Page 1
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Request for Proposal
For
Supply, Installation & Maintenance of Server for
CIDCO, Aurangabad
Ref No.: C.A. No. 02/CIDCO/SM/2014-15
Date: 11th August, 2014
Amount: Rs.1050 (Including 5% VAT)
`
Page 2
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Table of Contents
1. Invitation for Proposal......................................................................................................................................................3
1.1. Bidding Schedule .......................................................................................................................................................3
1.2. Other Important Information Related to Bid ..............................................................................................4
2. Instruction to Bidders .......................................................................................................................................................5
2.1. About CIDCO ................................................................................................................................................................5
2.2. Objective of RFP .........................................................................................................................................................5
2.3. Cost of RFP ....................................................................................................................................................................5
2.4. RFP Ownership ...........................................................................................................................................................6
2.5. Proposal Preparation Costs .................................................................................................................................6
2.6. Amendment of RFP Document ...........................................................................................................................6
2.7. Supplementary Information to the RFP ........................................................................................................6
2.8. CIDCO’s right to terminate the process .........................................................................................................6
2.9. Earnest Money Deposit (EMD) ...........................................................................................................................6
2.10. Authentication of Bid .........................................................................................................................................7
2.11. Instructions for Online submission ............................................................................................................7
2.12. Procedure for Submission of Bids ...............................................................................................................8
2.13. Bid Submission Format .....................................................................................................................................9
2.14. Bid Submission Instructions ..........................................................................................................................9
2.15. Late Bids and Bid Validity Period ............................................................................................................. 10
2.16. Modification and Withdrawal of Proposals ......................................................................................... 11
2.17. Acknowledgement of Understanding of Terms................................................................................. 11
2.18. Scope of Work ..................................................................................................................................................... 11
2.19. Payment Terms .................................................................................................................................................. 12
2.20. Pre-Qualification Criteria .............................................................................................................................. 12
2.21. Technical Specifications ................................................................................................................................ 13
2.22. Delivery and Installation ............................................................................................................................... 17
2.23. Delivery and Documents ............................................................................................................................... 18
3. Annexure............................................................................................................................................................................... 19
3.1. Pre-Qualification Cover Letter ........................................................................................................................ 19
3.2. Annexure - Bank Guarantee for Earnest Money Deposit ................................................................... 21
3.3. Annexure – Guidelines for Commercial Proposal.................................................................................. 23
3.3.1. Commercial Proposal Cover Letter ..................................................................................................... 23
3.3.2. Commercial Proposal Format ................................................................................................................ 24
`
Page 3
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
1. Invitation for Proposal
1. CIDCO hereby invites Proposals from, professionally competent Organizations /
Firms, who meet the minimum eligibility criteria as specified in this bidding
document for the “RFP for Supply, Installation and Maintenance of Server for CIDCO,
Aurangabad” as detailed in the "Scope of Work" section 2.18 of this RFP document.
2. The complete bidding document shall be published on
https://cidco.maharashtra.etenders.in for the purpose of downloading. The downloaded
bidding document shall be considered valid for participation in the electronic bidding
process (e-Procurement/ e-Tendering) subject to the submission of required tender/
bidding document fee in the form of Demand Draft and EMD through Bank Guarantee
and in favor of “CIDCO Ltd” payable at Mumbai/Navi Mumbai and must be submitted
physically as per date and venue mentioned in the section 1.1 of the RFP, failing which
the bid will be summarily rejected.
3. Bidder/ Agencies are advised to study this RFP document carefully before submitting
their proposals in response to the RFP Notice. Submission of a proposal in response to
this notice shall be deemed to have been done after careful study and examination of
this document with full understanding of its terms, conditions and implications.
