On: October 1, 2013

Page 13: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

KO Transmission Company Effective Date: 10/01/2013 Status: Effective FERC Docket: RP13-01183-000 FERC Order: Delegated Letter Order Order Date: 09/17/2013 Part 3, Currently Effective Rates, 7.0.0

CURRENTLY EFFECTIVE RATES APPLICABLE TO RATE SCHEDULES FTS AND ITS

RATE LEVELS - RATE PER DTH

RATE SCHEDULE FTS Reservation Charge 2/

Base Tariff Rater/

Maximum 1 $0.3560 Maximum 2 $0.3560 Daily Rate - Maximum 1 $0.0117 Daily Rate - Maximum 2 $0.0117

Commodity Maximum $0.0000 Minimum $0.0000 Overrun $0.0117

RATE SCHEDULE ITS Commodity Maximum $0.0117 Minimum $0.0000

1/ ACA assessed where applicable pursuant to Section 154.402 of the Commission's regulations and will be charged pursuant to Section 23 of the General Terms and Conditions at such time that initial and successive annual ACA assessments applicable to Transporter are made and posted on the Commission's website (<http://www.ferc.gov>).

2/ Minimum reservation charge is $0.00.

Transportation Retainage Adjustment 0.92%

NOTE: Utilizing GISB standards 5.3.22 and 5.3.23, Transporter's Rate Schedule FTS Reservation Charge can be converted to an applicable daily rate by dividing the above monthly rate by 30.4 days.

Page 14: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY KENTUCKY TOTAL RESERVATION COSTS FROM FIRM SUPPLIERS

ESTIMATED FOR EGC EFFECTIVE 3/1/2014

TOTAL ANNUAL RESERVATION COST:

TOTAL DOLLARS 31,926 (1)

TOTAL ANNUAL COVERAGE:

CITY GATE VOLUMES 12,810,689 Dth (2)

CALCULATED RATE: 0.0025 per Dth

(1) Reservation charges billed by firm suppliers for 2013 - 2014. (2) Contracted volumes for the 2013 - 2014 winter season.

DUKE ENERGY KENTUCKY TOTAL RESERVATION COSTS FROM NEEDLE PEAKING SUPPLIERS

ESTIMATED FOR EGC EFFECTIVE 3/1/2014

TOTAL ANNUAL RESERVATION COST:

TOTAL DOLLARS

TOTAL ANNUAL COVERAGE:

CITY GATE VOLUMES

$ $5,400.00 (1)

300,000 Dth (2)

CALCULATED RATE: 0.0180 per Dth

(1) Reservation charges billed by needle peaking suppliers for 2013 - 2014 (2) Contracted volumes for the 2013 - 2014 winter season.

Page 15: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

$37,325.95 Total Duke Energy Kentuck 14,890,689

2/4/2014

Duke Energy Kentucky Gas Resources

Supply Portfolio - November 2013 - March 2014 Reservation Fees

Chevron Columbia (Mainline) Base Fixed

Dth per Day Total Volume

Reserv. Fee

$0.0000

Total Cost Nov Dec Jan

3,000

Feb Mar

3,000 3,000 3,000 3,000 453,000 $0.00 Columbia (Mainline) Swing GD +.0025 18,500 18,000 15,500 15,000 18,500 2,587,000 $0.0025 $6,467.50

Total 3,040,000 $6,467.50

Energy America Columbia Backhaul (Leach) Swing GD +.1400 18,000 18,000 18,000 18,000 18,000 2,718,000 $0.0050 $13,590.00

Total 2,718,000 $13,590.00

Conoco Columbia (Mainline) Base Fixed 2,000 2,000 2,000 2,000 2,000 302,000 $0.0000 $0.00

Total 302,000 $0.00

J. P. Morgan Columbia (Mainline) Base FOMI 2,600 3,200 5,900 6,600 2,600 625,500 $0.0000 $0.00 Columbia (Mainline) Swing GD 18,500 18,000 15,500 15,000 18,500 2,587,000 $0.0000 $0.00

Total 3,212,500 $0.00

Southwestern Energy Columbia (Mainline) Base FOMI 2,600 2,950 5,850 6,550 2,500 611,700 $0.0000 $0.00

Total 611,700 $0.00

Sequent Columbia (Mainline) Swing GD 17,039 16,489 14,089 13,689 17,139 2,373,689 $0.0050 $11,868.45

Total 2,373,689 $11,868.45

NextEra Columbia (Mainline) Base FOMI 2,600 3,200 5,000 5,000 2,600 552,800 $0.0000 $0.00

Total 552,800 $0.00

ITotal Firm Supply 12,810,689 $ 31,925.95

25 Day Peaking Service (North) Twin Eagle (Lebanon) GD+$0.2000 12,000 12,000 12,000 1,080,000 $0.0050 $5,400.00

1,080,000 $5,400.00

'

Kentucky "Faux" Storage NET (1) Fixed 20,000 20,000 20,000 20,000 20,000 1,000,000 $0.00

(1) Must take a total of 1,000,000 Dths . Price based on average of Mich Con FOMI for Apr 13--Oct 13. Reservation fee of $100,000/month to be paid each month beginning April 2013 through October 2013.

Supply Portfolio 2013-14.xlsx

4

Fees

Page 16: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

ONET Date: February 19, 2013

Transaction Confirmation #: 181831

Transaction Confirmation for Immediate Delivery

3 Transaction Confirmation Is subject to the Base Contract between Seller and Buyer dated April 26, 2004. terms of the Transaction Confirmation are binding unless disputed in writing within 2 Business Days of

aipt unless otherwise specified in the Base Contract. For any issues regarding the confirmations, please contact Contract ninistration at (713) 800-1981, (713) 800-1985 or via email at [email protected].

OYER:

Duke Energy Kentucky, Inc. 139 East Fourth St. EX 460 Cincinnati, OH 45202

SELLER:

National Energy & Trade, LP 5847 San Felipe Street Suite 1910 Houston, TX 77057

Attn: Phone: Fax:

Steve Niederbaumer 513-287-3076 513-267 2123 k 7— LI 111

Attn: Phone: Fax:

Greg Trefz 713-800-1912 713-871-0510

Commodity Price: The average of the Inside FERC's Gas Market Report price located under the heading "Upper Midwest", the row titled "Mich Con city-gate", and the column heading "Index" for the 7 months beginning April 2013 through October 2013.

Payment Terms: Duke shall pay Commodity Price for the full SQ as per the terms of the NAESB agreement when the gas is called upon and delivered during period beginning November 1, 2013 and ending March 31, 2014.

Delivery Period: Begin: November 01, 2013 End: March 31, 2014

Maximum Daily Quantity (Max DQ): 20,000 MMBtu/day

Minimum Daily Quantity (Min DQ): 0 MMBtu/day, however, any volume greater than 0 must be dispatched in increments of 1,000 MMBtu/day

Seasonal Quantity (SQ): 1,000,000 MMBtus

Delivery Point(s): Duke's Springboro inter-connect with ANR or TETCO

cheduling: Duke shall notify NET of its election by 8:00 a.m. Central Time on the business day prior to flow. Duke shall not be required to take gas on a ratable basis over weekends and holidays.

uyer: 0‘)

/:

tie:

Duke Energy Kentucky, Inc.

Seller:

By:

Title:

Date:

/44 pui 44^ t s c -e S

ate:

February 19, 2013

Page 17: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Buyer: Duke Energy Kentucky, Inc.

By:

Title:

onal ergy & Trade, LP

VICE PRE T - NET GENERAL PARTNERS LLC

Seller:

By:

Title: 119am a,.5,e."- 6u5. c.c.

INET Date: February 19, 2013

Transaction Confirmation #: 181832

Transaction Confirmation for Immediate Delivery

is Transaction Confirtration is subject to the Base Contract between Seller and Buyer dated April 26, 2004. re terms of the Transaction Confirmation are binding unless disputed in writing within 2 Business Days of ceipt unless otherwise Specified in the Base Contract. For any issues regarding the confirmations, please contact Contract iministration at (713) 800-1961, (713) 800-1986 or via email at [email protected].

3UYER:

Duke Energy Kentucky, Inc. 139 East Fourth St. EX 460 Cincinnati, OH 45202

SELLER:

National Energy & Trade, LP 5847 San Felipe Street Suite 1910 Houston, TX 77057

Attn: Steve Nlederbaumer Attn: Greg Trefz Phone: 513-287-3076 Phone: 713-800-1912 Fax: 513-287-21.25— .2 8 7- Liar a Fax: 713-871-0510

Delivery Period: Begin: April 01, 2013 End: October 31, 2013

Associated with supply deal under confirm #181831.

Monthly Demand

$0.10 times the SQ ($100,000/month) to be paid each month beginning April 2013 through Charge:

October 2013.

