    C1-3 Drainage and manholes M 3.00 18,000 54,000

    Grade 25 RC concrete

    C1-4 Column footings M 40.00 18,500 740,000

    C1-5 Column shafts M 9.00 18,500 166,500

    C1-6 Ground beams M 11.00 18,500 203,500

    C1-7 Service ducts M 5.00 18,500 92,500

    C2 Form Work

    C2-1 Sides of column footings M 64.00 1,500 96,000

    C2-2 Sides of column shafts M 60.00 1,500 90,000

    C2-3 Sides of ground beams M 108.00 1,500 162,000

    C2-4 Sides of service ducts M 96.00 1,500 144,000

    C2-5 Sides of drainages M 72.00 1,500 108,000

    C3 Reinforcements

    C3-1 6mm Kg 250.00 195 48,750

    C3-2 10mm Kg 1000.00 195 195,000

    C3-3 12mm Kg 200.00 195 39,000

    C3-4 16mm Kg 300.00 195 5,850

    C3-5 20mm Kg 150.00 195 29,250

    D1-1 150mm t. hollow bricks foundation up to 3.0 M without plaster M 52.00 1,500 78,000

    TOTAL OF BOQ

    CLAIM NO :- 01CLIENT :- COLOMBO DOCKYARD PLCCONTRACTOR :- ASIAN ENGINEERING SERVICES (PVT) LTD.PERIOD :- FOR THE PERIOD OF 28TH MAY 2013 TO 20TH JULY 2013PROJECT :- WORKSHOP AT DOCK NO-3 SOUTH SIDE CDPLC

    ITEM DESCRIPTION UNIT QTY. RATE AMOUNT

    Extra Work & VariationEx-w1 Braking existing RCC concrete floor M 5,625

    Ex-w2 Removal of debris M 2,500

    Ex-w3 Hire of concrete brakers

    Breaker

    Days 5,000

    Ex-w4 Placing of Anchor bolts on column shafts

    4 nos /

    column 1,000

    TOTAL ( EXTRA AND VARIATIONS)

    Qty.

    BOQ. Prev

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    3/41

    CLAIM NO :- 01

    CLIENT :- COLOMBO DOCKYARD PLC

    CONTRACTOR :- ASIAN ENGINEERING SERVICES (PVT) LTD.

    PERIOD :- FOR THE PERIOD OF 28TH MAY 2013 TO 20TH JULY 2013

    PROJECT :- WORKSHOP AT DOCK NO-3 SOUTH SIDE CDPLC

    B2-1 Braking existing mass concrete floor - Grid line "C"

    Colum base at

    C12 1 2.50 1.60 0.35 1.40

    C16 1 2.30 1.60 0.35 1.29

    C17 1 2.20 1.60 0.30 1.06

    C18 1 2.50 1.60 0.30 1.20

    Braking existing mass concrete floor - Grid line "A"