1.1. Bidding Schedule
S. No. Item Description
1 Name of the Project Request for Proposal for Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
2 RFP Document Download Start/Expiry Date & Time
Start Date: 11/08/2014 at 2:00 P.M. Expiry Date: 5/09/2014 at 5:00 pm Please visit the below mentioned website https://cidco.maharashtra.etenders.in
6 Last date to send in requests for clarifications
The Bidders are requested to send their Pre-bid queries by email to [email protected] not later than 18/08/2014
7 Date, Time and place of pre-bid meeting
22/08/2014, 11:00 am Conference Hall, 2nd Floor, CIDCO Bhavan, CBD Belapur, Navi Mumbai - 400 614
8 Release of response to clarifications would be available at
The official website: https://cidco.maharashtra.etenders.in
9 Last date (deadline) for submission of bids
5/09/2014, 5:00 pm
`
Page 4
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
S. No. Item Description
10 Date Time and Place of opening of pre-qualification proposals
8/09/2014 at 3.00 pm at the aforementioned address of Pre bid meeting
11 Date Time and Place of opening of Commercial Proposals
Will be intimated later to the qualified bidders
12 Physical submission of EMD and Demand Draft for Tender fee as mentioned in section 2.9 of the RFP document
05/09/2014, 5:00 pm Address: CIDCO, Data Center, First Floor, CIDCO Bhavan, CBD Belapur, Navi Mumbai - 400614 Contact number: 02267918699/8631 Fax: 02267918166 Email id: [email protected]
13 Detail of the contact person Officer: Mr. Faiyaz Khan System Manager Contact number: 02267918699/8631 Fax: 02267918166 [email protected]
1.2. Other Important Information Related to Bid
S.
No. Item Description
1.
Earnest Money Deposit (EMD) in
the form of Bank Guarantee from a
Nationalized/ Scheduled Bank in
the name of CIDCO Ltd. as per
ANNEXURE 3.2 of the RFP.
Rs. 25,000 (Twenty Five Thousand)
2. RFP Document Fees Rs. 1,050 (including 5% VAT)
3.
Performance bank guarantee
(PBG) from a Nationalized or
Scheduled Bank
10% of the contract value
`
Page 5
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
2. Instruction to Bidders 2.1. About CIDCO
City and Industrial Development Corporation of Maharashtra Ltd. (CIDCO) is a premier
New Town Development Authority - developing Navi Mumbai, it was began in the year
1971. CIDCO was specially set up by the Government of Maharashtra as its fully owned
company to plan and develop Navi Mumbai in a systematic manner. CIDCO is also
actively involved as Special Planning Authority (SPA) for various new town projects such
as Aurangabad, Nashik, Jalna, Latur, Waluj and many others.
CIDCO's expertise extends across all disciplines involved in urban development:
a) Urban Planning & Architecture
b) Transportation & Communication
c) Housing & Urban Infrastructure
d) Economics & Finance
e) Marketing & Town Services
2.2. Objective of RFP
CIDCO proposes to procure a total solution for the Supply, Installation, Integration,
Implementation and Maintenance of Server mentioned in the RFP with 3 years
comprehensive onsite Warranty and 2 years comprehensive AMC after expiry of the
warranty.
The bidder shall provide support for all issues related to the configuration and operation
of the system including but not limited to application, system interfaces, documentation,
and user manual documentation. The Bidder should have acceptable experience as
sought in the RFP to undertake the activities.
2.3. Cost of RFP
1. RFP document will be made available to the Bidders in the public domain. RFP
document will not be issued manually from Department office. The RFP document can be
downloaded from the CIDCO e-Tender Portal https://cidco.maharashtra.etenders.in.
2. Bidders shall submit, along with their bids, RFP Document Fee of Rs.1050/ (including
5% VAT) in the form of a Demand Draft issued by any Nationalized/Scheduled bank in
favour of ‘CIDCO Ltd.’ payable at Mumbai/Navi Mumbai, Maharashtra. For details please
refer to Bidding Schedule as given in Section 1.1 of the RFP.
`
Page 6
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
2.4. RFP Ownership
The content of this RFP is a copy right material of CIDCO. No part or material of this RFP
document should be published on paper or electronic media without the prior written
permission from CIDCO.
2.5. Proposal Preparation Costs
1. The bidder shall submit the bid with all related costs accounted for and CIDCO shall
not be held responsible for any cost incurred by the bidder. Submission of a bid does not
entitle the bidder to claim any cost and rights over CIDCO and CIDCO shall be at liberty
to cancel any or all bids without giving any notice.