)ate:

Date: February 19, 2013

Page 18: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

SCHEDULE I PAGE 4 OF 4

GAS COST ADJUSTMENT DUKE ENERGY KENTUCKY

DETAILS FOR THE EGC RATE IN EFFECT AS OF : MARCH 3, 2014

GAS COMMODITY RATE FOR MARCH, 2014:

GAS MARKETERS : WEIGHTED AVERAGE GAS COST @ CITY GATE ($/Dth) (1): $4.9334 $/Dth DUKE ENERGY KENTUCKY FUEL 1.500% $0.0740 $5.0074 $/Dth DTH TO MCF CONVERSION 1.0279 $0.1397 $5.1471 $/Mcf ESTIMATED WEIGHTING FACTOR 87.600% $4.5089 $/Mcf

GAS MARKETERS COMMODITY RATE $4.509 $/Mcf

GAS STORAGE : COLUMBIA GAS TRANS. - STORAGE INVENTORY RATE $4.2027 $/Dth COLUMBIA GAS TRANS. FSS WITHDRAWAL FEE $0.0153 $4.2180 $/Dth COLUMBIA GAS TRANS. SST FUEL 1.957% $0.0825 $4.3005 $/Dth COLUMBIA GAS TRANS SST COMMODITY RATE $0.0170 $4.3175 $/Dth KO TRANS, COMMODITY RATE $0.0012 $4.3187 $/Dth DUKE ENERGY KENTUCKY FUEL 1.500% $0.0648 $4.3835 $/Dth DTH TO MCF CONVERSION 1.0279 $0.1223 $4.5058 $/Mcf ESTIMATED WEIGHTING FACTOR 12.300% $0.5542 $/Mcf

GAS STORAGE COMMODITY RATE - COLUMBIA GAS $0.554 $/Mcf

PROPANE: ERLANGER PROPANE INVENTORY RATE $0.57186 $/Gallon GALLON TO MCF CONVERSION 15.38 $8.2233 $8.7952 $/Mcf ESTIMATED WEIGHTING FACTOR 0.100% $0.0088 $/Mcf

PROPANE COMMODITY RATE $0.009 $/Mcf

(1) Weighted average cost of gas based on NYMEX prices on 2/6/14 and contracted hedging prices.

Page 19: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

1st Quarter

SCHEDULE II GAS COST ADJUSTMENT CLAUSE

DUKE ENERGY KENTUCKY, INC SUPPLIER REFUND ADJUSTMENT

DETAILS FOR THE THREE MONTH PERIOD ENDED

November 30, 2013

DESCRIPTION

UNIT AMOUNT

SUPPLIER REFUNDS RECEIVED DURING THREE MONTH PERIOD

x 0.9980 ) REFUNDS INCLUDING INTEREST ( $0.00

DIVIDED BY TWELVE MONTH SALES ENDED

CURRENT SUPPLIER REFUND ADJUSTMENT

$

0.00

0.9980

$

0.00

February 28, 2015 MCF 9,684,230

6/MCF 0.000

September 1, 2013 THROUGH November 30, 2013

INTEREST FACTOR (REFLECTING 90 DAY COMMERCIAL PAPER RATE)

DETAILS OF SUPPLIER REFUNDS RECEIVED DURING THE THREE MONTHS ENDED

November 30, 2013

DESCRIPTION

UNIT AMOUNT

SUPPLIER

TOTAL REFUNDS APPLICABLE TO THE CURRENT GCA

RAU

$

0.00

Page 20: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

1st Quarter SCHEDULE III

GAS COST ADJUSTMENT CLAUSE DUKE ENERGY KENTUCKY, INC

ACTUAL ADJUSTMENT DETAILS FOR THE THREE MONTH PERIOD ENDED

November 30, 2013

DESCRIPTION UNIT SEPTEMBER OCTOBER NOVEMBER

SUPPLY VOLUME PER BOOKS

PRIMARY GAS SUPPLIERS MCF 185,425 464,705 1,179,910 UTILITY PRODUCTION MCF 0 0 0 INCLUDABLE PROPANE MCF 0 0 70 OTHER VOLUMES (SPECIFY) ADJUSTMENT MCF 4,007 (4,137) (4,335)

TOTAL SUPPLY VOLUMES MCF 189,432 460,568 1,175,645

SUPPLY COST PER BOOKS

PRIMARY GAS SUPPLIERS $ 1,096,229 2,534,397 5,308,385 SPECIAL PURCHASES CREDIT $ 0 0 0 INCLUDABLE PROPANE $ 0 0 594 OTHER COSTS (SPECIFY): 0 0 0 GAS COST UNCOLLECTIBLE $ 3,127 499 3,228 MANAGEMENT FEE $ (13,862) (13,862) (21,658) X-5 TARIFF $ 0 0 0 TRANSPORTATION SERVICE "UNACCOUNTED FOR" $ 0 0 0 GAS COST CREDIT $ 0 0 0 LOSSES - DAMAGED LINES $ 0 0 (31) TRANSPORTATION TAKE-OR-PAY RECOVERY $ 0 0 0 SALES TO REMARKETERS $ 0 0 0

TOTAL SUPPLY COSTS $ 1,085,494 2,521,034 5,290,518

SALES VOLUMES

JURISDICTIONAL MCF 191,205.4 233,852.5 708,949.2 NON-JURISDICTIONAL MCF 0.0 0.0 0.0 OTHER VOLUMES (SPECIFY): MCF 0.0 0.0 0.0

TOTAL SALES VOLUMES MCF 191,205.4 233,852.5 708,949.2

UNIT BOOK COST OF GAS (SUPPLY $ / SALES MCF) $/MCF 5.677 10.780 7.462 LESS: EGC IN EFFECT FOR THE MONTH $/MCF 4.562 4.649 4.559

DIFFERENCE $/MCF 1.115 6.131 2.903 TIMES: MONTHLY JURISDICTIONAL SALES MCF 191,205.4 233,852.5 708,949.2

EQUALS MONTHLY COST DIFFERENCE $ 213,194.02 1,433,749.68 2,058,079.53

NET COST DIFFERENCE FOR THE THREE MONTH PERIOD $ 3,705,023.23

PRIOR PERIOD ADJUSTMENT - AUGUST 2013 $ (58,285.88)

TOTAL COST USED IN THE CURRENT AA CALCULATION $ 3,646,737.35

DIVIDED BY: 12 MONTH PROJECTED SALES ENDED February 28, 2015 MCF 9,684,230

EQUALS CURRENT QUARTERLY ACTUAL ADJUSTMENT $/MCF 0.377

AAU

Page 21: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

1st Quarter SCHEDULE IV

GAS COST ADJUSTMENT CLAUSE DUKE ENERGY KENTUCKY, INC

BALANCE ADJUSTMENT DETAILS FOR THE TWELVE MONTH PERIOD ENDED November 30, 2013

DESCRIPTION

UNIT AMOUNT

RECONCILIATION OF A PREVIOUS GAS COST VARIANCE

GAS COST DIFFERENCE TO BE RECOVERED FROM OR (RETURNED TO) CUSTOMERS WHICH WAS USED TO COMPUTE THE "AA" EFFECTIVE DECEMBER 1, 2012

$ 912,633.37

LESS: AMOUNT RECOVERED (RETURNED) BY THE AA OF $ APPLIED TO TOTAL SALES OF 9,889,076 MCF (TWELVE MONTHS ENDED November 30, 2013

BALANCE ADJUSTMENT FOR THE "AA"

)

0.088 /MCF

$ 870,238.73

$ 42,394.64

RECONCILIATION OF A PREVIOUS SUPPLIER REFUND

SUPPLIER REFUND AMOUNT TO BE DISTRIBUTED TO CUSTOMERS WHICH WAS USED TO COMPUTE THE "RA" EFFECTIVE DECEMBER 1, 2012 $ (6,415.92)

LESS: AMOUNT DISTRIBUTED BY THE "RA" OF $ (0.001) /MCF APPLIED TO TOTAL SALES OF 9,889,076 MCF (TWELVE MONTHS ENDED November 30, 2013 )

BALANCE ADJUSTMENT FOR THE "RA"

$ (9,889.07)

3,473.15

RECONCILIATION OF A PREVIOUS BALANCE ADJUSTMENT

AMOUNT TO BE RECOVERED FROM OR (RETURNED TO) CUSTOMERS WHICH WAS USED TO COMPUTE THE "BA" EFFECTIVE DECEMBER 1, 2012 $ (612,132.87)

LESS: AMOUNT RECOVERED (RETURNED) BY THE "BA" OF $ (0.059) /MCF APPLIED TO TOTAL SALES OF 9,889,076 MCF (TWELVE MONTHS ENDED November 30, 2013 ) $ (583,455.52)

BALANCE ADJUSTMENT FOR THE "BA" $ (28,677.35)

TOTAL BALANCE ADJUSTMENT AMOUNT $ 17,190.44

DIVIDED BY: 12 MONTHS PROJECTED SALES ENDED February 28, 2015 MCF 9,684,230

EQUALS: CURRENT QUARTER BALANCE ADJUSTMENT $/MCF 0.002

Page 22: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Revised Tariff Schedules

Page 23: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Duke Energy Kentucky, Inc. 4580 Olympic Blvd. Erlanger, Kentucky 41018

KY. P.S.C. Gas No. 2 Ninety-Sixth Revised Sheet No. 10 Cancelling and Superseding Ninety-Fifth Revised Sheet No. 10 Page 1 of 2

INDEX TO APPLICABLE GAS TARIFF SCHEDULES AND COMMUNITIES SERVED

SERVICE REGULATIONS

Sheet_ No.