    Colum base at

    A12 1 3.10 1.90 0.10 0.59

    A13 1 3.40 2.00 0.90 6.12

    A14 1 2.50 2.30 0.10 0.58

    A15 1 2.90 2.90 1.35 11.35

    A16 1 3.10 2.90 0.11 0.99 24.57 M

    B2-2 Excavation of pits for Column foundation

    Grid line "C" at

    C12 1 2.80 2.30 2.316 14.92

    C14 1 2.25 2.20 2.592 12.83

    C15 1 2.50 2.30 2.695 15.50

    C16 1 1.30 2.10 1.755 4.79

    C17 1 3.10 2.40 2.370 17.63

    C18 1 2.20 2.40 1.828 9.65

    C19 1 3.10 2.75 2.100 17.90 93.22 M

    Excavation of pits for Column foundation

    Grid line "A" at

    A12 [ Excavation up to existing Base top} 1 3.10 1.90 0.90 5.30

    [ Excavation from Base top to Rubble packing] 1 3.10 1.60 1.04 5.16

    [ Less volome of existing Base] -1 0.70 0.60 1.04 -0.44 10.02 M

    Description

    MEASUREMENT SHEET

    Sub total Total UnitItemTimes

    Length Breadth Height

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    4/41

    Description Sub total Total UItemTimes

    Length Breadth Height

    A13 [ Excavation up to existing Base top} 1 3.40 2.00 0.81 5.51

    [ Excavation from Base top to Rubble packing] 1 3.40 1.70 1.57 9.05

    [ Less volome of existing Base] -1 1.50 0.60 1.57 -1.41

    [ Less volome of existing Base] -1 0.60 0.60 1.57 -0.57 12.58 M

    A14 [ Excavation up to existing Base top} 1 2.50 2.30 0.57 3.28

    [ Excavation from Base top to Rubble packing] 1 2.50 2.00 1.81 9.03

    [ Less volome of existing Base] -1 1.20 0.60 1.81 -1.30 11.00 M

    A15 [ Excavation up to existing Base top} 1 2.90 2.90 0.67 5.59

    [ Excavation from Base top to Rubble packing] 1 2.90 2.60 1.49 11.23

    [ Less volome of existing Base] -1 1.50 0.60 1.49 -1.34

    A16 [ Excavation up to existing Base top} 1 3.10 2.90 0.62 5.57

    [ Excavation from Base top to Rubble packing] 1 3.10 2.60 1.47 11.85 66.51 M

    Total 193.32 M

    B3-2 Provisional item for disposal of de- water

    20.06.2013 1.00 1.00

    21.06.2013 1.00 1.00

    24.06.2013 1.00 1.00

    27.06.2013 1.00 1.00

    29.06.2013 1.00 1.00 5.00 Da

    B4-2 Filling under floors & ramp with Quary dust

    Grid line "C" at

    C12 [ Excavation from G.L to Rubble packing ] 1 2.80 2.30 3.065 19.74

    [ Less volume of column base] -1 2.00 1.90 0.475 -1.81

    [ Less volume of column shaft up to G.L] -1 0.70 0.50 1.420 -0.50 17.44 M

    C14 [ Excavation from G.L to Rubble packing ] 1 2.25 2.30 3.012 15.59

    [ Less volume of column base] -1 2.00 1.90 0.475 -1.81

    [ Less volume of column shaft up to G.L] -1 0.70 0.50 0.804 -0.28 13.50 M

    C15 [ Excavation from G.L to Rubble packing ] 1 2.50 2.30 3.095 17.80

    [ Less volume of column base] -1 2.00 1.90 0.475 -1.81

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    5/41

    Description Sub total Total UItemTimes

    Length Breadth Height

    [ Less volume of column shaft up to G.L] -1 0.70 0.50 1.198 -0.42 15.57 M

    C16 [ Excavation from G.L to Rubble packing ] 1 1.30 2.10 2.259 6.17

    [ Less volume of column base] -1 1.85 1.20 0.475 -1.05

    [ Less volume of column shaft up to G.L] -1 0.70 0.50 0.429 -0.15 4.96 M

    C17 [ Excavation from G.L to Rubble packing ] 1 3.10 2.40 2.600 19.34