2. All materials submitted by the bidder shall be the absolute property of CIDCO and
no copyright /patent etc. shall be entertained by CIDCO.
2.6. Amendment of RFP Document
1. All the amendments made in the document would be published on the CIDCO website
and shall be part of RFP.
2. The bidders are advised to visit the aforementioned website on regular basis to check
for necessary updates. The CIDCO also reserves the rights to amend the dates mentioned
in this RFP.
2.7. Supplementary Information to the RFP
If CIDCO deems it appropriate to revise any part of this RFP or to issue additional data to
clarify an interpretation of provisions of this RFP, it may issue supplements to this RFP.
Any such corrigendum shall be deemed to be incorporated by this reference into this RFP.
2.8. CIDCO’s right to terminate the process
CIDCO may terminate the RFP process at any time without assigning any reason. CIDCO
reserves the right to amend/edit/add delete any clause of this Bid Document. This will be
informed to all and will become part of the bid /RFP and information for the same would
be published on the CIDCO website.
2.9. Earnest Money Deposit (EMD)
1. Bidders shall submit, along with their bids, EMD of Rs. 25, 000/- in the form of a Bank
Guarantee issued by any Nationalized/ Scheduled bank in favour of CIDCO Ltd. In case
Bank Guarantee is issued out of Mumbai/Navi Mumbai then endorsement should be
done from local branch of the bank.
2. The EMD shall be denominated in Indian Rupees only. No interest will be paid by
CIDCO on the EMD amount and EMD will be refunded to the all Bidders (including the
successful Bidder) without any accrued interest on it
`
Page 7
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
3. The EMD shall be submitted as mentioned in the section 2.9 of the RFP document.
Bids submitted without adequate EMD shall be liable for rejection.
4. Unsuccessful bidder’s EMD will be returned to the unsuccessful bidder within 90 days
from the date of opening of the financial bid. The Bid Security, for the amount mentioned
above, of the successful Bidder would be returned upon submission of Performance
Bank Guarantee for an amount equal to 10% of Total Contract Value.
5. The EMD may be forfeited:
a) If a Bidder withdraws his bid or increases his quoted prices during the
period of bid validity or its extended period, if any.
b) In case of a successful Bidder, if the Bidder fails to sign the Contract in
accordance with the terms and conditions
c) If during the bid process, a bidder indulges in any such deliberate act as
would jeopardize or unnecessarily delay the process of bid evaluation and
finalization
d) If, during the bid process, any information is found false/fraudulent/mala
fide, then CIDCO shall reject the bid and, if necessary, initiate action.
The decision of the CIDCO regarding forfeiture of the EMD shall be final and binding
upon bidders.
2.10. Authentication of Bid
Authorized person of the bidder who signs the bid shall obtain the authority letter from
the bidder, which shall be submitted with the Bid. All pages of the bid and its annexures,
etc. shall be singed and stamped by the person or persons signing the bid.
2.11. Instructions for Online submission
Proposals must be direct, concise, and complete and must be submitted online only.
CIDCO will evaluate the Bidder’s Proposal based on its clarity, relevance and the
directness of its response to the requirements of the Project as outlined in this RFP.
Bidders shall furnish the required information on their Pre-Qualification and Commercial
Proposals in the enclosed formats only. In case of any deviations in the format Bid will be
liable for rejection.
The following points need to be considered while submitting the bids:-
1. Bidders Tool Kit link (detailed Help documents, designed for bidders) has been
provided on e-Tendering website
(https://maharashtra.etenders.in/mah/toolkitBidder.asp) in order to guide them
`
Page 8
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
through different steps involved during e-Tendering such as online procedure for
tender document purchase, bid preparation, bid submission.
2. If any assistance is required regarding e-Tendering (registration / upload /
download) please contact e-Tendering Help Desk on number: 020 25315555 /
9167969614.
3. The tender document is uploaded / released on CIDCO e-tendering website
https://cidco.maharashtra.etenders.in. Tender document and supporting documents
may be downloaded from above mentioned link. Subsequently, bid has to be prepared
and submitted online ONLY on the e-Tender portal.