Billing Effective

Date Effective Date per Order

Service Agreements 20 01/04/10 01/04/10 Supplying and Taking of Service 21 01/04/10 01/04/10 Customer's Installation 22 01/04/10 01/04/10 Company's Installation 23 01/04/10 01/04/10 Metering 24 01/04/10 01/04/10 Billing and Payment 25 01/04/10 01/04/10 Deposits 26 01/04/10 01/04/10 Application 27 01/04/10 01/04/10 Gas Space Heating Regulations 28 01/04/10 01/04/10 Availability of Gas Service 29 01/04/10 01/04/10

FIRM SERVICE TARIFF SCHEDULES Rate RS, Residential Service 30 03/03/14 03/03/14 (T) Rate GS, General Service 31 03/03/14 03/03/14 (T) Reserved for Future Use 32 Reserved for Future Use 33 Reserved for Future Use 34 Reserved for Future Use 35 Reserved for Future Use 36 Reserved for Future Use 37 Reserved for Future Use 38 Reserved for Future Use 39 Reserved for Future Use 40 Reserved for Future Use 41 Reserved for Future Use 42 Reserved for Future Use 43 Rate FRAS, Full Requirements Aggregation Service 44 01/04/10 01/04/10 Reserved for Future Use 45 Reserved for Future Use 46 Reserved for Future Use 47 Reserved for Future Use 48 Reserved for Future use 49

TRANSPORTATION TARIFF SCHEDULE Rate IT, Interruptible Transportation Service 50 01/04/10 01/04/10 Rate FT-L, Firm Transportation Service 51 01/04/10 01/04/10 Reserved for Future Use 52 Rate SSIT, Spark Spread Interruptible Transportation Rate 53 01/04/10 01/04/10 Reserved for Future Use 54 Rate AS, Pooling Service for Interruptible Transportation 55 01/04/10 01/04/10 Reserved for Future Use 56 Rate GTS, Gas Trading Service 57 01/04/10 01/04/10 Rate IMBS, Interruptible Monthly Balancing Service 58 01/04/10 01/04/10 Rate DGS, Distributed Generation Service 59 01/04/10 01/04/10

Issued by authority of an Order of the Kentucky Public Service Commission dated , 2014 in Case No. 2014-00

Issued: , 2014 Effective: March 3, 2014 Issued by James P. Henning, President

Page 24: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Duke Energy Kentucky, Inc. 4580 Olympic Blvd. Erlanger, Kentucky 41018

KY.P.S.C. Gas No. 2 Ninety-Sixth Revised Sheet No. 10 Cancelling and Superseding Ninety-Fifth Revised Sheet No. 10 Page 2 of 2

INDEX TO APPLICABLE GAS TARIFF SCHEDULES AND COMMUNITIES SERVED (Contd.)

RIDERS

Sheet

Billing Effective

No. Date Effective Date

per Order

Rider X, Main Extension Policy 60 01/04/10 01/04/10 Rider DSM, Demand Side Management Cost Recovery Program 61 01/04/10 01/04/10 Rider DSMR, Demand Side Management Rate 62 05/01/13 05/01/13 Reserved for Future Use 63 Reserved for Future Use 64 Reserved for Future Use 65 Reserved for Future Use 66 Reserved for Future Use 67 Reserved for Future Use 68 Reserved for Future Use 69

GAS COST RECOVERY RIDERS Gas Cost Adjustment Clause 70 01/04/10 01/04/10 Reserved for Future Use 71 Reserved for Future Use 72 Reserved for Future Use 73 Reserved for Future Use 74 Reserved for Future Use 75 Reserved for Future Use 76

Rider GCAT, Gas Cost Adjustment Transition Rider 77 03/03/14 03/03/14 Reserved for Future Use 78 Reserved for Future Use 79

MISCELLANEOUS Bad Check Charge 80 01/04/10 01/04/10 Charge for Reconnection of Service 81 01/04/10 01/04/10 Local Franchise Fee 82 01/04/10 01/04/10 Curtailment Plan 83 01/04/10 01/04/10 Rate MPS, Meter Pulse Service 84 01/04/10 01/04/10 Reserved for Future Use 85 Reserved for Future Use 86 Reserved for Future Use 87 Reserved for Future Use 88 Reserved for Future Use 89

Issued by authority of an Order of the Kentucky Public Service Commission dated , 2014 in Case No. 2014-00

Issued: , 2014 Effective: March 3, 2014 Issued by James P. Henning, President

(T)

Page 25: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Duke Energy Kentucky, Inc. 4580 Olympic Blvd. Erlanger, Kentucky 41018

KY.P.S.C. Gas No. 2 Ninetieth Revised Sheet No. 30 Cancelling and Superseding Eighty-Ninth Revised Sheet No. 30 Page 1 of 1

RATE RS RESIDENTIAL SERVICE

APPLICABILITY Applicable to firm natural gas service, which is comprised of commodity gas supply and local delivery service, required for all domestic purposes in private residences, single occupancy apartments, and common use areas of multi-occupancy buildings, when supplied at one point of delivery where distribution mains are adjacent to the premises to be served.

NET MONTHLY BILL The Net Monthly Bill is determined as follows: All gas is billed in units of 100 cubic feet (CCF).

Customer Charge per month:

$16.00

Delivery Gas Cost Rate Adjustment Total Rate

Plus a commodity Charge for

all CCF at

$0.37213 plus $0.5891 Equals $0.96123 ( I )

Plus, all delivered gas shall be subject to an adjustment per CCF as set forth on Sheet No. 62, Rider DSMR, Demand Side Management Rate.

The "Customer Charge" shown above shall be the minimum amount billed each month.

The "Gas Cost Adjustment" as shown above, is an adjustment per 100 cubic feet determined in accordance with the "Gas Cost Adjustment Clause" set forth on Sheet No. 70 of this tariff.

When bills are rendered less frequently than monthly the time related units such as cubic feet blocks, minimum or other charges, will be billed in accordance with the number of billing months in the meter reading interval.

LATE PAYMENT CHARGE Payment of the Net Monthly Bill must be received in the Company's office within twenty-one (21) days from the date the bill is mailed by the Company. When not so paid, the Gross Monthly Bill, which is the Net Monthly Bill plus 5%, is due and payable.

SERVICE REGULATIONS The supplying of, and billing for, service and all conditions applying thereto, are subject to the jurisdiction of the Kentucky Public Service Commission and to Company's Service Regulations currently in effect, as filed with the Kentucky Public Service Commission, as provided by law.

Issued by authority of an Order of the Kentucky Public Service Commission dated , 2014 in Case No. 2014-000 Issued: , 2014 Effective: March 3, 2014 Issued by James P. Henning, President

Page 26: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Duke Energy Kentucky, Inc. 4580 Olympic Blvd. Erlanger, Kentucky 41018

KY.P.S.C. Gas No. 2 Ninetieth Revised Sheet No. 31 Cancelling and Superseding Eighty-Ninth Revised Sheet No. 31 Page 1 of 1

RATE GS

GENERAL SERVICE APPLICABILITY

Applicable to firm natural gas service, which is comprised of commodity gas supply and local delivery service, required for any purpose by an individual non-residential customer at one location when supplied at one point of delivery where distribution mains are adjacent to the premises to be served. This schedule is also applicable to non-metered natural gas commodity supplies and local delivery service for street lighting to such entities as certificated homeowners associations, businesses, and federal, state, and local governments. The Company may decline requests for service under this tariff due to gas supply limitations.

NET MONTHLY BILL The Net Monthly Bill is determined as follows: All gas is billed in units of 100 cubic feet (CCF)

Customer Charge per month: $47.50

Delivery Gas Cost Rate Adjustment Total Rate

Plus a Commodity Charge for all CCF at

$0.20530 Plus $0.5891 Equals $0.7944 ( I )

Plus all delivered gas shall be subject to an adjustment per CCF as set forth on: Sheet No. 62, Rider DSMR, Demand Side Management Rate for non-residential service

The "Customer Charge" shown above shall be the minimum amount billed per month.

