o Material arrangement for the site.

o Laying of conduit in concrete, slab & structure.

o Pulling of cables in conduit and in cable tray and trenches.

o Fixing of cable tray.

o Laying of main cables from LV panels to SMDB’s and DB’s

o Fixing of wiring devices i.e. switches and sockets in walls and trunking.

o Installation of Light Fixture in ceiling, installation of Auditorium lights & hidden o light.

o Lighting Protection system installation.

o Main Earthing system installation.

o Installation of UPS System.

o LV Panel installation and cable termination.

o Installation of distribution board and cable termination.

o Electrical system commissioning.

o Equipment termination and energizing.

o Testing & Commissioning of Electrical system.

o Maintenance of Main Building.

o Central control system of Lighting.

o Cable pulling of Plumbing & HVAC system and cable termination.

o Ensuring site safety

o providing technical advice

o Problem solving

Page 2: Duties of Electrical Engineer

o Ensuring Management of Change processes are implemented, and documentation/ drawings are verified and updated.

o Liasioning  with government electrical officers for setting up new connections with site.

o Coordinate with other service provider/contractors for successful completion of project.

o Review of shop drawings from contractor and suggesting technical inputs.

o Insuring that asbuilt drawings are prepared by contractor and handing over to operation team.

o To make plan and bar chart according to the site as per daily work

o Maintaining daily work diary.

o Measurements on daily basis with the contractor and mainting records of joint measurement

o Checking of electrical works bill and incorporating BOQ Specification.

o Coordinating with vendor for floor panels and ensuring technical specifications.