4. The date and time for online submission shall strictly apply in all cases. The
tenderers should ensure that their tender is prepared online before the expiry of the
scheduled date and time and then submitted online before the expiry of the scheduled
date and time. No delay on account of any cause will be entertained. Offers not
submitted online will not be entertained.
5. In the event of the specified date for the submission of Bids being declared a holiday,
the Bids can be submitted online up to the appointed time on the next working day for
which CIDCO will make necessary provisions.
6. CIDCO may, at its own discretion, extend the date for submission of bids. In such a
case all rights and obligations of CIDCO and the Bidders shall be applicable to the
extended time frame.
7. The offers submitted as documents, by telex/telegram/fax/Email or any manner
other than specified in point ‘4’ of this section, will not be considered. No
correspondence will be entertained on this matter.
8. Printed terms and conditions of the bidders will not be considered as forming part
of their bid.
9. The amendment will be notified on tendering website:
http://cidco.maharashtra.etenders.in. The amendment should be taken into
consideration by the Bidders while preparing their bids.
2.12. Procedure for Submission of Bids
1. To view- Tender Notice, Detailed Time Schedule, Tender Document for this Tender
and subsequently download the Tender Document and its supporting documents,
kindly visit following e-Tendering website: http://cidco.maharashtra.etenders.in
2. The Bidders participating first time for e-Tenders on GoM e-tendering portal will
have to complete the Online Registration Process for the e-Tendering portal.
`
Page 9
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
3. All bidders interested in participating in the On-line e-Tendering process are
required to obtain Class II or Class III Digital Certificates. The tender should be
prepared & submitted online using individual’s digital signature certificate.
4. The interested bidders will have to make online payment (using credit card/debit
card/net banking/Cash Card) of Rs. 1038/- (inclusive of all taxes) per bid per tender
to online service provider of e-Tendering system at the time of entering online Bid
Submission stage of the tender schedule.
2.13. Bid Submission Format
1. The entire proposal shall be submitted strictly as per the format specified in this
Request for Proposal.
2. Bids not confirming to the eligibility criteria listed in this RFP will be summarily
rejected.
3. Submission of forged documents will also result in summary rejection of the bid.
4. Bids with deviation from any of prescribed formats are liable for rejection.
2.14. Bid Submission Instructions
1. Complete bidding process will be online (e-Tendering) in two envelope system. Submission
of bids shall be in accordance to the instructions given in the Table below:
Particulars Instructions
Envelope A:
RFP Document Fees and
EMD
Scanned copy of RFP Document Fees and EMD should be
submitted online. Bidder will ensure to send the original
RFP Document Fees and EMD by Courier / Hand at the
address:
Mr. Faiyaz Khan
System Manager
CIDCO, Data Center, First Floor, CIDCO Bhavan
CBD Belapur, Navi Mumbai - 400 614
Proof of Submission of RFP Document Fees and Proof of
Submission of EMD should be submitted as part of the Pre-
qualification Proposal
Envelope A:
Pre-qualification Proposal
The Pre-qualification Proposal shall be prepared in
accordance with the requirements specified in Section 2.20
of the RFP
`
Page 10
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Particulars Instructions
Each page of the Pre-qualification Proposal should be signed
and stamped by the Authorized Signatory of the Bidder. Pre-
qualification Proposal should be submitted through online
bid submission process only
Envelope B:
Commercial Proposal
The Commercial Proposal shall be prepared in accordance
with the requirements specified in this RFP and in the
formats of prescribed in ANNEXURE 3.3 of the RFP.
Each page of the Commercial Proposal should be signed and
stamped by the Authorized Signatory of the Bidder.
Commercial Proposal should be submitted through online
bid submission process only.
Note: The front page of the proposal document shall indicate the name and address of the
Bidder.