The "Gas Cost Adjustment," as shown above, is an adjustment per 100 cubic feet determined in accordance with the "Gas Cost Adjustment Clause" set forth on Sheet No. 70 of this tariff.

When bills are rendered less frequently than monthly the time related units such as cubic feet blocks, minimum bills or other charges, will be billed in accordance with the number of billing months in the meter reading interval.

LATE PAYMENT CHARGE Payment of the Net Monthly Bill must be received in the Company's office within twenty-one (21) days from the date the bill is mailed by the Company. When not so paid, the Gross Monthly Bill, which is the Net Monthly Bill plus 5%, is due and payable.

TERM OF SERVICE One year, terminable thereafter on ten (10) days written notice by either customer or Company.

SERVICE REGULATIONS The supplying of, and billing for, service and all conditions applying thereto, are subject to the jurisdiction of the Kentucky Public Service Commission, and to Company's Service Regulations currently in effect, as filed with the Kentucky Public Service Commission as provided by law.

Issued by authority of an Order of the Kentucky Public Service Commission dated , 2014 in Case No. 2014-000

Issued: , 2014 Effective: March 3, 2014 Issued by James P. Henning, President

Page 27: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Duke Energy Kentucky, Inc. 4580 Olympic Blvd. Erlanger, Kentucky 41018

KY.P.S.C. Gas No. 2 Thirty-First Revised Sheet No. 77 Cancelling and Superseding Thirtieth Revised Sheet No. 77 Page 1 of 1

RIDER GCAT

GAS COST ADJUSTMENT TRANSITION RIDER

APPLICABILITY Applicable to all customers served under Rate FT-L after the effective date of this tariff who paid gas supply costs through the Company's Gas Cost Adjustment (GCA) mechanism during the twelve month period immediately preceding the date on which the customer began receiving service under Rate FT-L.

GCA TRANSITION RIDER A charge or credit shall be applied to all volumes transported pursuant to Rate FT-L in order to pass through to former GCA customers the Company's quarterly Actual Adjustment (AA), Balance Adjustment (BA), and Supplier Refund and Reconciliation Adjustment (RA) costs or credits during the first twelve months that the former sales customer participates in the Company's firm transportation program.

The amount of this charge or (credit) shall be $0.0213 per 100 cubic feet. This rate shall be in effect during the month of March 2014 through May 2014 and shall be updated quarterly, concurrent with the Company's GCA filings.

Issued by authority of an Order of the Kentucky Public Service Commission dated in Case No. 201

Issued: Effective: March 3, 2014 Issued by James P. Henning, President

Page 28: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY KENTUCKY SUPPLEMENTAL INFORMATION

FOR THE EXPECTED GAS COST (EGC) RATE CALCULATION OF THE GAS COST RECOVERY RATE

IN EFFECT AS OF MARCH 3, 2014

Page 29: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

1st Quarter

DUKE ENERGY Kentucky, Inc. USED FOR GCA EFFECTIVE March 3, 2014

COMPUTATION OF THE INTEREST FACTOR DECEMBER 2012 0.17 FOR THE GCA CALCULATION ON SCHEDULE II JANUARY 2013 0.17

FEBRUARY 2013 0.15 TWELVE MONTHS ENDED December 31, 2013 MARCH 2013 0.17 BLOOMBERG REPORT (90-DAY COMMERCIAL PAPER RATES) APRIL 2013 0.15

MAY 2013 0.11 INTEREST RATE -0.0037 JUNE 2013 0.15

JULY 2013 0.11 PAYMENT 0.083166 AUGUST 2013 0.09

SEPTEMBER 2013 0.09 ANNUAL TOTAL 0.9980 OCTOBER 2013 0.10

NOVEMBER 2013 0.12 1.58 DECEMBER 2013 0.14 1.72

MONTHLY INTEREST (0.000308)

AMOUNT 1

PRIOR ANNUAL TOTAL

1.58

PLUS CURRENT MONTHLY F

0.14

LESS YEAR AGO RATE

0.17

NEW ANNUAL TOTAL

1.55

AVERAGE ANNUAL RATE

0.13

LESS 0.5% (ADMINISTRATIVE

(0.37)

Page 30: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY COMPANY KENTUCKY DETERMINATION OF TOTAL SUPPLY COST

MONTH OF

DESCRIPTION W/P

September 2013

TOTAL AMOUNT

ROUNDED

PRIMARY GAS SUPPLY COST B1 1,104,091.44 current month estimate

adjustments from prior month B2 (1,490.42) Interruptible Transportation monthly charges by Gas Supply - PN C (6,371.91) 1,096,229

LESS: RATE SCHEDULE CF CREDIT

0.00 current month adjustments 0.00 0

PLUS: INCLUDABLE PROPANE a/c 728-3 Erlanger D2 0.00 0

PLUS: GAS COST UNCOLLECTIBLE E 3,127.00 3,127

LESS: X-5 TARIFF 0.00 0

LESS Tenaska MANAGEMENT FEE F 13,862.00 (13,862)

LESS: TOP TRANSP. RECOVERIES 0.00 0

LESS: GAS LOSSES - DAMAGED LINES G 0.00 0

0.00 adjustments 0.00 0

LESS: GAS COST CREDIT 0.00 0

LESS: FIRM TRANSPORTATION ADJUSTMENTS 0.00 current month

adjustments 0.00 0

TOTAL SUPPLY COSTS 1,085,494

ACCOUNTING ENTRY FOR DEFERRAL ONLY AMOUNT

ACCOUNT - 1 91 990/1 91400 213,194.02 ACCOUNT 0805002 (213,194.02)

Page 31: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

PURCHASED GAS ADJUSTMENT SCHEDULE III

COMPANY NAME: DUKE ENERGY COMPANY KENTUCKY

ACTUAL ADJUSTMENT

DETAILS FOR THE MONTH September 2013

PARTICULARS UNIT W/P MONTH

September 2013

SUPPLY VOLUME PER BOOKS

Primary Gas Suppliers MCF B1 185,425 Utility Production MCF 0 Includable Propane MCF D1 0 Other Volumes (Specify) - Previous Month Adj. MCF B2 4,007

TOTAL SUPPLY VOLUMES MCF 189,432

SUPPLY COST PER BOOKS

Primary Gas Suppliers $ Al 1,096,229 Includable Propane $ 0 Gas Cost Uncollectible $ Al 3,127 Other Cost (Specify) - Gas Cost Credit $ 0

- Unacct'd for Transp. $ 0 - CF Credit $ 0 - X-5 Tariff $ 0 - CMT Management Fee $ Al (13,862)

- Losses-Damaged Lines $ Al 0 - Gas Sold to Remarketers $ 0 - TOP Transp. Recoveries $ 0

TOTAL SUPPLY COST $ Al 1,085,494

SALES VOLUMES

Jurisdictional MCF H 191,205 Non-Jurisdictional MCF

Other Volumes (Specify) - MCF

TOTAL SALES VOLUME MCF 191,205.4

UNIT BOOK COST OF GAS (SUPPLY $ / SALES MCF) $/MCF 5.677 LESS: EGC IN EFFECT FOR MONTH $/MCF H 4.562

DIFFERENCE $/MCF 1.115 TIMES: MONTHLY JURISDICTIONAL SALES MCF 191,205.4

MONTHLY COST DIFFERENCE 213,194.02

Page 32: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY COMPANY KENTUCKY

September 2013

GAS FUEL ADJUSTMENT BILLED

Applied W/P Amount $/MCF MCF Sales

EGC 191,205.4 H 872,330 4.56226707 RA H (192) AA H 16,618 BA H (6,972)

TOTAL GAS COST RECOVERY(GCR) 881,783.75

TOTAL SALES VOLUME 191,205.4 LESS: NON-JURISDICTIONAL SALES 0.0

JURISDICTIONAL SALES 191,205.4

PROOF OF UNRECOVERED PURCHASED GAS COST ENTRY

SUPPLIER COST - CURRENT MONTH 191,205.4 1,085,494.00 5.67710954 UNRECOVERED PURCHASED GAS COST (196,576.49) ROUNDING(ADD/(DEDUCT)) 30.12

TOTAL GAS COST IN REVENUE 888,947.63

TOTAL GAS COST RECOVERY(GCR) 881,783.75 LESS: RA (192.18)

BA (6,971.70)

PLUS: COST OF NON-JURISDICTIONAL SALES

874,619.87

UNRECOVERED PURCHASED GAS COST ENTRY (196,576.49) LESS: AA 16,617.53

MONTHLY COST DIFFERENCE (213,194.02) EXTENDED MONTHLY COST DIFFERENCE (213,163.90)

ROUNDING 30.12

Page 33: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY KENTUCKY GAS SERVICE

