November, 2010 1 L TOYO ENGINEERING CORPORATION (TEC) Chiba, Japan Toyo DME Synthesis Technology Ready for Market Toyo DME Synthesis Technology Ready for Market

Upload: nikulya

Post on 08-Nov-2014

98 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: DME Presentation 101125

November, 2010

1

L TOYO ENGINEERING CORPORATION (TEC)Chiba, Japan

Toyo DME Synthesis Technology Ready for Market

Toyo DME Synthesis Technology Ready for Market

Page 2: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 1 -

1. Introduction: What is DME?2. DME Synthesis Technology3. Fuel DME Plants in China - Toyo’s Experience –4. Toyo’s Jumbo DME

ContentsContents

Page 3: DME Presentation 101125

What is DME ? What is DME ?

Page 4: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 3 -

DME: Di-Methyl EtherMolecular Formula: C2H6O, CH3OCH3

Gas : ambient temp. & press

Liquid: - 25℃ or 6 Bar (Amb. temp.)

What is DME?What is DME?

Page 5: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 4 -

Properties of DMEProperties of DME

DME Diesel Gasoline Methane Propane Methanol

LHV kcal/kg(gas) 6,900 10,200 10,270 12,000 11,100 5,040

Sp. Gravity(liquid) 0.67 0.84 0.69~0.79 - 0.49 0.79

Viscosity(liquid) 10-3 kg/ms

0.15 2~4 0.37~0.44 - 0.15 0.59

Boiling point C - 25.1 180~360 30~190 - 161.5 - 42 64.8

Ignition point C 350 250 - 632 504 470

Explosion limit % 3.4~17 0.6~7.5 1.4~7.6 5~15 2.1~9.4 5.5~36

Air ratio kg/kg 9 14.7 14.7 18.0 15.6 6.5

Cetane number 55~60 40~55 5~20 - 5 5

Octane number (RON) 35.5 - 88~100 120 112 109

Page 6: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 5 -

Natural Gas Chain with DMENatural Gas Chain with DME

City GasPower Plant

Fuel for Auto

LPG Chemicals

DME Features : Lower investment cost: Various markets

LNG Tank

LNG Plant LNG Vessel

GTLPlant

ExistingOil Vessel

ExistingOil Tank

ExistingExistingLPG TankLPG Tank

Methanol Plant

Existing MeOHVessel

Existing MeOH TankN.G

LNG

Methanol

GTL

DMEDME

Gas Field300

mmSCFD

∼ 2 mmt/y

∼ 3.2 mmt/y

∼ 32000 bpd

∼ 2.3 mmt/y: suitable : applicable

ExistingExistingLPG LPG

VesselVessel

DMEDMEPlantPlant

Page 7: DME Presentation 101125

Toyo’s DME Synthesis Technology

Toyo’s DME Synthesis Technology

Page 8: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 7 -

Methane(CH4)

Syn. Gas(CO/H2/CO2)

Methanol(CH3OH)

DME(CH3OCH3)

H OC:H, :O:C,

OC

+

++

H2O or O2

H2O

C

O C O

CH

H

H

HH H

O HCH

H

H

O HCH

H

H

HOCH

H

H

H

H

O HH

Methanol Dehydration

Methanol Synthesis

CO

How to produce DME How to produce DME

Page 9: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 8 -

Typical Flow Scheme of DME SynthesisTypical Flow Scheme of DME Synthesis

Methanol

Water

DMEReactor

Product DME Tank

Fuel Gas

STM

STMSTM

CW

CW

CWCW

STM

Methanol requirement for DME productionapprox. 1.4 ton-MeOH / ton-DME

Page 10: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 9 -

Feature ①Proven Scheme and Catalyst②DME and Methanol Production in any Ratio

NG

Typical Scheme of NG to DME PlantTypical Scheme of NG to DME Plant

DMESynthesis

MethanolSynthesis

Purge Gas

Reforming

Water

DME

Water

Recycle Gas Methanol

Methanol

Methanol Plant DME Plant

(TOYO’s MRF-Z)(TOYO Reformer )(ISOP catalyst)

Page 11: DME Presentation 101125

Fuel DME Plants in China- Toyo’s Experience -

Fuel DME Plants in China- Toyo’s Experience -

Page 12: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 11 -

Toyo DME Plant ExperienceToyo DME Plant Experience

Page 13: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 12 -

Fuel DME Plants in China designed by TOYOFuel DME Plants in China designed by TOYO

Owner Lutianhua GroupIncorp. (LTH)

LTHLocal Gov.

Shenhua Ningxia Coal Gr

CNTIC

Shanxi LanhuaClean Energy

Location Luzhou, Sichuan Lingwu, Ningxia Jinheng, Shanxi

Capacity(name plate)

30 t/d(10,000 t/y)

340 t/d(100,000 t/y)

700 t/d(210,000 t/y)

420 t/d(140,000 t/y)

Feature World 1st FuelDME Plant

World Largest DME Plant under

operation at the time

World Largest DME Plant with Coal

Feedstock

Largest DME Plant in Shanxi

Prov.

