Ocenn Dopravn stavba roku 2007Nov tv na spolenosti
Vizualizace
Aspe
Infratructure TranportaonWidening Highway I/13 (I/35)
Roadway of lenght7 485 m
DeignValbe, pol. r.o.
OwnersD R
Contractor
skANskADs, a..start of contruction
October 2003
Completion of contructionJune 2006
Cot936 mil. CZk
WideningHighway I/13 (I/35)
str n. N. Bl kotel
-
8/14/2019 Dopravni Stavby En
2/8
Highway I/13 i with it length of 333m the econd longet
road between eat and wet region of the Czech Republic. Therecent deign to widen the road to 4 lane ha been implementedand completed in June 2006. Fund for contrucon came fromnaonal fund for tranportaon infratructure and from EuropeanUnion Phare CBC Programme.
WideningHighway I/13 (I/35)str n. N. Bl kotel
-
8/14/2019 Dopravni Stavby En
3/8
Ocenn Dopravn stavba roku 2007Nov tv na spolenosti
Vizualizace
Aspe
Infratructure TranportaonLight Rail RetrofitLINE LIDOV sADY - HORN HANYCHOV
Retrofit lenght8,5 m
DeignValbe, pol. r.o.
OwnerCITY OF LIBEREC
Contractorss, a..
start of contruction1990
Completion of contruction2005
RehabilitaionLiberec Light Rail
Liberec
-
8/14/2019 Dopravni Stavby En
4/8
RehabilitaionLiberec Light RailLiberec
Change of rail gauge from 1000 mm to tandardized 1435 mm called
for major retrot of the city light rail line for total length of 8.5 m.Included in the retrot were three addional turn-table (Lidove sady,Lower Hanychov, Upper Hanychov), connector to depot and hunngline near Vapena top.
-
8/14/2019 Dopravni Stavby En
5/8
Ocenn Dopravn stavba roku 2007Nov tv na spolenosti
Vizualizace
Aspe
RELOCATION OF HIGHWAY I/14
Deign leght of 1t phae1 835 m
DeignValbe, pol. r.o.
OwnersD R
ContractorskANskA Ds, a.., ss, a..
start of contructionlitopad 2002
Completion of contructionjen 2005
Cot1,126 bil CZk
Relocaon of Highway I/14KM 0,000 1,835
Liberec - kunraca
Infratructure Tranportaon
-
8/14/2019 Dopravni Stavby En
6/8
Peloka silnice I/14km 0,000 1,835
Liberec kunrac
Relocaon, or a new contrucon, of grade eparated 4-lane highway
I/14 required ubtanal engineering eort. New alignment throughCity Indutrial Zone mandated relocaon of large amount of ulieto include re-roung Nia River, which wa in direct conict withpropoed oluon.
-
8/14/2019 Dopravni Stavby En
7/8
Ocenn Dopravn stavba roku 2007Nov tv na spolenosti
Vizualizace
Aspe
Motorway D8
DeignValbe, pol. r.o.
Motorway
D8
Infratructure Tranportaon
General informaon
The D8 Motorway (nown a E55 North) from Prague to Czech-Germanborder, with it deign length of 92.7km jut in the Czech Republic, i
a part of the IV European mul-modal corridor of TransEuropean net-work TEN. The connuaon of the i motorway in Germany i nown a
the Motorway A17.
VALBEk, pol. r.o. Liberec wa the main designer for the part of amotorway tretch between Kninice and Czech-German border, nown
a construcon number 0807/II. In addion to preparing the projectdocumentaon, the company repreentave conducted building ite
uperviion and too part in coordinaon of the contrucon equenc-ing. VALBEk, pol. r.o. wa in charge of the taged contrucon
organizaon in the area of the D8 with A17 juncon for both Czech andGerman region of the project. The water reource uperviion wa
alo a reponibility of VALBEk, pol. r.o.
The project was awarded by Secretary of Transportaon in the 2006
Transportaon Project of the Year compeon.
-
8/14/2019 Dopravni Stavby En
8/8
Brief Descripon of Construcon
A total of 191 tructure were implemented a a part of the contrucon0807/II project. Among them were eight mainline bridge, threeuplementary bridge, two mainline tunnel, a gallery paageway, complexretaining wall extending from the north and outh portal of Libouchectunnel, and noie barrier with total area of 22, 965 qm. In addion, theproject included a contrucon of a grade-eparated interecon anda 11,704m long roadway in category D27.5/120 with a urface area of
134,664 qm (urface area excluding bridge and tunnel). The nal lengthof the bridge and tunnel reached 3,037m and 2,624m, repecvely. Thedicult condion in the mountainou region are illutrated by a fact thatout of total length 11,704m , a total of 5,359m i taen away by bridgeand tunnel. The project realizaon mandated excavaon and removal of1,177,166m3 of oil and roc. Mot of the excavated oil wa ued a llfor the embanment; the ret wa tranported oite. The bae oil waimproved through the addion of 141,872m3 of tone aggregate.
MotorwayD8