SUMMARY OF SCA COMPONENTS MONTH: September 2013

RECONCILIATION ADJUSTMENT CURRENT PREVIOUS SEC.PREV. THRD.PREV. TOTAL

I 0.080 00oo 8.008 RA

ACTUAL ADJUSTMENT CURRENT PREVIOUS SEC.PREV, THRD.PREV. TOTAL 10.2131 I 0001 Ars 0080 AA

BALANCE ADJUSTMENT BILL

CODE

121 141 151

REPORTED EGG SALES SINCE

5.304 5.641 5.262

S

000 000 0.00

161 0,0 5.237 0.00 012 U.S 5.241 0 00 032 0.0 4.757 0 00

042 0.0 4.333 000 062 5.9 3.795 22.39 072 2.9 4,150 1204

082 1.9 4.618 102 14.51 4.653 112 8.3 4.753

122 46.5 4.6112 1771 142 142.7 4353 62169 152 232.0 4.594 Ey 1.0e5

162 11.058.8) 4.592 14.862.011 013 2.054.9 4.281 8.79703 033 255.5 4.261 108911

043 12.748.31 4.361 113,985.341 063 2.960.1 4.59 13.58082 073 (242.31 5.0 (1.230161

083 1855.41 .995 (4.271721 103 1868.31 5.115 (4441551 123 (1.377.71/ 4.856 (6.731 44)

143 192..9.9 4.570 880.410 04

TOTAL 191 205 4 872330.1

URRENT PREVIOUS SEC.PREV. THRD.PREV TOTAL le ooso I 0.026 3 0 oes 1 (0.089)

(IA

193,894.5 + 44.4 + 13.0 + 790.5 - 1,488,9 - 1,002 +398.4

1. 1.06

(2051 (2051

(0.261 (0.261

000 275 275 000 12.96) (206) oca 024 0.24

coo aoo 0.86 086 000 0.00 0.67 0.87 000 070 1.38 118

000

ono coo (192.651 1191651

000 000 000 (190.76) (190.767

191171 193.171

18083 180.83

2249 2249

(766781 (241851 11.008 631

82087 260 49 1.06036

(67601 (21.32) (88921

10 861 238661 175.281 (31480) (0.67) (242.261 176 411 (31904) (1381 (384.381 (121.24) 1507001

(53.364021 192 65 53,74032 16.95379 17.53714

6402) 189.54 52875 51 167677] 73 16,488 76

6247 6247

1121141 (121141

(1508) 115.08)

(11741 162.15 141141 1400 1174.651 1159051 (1211 1430 1109

22.241 14.281 5047 2195

(22081 14.341 51 23 2431

(35821 (6.891 81 28 3657

11.541.201 5,00990 963 25 111.366341 16.93539)

11541101 492826 94769 (11 255 417_ (60212761

TRANSPORTATION: 1E53 Customer Choice Program (GOAT):

171 & 022 052 092 132

172 & 023 053

093, 113. 133 1 415 6 153

0.00 0.00

000 0.00 0.00 000 000 coo 0.00

(39796) 142 394.79 124.52 12877

coo 0.00 000

(1152) 3679 708

000

0.00 000

0.D0

0.00

0.00

coo

OLIO

O. DO

0.00

00

(1421

(1421

0.00

coa 000

0.00 009

000 (82 491

150 941

FT CHOICE 1.4150 TOTAL FOR CHOICE 000

000

00

421

421 (39106)

142

394 79

124 52

128.77 (1132)

36.79

7.08

183 491

150 .1

90 96 TOTAL FOR GCR

Firm TiansDorta IFT 97,567.9

0.0 00

FT 07.567.9 Interruptible Transportation: 1101

143.500 142.5901

000 000 000 92 8

CONTROL CK posaiveecoveredect 25313 negalryeerecluce 701070,1125313

JE 10 -KUNBIL ANY

7030 16 912. 5 CONTROL CK posiivesecoveredi c9, 140. negative=refund=dr

OS 954 67 11 33890 6 97 CONTROL CK 16.97 prodNeerecoveredect 25313 negatiyorreduce re/n.4425313

Grand Total

ADJUSTED EGG

432,768.4 ties to last pg of A

Filing Periods December-February March May June August September-November

Adjustments for Stair Steps is REQUIRED in the month FOLLOWING the filings: March June September December

DEK

NOTE: Move the RA (0253130) to BA (0253130) & BEI( - Reclass is AA (0191400) to BA (0253130) -Also DEK account 0253130 is far BOTH RA and BA activity February May August November

Page 34: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY COMPANY KENTUCKY DETERMINATION OF TOTAL SUPPLY COST

MONTH OF

DESCRIPTION W/P

October 2013

TOTAL AMOUNT

ROUNDED

PRIMARY GAS SUPPLY COST B1 2,551,006.18 current month estimate

adjustments from prior month B2 (17,094.99) Interruptible Transportation monthly charges by Gas Supply - PN C 485.52 2,534,397

LESS: RATE SCHEDULE CF CREDIT

0.00 current month adjustments 0.00 0

PLUS: INCLUDABLE PROPANE a/c 728-3 Erlanger D2 0.00 0

PLUS: GAS COST UNCOLLECTIBLE E 499.00 499

LESS: X-5 TARIFF 0.00 0

LESS Tenaska MANAGEMENT FEE F 13,862.00 (13,862)

LESS: TOP TRANSP. RECOVERIES 0.00 0

LESS: GAS LOSSES - DAMAGED LINES G 0.00 0

0.00 adjustments 0.00 0

LESS: GAS COST CREDIT 0.00 0

LESS: FIRM TRANSPORTATION ADJUSTMENTS 0.00 current month

adjustments 0.00 0

TOTAL SUPPLY COSTS 2,521,034

ACCOUNTING ENTRY FOR DEFERRAL ONLY AMOUNT

ACCOUNT - 191990/191400

1,433,749.68 ACCOUNT 0805002

(1,433,749.68)

Page 35: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

PURCHASED GAS ADJUSTMENT SCHEDULE III

COMPANY NAME: DUKE ENERGY COMPANY KENTUCKY

ACTUAL ADJUSTMENT

DETAILS FOR THE MONTH

PARTICULARS

October 2013

UNIT W/P MONTH

October 2013

SUPPLY VOLUME PER BOOKS

Primary Gas Suppliers MCF B1 464,705 Utility Production MCF 0 Includable Propane MCF D1 0 Other Volumes (Specify) - Previous Month Adj. MCF B2 (4,137)

TOTAL SUPPLY VOLUMES MCF 460,568

SUPPLY COST PER BOOKS

Primary Gas Suppliers $ Al 2,534,397 Includable Propane $ 0 Gas Cost Uncollectible $ Al 499 Other Cost (Specify) - Gas Cost Credit $ 0

- Unacct'd for Transp. $ 0 - CF Credit $ 0 - X-5 Tariff $ 0 - CMT Management Fee $ Al (13,862) - Losses-Damaged Lines $ Al 0 - Gas Sold to Remarketers $ 0 - TOP Transp. Recoveries $ 0

TOTAL SUPPLY COST $ Al 2,521,034

SALES VOLUMES

Jurisdictional MCF H 233,852.5 Non-Jurisdictional MCF

Other Volumes (Specify) - MCF

TOTAL SALES VOLUME MCF 233,852.5

UNIT BOOK COST OF GAS (SUPPLY $ / SALES MCF) $/MCF 10.780 LESS: EGC IN EFFECT FOR MONTH $/MCF H 4.649

DIFFERENCE $/MCF 6.131 TIMES: MONTHLY JURISDICTIONAL SALES MCF 233,852.5

MONTHLY COST DIFFERENCE 1,433,749.68

Page 36: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY COMPANY KENTUCKY

October 2013

GAS FUEL ADJUSTMENT BILLED

Applied W/P Amount $/MCF MCF Sales

EGC 233,852.5 H 1,087,200 4.64908607 RA H (235) AA H 21,337 BA H (8,500)

TOTAL GAS COST RECOVERY(GCR) 1,099,802.76

TOTAL SALES VOLUME 233,852.5 LESS: NON-JURISDICTIONAL SALES 0.0

JURISDICTIONAL SALES 233,852.5

PROOF OF UNRECOVERED PURCHASED GAS COST ENTRY

SUPPLIER COST - CURRENT MONTH 233,852.5 2,521,034.00 10.78044494 UNRECOVERED PURCHASED GAS COST (1,412,412.70) ROUNDING(ADD/(DEDUCT)) (83.92)

TOTAL GAS COST IN REVENUE 1,108,537.38

TOTAL GAS COST RECOVERY(GCR) 1,099,802.76 LESS: RA (234.57)

BA (8,500.05)

