Page 1 of 2 This Addendum shall be considered part of the Contract Documents and Project Manual for the above mentioned project as though it had been issued at the same time and shall be incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original Contract Documents and Project Manual, the Addendum shall govern and take precedence. Electrical Addendum Questions 1. The one-line calls for new RMP secondary’s and Primary but no site drawing to provide location of this equipment. a. This is shown on sheet ES101. 2. The EY101 sheet and the hardware/architectural sheets do not match. The access control sub is having a difficult time figuring out what needs card access. a. The EY sheets were updated in Addendum #1. 3. Do the below grade plumbing pipes and electrical floor boxes get cut flush with the top of slab and then filled with concrete or do we cut a 1’ x 1’ chunk of slab, cap pipe or conduit below the slab and then patch the 1’ x 1’ removed labe with concrete? a. We would prefer to have the 1’ x 1’ chunk of slab removed and patched in order to cap the conduit below the slab. 4. The transformer replacement is one of the first things that will need to take place due to being sandwiched between the chiller and an adjacent property owner. Has the transformer replacement work been scheduled with RMP yet? They usually schedule the work months after the contract is signed and paid for. Is there a contact at RMP we can talk to? Depending on what RMP says, we may need to rent a large generator for a while to power the building. Are new bollards needed at the transformer? The existing ones will get ripped out during vault excavation. Electrical Addendum #3 Date: June 10, 2021 To: Carlos Linan From: Jason Worthen Company: VCBO Architecture Email: jrw@spectrum-engineers.com Job: IHC Imaging LLC Orem Phone: 801-401-8442 Job No: 210183 Re: Cc:

Upload: others

Post on 04-May-2022

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Electrical Addendum #3

Page 1 of 2

This Addendum shall be considered part of the Contract Documents and Project Manual for the above

mentioned project as though it had been issued at the same time and shall be incorporated integrally

therewith. Where provisions of the following supplementary data differ from those of the original

Contract Documents and Project Manual, the Addendum shall govern and take precedence.

Electrical Addendum

Questions

1. The one-line calls for new RMP secondary’s and Primary but no site drawing to provide location

of this equipment.

a. This is shown on sheet ES101.

2. The EY101 sheet and the hardware/architectural sheets do not match. The access control sub is

having a difficult time figuring out what needs card access.

a. The EY sheets were updated in Addendum #1.

3. Do the below grade plumbing pipes and electrical floor boxes get cut flush with the top of slab

and then filled with concrete or do we cut a 1’ x 1’ chunk of slab, cap pipe or conduit below the

slab and then patch the 1’ x 1’ removed labe with concrete?

a. We would prefer to have the 1’ x 1’ chunk of slab removed and patched in order to cap

the conduit below the slab.

4. The transformer replacement is one of the first things that will need to take place due to being

sandwiched between the chiller and an adjacent property owner. Has the transformer

replacement work been scheduled with RMP yet? They usually schedule the work months after

the contract is signed and paid for. Is there a contact at RMP we can talk to? Depending on what

RMP says, we may need to rent a large generator for a while to power the building. Are new

bollards needed at the transformer? The existing ones will get ripped out during vault

excavation.

Electrical Addendum #3

Date: June 10, 2021

To: Carlos Linan From: Jason Worthen

Company: VCBO Architecture Email: [email protected]

Job: IHC Imaging LLC – Orem Phone: 801-401-8442

Job No: 210183 Re:

Cc:

Page 2: Electrical Addendum #3

Page 2 of 2

a. We have met with RMP on-site. I do not believe there is a contract in place at this time.

New bollards will be needed to protect both transformers. Contractor will be

responsible for scheduling the work with RMP.

5. The background image (room layout) for the electrical drawings doesn’t match the architectural

drawings. The electrical power, lighting, telecom and security drawings need to be re-worked.

a.

Drawings

1. EP101 – Level 1 Power Plan

a. Revised drawings to match architectural backgrounds.

2. EL101 – Level 1 Lighting Plan

a. Revised drawings to match architectural backgrounds.

3. ET101 – Level 1 Telecomm Plan

a. Revised drawings to match architectural backgrounds.

4. EY101 – Level 1 Auxiliary Plan

a. Revised drawings to match architectural backgrounds.