2. The following points shall be kept in mind for submission of bids:
a. CIDCO will not accept delivery of Proposal in any manner other than that specified in
this RFP. Proposal delivered in any other manner shall be treated as defective, invalid
and rejected
b. The Bidder is expected to price all the items and services sought in the RFP. The Bid
should be comprehensive and inclusive of all the services to be provided by the
Bidder as per the scope of his work and must cover the entire Contract Period.
c. Commercial Proposal shall not contain any technical information.
d. If any Bidder does not qualify the Pre-qualification criteria stated in Section 2.20 of
this RFP, the Commercial Proposal of the Bidder shall not be opened in the e-
Tendering system.
e. It is required that the all the Bids submitted in response to this RFP should be
unconditional in all respects, failing which CIDCO reserves the right to reject the Bid
f. Bids sent by telex/telegraphic/tale-fax post/ courier will be rejected.
2.15. Late Bids and Bid Validity Period
Bids received after the due date and the specified time (including the extended period if any)
for any reason whatsoever, shall not be entertained and shall not be opened in the e-
`
Page 11
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Tendering system. The validity of the bids submitted before deadline shall be till 180 days
from the date of submission of Bid.
2.16. Modification and Withdrawal of Proposals
No Proposal may be withdrawn in the interval between the deadline for submission of
Proposals and the expiration of the validity period specified by the Bidder on the
Proposal form. Entire EMD may be forfeited if any of the Bidders withdraw their Bid
during the validity period.
2.17. Acknowledgement of Understanding of Terms
By submitting a Proposal, each Bidder shall be deemed to acknowledge that he has
carefully read all sections of this RFP, including all forms, schedules, annexure,
corrigendum and addendums (if any) hereto, and has fully informed itself as to all
existing conditions and limitations.
2.18. Scope of Work
a) The scope of the work for this project includes Supply and Installation of the
server and to provide onsite maintenance support for the server during the
warranty period of 3 years (with next business day response and resolution at
CIDCO Aurangabad Office) from the date of acceptance of the systems at the
Aurangabad office of CIDCO.
b) In case of any failure of Hard Disk or any parts /equipment during the warranty
period, the Successful Bidder shall be responsible to replace such Hard Disk or any
parts /equipment with new one.
c) Bidders should provide comprehensive onsite support during Annual
Maintenance Contract (AMC) for the period of 2 years with response time of 6
hours and resolution time of 12 hrs.
d) The Successful bidder shall appoint a dedicated Person (though not required to be
deployed full time) during the period of the contract that should be present for
discussions, important meetings and should act as one point contact for CIDCO.
e) CIDCO reserves the right to place Purchase order to the successful Bidder for any
further requirement of server at the agreed unit rate i.e. the rate contract for a
period of six months from the date of first Purchase Order.
`
Page 12
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
2.19. Payment Terms
S No. Activity % of Total Fee
1 Upon delivery and installation of supplied
hardware at CIDCO Aurangabad office
90%
2 On submission of PBG of 10% of the total
contract value Valid up-to 180 days after
the contract completion
10%
2.20. Pre-Qualification Criteria
The Bidder should possess the requisite experience, resources and capabilities in
providing the services necessary to meet the requirements, as described herein. The
Bidder should also possess the technical know-how and the financial wherewithal that
would be required to complete the scope of work. The Bid must be complete in all
respects and should cover the entire scope of work as stipulated in the document.
Bidders not meeting the following Pre-qualification Criteria will not be considered for
further evaluation.
a. The Bidder should be a company registered under the Companies Act, 1956
since the last three years.
b. The Bidder should have minimum annual turnover of ₹ 2 Cr during the last
three financial years (2011-12, 2012-13, 2013-14) or calendar years 2011,
2012, 2013 or bidder’s financial years.
c. The Bidder should be a profit (profit after tax) making company in the last
financial year i.e. 2013-14 or calendar year 2013 or the Bidder’s financial year.
d. The Bidder should be authorized business and support partner for OEM
equipment.
e. The Bidder must provide references of two clients who have procured servers
from them.
f. The Bidder should not be banned from participating in any of the Tenders by
Government of Maharashtra/ Any State Government/ Government of India as
on date of submission of the Bid
`
Page 13
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
2.21. Technical Specifications
Server: Data Base Server
Component Description of Requirement
Chassis 2 U Rack Mountable
CPU The server should be configured with minimum 16 Intel Processor,
Octa/Hexa/Quad Core Intel Xeon latest series Processor.