PLUS: COST OF NON-JURISDICTIONAL SALES

1,091,068.14

UNRECOVERED PURCHASED GAS COST ENTRY (1,412,412.70) LESS: AA 21,336.98

MONTHLY COST DIFFERENCE (1,433,749.68) EXTENDED MONTHLY COST DIFFERENCE (1,433,833.60)

ROUNDING (83.92)

Page 37: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

BILL REPORTED EGO

DUKE ENERGY KENTUCKY GAS SERVICE

SUMMARY OF GOA COMPONENTS MONTH: October 2012

CURRENT RECONCILIATION ADJUSTMENT

PREVIOUS ACTUAL ADJUSTMENT BALANCE ADJUSTMENT

CODE SALES SPACE 0.000 0,000 SEC.PREV. THRO.PREV.

j 0,044 I 18.0511 CURRENT

18.2721 PREVIOUS

o poi SEC PRET

o 070 THFO PREV TOTAL

I 0 us AA CURRENT

10 Mei PREVIOUS

0 625 SEC.PREV

I 0.006 THROPREV TOTAL

160691 BA

121 6204 000 232515.9 4. 23.7 + 26.0 +582.0 141 151

5.641 0.00

5.262 000

161 0.0 1.217 000 012 00 5.241 032 0.0 4.767

042 0.0 4.333 00 062 0.7 3.795 266 072 0,0 4.150 0.00

022 0.0 4.618 I 0.00 102 29 4.653 / 1309 112 204 4753 y 96.96

122 47.7 4.622 223.33 142 145.4 4.358 633 65 152 330.4 4.594 7 151786

162 (.5.51 4.662 f (2.504 941 0.55 055 148.001 (40001 32.18 32.18 013 1061.9 4.221 f 7.97079 11061 11.861 163.85 163.85 1100551 (109051 033 642.4 4261 /. 2.73727 10641 (0.591 5653 56 53 (37901 13790/

043 (1.89101 9. (2.250 141 000 1.89 1.89 1527.811 (166481 (694291 19251 111,62 102.16 063 2256.1 10.357 76 COO 2.261 (2261 62045 198.54 82799 11/B (133.111 1121.831 073 32.5 5 77 165.00 aoo 10.031 (0.031 907 286 11.93 0.18 (1921 (1.701

083 (17.21 4.965 104.221 000 aoo 002 0.02 10.021 (A741 (1501 (6.26) 10.441 10091 100 047 103 1400 6.115 720.19 000 000 10.141 (0.741 014 3928 12.39 51,81 166 07D 10311 (195) 123 (530.81 4.882 (2.593 491 000 0.00 053 0.53 51531 1148.051 (46,711 1195031 (13.801 2551 31.32 14.87

143 11029.81 4.670 (8.819 191 000 000 0.00 193 1,93 534 55 0931 153801) 1150821 (175611 1544 (50.17) 19 651 113.86 6948 163 233266.2

TOTAL 2338525

4.651 1.086014 12

1 087 200 46

0.00 0 DO 000 233291 1231291 164.620 291 23129 65,086 85 20.529 19 21.22984 11.866 291 6.06504 1,16643 113.761091 18.398311

000 0 DO 000 (233301 233301 (6488574) 230 95 6454560 2053085 21,221 66 85085) 6,004 72 113, 765 001 18 454 At)

TRANSPORTATION: IFTS Customer Choice Program MCAT):

171 8 022 052 092 132

172 8 023 0.00 o 00 000 000 0.0 090 063 000 000 0.00 0.00 000 000 000 0.00 0.00

091111 133 000 0.00 COO 000 000 000 000 aoo 000 0.00 153 1.2672 00 000

000 027 000 (1.271 (1.271 (35101) 1.27 353 55 11151 115 32 110.141 3295 6.34 (74.76) (45.611

FT CHOICE 1267.2 TOTAL FOR CHOICE 000 000 000 (1271 (1271 (351011 127 353 55 11151 115.32 1014) 95 634 174761 (45611

TOTAL FOR OCR 000 0 00 000 jam (64 436 75) 23222 64 1199 15 20642.36 21 336 98 6037. 63 06 13 839 76 650805 CONTROL CIV (234.571 CONTROL CK 21,33698 CONTROL CK (8,006.05) pasdivonrecover.Ter 25313 negativenroduce refundvdr25313

posarrenrecoveredscr 19140 negative=refundvdr 19140

positiveirrecovetedvcr 25313 negativevreduce tefund=0(29313

Finn Transportation: IFT 100021.3

09 DD

JE ID .108 L

FT 100.421.3 Interruptible Transportation: 1201

119,546.2 IT 119.540,2

Grand Total 455067.2 has to last pg of A

ADJUSTED EGO 4649

Filing Periods December -February March . May June August September-November

Adjustments for Stair Steps is REQUIRED in the month FOLLOWING the filings: March June September December

DEK

NOTE: Move the RA 10253130) to BA (0253130) & DEK - Reclass is AA (0191400) to BA (0253130) -

Also DEK account 0253130 is for BOTH RA and BA activity

,ctoni May August November

Page 38: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY COMPANY KENTUCKY DETERMINATION OF TOTAL SUPPLY COST

MONTH OF

DESCRIPTION W/P

November 2013

TOTAL AMOUNT

ROUNDED

PRIMARY GAS SUPPLY COST B1 5,337,935.03 current month estimate

adjustments from prior month B2 (33,808.81) Interruptible Transportation monthly charges by Gas Supply - PM C 4,258.40 5,308,385

LESS: RATE SCHEDULE CF CREDIT

0.00 current month adjustments 0.00 0

PLUS: INCLUDABLE PROPANE a/c 728-3 Erlanger D2 593.59 594

PLUS: GAS COST UNCOLLECTIBLE E 3,228.00 3,228

LESS: X-5 TARIFF 0.00 0

LESS Tenaska MANAGEMENT FEE F 21,658.00 (21,658)

LESS: TOP TRANSP. RECOVERIES 0.00 0

LESS: GAS LOSSES - DAMAGED LINES G (31.40) (31)

0.00 adjustments 0.00 0

LESS: GAS COST CREDIT 0.00 0

LESS: FIRM TRANSPORTATION ADJUSTMENTS 0.00 current month

adjustments 0.00 0

TOTAL SUPPLY COSTS 5,290,518

ACCOUNTING ENTRY FOR DEFERRAL ONLY AMOUNT

ACCOUNT - 191990/191400

2,058,079.53 ACCOUNT 0805002

(2,058,079.53)

Page 39: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

PURCHASED GAS ADJUSTMENT SCHEDULE III

COMPANY NAME: DUKE ENERGY COMPANY KENTUCKY

ACTUAL ADJUSTMENT

DETAILS FOR THE MONTH November 2013

MONTH PARTICULARS UNIT W/P November 2013

SUPPLY VOLUME PER BOOKS

Primary Gas Suppliers MCF B1 1,179,910 Utility Production MCF 0 Includable Propane MCF D1 70 Other Volumes (Specify) - Previous Month Adj. MCF B2 (4,335)

TOTAL SUPPLY VOLUMES MCF 1,175,645

SUPPLY COST PER BOOKS

Primary Gas Suppliers $ Al 5,308,385 Includable Propane $ 594 Gas Cost Uncollectible $ Al 3,228 Other Cost (Specify) - Gas Cost Credit $ 0

- Unacct'd for Transp. $ 0 - CF Credit $ 0 - X-5 Tariff $ 0 - CMT Management Fee $ Al (21,658) - Losses-Damaged Lines $ Al (31) - Gas Sold to Remarketers $ 0 - TOP Transp. Recoveries $ 0

TOTAL SUPPLY COST $ Al 5,290,518

SALES VOLUMES

Jurisdictional MCF H 708,949.2 Non-Jurisdictional MCF Other Volumes (Specify) - MCF

TOTAL SALES VOLUME MCF 708,949.2

UNIT BOOK COST OF GAS (SUPPLY $ / SALES MCF) $/MCF 7.462 LESS: EGC IN EFFECT FOR MONTH $/MCF H 4.559

DIFFERENCE $/MCF 2.903 TIMES: MONTHLY JURISDICTIONAL SALES MCF 708,949.2

MONTHLY COST DIFFERENCE 2,058,079.53

Page 40: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY COMPANY KENTUCKY

November 2013

GAS FUEL ADJUSTMENT BILLED

Applied W/P Amount $/MCF MCF Sales

EGC 708,949.2 H 3,231,807 4.55858692 RA H (710) AA H 64,275 BA H (25,593)

TOTAL GAS COST RECOVERY(GCR) 3,269,778.79

TOTAL SALES VOLUME 708,949.2 LESS: NON-JURISDICTIONAL SALES 0.0

JURISDICTIONAL SALES 708,949.2

PROOF OF UNRECOVERED PURCHASED GAS COST ENTRY

SUPPLIER COST - CURRENT MONTH 708,949.2 5,290,518.00 7.46247827 UNRECOVERED PURCHASED GAS COST (1,993,804.57) ROUNDING(ADD/(DEDUCT)) (631.92)

