diesel engine assembly line - abb · pdf filediesel engine assembly line is based on abb...
TRANSCRIPT
ABB Automation Technologies AB
www.abb.com/automotive 1
Diesel Engine Assembly Line
Industry: • Automotive OEM
Product: • Diesel Engines
Installation Date: • December 2003
Description:
Diesel Engine assembly line is based on ABB standard modular concept. This line consists of four conveyor systems, one for short block assembly, one for piston sub assembly, one for cylinder head sub assembly and one for final assembly. The assembly lines are a mix between manual, semi automatic and automatic stations, between some of the assembly stations is a buffer station placed. Currently assembles 4-9 liters (4-6 cylinder) engines with weekly production reaching 1000 units with two shift operation
Equipment:
• 21 Automatic stations • 87 Manual stations • 16 Semi-auto stations • 6 robots • ABB turnover device • ABB nut runner stations • ABB leakage test station for cylinder head
Customer Benefits:
• High quality assembly processes to assure product quality and production • Automatic assembly of heavy parts with robot • Cost effective solution • High flexibility, currently assembles 4 types in the line 4-9 liters • Glueing application by robot • Easy and low cost startup of new variants
ABB Automation Technologies AB ABB Inc. ABB Automation GmbH ABB Engineering Ltd. Powertrain 1250 Brown Road Business Area Unit Robotics 31 Industrial Building Omformargatan 18 Auburn Hills, Michigan 48326 Grüner Weg 6 Fu Te Dong San Road SE-72137 Västerås T/ 248-393-4600 D-61169 Friedberg Waigaoqiao FTZ, Pudong Sweden F/ 248-393-4603 Germany Shanghai, P. R. China 200131 T/ +46-21-3600-400 T/ +49-6031-85-0 T/ +86-21-6105-6666 F/ +46-21-3600-450 F/ +49-6031-85-297 F/ +86-21-6105-6667
ABB Automation Technologies AB www.abb.com/automotive 2
Diesel Engine Assembly Line
Technical Data • Capacity: 50,000/year (2-shift production)
• Cycle time: 90 seconds
Unique Elements:
• Automatic assembly of cam shaft bearings • Automatic control of axial clearance and rotation torque • 3 automatic leakage test stations • Laser key up check
Customer Provided Equipment:
• None
Project/Steps to Implementation:
• Concept design • Concept approval • Engineering (Detail design) • Project management • Manufacturing • Installation • Training • Production support on site 6 month.
Project Responsibility: Video/Photos/Reference:
Powertrain Can be supplied by ABB.
Pro
ject
# 1
0203
99 R
ev. 1
Cop
yrig
ht, J
uly
2005
P
rinte
d in
Sw
eden
, AB
B re
serv
es th
e rig
ht to
cha
nge
spec
ifica
tions
with
out n
otic
e.
Cylinder head line
Short block line & Piston line
Final assembly
100 m