CPU L3 CACHE
Memory Min 25MB (1 x 25 MB) L3 cache
Motherboard Intel® C600 Series Chipset
Intel® E5-2400v2 Processor Family
Memory 64GB Memory scalable up to 192GB Memory
Scalability Scalability - The proposed server should have the capability of 100%
vertical scalability.
Hard disk drive
The proposed server should be configured with 2*300GB 10K or
more SAS dkrives in Raid 10 and 10*900GB 10K SAS drives in Raid
0/1/5
Controller PCIe 3.0 based SAS Raid Controller with RAID 0/1/1+0/5/5+0
Networking features
Server should support one of the following along with dedicated
Mgmt port:
1. 1Gb 2-port network adaptor
2. 10Gb 2-port Ethernet adaptor supporting all enterprise class
features.
3. 10Gb 2-port Adapter providing Ethernet and iSCSI or Fibre
Channel Over Ethernet (FCoE) .
Power Supply Redundant Power Supplies
Fans Redundant Fans
Industry Standard
Compliance
ACPI 2.0 Compliant, PCIe 3.0 Compliant, PXE support, WOL Support,
Microsoft® Logo certifications, USB 2.0 Support
OS Support
Microsoft Windows Server, Microsoft Windows Server Hyper-V, Red
Hat Enterprise Linux (RHEL), Red Hat Enterprise Linux
Virtualization, SUSE Linux Enterprise Server (SLES), SUSE Linux
Enterprise Server with XEN
Oracle Solaris for x86/x64 based Systems, VMware, Citrix XenServer
Warranty 3 years onsite warranty
OS & Antivirus Windows Server – 2012, Antivirus with 3 Years support
`
Page 14
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Server: Application Base Server
Component Description of Requirement
Chassis 2 U Rack Mountable
CPU The server should be configured with minimum 16 Intel Processor,
Octa/Hexa/Quad Core Intel Xeon latest series Processor.
CPU L3 CACHE
Memory Min 25MB (1 x 25 MB) L3 cache
Motherboard Intel® C600 Series Chipset
Intel® E5-2400v2 Processor Family
Memory 64GB Memory scalable up to 192GB Memory
Scalability Scalability - The proposed server should have the capability of
100% vertical scalability.
Hard disk drive
The proposed server should be configured with 2*300GB 10K or
more SAS drives in Raid 10 and 5*900GB 10K SAS drives in Raid
0/1/5
Controller PCIe 3.0 based SAS Raid Controller with RAID 0/1/1+0/5/5+0
Networking features
Server should support one of the following along with dedicated
Mgmt port:
1. 1Gb 2-port network adaptor
2. 10Gb 2-port Ethernet adaptor supporting all enterprise class
features.
3. 10Gb 2-port Adapter providing Ethernet and iSCSI or Fibre
Channel Over Ethernet (FCoE).
Power Supply Redundant Power Supplies
Fans Redundant Fans
Industry Standard
Compliance
ACPI 2.0 Compliant, PCIe 3.0 Compliant, PXE support, WOL Support,
Microsoft® Logo certifications, USB 2.0 Support
OS Support
Microsoft Windows Server, Microsoft Windows Server Hyper-V,
Red Hat Enterprise Linux (RHEL), Red Hat Enterprise Linux
Virtualization, SUSE Linux Enterprise Server (SLES), SUSE Linux
Enterprise Server with XEN
Oracle Solaris for x86/x64 based Systems, VMware, Citrix
XenServer
Warranty 3 years onsite warranty
OS & Antivirus Windows Server – 2012, Antivirus with 3 Years support
`
Page 15
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Server: Support Server
Component Description of Requirement
Chassis 2 U Rack Mountable
CPU The server should be configured with minimum 4 Intel Processor
Duel/Quad Core Intel Xeon latest series Processor.
Motherboard Intel® C600 Series Chipset
Memory 16 GB Memory scalable up to 192GB Memory
Scalability Scalability - The proposed server should have the capability of
100% vertical scalability .