TOTAL GAS COST IN REVENUE 3,296,081.51

TOTAL GAS COST RECOVERY(GCR) 3,269,778.79 LESS: RA (709.99)

BA (25,592.73)

PLUS: COST OF NON-JURISDICTIONAL SALES

3,243,476.07

UNRECOVERED PURCHASED GAS COST ENTRY (1,993,804.57) LESS: AA 64,274.96

MONTHLY COST DIFFERENCE (2,058,079.53) EXTENDED MONTHLY COST DIFFERENCE (2,058,711.45)

ROUNDING (631.92)

Page 41: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

0.00 000 aoo

15881.681 7,761.54

11.619551

11.481.021 12.179501 (2.425901

000 0 000 0 0.00

(2,473281 13576.611

3.239,48647

000 000 aoo

000 0 000 0 000 0

054 083

(710411 0.54

1710411

O00 96.4 [709,800.00 + + 444 -F 000

000 / 060 / OM •

0.00 • Panel, Rant:

73.3

000 006

10

25 /441.87 / (1431

/ 36.52 / 82.60

/ 33444

(3.907 791 6.49420 1.396.76

0 85 11.521 10331

000 0.00 0 00

(1.161

0.00 000 0.00 (1.161

DUKE ENERGY KENTUCKY GAS SERVICE

SUMMARY OF GCA COMPONENTS MONTH( November 2013

RECONCILIATION ADJUSTMENT f ACTUAL ADJUSTMENT

CURRENT PREVIOUS SEC.PREV. THRD.PREV. TOTAL CURRENT PREVIOUS SEC.PREV. THRO.PREV. TOTAL 0.000 L0000 0800 I 190011 RA AA 10.271, I a 228 0.0a

BALANCE ADJUSTMENT EVIOUS scc PREV THRD.PREV TOTAL 7.016 L r,11,05. i 10.0E01

BILL REPORTED EGC CODE SALES S/MCF

CURRENT 121 SAAB 141 5.641 151 5.262

161 0.0 5.237 012 0.0 5.241 012 0.0 4.757

942 0.0 4.333 062 CO 3.735 072 2.5 4,150

002 5.9 4.610 102 4.7 4.653 112 10.31 4.753

122 7.8 4.602 142 19.0 4.358 152 72.8 4.594

162 1851.01 4.592 013 1.517.0 4.261 033 327.0 4.261 043 11.348.71 4.361 063 1.690.6 4.59 073 13111.111 5.09

083 m96.61 UABS 103 123

1426.11 (49851

8.;;: •4.

143 1811.21 4.576 163 1833.51 4,651 173 710.4137 4.560

TOTAL 7089

0.85 (1521 (0 331

0.00 1.35 1.35 000 11.691 (1991 000 0.32 032 0.00 030 0.30 0.00 0.43 0.43 000 0.50 am.

174 891 (74.891

133 50 133 50

26 135 28 85

(379291 (118.691 (494981

47108 14077 620 45

(89951 128951 (117901 10 301 182 721 126.091 (109.111 10431 (118.881 (37.501 (15E811 10 501 1130521 (43 691 (182711

148 91 (0541 (150991 147.631 149.251

23088 (0.831 (232.551 (73.351 175.651

1195.764.591 710.41 198.205.42 62.51641 64.64755 (196,403 801 707 81 197,405 20 62 377 64 64,169 85

50.27 54127 189501 189.501 (19341 119 341 7057 7183

(90751 (91.301 18 B1 17.22

(7.711 /1.481 1249 830

0 1.081 12.131 25.14 11.93

112 911 12481 2929 13.90

433 (14.071 (1711 31.93 19.48

607 mall (4.171 49.18 30.01

15.683311 10470.76 3.55107 (41.914.41) 125.574891 (5,672.31) 18,403 32 3 539 2 (41821381 (25,551 15) 000 000 000 (708831 (703631

1574) 8.45

(1591

(319911 900 0.00 578

TRANSPORTATION: IFT3 Customer Choice Program IGCATI:

171 8 022 052 092 132

172 8 023 053

093. 113,133 153 1.155.0

0.00

0.00 0. 00 000 0.00 000

0.00 000

0.00 aoo aoo 000 aoo aoo oao 1.16 322.25 101.64 105_11

0.00 19.241 3003

000 0.00 0.00 aoo 0.00 0.00

168.151 (41581 0 DO (319941 FT CHOICE 1.155 0 TOTAL FOR CHOICE 000 000 11.16) (1.161 1.16 322.25 101.64 105.11 166.151 141 581 19.241 30 03 5 78

TOTAL FOR GCR

Firm Transportation: (FT 139.071.5

OO 0

FT 139.071.5 Interruptible Transportation: 1T01

139322.7 IT 139.3262

000 000 (709991 (700991

CONTROL CE (7099) posgmeerecoyarectecr 25313 negatlyeerecluce relonde0r25313

000 (196,723 741 708 97 197,810 45 62,47028 64 27496 43335 3.54500 41 88953 25592.731 '1 CONTROL CK 04,27496 posilNemecoveteclecr 19140 negativemefunderk 19140

CONTROL CK posrtrtmerecoyeredecr 25313 negate/am/91.e refontle025313

JE IC, /1CUNSIL Ara

Grand Total ADJUSTED EGO

988.502 4 c t ;of A

Filing Periods December-February March / May June-August Sep/ember - November

Adjustments for Stair Steps Is REQUIRED in the month FOLLOWING the filings: March June September December

DEK NOTE: Move the RA 102531301 to BA 102531301 & DEK - Reclass is AA 101914001 to BA 102531301 -Also DEE account 0253130 is for BOTH RA and BA activity February May August November

Page 42: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY KENTUCKY

SUMMARY OF GAS COST RECOVERY COMPONENTS

BY BILLING CODE

MONNR

BILLING

CODE

EST'D.

GAS

COST

QUARTERLY RECONCILIATION ADJUSTMENT QUARTERLY ACTUAL ADJUSTMENT BALANCE ADJUSTMENT TOTAL

CURRENT PREVIOUS 2ND PREV 3RD PREV CURRENT PREVIOUS 2ND PREV 3RD PREV CURRENT PREVIOUS 2ND PREV 3RD PREV

GCR

FACTOR

5 5 5 5 $ $ $ $ $ $ $ 5 $ $

Jan-12 012 5.241 (0.001) (0.001) (0.001) (0.001) 0.038 (0.308) (0.038) 0.372 (0.008) 0,001 0.011 (0.003) 5.302

Feb-12 032 4.757 (0.001) (0.001) (0.001) (0.001) 0.038 (0.308) (0,038) 0.372 (0.008) 0.001 0,011 (0.003) 4.818

Mar-12 042 4.333 (0.001) (0.001) (0,001) (0.001) 0.174 0.038 (0.308) (0.038) 0.000 (0,008) 0.001 0.011 4.199

Apr-12 062 3.795 (0.001) (0,001) (0.001) (0.001) 0.174 0.038 (0.308) (0.038) 0.000 (0.008) 0.001 0.011 3.661

May-12 072 4,150 (0.001) (0.001) (0.001) (0.001) 0.174 0.038 (0.308) (0.038) 0.000 (0.008) 0.001 0.011 4.016

Jun-12 082 4.618 (0.001) (0.001) (0.001) (0.001) a (0.233) 0.174 0.038 (0.308) 0.055 0.000 (0.008) 0.001 4,333

Jul-12 102 4.653 (0.001) (0.001) (0.001) (0.001) (0.233) 0.174 0.038 (0.308) 0.055 0,000 (0.008) 0.001 4.368

Aug-12 112 4.753 (0.001) (0.001) (0.001) (0.001) (0.233) 0.174 0.038 (0.308) 0.055 0.000 (0.008) 0,001 4.468

Sep-12 122 4.682 (0.014) (0.001) (0.001) (0,001) (0.161) (0.233) 0.174 0.038 (0.005) 0.055 0.000 (0.008) 4.525

Oct-12 142 4.358 (0.014) (0.001) (0.001) (0.001) (0.161) (0.233) 0.174 0,038 (0.005) 0.055 0.000 (0.008) 4.201

Nov-12 152 4.594 (0.014) (0.001) (0.001) (0.001) (0.161) (0.233) 0.174 0.038 (0.005) 0.055 0.000 (0.008) 4.437

Dec-12 162 4.592 (0.001) (0.014) (0.001) (0.001) 0.088 (0.161) (0.233) 0.174 (0.059) (0,005) 0.055 0.000 4.434

