Download - Electrical Addendum #3
Page 1 of 2
This Addendum shall be considered part of the Contract Documents and Project Manual for the above
mentioned project as though it had been issued at the same time and shall be incorporated integrally
therewith. Where provisions of the following supplementary data differ from those of the original
Contract Documents and Project Manual, the Addendum shall govern and take precedence.
Electrical Addendum
Questions
1. The one-line calls for new RMP secondary’s and Primary but no site drawing to provide location
of this equipment.
a. This is shown on sheet ES101.
2. The EY101 sheet and the hardware/architectural sheets do not match. The access control sub is
having a difficult time figuring out what needs card access.
a. The EY sheets were updated in Addendum #1.
3. Do the below grade plumbing pipes and electrical floor boxes get cut flush with the top of slab
and then filled with concrete or do we cut a 1’ x 1’ chunk of slab, cap pipe or conduit below the
slab and then patch the 1’ x 1’ removed labe with concrete?
a. We would prefer to have the 1’ x 1’ chunk of slab removed and patched in order to cap
the conduit below the slab.
4. The transformer replacement is one of the first things that will need to take place due to being
sandwiched between the chiller and an adjacent property owner. Has the transformer
replacement work been scheduled with RMP yet? They usually schedule the work months after
the contract is signed and paid for. Is there a contact at RMP we can talk to? Depending on what
RMP says, we may need to rent a large generator for a while to power the building. Are new
bollards needed at the transformer? The existing ones will get ripped out during vault
excavation.
Electrical Addendum #3
Date: June 10, 2021
To: Carlos Linan From: Jason Worthen
Company: VCBO Architecture Email: [email protected]
Job: IHC Imaging LLC – Orem Phone: 801-401-8442
Job No: 210183 Re:
Cc:
Page 2 of 2
a. We have met with RMP on-site. I do not believe there is a contract in place at this time.
New bollards will be needed to protect both transformers. Contractor will be
responsible for scheduling the work with RMP.
5. The background image (room layout) for the electrical drawings doesn’t match the architectural
drawings. The electrical power, lighting, telecom and security drawings need to be re-worked.
a.
Drawings
1. EP101 – Level 1 Power Plan
a. Revised drawings to match architectural backgrounds.
2. EL101 – Level 1 Lighting Plan
a. Revised drawings to match architectural backgrounds.
3. ET101 – Level 1 Telecomm Plan
a. Revised drawings to match architectural backgrounds.
4. EY101 – Level 1 Auxiliary Plan
a. Revised drawings to match architectural backgrounds.
END OF ADDENDUM
Attachments < EP101, EL101, ET101, EY101 >