Hard disk drive The proposed server should be configured with 2*300GB 10K
drives in Raid 0/1/5
Controller PCIe 3.0 based SAS Raid Controller with RAID 0/1/1+0/5/5+0
Power Supply Redundant Power Supplies
Fans Redundant Fans
Industry Standard
Compliance
ACPI 2.0 Compliant, PCIe 3.0 Compliant, PXE support, WOL Support,
Microsoft® Logo certifications, USB 2.0 Support
OS Support
Microsoft Windows Server, Microsoft Windows Server Hyper-V,
Red Hat Enterprise Linux (RHEL), Red Hat Enterprise Linux
Virtualization, SUSE Linux Enterprise Server (SLES), SUSE Linux
Enterprise Server with XEN
Oracle Solaris for x86/x64 based Systems, VMware, Citrix
XenServer
Warranty 3 years onsite warranty
OS & Antivirus Windows Server – 2012, Antivirus with 3 Years support
Element Server Racks 42U
Specifications 19” 42U racks shall be used for hosting the department applications.
All the racks should be mounted on the floor with castor wheels
with brakes (set of 4 per rack)
Floor Standing Server Rack - 42U with Heavy Duty Extruded
Aluminum Frame for rigidity. Top cover with FHU provision. Top &
Bottom cover with cable entry gland plates. Heavy Duty Top and
Bottom frame of MS. Two pairs of 19" mounting angles with 'U'
marking. Depth support channels - 3 pairs. With an overall weight
carrying Capacity of 500Kgs.
The racks should conform to EIA-310 Standard for Cabinets, Racks,
Panels and Associated Equipment and accommodate industry
standard 19” rack mount equipment.
Front and Back doors should be perforated with at least 63% or
`
Page 16
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Element Server Racks 42U
higher perforations.
All racks should be OEM racks with Adjustable mounting depth,
Multi-operator component compatibility, Numbered U positions,
Powder coat paint finish and Protective grounding provisions
All racks should have mounting hardware 2 Packs, Blanking Panel
(4u to 5U size)
Keyboard Tray with BB Slides (Rotary Type) (1 no. per Rack)
Stationery Shelf 627mm Network (2 sets per Rack)
All racks must be lockable on all sides with unique key for each rack
Racks should be compatible with floor-throw as well as top-throw
data center cooling systems.
Server Racks should have the following things in addition to the
above mentioned hardware
PS/2 Interface adapter
USB Interface adapter
Racks should have Rear Cable Management channels, Roof and base
cable access Wire managers
Two vertical and four horizontal
Power distribution Unit
Power Distribution Unit - Vertically Mounted, 32AMPs with 25
Power Outputs. (20 Power outs of IEC 320 C13 Sockets & 5 Power
outs of 5/13Amp Sockets),Electronically controlled circuits for
Surge & Spike protection, LED readout for the total current being
drawn from the channel, 32AMPS MCB, 6 KVA isolated input to
Ground & Output to Ground (1 No per Rack)
Door
The racks must have steel (solid / grill / mesh) front / rear doors
and side panels. Racks should NOT have glass doors / panels.
Both the front and rear doors should be designed with quick release
hinges allowing for quick and easy detachment without the use of
tools.
Fan trays
Fan 90CFM 230V AC, 4" diameter (4 Nos. per Rack)
Fan Housing Unit 4 Fan Position (Top Mounted) (1 no. per Rack) -
Monitored -
Thermostat based - The Fans should switch on based on the
Temperature within the rack. The temperature setting should be
`
Page 17
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
Element Server Racks 42U
factory settable. This unit should also include - humidity &
temperature sensor
Depth - 1000 mm
Metal - Aluminum extruded profile
Side panel - Detachable side panels (set of 2 per Rack)
Width - 19” equipment mounting, extra width is recommended for
managing voluminous cables
Networking
Equipment
KVM
Specifications It should be rack-mountable.
It should have a minimum of 8 ports scalable up to 16 ports.
It should support local user port for rack access.
It should support both USB and PS/2 connections.
It should support access over IP
It should be capable of storing username and profiles.
It should support high resolution 1600 x 1200
It should be capable to auto scan servers
It should work on CAT 6 / CAT 7 cables.