    [ Less volume of column base] -1 2.00 1.90 0.475 -1.81

    [ Less volume of column shaft up to G.L] -1 0.70 0.50 0.350 -0.12 17.42 M

    C18 [ Excavation from G.L to Rubble packing ] 1 2.20 2.40 0.812 4.29

    [ Less volume of column base] -1 2.50 1.90 0.475 -2.26

    [ Less volume of column shaft up to G.L] -1 0.70 0.50 0.412 -0.14 1.89 M

    C19 [ Excavation from G.L to Rubble packing ] 1 3.10 2.75 2.40 20.46

    [ Less volume of column base] -1 2.00 2.10 0.48 -2.00

    [ Less volume of column shaft up to G.L] -1 0.70 0.50 0.39 -0.13 18.33 M

    Filling under floors & ramp with Quary dust

    Grid line "A" at

    A12 [ Filling from Rubble packing to bottom of Base ] 1 3.10 1.60 0.59 2.93

    [ Less volume of column base] -1 0.70 0.60 0.59 -0.25 2.68 M

    A13 [ Filling from Rubble packing to bottom of Base ] 1 3.40 1.70 1.17 6.73

    [ Less volume of column base] -1 1.50 0.60 1.17 -1.05

    [ Less volume of column base] -1 0.60 0.60 1.17 -0.42 5.27 M

    A14 [ Filling from Rubble packing to bottom of Base ] 1 2.50 2.00 1.51 7.55

    [ Less volume of column base] -1 1.20 0.60 1.51 -1.09 6.46 M

    A15 [ Filling from Rubble packing to bottom of Base ] 1 2.90 2.60 1.19 8.97

    [ Less volume of column base] -1 1.50 0.60 1.19 -1.07 7.90 M

    A16 [ Filling from Rubble packing to bottom of Base ] 1 3.10 2.60 1.23 9.91 9.91 M

    121.33 M

    C Concrete Work

    C1 Grade 15 concrete

    C12, C14, C15, C17, C19. 5 2.00 1.90 0.08 1.43 1.43 M

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    6/41

    Description Sub total Total UniItemTimes

    Length Breadth Height

    C16 1 1.85 1.30 0.30 0.72

    1 1.00 0.50 0.30 0.15

    1 1.60 1.00 0.08 0.12

    1 1.30 0.25 0.08 0.02 1.02 M

    C18 1 2.04 2.15 0.35 1.54

    1 0.55 0.69 0.35 0.13

    1 1.35 0.50 0.08 0.05 1.72 M

    C13 1 2.70 1.80 0.08 0.36 0.36 M

    4.52 M

    Grade 25 RC concrete

    C1-4 Column footings

    C12, C14, C15, C16, C17, C18. 6 2.00 1.90 0.40 9.12

    C13 1 2.50 1.80 0.40 1.80

    C19 1 2.10 2.00 0.40 1.68 12.60 M

    C1-5 Column shafts

    C12 1 0.70 0.50 1.57 0.55

    C13 1 0.70 0.50 0.37 0.13

    C14 1 0.70 0.50 1.40 0.49

    C15 1 0.70 0.50 1.39 0.49

    C16 1 0.70 0.50 0.48 0.17

    C17 1 0.70 0.50 1.22 0.43

    C18 1 0.70 0.50 0.44 0.15

    C19 1 0.70 0.50 1.10 0.38 2.78 M

    C2 Form Work

    C2-1 Sides of column footings

    C12, , C14, C15, C17, C18, C19. 6 7.80 0.48 22.23

    C18 1 3.90 0.48 1.85 24.08 M

    C2-2 Sides of column shafts

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    7/41

    Description Sub total Total UnItemTimes

    Length Breadth Height

    C12 1 2.40 1.57 3.76

    C13 1 2.40 0.37 0.88

    C14 1 2.40 1.40 3.36

    C15 1 2.40 1.39 3.34

    C16 1 2.40 0.48 1.14

    C17 1 2.40 1.22 2.92

    C18 1 2.40 0.44 1.06

    C19 1 2.40 1.10 2.63 19.09 M

    C3 Reinforcements

    C3-1 6mm [ Column shafts] 50 2.20 110.00

    50 1.65 82.50 192.50 L.M

    42.74 Kg

    C3-2 10mm [ For Col Bases]

    C12, C13,C14, C15, C16, C17, C18, C19. 8 10 2.10 168.00

    8 10 2.00 160.00 328.00 L.M

    202.47 Kg

    C3-3 12mm [ Column shafts]