UWS ShelfUWS Shelf
UWS
Shelf
24" L24" L24" L24" L24" L24" L
24" L24" L24" L
24" L24" L24" L
24" L24" L24" L 24" L24" L24" L24" L24" L
24" L
C C
C
C
4
4
4
EP
O
4
EPO
EPO
EP
O
EPO
J
J
J
L L
M M
K K
1
1
2
2
3
3
4
4
4.3
4.3
4.144.14
CT
DRESSING /
INJECTION
105
CT
DRESSING /
INJECTION
106
CLEAN
HOLD
109
DATA
112
EQUIPMENT/ELECTRICAL
111
MRI
113
CT SCAN
103
EVS /
SOILED
HOLD
108
BREAK
ROOM
115
CT
CONTROL
ROOM
102
MRI
CONTROL
ROOM
114
MRI
DRESSING /
INJECTION
117
HALL
119
WAITING/REGISTRATION
101
RADIOLOGIST
READING
RM
104
HALL
118
TOILET
110
MRI
DRESSING /
INJECTION
116
"L1"
"T1"
"MDP"
A
A
A
A
A
AA
A
+54"
+40"
+44"A
A AA
"ME
TE
R/C
T"
3
L1-3,5
1
11
11,13
L1-11,13,15
L1-17,19
L1-21,23,25
21,23
21
7
L1-7,9
WP
27
27,29
L1-33
1
2
18
MDP-2
MP
1
18
MDP-3
MP2
A
17
L1-27,29,31
A
FC-1
TO FC-1
EP101
D1
HU-1 HU-2
MDP-5 MDP-6
WH-1L2-13,15,17
RCP-1L2-19
CH-MRI
MDP-7
14
"L2"
L1-37
"FC
P"
4
4
4
TOILET
107
M M
4
4
M M
4
4
L1-35
IU-1B
IU-1A
TO OU-1A
TO OU-1B
3
L1-12,14
L1-16
L1-18,20
324 S. State St., Suite 400Salt Lake City, UT 84111
800-678-7077801-328-5151
fax: 801-328-5155www.spectrum-engineers.com
REV DATE DESCRIPTION
VCBO NUMBER:
DATE:
524 SOUTH 600 EAST
SALT LAKE CITY, UT 84102
801.575.8800
VCBO.COM
E
1 2 3 4 5
E
6
C
A
B
D D
C
B
A
1 2 3 4 5 6
05/10/2021
6/10
/202
1 11
:04:
02 A
M
C:\U
sers
\jrw
.SP
EC
EN
G.0
00\D
ocum
ents
\210
183_
Ele
c C
entr
al_O
rem
_jrw
LMM
9H.r
vt
EP101
LEVEL 1 - POWER PLAN
INT
ER
MO
UN
TA
IN I
MA
GIN
G L
LC
-O
RE
M
05/10/2021
21230.00
PE
RM
IT S
ET
/ B
ID S
ET
INT
ER
MO
UN
TA
IN H
EA
LTH
CA
RE
GENERAL SHEET NOTES
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"A1LEVEL 1 - POWER PLAN
1 RE-FEED EXISTING ELECTRICAL PANEL FROM NEW TRANSFORMER. CUT EXISTINGCONDUIT FROM METER ABOVE GROUND, REMOVE WIRE AND CAP.
2 ROUTE CIRCUIT THROUGH MRI FILTER.
3 PROVIDE TWO NEMA L6-30 RECEPTACLES AND ONE NEMA 5-20 RECEPTACLEABOVE DATA RACK.
4 PROVDIE 120V CIRCUIT FOR DOOR AUTO-OPERATOR.
1 PROVIDE DEDICATED NETURALS FOR ALL BRANCH CIRCUITS.
2 ALL RECEPTACLES LOCATED WITHIN 6' OF THE EDGE OF A SINK SHALL BEGFCI PROTECTED.
3 ALL WIRING IN PATIENT CARE AREAS SHALL MEET THE REQUIREMNETS OFNEC 517.13.
4 REFER TO VENDOR DRAWINGS ON EE700 SERIES SHEETS FOR ADDITIONALCONTRACTOR RESPONSIBILITIES.
1 06/09/21 ADDENDUM #1
2 06/10/21 ADDENDUM #3
SCALE: 1/2" = 1'-0"D1ENLARGED DATA ROOM POWER PLAN
2
24" L24" L24" L24" L24" L24" L
24" L24" L
24" L24" L
24" L24" L24" L24" L24" L
24" L24" L24" L24" L24" L
24" L
L 1D1 DC
DC
L1D
P1 DC DCL 1D1L 1D1 RC
L 1S1
RCL 1S1
RC L 1S1
DC
L2D
1
DC
L 1DP1
DCL 1D1
DC
DC
RC
L 1S1
DCL 1D1
DC
L 1DP1
L1D
1L
1D
1
RC
RC
L 1S3
L 1S3
DC
DC
L 1D1
DC
L L
M M
K K
1
1
2
2
3
3
4
4
4.3
4.3
4.144.14
CT
DRESSING /
INJECTION
105
CT
DRESSING /
INJECTION
106CLEAN
HOLD
109
DATA
112
EQUIPMENT/ELECTRICAL
111
MRI
113
EVS /
SOILED
HOLD
108