END OF ADDENDUM

Attachments < EP101, EL101, ET101, EY101 >

Page 3: Electrical Addendum #3

UWS ShelfUWS Shelf

UWS

Shelf

24" L24" L24" L24" L24" L24" L

24" L24" L24" L

24" L24" L24" L

24" L24" L24" L 24" L24" L24" L24" L24" L

24" L

C C

C

C

4

4

4

EP

O

4

EPO

EPO

EP

O

EPO

J

J

J

L L

M M

K K

1

1

2

2

3

3

4

4

4.3

4.3

4.144.14

CT

DRESSING /

INJECTION

105

CT

DRESSING /

INJECTION

106

CLEAN

HOLD

109

DATA

112

EQUIPMENT/ELECTRICAL

111

MRI

113

CT SCAN

103

EVS /

SOILED

HOLD

108

BREAK

ROOM

115

CT

CONTROL

ROOM

102

MRI

CONTROL

ROOM

114

MRI

DRESSING /

INJECTION

117

HALL

119

WAITING/REGISTRATION

101

RADIOLOGIST

READING

RM

104

HALL

118

TOILET

110

MRI

DRESSING /

INJECTION

116

"L1"

"T1"

"MDP"

A

A

A

A

A

AA

A

+54"

+40"

+44"A

A AA

"ME

TE

R/C

T"

3

L1-3,5

1

11

11,13

L1-11,13,15

L1-17,19

L1-21,23,25

21,23

21

7

L1-7,9

WP

27

27,29

L1-33

1

2

18

MDP-2

MP

1

18

MDP-3

MP2

A

17

L1-27,29,31

A

FC-1

TO FC-1

EP101

D1

HU-1 HU-2

MDP-5 MDP-6

WH-1L2-13,15,17

RCP-1L2-19

CH-MRI

MDP-7

14

"L2"

L1-37

"FC

P"

4

4

4

TOILET

107

M M

4

4

M M

4

4

L1-35

IU-1B

IU-1A

TO OU-1A

TO OU-1B

3

L1-12,14

L1-16

L1-18,20

324 S. State St., Suite 400Salt Lake City, UT 84111

800-678-7077801-328-5151

fax: 801-328-5155www.spectrum-engineers.com

REV DATE DESCRIPTION

VCBO NUMBER:

DATE:

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

6

C

A

B

D D

C

B

A

1 2 3 4 5 6

05/10/2021

6/10

/202

1 11

:04:

02 A

M

C:\U

sers

\jrw

.SP

EC

EN

G.0

00\D

ocum

ents

\210

183_

Ele

c C

entr

al_O

rem

_jrw

LMM

9H.r

vt

EP101

LEVEL 1 - POWER PLAN

INT

ER

MO

UN

TA

IN I

MA

GIN

G L

LC

-O

RE

M

05/10/2021

21230.00

PE

RM

IT S

ET

/ B

ID S

ET

INT

ER

MO

UN

TA

IN H

EA

LTH

CA

RE

GENERAL SHEET NOTES

SHEET KEYNOTES

SCALE: 1/4" = 1'-0"A1LEVEL 1 - POWER PLAN

1 RE-FEED EXISTING ELECTRICAL PANEL FROM NEW TRANSFORMER. CUT EXISTINGCONDUIT FROM METER ABOVE GROUND, REMOVE WIRE AND CAP.