    C12 2 2.67 5.34

    C13 2 1.47 2.93

    C14 2 2.50 5.00

    C15 2 2.49 4.99

    C16 2 1.58 3.15

    C17 2 2.32 4.63

    C18 2 1.54 3.08

    C19 2 2.20 4.39 33.51 L.M

    29.79 Kg

    C3 Reinforcements

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    8/41

    Description Sub total Total UnItemTimes

    Length Breadth Height

    C3-4 16mm

    C12 6 2.67 16.01

    C13 6 1.47 8.80

    C14 6 2.50 15.00

    C15 6 2.49 14.96

    C16 6 1.58 9.46

    C17 6 2.32 13.90

    C18 6 1.54 9.25

    C19 6 2.20 13.17 100.54 L.M

    158.86 Kg

    Ex-1 Braking existing RCC concrete floor - Grid line "C"

    Colum base at

    Ditto in - C13 1 2.50 1.60 0.45 1.80

    Ditto in - C13 1 2.20 1.60 0.40 1.41

    Ditto in - C13 1 2.30 1.60 0.40 1.47

    Ditto in - C13 1 2.40 1.60 0.30 1.15

    Existing Plinth Beam at C19 1 2.50 1.60 0.30 1.20

    Existing Plinth Beam at C18 1 2.40 1.60 0.30 1.15 8.18 M

    Ex-w2 Removal of debris

    Date Lorry GIN G.P

    1 6/6/2013 LI-8105 0001- Buckets 5 1.00 5.00 M

    2 7/6/2013 LI-4348 0002- 162767 Buckets 11 1.00 11.00 M

    3 12/6/2013 LJ-9157 0003- 162771 1 4.46 2.30 1.10 11.28 M

    3 LJ-9157 0003- 162768 1 4.46 2.30 1.10 11.28 M

    3 LJ-9157 0003- 162769 1 4.46 2.30 1.10 11.28 M

    3 LJ-9157 0003- 1 4.46 2.30 1.10 11.28 M

    4 13/6/2013 LD-9338 0004- 162774 1 4.00 2.27 1.00 9.08 M

    5 13/6/2013 LI-0505 0005- 162773 1 4.10 2.30 0.93 8.77 M

    6 14/6/2013 LK-5469 0006- 162776 1 4.10 2.30 0.93 8.77 M

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    9/41

    Description Sub total Total UnItemTimes

    Length Breadth Height

    7 14/6/2013 LD-9338 0007- 162775 1 4.00 2.27 1.00 9.08 M

    8 17/6/2013 LD-8181 0008- 162779 1 4.00 2.30 0.93 8.56 M

    9 12/6/2013 LE-7833 0009- 162780 1 4.00 2.30 0.93 8.56 M

    10 20/6/2013 LA-1759 0010- 1 4.47 2.27 0.92 9.34 M

    11 27/6/2013 LK-5469 0011- 162778 1 4.00 2.30 0.95 8.74 M

    12 1/7/2013 LK-5469 0012- 162781 1 4.00 2.30 0.95 8.74 M

    13 2/7/2013 LK-5469 0013- 1 4.00 2.30 0.95 8.74 M

    14 3/7/2013 LA-1794 0014- 1 4.10 2.30 0.95 8.96 M