Scope of TOYO

Licensing, Process Design Package (PDP), Catalyst, Technical Service

Licensing, Basic Design Package,

Catalyst, Technical Service

Licensing, PDP, Catalyst,

Technical Service

Contract July, 2002 Dec., 2003 Dec., 2005 July, 2006

Start-up Aug., 2003 March, 2006 December, 2007 August, 2008

Feedstock Methanol (NG Feedstock) Methanol (Coal Feedstock)

ProductUse LPG Substitute, Industrial Use, etc. Chemical, LPG

Diesel Substitute

Page 14: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 13 -

Lutianhua 10,000 t/y DME PlantLutianhua 10,000 t/y DME Plant

10,000 t/y 10,000 t/y started in started in Aug. 2003Aug. 2003at Luzhouat Luzhouin Chinain China

Page 15: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 14 -

Lutianhua 110,000 t/y DME PlantLutianhua 110,000 t/y DME Plant

110,000 t/y 110,000 t/y started in started in Mar. 2006Mar. 2006at Luzhouat Luzhouin Chinain China

Page 16: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 15 -

Ningxia 210,000 t/y DMENingxia 210,000 t/y DME

Ningxia 210,000 t/y DME PlantSuccessfully started up in December, 2007

Page 17: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 16 -

Shanxi Lanhua 140,000 t/y DME plant has successfully started-up in August, 2008

Shanxi Lanhua 140,000 t/y DMEShanxi Lanhua 140,000 t/y DME

Page 18: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 17 -

- Toyo DME received 2006 Japan Petroleum Institute Award for Technological Progress as “Commercialization of Indirect Method of DME Process

Page 19: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 18 -

• Feedback of DME existing plant know-how–3,000 t/y for chemical with ten years operation –10,000 t/y at Lutianhua in China (started in 2003)–110,000 t/y at Lutianhua in China (started in 2006)–210,000 t/y at Shenhua Ningxia in Chaina (started in 2007)–140,000 t/y at Shanxi Lanhua Clean Energy (started in 2008)

• Own Technologies applied–High active steam reforming catalyst (ISOP)–Steam reforming technology (43 units)–Methanol converter (MRF-Z®)

• Scale-up technology applied based on TOYO’s Jumbo Methanol Plant

–Development of a Jumbo DME Plant

Background of TOYO’s DME TechnologyBackground of TOYO’s DME Technology

Page 20: DME Presentation 101125

Toyo’s Jumbo DMEToyo’s Jumbo DME

Page 21: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 20 -

Feature of Toyo’s Jumbo DME PlantFeature of Toyo’s Jumbo DME Plant

DMESYN

MeOHSYNNG

Purge gas

REF

Water

DME

Recycle gas MeOH

Methanol Plant

Combination of Methanol and DME Synthesis

Page 22: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 21 -

Toyo DME Process Scheme (Methanol Dehydration Route)Toyo DME Process Scheme (Methanol Dehydration Route)

Toyo DME Process has following features.

- Scheme and DME catalyst commercially proven - Any ratio (0~100%) of methanol and DME can be produced- Very simple and less investment cost - No oxygen required- Less total investment cost- CO2 is not produced in DME synthesis

STK

STM

NG

AIRFDF

DS

IDF

STM

SSH

STEAMREFOMER

CW

BFW

SYN

COMP

MRF-Z

CW

SYNLOOP

HEATRECADIABATIC

REFORMER

STK

STM

NG

AIRFDF

DS

IDF

STM

SSH

STEAMREFOMER

CW

BFW

SYN

COMP

MRF-Z

CW

SYNLOOP

HEATRECHEATRECADIABATIC

REFORMER Water

MethanolColumn

Fuel gas

DME Reactor

Water

MethanolColumn

Fuel gas

DME Reactor

DMETank

DME Column

Fuel Gas

ChillingUnit

~ ~

Water

MethanolColumn

Fuel gas

DME Reactor

Water

MethanolColumn

Fuel gas

DME Reactor

DMETank

DME Column

Fuel Gas

ChillingUnit

~ ~

Page 23: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 22 -

Plant Layout of 7,000 t/d DME (typical) Plant Layout of 7,000 t/d DME (typical)

DME DME SynthesisSynthesis

Page 24: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 23 -

• Commercial DME plants for fuel use licensed by TOYO started in Aug. 2003 and in March 2006. DME supply chain as LPG substitute was established at Lutianhua in China.

• Coal-based DME plants of 210,000t/y for Ningxia Coal Group and 140,000t/y for Shanxi Lanhua Clean Energy were started up in 2007 and 2008 respectively.

• DME synthesis technology is ready for market based on commercially proven experiences.

• A Jumbo DME Plant is combination of methanol plant and DME synthesis plant incorporating commercially proven technologies.

• The total investment cost of a Jumbo DME Plant is less and the production cost could be feasible compared with LNG and LPG.

Summary of TOYO’s DME Plant Summary of TOYO’s DME Plant

Page 25: DME Presentation 101125

L TOYO ENGINEERING CORPORATION ©2009- 24 -

Thank you

L Toyo Engineering Corporation (TEC)

Mike Uchida e-mail: [email protected] Akanehama, Narashino-shi, Chiba 275-0024, Japan

Tel: +81-47-454-1166 Fax: +81-47-454-1160