2 ROUTE CIRCUIT THROUGH MRI FILTER.

3 PROVIDE TWO NEMA L6-30 RECEPTACLES AND ONE NEMA 5-20 RECEPTACLEABOVE DATA RACK.

4 PROVDIE 120V CIRCUIT FOR DOOR AUTO-OPERATOR.

1 PROVIDE DEDICATED NETURALS FOR ALL BRANCH CIRCUITS.

2 ALL RECEPTACLES LOCATED WITHIN 6' OF THE EDGE OF A SINK SHALL BEGFCI PROTECTED.

3 ALL WIRING IN PATIENT CARE AREAS SHALL MEET THE REQUIREMNETS OFNEC 517.13.

4 REFER TO VENDOR DRAWINGS ON EE700 SERIES SHEETS FOR ADDITIONALCONTRACTOR RESPONSIBILITIES.

1 06/09/21 ADDENDUM #1

2 06/10/21 ADDENDUM #3

SCALE: 1/2" = 1'-0"D1ENLARGED DATA ROOM POWER PLAN

2

Page 4: Electrical Addendum #3

24" L24" L24" L24" L24" L24" L

24" L24" L

24" L24" L

24" L24" L24" L24" L24" L

24" L24" L24" L24" L24" L

24" L

L 1D1 DC

DC

L1D

P1 DC DCL 1D1L 1D1 RC

L 1S1

RCL 1S1

RC L 1S1

DC

L2D

1

DC

L 1DP1

DCL 1D1

DC

DC

RC

L 1S1

DCL 1D1

DC

L 1DP1

L1D

1L

1D

1

RC

RC

L 1S3

L 1S3

DC

DC

L 1D1

DC

L L

M M

K K

1

1

2

2

3

3

4

4

4.3

4.3

4.144.14

CT

DRESSING /

INJECTION

105

CT

DRESSING /

INJECTION

106CLEAN

HOLD

109

DATA

112

EQUIPMENT/ELECTRICAL

111

MRI

113

EVS /

SOILED

HOLD

108

BREAK

ROOM

115

CT

CONTROL

ROOM

102

MRI

CONTROL

ROOM

114MR

I

DR

ES

SIN

G /

INJE

CT

ION

117

HALL

119

WAITING/REGISTRATION

101

RADIOLOGIST

READING

RM

104

HALL

118

TOILET

110

MR

I

DR

ES

SIN

G /

INJE

CT

ION

116

(DX-5)

c

c

(G-2)

(G-2)

(G-2) (G-2)

(DX-2)

(E10

-2)

(E10-1)

(E10-1)

(G-1)

(EG-2) (EG-2)

(EG-2)

(G-2)

h h h h g

g

g

g

g

h

(WS-2)

(DX-2)

(WS-2)

(G-2)

c

(SA

-1)

(DX-5)

c

c c

(E10-2)

(G-2)

(E10-1)

"MDP" "L1"

"T1"

1

1(E3-2)

(E3-1)

(DX-1)

b

a

ab

ga,b

a a

bb

a,b

(SA

-1)

MDP-8

(DX-1) (DX-1)

(DX-5)

(DX-5)c c

(DX-5)

(DX-5)c c

(DX-5)

(DX-5)c c

(DX-5)

(DX-5)c c

(DX-5)

(DX-5)

(DX-5)

(DX-5)

(DX-5)

(DX-5)

(DX-5)

(DX-5)c

c

c

c

c

c

c

c (EG-1)

(G-2)

(G-1)

h

h h

(EG

-2)

(G-2

)(E

G-2

)

g

g

g

MDP-8

(G-2)(G-2)

(G-1)

(G-1)(EG-1)

(G-2

)(G

-2)

(G-2)

(G-2)

324 S. State St., Suite 400Salt Lake City, UT 84111

800-678-7077801-328-5151

fax: 801-328-5155www.spectrum-engineers.com

REV DATE DESCRIPTION

VCBO NUMBER:

DATE:

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

6

C

A

B

D D

C

B

A

1 2 3 4 5 6

05/10/2021

6/10

/202

1 11

:03:

46 A

M

C:\U

sers

\jrw

.SP

EC

EN

G.0

00\D

ocum

ents

\210

183_

Ele

c C

entr

al_O

rem

_jrw

LMM

9H.r

vt

EL101

LEVEL 1 LIGHTING PLAN

INT

ER

MO

UN

TA

IN I

MA

GIN

G L

LC

-O

RE

M

05/10/2021

21230.00

PE

RM

IT S

ET

/ B

ID S

ET

INT

ER

MO

UN

TA

IN H

EA

LTH

CA

RE

GENERAL SHEET NOTES

SHEET KEYNOTES

SCALE: 1/4" = 1'-0"A1LEVEL 1 - LIGHTING PLAN

1 CIRCUIT WITH 120V RECEPTACLE CIRCUIT IN IMAGING ROOM.

1 CIRCUIT ALL BUGEYE FIXTUERS AND EXIST SIGNS TO MDP-3.

1 06/09/21 ADDENDUM #1

2 06/10/21 ADDENDUM #3

2

Page 5: Electrical Addendum #3

UWS ShelfUWS Shelf

UWS

Shelf

24" L24" L24" L24" L24" L24" L

24" L24" L24" L

24" L24" L24" L

24" L24" L24" L 24" L24" L24" L24" L24" L

24" L

C C

C

C

4

4

4

4

L L

M M

K K

1

1

2

2

3

3

4

4

4.3

4.3

4.144.14

CT

DRESSING /

INJECTION

105

CT

DRESSING /

INJECTION

106CLEAN

HOLD

109

DATA

112

EQUIPMENT/ELECTRICAL

111

MRI

113

CT SCAN

103

EVS /

SOILED

HOLD

108

BREAK

ROOM

115

CT

CONTROL

ROOM

102

MRI

CONTROL

ROOM

114

MRI

DRESSING /

INJECTION

117

HALL

119

WAITING/REGISTRATION

101

RADIOLOGIST

READING

RM

104

HALL

118

TOILET

110

MRI

DRESSING /

INJECTION

116

ET401

B5ET401

A5

12"x4"+114" AFF

12"x4"+114" AFF

12"x4"+114" AFF

1

C2

A

A

+120"