    15 5/7/2013 HQ-8308 0015- 162784 1 1.60 3.12 0.56 2.80 M

    16 5/7/2013 HQ-8308 0016- 162785 1 1.60 3.12 0.56 2.80 M

    17 6/7/2013 HQ-8308 0017- 1 1.60 3.12 0.56 2.80 M

    18 6/7/2013 HQ-8308 0018- 1 1.60 3.12 0.56 2.80 M

    19 8/7/2013 HQ-8308 0019- 1 1.60 3.12 0.56 2.80 M

    20 8/7/2013 HQ-8308 0020- 1 1.60 3.12 0.56 2.80 M

    21 9/7/2013 HQ-8308 0021- 1 1.60 3.12 0.56 2.80 M

    22 9/7/2013 HQ-8308 0022- 1 1.60 3.12 0.56 2.80 M

    23 9/7/2013 HQ-8308 0023- 1 1.60 3.12 0.56 2.80 M

    24 11/7/2013 HQ-8308 0024- 162789 1 1.60 3.12 0.56 2.80 M

    25 15/7/2013 HQ-8308 0025- 162800 1 1.60 3.12 0.56 2.80 M

    26 15/7/2013 HQ-8308 0026- 162801 1 1.60 3.12 0.56 2.80 M

    27 15/7/2013 LE-7833 0027- 1 4.00 2.30 0.93 8.56 M

    28 15/7/2013 HQ-8308 0028- 166302 1 1.60 3.12 0.56 2.80 M

    29 16/7/2013 HQ-8308 0029- 1 1.60 3.12 0.56 2.80 M

    30 16/7/2013 HQ-8308 0030- 1 1.60 3.12 0.56 2.80 208.95 M

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    10/41

    Description Sub total Total UnitItemTimes

    Length Breadth Height

    Ex-w3 Hire of concrete brakers

    Date

    30/5/2013 1.00 1.00

    31/5/2013 1.00 1.00

    1/6/2013 1.00 1.00

    2/6/2013 1.00 1.00

    3/6/2013 2 1.00 2.00

    4/6/2013 2 1.00 2.00

    5/6/2013 4 1.00 4.00

    6/6/2013 4 1.00 4.00

    7/6/2013 4 1.00 4.00

    8/6/2013 4 1.00 4.00

    9/6/2013 4 1.00 4.00

    10/6/2013 4 1.00 4.00

    11/6/2013 4 1.00 4.00

    21/6/2013 1.00 1.00

    22/6/2013 1.00 1.00

    23/6/2013 1.00 1.00

    24/6/2013 1.00 1.00

    25/6/13 1.00 1.00

    27/6/2013 1.00 1.00

    28/6/2013 1.00 1.00

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    11/41

    Description Sub total Total UnitItemTimes

    Length Breadth Height

    29/6/2013 1.00 1.00

    30/6/2013 1.00 1.00

    6/7/2013 1.00 1.00

    7/6/2013 1.00 1.00

    8/7/2013 1.00 1.00

    12/7/2013 1.00 1.00

    13/7/2013 1.00 1.00

    14/7/2013 1.00 1.00

    15/7/2013 1.00 1.00

    16/7/2013 1.00 1.00 53.00 Days

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    12/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    13/41