BREAK
ROOM
115
CT
CONTROL
ROOM
102
MRI
CONTROL
ROOM
114MR
I
DR
ES
SIN
G /
INJE
CT
ION
117
HALL
119
WAITING/REGISTRATION
101
RADIOLOGIST
READING
RM
104
HALL
118
TOILET
110
MR
I
DR
ES
SIN
G /
INJE
CT
ION
116
(DX-5)
c
c
(G-2)
(G-2)
(G-2) (G-2)
(DX-2)
(E10
-2)
(E10-1)
(E10-1)
(G-1)
(EG-2) (EG-2)
(EG-2)
(G-2)
h h h h g
g
g
g
g
h
(WS-2)
(DX-2)
(WS-2)
(G-2)
c
(SA
-1)
(DX-5)
c
c c
(E10-2)
(G-2)
(E10-1)
"MDP" "L1"
"T1"
1
1(E3-2)
(E3-1)
(DX-1)
b
a
ab
ga,b
a a
bb
a,b
(SA
-1)
MDP-8
(DX-1) (DX-1)
(DX-5)
(DX-5)c c
(DX-5)
(DX-5)c c
(DX-5)
(DX-5)c c
(DX-5)
(DX-5)c c
(DX-5)
(DX-5)
(DX-5)
(DX-5)
(DX-5)
(DX-5)
(DX-5)
(DX-5)c
c
c
c
c
c
c
c (EG-1)
(G-2)
(G-1)
h
h h
(EG
-2)
(G-2
)(E
G-2
)
g
g
g
MDP-8
(G-2)(G-2)
(G-1)
(G-1)(EG-1)
(G-2
)(G
-2)
(G-2)
(G-2)
324 S. State St., Suite 400Salt Lake City, UT 84111
800-678-7077801-328-5151
fax: 801-328-5155www.spectrum-engineers.com
REV DATE DESCRIPTION
VCBO NUMBER:
DATE:
524 SOUTH 600 EAST
SALT LAKE CITY, UT 84102
801.575.8800
VCBO.COM
E
1 2 3 4 5
E
6
C
A
B
D D
C
B
A
1 2 3 4 5 6
05/10/2021
6/10
/202
1 11
:03:
46 A
M
C:\U
sers
\jrw
.SP
EC
EN
G.0
00\D
ocum
ents
\210
183_
Ele
c C
entr
al_O
rem
_jrw
LMM
9H.r
vt
EL101
LEVEL 1 LIGHTING PLAN
INT
ER
MO
UN
TA
IN I
MA
GIN
G L
LC
-O
RE
M
05/10/2021
21230.00
PE
RM
IT S
ET
/ B
ID S
ET
INT
ER
MO
UN
TA
IN H
EA
LTH
CA
RE
GENERAL SHEET NOTES
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"A1LEVEL 1 - LIGHTING PLAN
1 CIRCUIT WITH 120V RECEPTACLE CIRCUIT IN IMAGING ROOM.
1 CIRCUIT ALL BUGEYE FIXTUERS AND EXIST SIGNS TO MDP-3.
1 06/09/21 ADDENDUM #1
2 06/10/21 ADDENDUM #3
2
UWS ShelfUWS Shelf
UWS
Shelf
24" L24" L24" L24" L24" L24" L
24" L24" L24" L
24" L24" L24" L
24" L24" L24" L 24" L24" L24" L24" L24" L
24" L
C C
C
C
4
4
4
4
L L
M M
K K
1
1
2
2
3
3
4
4
4.3
4.3
4.144.14
CT
DRESSING /
INJECTION
105
CT
DRESSING /
INJECTION
106CLEAN
HOLD
109
DATA
112
EQUIPMENT/ELECTRICAL
111
MRI
113
CT SCAN
103
EVS /
SOILED
HOLD
108
BREAK
ROOM
115
CT
CONTROL
ROOM
102
MRI
CONTROL
ROOM
114
MRI
DRESSING /
INJECTION
117
HALL
119
WAITING/REGISTRATION
101
RADIOLOGIST
READING
RM
104
HALL
118
TOILET
110
MRI
DRESSING /
INJECTION
116
ET401
B5ET401
A5
12"x4"+114" AFF
12"x4"+114" AFF
12"x4"+114" AFF
1
C2
A
A
+120"
A
324 S. State St., Suite 400Salt Lake City, UT 84111
800-678-7077801-328-5151
fax: 801-328-5155www.spectrum-engineers.com
REV DATE DESCRIPTION
VCBO NUMBER:
DATE:
524 SOUTH 600 EAST
SALT LAKE CITY, UT 84102
801.575.8800
VCBO.COM
E
1 2 3 4 5
E
6
C
A
B
D D
C
B
A
1 2 3 4 5 6
05/10/2021
6/10
/202
1 11
:04:
19 A
M
C:\U
sers
\jrw
.SP
EC
EN
G.0
00\D
ocum
ents
\210
183_
Ele
c C
entr
al_O
rem
_jrw
LMM
9H.r
vt
ET101
LEVEL 1 - TELECOM PLAN
INT
ER
MO
UN
TA
IN I
MA
GIN
G L
LC
-O
RE
M
05/10/2021
21230.00
PE
RM
IT S
ET
/ B
ID S
ET
INT
ER
MO
UN
TA
IN H
EA
LTH
CA
RE
SHEET KEYNOTES1 PROVIDE 2 EA., 4" CND AT +9'-6" AFF.