Jan-13 013 4.281 (0.001) (0.014) (0.001) (0.001) 0.088 (0.161) (0.233) 0.174 (0.059) (0.005) 0.055 0.000 4.123

Feb-13 033 4.261 (0.001) (0.014) (0.001) (0.001) 0.088 (0.161) (0.233) 0.174 (0.059) (0.005) 0,055 0.000 4.103

Mar-13 043 4.361 0.000 (0.001) (0.014) (0.001) 0.279 0.088 (0.161) (0.233) 0,005 (0.059) (0,005) 0.055 4.314

Apr-13 063 4.591 0.000 (0.001) (0.014) (0.001) 0.279 0.088 (0.161) (0.233) 0.005 (0.059) (0.005) 0.055 4.544

May-13 073 5.077 0.000 (0.001) (0.014) (0.001) 0.279 0.088 (0,161) (0.233) 0.005 (0.059) (0.005) 0.055 5.030

Jun-13 083 4.995 0.000 0.000 (0.001) (0.014) 0.001 0.279 0.088 (0.161) 0.026 0.005 (0.059) (0.005) 5.154

Jul-13 103 5.115 0.000 0.000 (0.001) (0.014) 0.001 0.279 0.088 (0.161) 0,026 0.005 (0.059) (0.005) 5.274

Aug-13 123 4.886 0.000 0.000 (0.001) (0.014) 0.001 0.279 0.088 (0.161) 0,026 0.005 (0.059) (0.005) 5.045

Sep-13 143 4.570 0.000 0.000 0.000 (0.001) (0.277) 0.001 0.279 0.088 (0.008) 0.026 0.005 (0.059) 4.624

Oct-13 163 4.651 0,000 0.000 0.000 (0.001) (0.277) 0.001 0.279 0.088 (0.008) 0.026 0.005 (0.059) 4.705

Nov-13 173 4.560 0.000 0.000 0.000 (0.001), (0.277) 0.001 0.279 0.088 (0,008) 0.026 0.005 (0.059) 4.614

Dec-13 183 4.426 0.000 0,000 0.000 0.000 0.100 (0.277) 0.001 0.279 (0.008) (0.008) 0.026 0.005 4,544

Page 43: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

Summary of Prior Period Adjustments on Schedule III

Page 44: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

DUKE ENERGY KENTUCKY

Summary of Prior Period Adjustment to Schedule III

Total Cost Used In The Current AA Calculation

Revised (page 2 of 3) 1,020,834.62

Originally filed (page 3 of 3) 1,079,120.50

Difference -58,285.88

The EGC rate in effect for the month of August was originally calculated at $4.495.

The correct rate should have been $4.854 resulting in the difference above.

page 1 of 3

Page 45: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

SUPPLY VOLUME PER BOOKS

PRIMARY GAS SUPPLIERS MCF 253,007 250,412 UTILITY PRODUCTION MCF 0 0 INCLUDABLE PROPANE MCF 0 0 OTHER VOLUMES (SPECIFY) ADJUSTMENT MCF (788) (2,962)

TOTAL SUPPLY VOLUMES MCF 252,219 247,450

SUPPLY COST PER BOOKS

PRIMARY GAS SUPPLIERS $ 1,455,521 1,416,828 SPECIAL PURCHASES CREDIT $ 0 0 INCLUDABLE PROPANE $ 0 0 OTHER COSTS (SPECIFY): GAS COST UNCOLLECTIBLE $ 2,359 8,404 MANAGEMENT FEE $ (13,862) (13,862) X-5 TARIFF $ 0 0 TRANSPORTATION SERVICE "UNACCOUNTED FOR" $ 0 0 GAS COST CREDIT $ 0 0 LOSSES - DAMAGED LINES $ 0 0 TRANSPORTATION TAKE-OR-PAY RECOVERY $ 0 0 SALES TO REMARKETERS $ 0 0

TOTAL SUPPLY COSTS $ 1,444,018 1,411,370

SALES VOLUMES

JURISDICTIONAL MCF 230,708.5 220,446.0 NON-JURISDICTIONAL MCF 0.0 0.0 OTHER VOLUMES (SPECIFY): MCF 0.0 0.0

TOTAL SALES VOLUMES MCF 230,708.5 220,446.0

UNIT BOOK COST OF GAS (SUPPLY $ / SALES MCF) $/MCF 6.259 6.402 LESS: EGC IN EFFECT FOR THE MONTH $/MCF 4.984 5.100

DIFFERENCE $/MCF 1.275 1.302 TIMES: MONTHLY JURISDICTIONAL SALES MCF 230,708.5 220,446.0

EQUALS MONTHLY COST DIFFERENCE $ 294,153.34 287,020.69

NET COST DIFFERENCE FOR THE THREE MONTH PERIOD

TOTAL COST USED IN THE CURRENT AA CALCULATION

DIVIDED BY: 12 MONTH PROJECTED SALES ENDED November 30, 2014 MCF

EQUALS CURRENT QUARTERLY ACTUAL ADJUSTMENT $/MCF

AAU

214,013 0 0

(1,391)

212,622

1,237,878 0 0

3,953 (13,862)

0 0 0

(172) 0 0

1,227,797

162,356.2 0.0 0.0

162,356.2

7.562 4.854

2.708 162,356.2

439,660.59

1,020,834.62

10,767,398

0.095

4th Quarter

GAS COST ADJUSTMENT CLAUSE DUKE ENERGY KENTUCKY, INC

ACTUAL ADJUSTMENT DETAILS FOR THE THREE MONTH PERIOD ENDED August 31, 2013

SCHEDULE III

DESCRIPTION

UNIT JUNE JULY AUGUST

PAGE 2 0C- 3

Page 46: di- DUKE M- ENERGY® .@1`D cases/2014-00041...Feb 11, 2014  · Adjustment (TCRA) and Electric Power Costs Adjustment (EPCA), respectively. 2/ Excludes the Annual Charge Adjustment

SUPPLY VOLUME PER BOOKS

PRIMARY GAS SUPPLIERS MCF 253,007 250,412 UTILITY PRODUCTION MCF 0 0 INCLUDABLE PROPANE MCF 0 0 OTHER VOLUMES (SPECIFY) ADJUSTMENT MCF (788) (2,962)

TOTAL SUPPLY VOLUMES MCF 252,219 247,450

SUPPLY COST PER BOOKS

PRIMARY GAS SUPPLIERS $ 1,455,521 1,416,828 SPECIAL PURCHASES CREDIT $ 0 0 INCLUDABLE PROPANE $ 0 0 OTHER COSTS (SPECIFY): GAS COST UNCOLLECTIBLE $ 2,359 8,404 MANAGEMENT FEE $ (13,862) (13,862) X-5 TARIFF $ 0 0 TRANSPORTATION SERVICE "UNACCOUNTED FOR" $ 0 0 GAS COST CREDIT $ 0 0 LOSSES - DAMAGED LINES $ 0 0 TRANSPORTATION TAKE-OR-PAY RECOVERY $ 0 0 SALES TO REMARKETERS $ 0 0

TOTAL SUPPLY COSTS $ 1,444,018 1,411,370

SALES VOLUMES

JURISDICTIONAL MCF 230,708.5 220,446.0 NON-JURISDICTIONAL MCF 0.0 0.0 OTHER VOLUMES (SPECIFY): MCF 0.0 0.0

TOTAL SALES VOLUMES MCF 230,708.5 220,446.0

UNIT BOOK COST OF GAS (SUPPLY $ / SALES MCF) $/MCF 6.259 6.402 LESS: EGC IN EFFECT FOR THE MONTH $/MCF 4.984 5.100

DIFFERENCE $/MCF 1.275 1.302 TIMES: MONTHLY JURISDICTIONAL SALES MCF 230,708.5 220,446.0

EQUALS MONTHLY COST DIFFERENCE $ 294,153.34 287,020.69

NET COST DIFFERENCE FOR THE THREE MONTH PERIOD

TOTAL COST USED IN THE CURRENT AA CALCULATION

DIVIDED BY: 12 MONTH PROJECTED SALES ENDED November 30, 2014 MCF

EQUALS CURRENT QUARTERLY ACTUAL ADJUSTMENT $/MCF

AAU

162,356.2 0.0 0.0

162,356.2

7.562 4.495

3.067 162,356.2

497,946.47

1,079,120.50

1,079,120.50

10,767,398

0.100

214,013 0 0

(1,391)

212,622

1,237,878 0 0

3,953 (13,862)

0 0 0

(172) 0 0

1,227,797

4th Quarter

GAS COST ADJUSTMENT CLAUSE DUKE ENERGY KENTUCKY, INC

ACTUAL ADJUSTMENT DETAILS FOR THE THREE MONTH PERIOD ENDED August 31, 2013

SCHEDULE III

DESCRIPTION

UNIT JUNE JULY AUGUST

PAGE 3 DS 3