    A 16 1 3.1 2.600 0.445

    1 3.1 2.900 0.620

    9.161

    Less 1 2.4 2.200 0.475

    1 0.7 0.500 0.590

    -2.715

    6.44634.915

    C1.1

    1 2.4 1.600 0.075 0.288

    1 2.85 1.950 0.075 0.417

    1 1.30 0.600 0.075 -0.059

    1 2.40 2.100 0.075 0.378

    1 1.20 0.350 0.075 -0.0321 2.40 2.400 0.075 0.432

    1 1.50 0.350 0.075 -0.039

    1 2.40 2.200 0.075 0.396

    1.781

    C1.4

    1 2.40 1.600 0.400 1.536

    1 2.85 1.950 0.400 2.223

    1 1.30 0.600 0.400 -0.312

    1 2.40 2.100 0.400 2.0161 1.20 0.350 0.300 -0.126

    1 2.40 2.400 0.400 2.304

    1 1.50 0.350 0.300 -0.158

    1 2.40 2.200 0.400 2.112

    9.596

    C1.5

    A12 1 0.70 0.500 0.500 0.175

    A13 1 0.70 0.500 0.440 0.154

    A14 1 0.70 0.500 0.500 0.175

    A15 1 0.70 0.500 0.450 0.158A16 1 0.70 0.500 0.590 0.207

    0.868

    C1.6

    25.00 0.700 0.500 8.750

    8.750

    Deduct

    A14Deduct

    A15

    Deduct

    A16

    G 25 RC Concrete

    Grid A column footings

    A12

    A13

    Deduct

    A-14

    DeductA-15

    Deduct

    A-16

    G-15 concrete

    Gride A

    A-13

    Column shaft

    Concrete G 25 ground beam

    Grid A 12 to A 16

    Column concreting

    A-12

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    14/41

    1 6.00 0.300 0.415 0.747

    1 5.00 0.300 0.375 0.563

    1 5.00 0.300 0.355 0.533

    C14-C15 1 1.70 0.300 0.400 0.204

    1 5.50 0.300 0.405 0.668

    C16-C17

    1 5.50 0.300 0.425 0.701

    C17-C18

    1 5.50 0.300 0.420 0.693

    C18-C19

    1 5.50 0.300 0.400 0.660

    4.769

    13.519

    C2

    C2.1

    1 2.40 0.400 0.960

    2.4 1 1.40 0.400 0.560

    1 1.60 0.400 0.640

    1 2.85 0.400 1.140

    1 1.40 0.400 0.560

    2.85 1 1.90 0.400 0.760

    1 2.40 0.400 0.960

    1 2.10 0.400 0.840

    2.4 1 1.60 0.400 0.640

    1.6

    A14 2.1

    1.9

    1.6

    A13 1.4

    Form work

    Side of column footing

    A12 1.4

    h=(460+370+450)/3

    C13-C14

    C15-C16

    (h=(410+360+450)/3

    (h=(420+420+410)/3)

    (h=(340+380+410)/3

    (h=(390+380+300)/3)