2 COORDINATE EXACT TERMINATION LOCATION OF DATA DEVICE IN OPEN CEILING WITHELECTRICAL INSTALLER.
SCALE: 1/4" = 1'-0"A1LEVEL 1 - TELECOM PLAN
1 06/09/21 ADDENDUM #1
2 06/10/21 ADDENDUM #3
2
UWS ShelfUWS Shelf
UWS
Shelf
24" L24" L24" L24" L24" L24" L
24" L24" L24" L
24" L24" L24" L
24" L24" L24" L 24" L24" L24" L24" L24" L
24" L
B B
B B
B
B
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR
CR#4
#4
#4
#2
#1
#3
#4
#4
#4
#4
#4
J
J
J
J
J
J J
J
J J
J
HC
HC
NC
M
NCM
D
P
NC
M
HC
J
#1
CR
HC
HC
L L
M M
K K
1
1
2
2
3
3
4
4
4.3
4.3
4.144.14
CT
DRESSING /
INJECTION
105
CT
DRESSING /
INJECTION
106
CLEAN
HOLD
109
DATA
112
EQUIPMENT/ELECTRICAL
111
MRI
113
CT SCAN
103
EVS /
SOILED
HOLD
108
BREAK
ROOM
115
CT
CONTROL
ROOM
102
MRI
CONTROL
ROOM
114
MRI
DRESSING /
INJECTION
117
HALL
119
WAITING/REGISTRATION
101
RADIOLOGIST
READING
RM
104
HALL
118
TOILET
110
MRI
DRESSING /
INJECTION
116
"MDP""T1"
"L1"
ZZ
ACS
ACS
ACS
ACS
ACS
ACS
ACSACS
ACS
#4
#1
#4
#1
ACS
"ME
TE
R/C
T"
"FC
P"
"FSA"
103
105
104
106
107
108
102
101B
?
116
115A
115B
117
114
113
118
109
110
111
112
E147
ACS
TOILET
107
324 S. State St., Suite 400Salt Lake City, UT 84111
800-678-7077801-328-5151
fax: 801-328-5155www.spectrum-engineers.com
REV DATE DESCRIPTION
VCBO NUMBER:
DATE:
524 SOUTH 600 EAST
SALT LAKE CITY, UT 84102
801.575.8800
VCBO.COM
E
1 2 3 4 5
E
6
C
A
B
D D
C
B
A
1 2 3 4 5 6
05/10/2021
6/10
/202
1 11
:04:
33 A
M
C:\U
sers
\jrw
.SP
EC
EN
G.0
00\D
ocum
ents
\210
183_
Ele
c C
entr
al_O
rem
_jrw
LMM
9H.r
vt
EY101
LEVEL 1 - SECURITY PLAN
INT
ER
MO
UN
TA
IN I
MA
GIN
G L
LC
-O
RE
M
05/10/2021
21230.00
PE
RM
IT S
ET
/ B
ID S
ET
INT
ER
MO
UN
TA
IN H
EA
LTH
CA
RE
GENERAL SHEET NOTES
SHEET KEYNOTES
SCALE: 1/4" = 1'-0"A1LEVEL 1 - AUXILIARY PLAN
1 06/09/21 ADDENDUM #1
2 06/10/21 ADDENDUM #3
2