A

324 S. State St., Suite 400Salt Lake City, UT 84111

800-678-7077801-328-5151

fax: 801-328-5155www.spectrum-engineers.com

REV DATE DESCRIPTION

VCBO NUMBER:

DATE:

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

6

C

A

B

D D

C

B

A

1 2 3 4 5 6

05/10/2021

6/10

/202

1 11

:04:

19 A

M

C:\U

sers

\jrw

.SP

EC

EN

G.0

00\D

ocum

ents

\210

183_

Ele

c C

entr

al_O

rem

_jrw

LMM

9H.r

vt

ET101

LEVEL 1 - TELECOM PLAN

INT

ER

MO

UN

TA

IN I

MA

GIN

G L

LC

-O

RE

M

05/10/2021

21230.00

PE

RM

IT S

ET

/ B

ID S

ET

INT

ER

MO

UN

TA

IN H

EA

LTH

CA

RE

SHEET KEYNOTES1 PROVIDE 2 EA., 4" CND AT +9'-6" AFF.

2 COORDINATE EXACT TERMINATION LOCATION OF DATA DEVICE IN OPEN CEILING WITHELECTRICAL INSTALLER.

SCALE: 1/4" = 1'-0"A1LEVEL 1 - TELECOM PLAN

1 06/09/21 ADDENDUM #1

2 06/10/21 ADDENDUM #3

2

Page 6: Electrical Addendum #3

UWS ShelfUWS Shelf

UWS

Shelf

24" L24" L24" L24" L24" L24" L

24" L24" L24" L

24" L24" L24" L

24" L24" L24" L 24" L24" L24" L24" L24" L

24" L

B B

B B

B

B

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR

CR#4

#4

#4

#2

#1

#3

#4

#4

#4

#4

#4

J

J

J

J

J

J J

J

J J

J

HC

HC

NC

M

NCM

D

P

NC

M

HC

J

#1

CR

HC

HC

L L

M M

K K

1

1

2

2

3

3

4

4

4.3

4.3

4.144.14

CT

DRESSING /

INJECTION

105

CT

DRESSING /

INJECTION

106

CLEAN

HOLD

109

DATA

112

EQUIPMENT/ELECTRICAL

111

MRI

113

CT SCAN

103

EVS /

SOILED

HOLD

108

BREAK

ROOM

115

CT

CONTROL

ROOM

102

MRI

CONTROL

ROOM

114

MRI

DRESSING /

INJECTION

117

HALL

119

WAITING/REGISTRATION

101

RADIOLOGIST

READING

RM

104

HALL

118

TOILET

110

MRI

DRESSING /

INJECTION

116

"MDP""T1"

"L1"

ZZ

ACS

ACS

ACS

ACS

ACS

ACS

ACSACS

ACS

#4

#1

#4

#1

ACS

"ME

TE

R/C

T"

"FC

P"

"FSA"

103

105

104

106

107

108

102

101B

?

116

115A

115B

117

114

113

118

109

110

111

112

E147

ACS

TOILET

107

324 S. State St., Suite 400Salt Lake City, UT 84111

800-678-7077801-328-5151

fax: 801-328-5155www.spectrum-engineers.com

REV DATE DESCRIPTION

VCBO NUMBER:

DATE:

524 SOUTH 600 EAST

SALT LAKE CITY, UT 84102

801.575.8800

VCBO.COM

E

1 2 3 4 5

E

6

C

A

B

D D

C

B

A

1 2 3 4 5 6

05/10/2021

6/10

/202

1 11

:04:

33 A

M

C:\U

sers

\jrw

.SP

EC

EN

G.0

00\D

ocum

ents

\210

183_

Ele

c C

entr

al_O

rem

_jrw

LMM

9H.r

vt

EY101

LEVEL 1 - SECURITY PLAN

INT

ER

MO

UN

TA

IN I

MA

GIN

G L

LC

-O

RE

M

05/10/2021

21230.00

PE

RM

IT S

ET

/ B

ID S

ET

INT

ER

MO

UN

TA

IN H

EA

LTH

CA

RE

GENERAL SHEET NOTES

SHEET KEYNOTES

SCALE: 1/4" = 1'-0"A1LEVEL 1 - AUXILIARY PLAN

1 06/09/21 ADDENDUM #1

2 06/10/21 ADDENDUM #3

2