    C11-C12

    C12-C13

    h=(380+480+400)/3

    h=(380+390+430)/3

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    15/41

    1 2.40 0.400 0.960

    1 2.40 0.400 0.960

    2.4 1 2.20 0.400 0.880

    2.2 2 2.40 0.400 1.920

    2 2.20 0.400 1.760

    2.4 2.4 13.540

    C2.2

    A12 2 0.50 0.500 0.500

    2 0.70 0.500 0.700

    A13 2 0.50 0.440 0.440

    2 0.70 0.440 0.616

    A14 2 0.50 0.500 0.500

    2 0.70 0.500 0.700

    A15 2 0.50 0.450 0.450

    2 0.70 0.450 0.630

    A16 2 0.50 0.590 0.590

    2 0.70 0.590 0.826

    5.952

    C 2.3 2 25.00 0.500 25.000

    2 0.70 0.500 0.700

    25.700

    C11-C12 2 6.00 0.415 4.980

    C12-C13 2 5.00 0.375 3.750

    C13-C14 2 5.00 0.355 3.550

    C14-C15 2 1.70 0.400 1.360

    C15-C16 2 5.50 0.405 4.455

    C16-C17 2 5.50 0.425 4.675

    C17-C18 2 5.50 0.420 4.620

    C18-C19 2 5.50 0.400 4.400

    31.790

    57.490

    2.2

    2.2

    A16

    A15 2.4

    Side of column shaft

    Form work Ground beam

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    16/41

    C3

    C.3.1 6mm

    600

    400

    100

    A12 100 7 2.15 0.222 3.341

    A13 7 2.15 0.222 3.341

    A14 7 2.15 0.222 3.341

    A15 7 2.15 0.222 3.341

    A16 8 2.15 0.222 3.818

    17.183

    Beam

    C-11-C12 1 31 0.90 0.222 6.194

    C12-C14 2 26 0.90 0.222 10.390

    C14-C15 1 8 0.90 0.222 1.598

    C15-C19 28 4 0.90 0.222 22.378

    40.559 40.559

    57.742

    C3.2

    A12

    100 2300 100 11 2.50 0.617 16.968

    100 1400 100 19 1.60 0.617 18.757

    A13

    100 2700 100 10 2.90 0.617 17.893

    100 1400 100 4 1.60 0.617 3.949

    100 1230 100 10 1.43 0.617 8.823

    100 1930 100 10 1.93 0.617 11.908

    A14

    100 2300 100 13 2.50 0.617 20.053

    100 1100 100 3 1.80 0.617 3.332

    100 1920 100 9 2.12 0.617 11.772

    Reinforcement

    10mm

    Mild steel

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    17/41

    100 100 10 1.70 0.617 10.489

    0.000

    100 2300 100 15 2.50 0.617 23.138

    4 0.80 0.617 1.974

    100 100 6 2.47 0.617 9.144

    600 13 2.00 0.617 16.042

    100 2270 100

    100 1800 100

    100 2300 100 17 2.50 0.617 26.223

    19 2.20 0.617 25.791

    100 2000 100 226.254

    600

    A12-A13 18 2.10 0.617 23.323

    400 18 1.35 0.617 14.993

    A13-A14 18 2.10 0.617 23.323

    18 1.35 0.617 14.993

    A14-A15 24 2.10 0.617 31.097

    24 1.35 0.617 19.991

    A15-A16 21 2.10 0.617 27.21021 1.35 0.617 17.492

    172.421

    398.675

    C3.3 12mm 100

    2 1.77 0.888 3.144

    A 12

    1290

    400

    100

    A13 2 1.71 0.888 3.037

    1210

    400

    A14 100

    A16

    A15

    Ground beam 10mm R/F

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    18/41

    2 1.77 0.888 3.144

    1275

    100 400

    A152 1.72 0.888 3.055

    1220

    400

    A16 100 2 1.86 0.888 3.303

    15.682

    1360

    400

    12mm R/F

    C11-C14 4 18.15 0.888 64.469

    C15-C16

    4 1.20 0.888 4.262

    150 6.4 150

    4 6.70 0.888 23.798

    C16-C18

    150 12.4 150 4 12.70 0.888 45.110

    C18-C19150 6.4 150 4 6.70 0.888 23.798

    1200 4 1.20 0.888 4.262

    165.701

    181.383

    C3.4

    A12 6 1.77 1.580 16.780

    A13 6 1.71 1.580 16.211

    A13 6 1.77 1.580 16.780

    A14 6 1.72 1.580 16.306

    16 mm

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    19/41

    A15 6 1.86 1.580 17.633

    83.708

    C3.5

    2 32.45 2.470 160.303

    2 30.00 2.470 148.200

    2 31.65 2.470 156.351

    3 31.35 2.470 232.304

    2 30.00 2.470 148.200

    2 32.15 2.470 158.821

    1 32.00 2.470 79.040

    2 30.65 2.470 151.411

    1 32.10 2.470 79.287

    1 30.00 2.470 74.100

    1388.017

    Ex

    Ex-03

    8.00 8.000

    5.00 5.000

    13.000

    Ex-04 1 0.90 1.950 1.7551 0.98 2.100 2.048

    3.803

    Remove two nos of door and close it by

    cement block work(1:5 motar)

    Extra work

    Apply level scread on column top at75mm thick Conbentra GP with

    formwork and chip and clean all surface.

    Bottom reinforcement

    20mm

    Top reinforcement

    Grid -C

    Grid -A

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    20/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    21/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    22/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    23/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    24/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    25/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    26/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    27/41

    m3

    m3

    m3

    m3

    Unit

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    28/41

    m3m3

    m3

    m3

    m3

    m3

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    29/41

    m3

    m3

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    30/41

    m2

    m2

    m2

    m2

    m2

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    31/41

    Kg

    Kg

    kg

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    32/41

    Kg

    Kg

    Kg

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    33/41

    Kg

    Kg

    Kg

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    34/41

    Kg

    Kg

    Nos

    m2

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    35/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    36/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    37/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    38/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    39/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    40/41

  • 8/12/2019 Dock No-3 - Bill Claim - No-2

    41/41