Directional core drilling in tunnel construction. Directional core drilling. Devico AS Borehole survey systems Directional core drilling DeviDrill directional core barrel First version in 1988 Present version in 2001 Projects Geotechnical exploration Mineral exploration. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Directional core drilling in tunnel construction

Directional core drilling in tunnel

construction

Page 2: Directional core drilling in tunnel construction

Directional core drilling

• Devico AS• Borehole survey systems• Directional core drilling

• DeviDrill directional core barrel• First version in 1988• Present version in 2001

• Projects• Geotechnical exploration• Mineral exploration

Page 3: Directional core drilling in tunnel construction

Geotechnical exploration

• Change direction of boreholes• Steer towards targets or keep hole within limits• Retrive core from the most relevant areas

Page 4: Directional core drilling in tunnel construction

Coring along planned tunnel alignment

• Continuous rock core• Fault zones• Fractures• Geological anomalies• Rock mechanical properties

• Hole for various analysis• Geophysical• Water in-/outflow• Hydraulic fracturing

Page 5: Directional core drilling in tunnel construction

Directional coring in Hong Kong

• 4 projects completed last five years• Traffic tunnels (2)• Drainage tunnels (4)• Sewage tunnels (6)

• Guidance note from the HK Government• “4.1 Directional drilling techniques are now available to drill from

ground level to great depth and then along a horizontal alignment. This method does not require provision of working space at the tunnel level and can be very useful in GI for deep tunnels.”

Page 6: Directional core drilling in tunnel construction

Eagle’s Nest

• 2 boreholes• 580 and 1150 meters• 8 m radius tolerance• Borehole between twin

tunnels• Fault zones

Pressure grouting schedules

Page 7: Directional core drilling in tunnel construction

Harbor Treatment Scheme, Stage II

• 6 boreholes• 600 to 1250 meters• 10 x 10m tolerance• Start inclination from -33° to -45°

Page 8: Directional core drilling in tunnel construction

Conclusion

• Accurate impression of the rock formations along the tunnel alignment

• Security during construction• Stabilization measures• Predict leakage and ground setting• Material estimations• Time & cost estimations

• Achieves reliable results, proven in mining and geotechnical exploration projects worldwide

Page 9: Directional core drilling in tunnel construction

Thank you for your attention!