Download - MS Activities during TS#3
MS Activities during TS#3
Courtesy of JC, Kajetan, Arek, Jacek, Yan, Richard and Pierre
Warm Magnet Interlocks• Final validation test of SPS spares for main magnet interlocks• Installation of several dosimeters for radiation profile in SPS tunnel (in
prospect of future WIC installation)• Confirmation of cabling layout and patch location for SPS renovation
project with EN/EL
Software upgrades for MPESection Description Risk of doing the
changeRisk to
OP (0-5)Affected systems/functionality
Risk Mitigation Risk of not doing it Responsible
How to do testing
When
MS New version of PMA server + GUI (new SMP IPOC, Beam Power Loss, Fill Statistics module)
Minor risk that refactored Fill Statistics module will not work correctly anymore.
1 PMA server, PM Database
Usual extensive testing of new module in DEV server. 'Dry-dumps' after deployment.
Discrepancy of information between PLAYBACK and ONLINE server for Fill Statistics, missing new functionality of new modules if not deployed.
R.Gorbonosov, J.Suchowski, A.Gorzawski, M.Zerlauth
Usual extensive testing of new module in DEV server. 'Dry-dumps' after deployment.
Dependent of the Logging API release, so asap after this one
MS New version of cern.pm.data to add a feature to retrieve the SessionConfirmationInfo from a SessionInfoData, and to store the analysis flags of session handles.
None 1 PMA server, newly stored PM data
Test with development servers before deployment in production. Possible rollback
Missing information from Session Data
JC Garnier, R Gorbonosov
Testing with the pm-playback-gui and pm-online-gui in dev
MS PCInterlock to take into account Collision beam process split
Minor defects possible as coverage not optimal yet
2 LHC SIS Maskable interlock No management of splitted collision beam process
K. Fuchsberger
Validation with operators
MS New SMP GUI PRO release to follow the changes made to the HW (expert functionality)
Operation should not be affected as the change is made to an expert functionality.
0 SMP GUI application need to be rebooted
roll-back not synchronized with the SMP hardware, new functionality not provided to experts.
M. Audrain
Validation of the expert functionality change during the TS
NEW PM MODULES• New PM analysis modules and
Viewers for SMP and Beam Power Loss analysis
PcInterlock upgrade• Refactoring and GUI improvements• Possibility to split collision beam process (independent for IR1/2/5 and IR8)