Rack Mountable LCD Monitor with In-built Keyboard & Mouse
Display size: 15 inches diagonal
Compatible to both PS/2 and USB based inputs
2.22. Delivery and Installation
1) The Bidder should deliver the goods within 6 weeks from the date of Purchase Order.
2) Delivery of the Goods shall be made by the Bidder in accordance with the terms of
the Purchase Contract. The vendor should take responsibility of the Goods till it reaches the delivery destination as informed by the CIDCO, transport to such place of destination in Aurangabad, including insurance and storage, as shall be specified in the Contract, shall be arranged by the Bidder. Bidder shall arrange for the Road Permits etc., wherever required.
3) The Bidder should deliver the goods within the stipulated date of delivery. If the
vendor fails to do so, the CIDCO will impose a penalty of 1% of the total order value for the late delivered item for each week’s delay or part thereof, subject to
`
Page 18
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
maximum of 5% of value of the late installed items. Penalty, if any, shall be adjusted against final payment.
4) Installation will be treated as incomplete in one/all of the following situations:
a. Non-delivery of any hardware or other components and software modules
mentioned in the order b. Non-delivery of supporting documentation c. Delivery, but no installation of the components and/or software d. System operational, but unsatisfactory to the CIDCO e. Necessary operational / administrative training not provided
5) Products shall be supplied in a ready to use condition along with all Cables,
Connectors, Software Drivers, Manuals and Media etc.
2.23. Delivery and Documents
The details of shipping and/or other documents to be furnished by the Supplier are specified
hereunder.
a. Original copy of Supplier’s invoices showing contract number, goods description,
quantity, unit price and total amount;
b. Manufacturer’s / Supplier’s warranty certificate;
c. Inspection certificate issued by the nominated CIDCO official, if any, and the
Supplier’s factory inspection report and Quality Control Test Certificates, if any
`
Page 19
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
3. Annexure
3.1. Pre-Qualification Cover Letter
(To be submitted on the letterhead of the bidder)
Place
Date}
To
System Manager
CIDCO, Data Center, 1st Floor, CIDCO Bhavan,
CBD Belapur,
Navi Mumbai - 400 614
Subject: Submission of proposal in response to the RFP for “Supply, Installation and Maintenance of Server for CIDCO, Aurangabad”
Ref: CA No. 02/CIDCO/SM/2014-15
Dear Sir, Having examined the RFP, the receipt of which is hereby duly acknowledged, we, the undersigned, offer to provide the professional services as required and outlined in the RFP for the Appointment of Service Provider for the Project “Supply, Installation and Maintenance of Server for CIDCO, Aurangabad”. We attach hereto our responses to pre-qualification requirements and commercial proposals as required by the RFP. We confirm that the information contained in these responses or any part thereof, including the exhibits, and other documents and instruments delivered or to be delivered to CIDCO, is true, accurate, verifiable and complete. This response includes all information necessary to ensure that the statements therein do not in whole or in part mislead the CIDCO in its short-listing process. We fully understand and agree to comply that on verification, if any of the information provided here is found to be misleading the selection process, we are liable to be dismissed from the selection process or termination of the contract during the project, if selected to do so. We agree for unconditional acceptance of all the terms and conditions set out in the RFP document and also agree to abide by this tender response for a period of 180 days from the date of submission of bid. We hereby declare that in case the contract is awarded to us, we shall submit the contract performance guarantee bond as mentioned in the RFP.
`
Page 20
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
We agree that you are not bound to accept any tender response you may receive. We also agree that you reserve the right in absolute sense to reject all or any of the products/ services specified in the tender response. It is hereby confirmed that I/We are entitled to act on behalf of our company/ corporation/ firm/ organization and empowered to sign this document as well as such other documents, which may be required in this connection. ____________________________________ Signature of Authorized Signatory (with official seal) (Lead Partner in case of Consortium) Name : Designation : Address : Telephone & Fax : E-mail address :
`
Page 21
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
3.2. Annexure - Bank Guarantee for Earnest Money Deposit
For Earnest Money Deposit
Ref: _________________ Date: _________________
Bank Guarantee No.: ____________________
To
System Manager
CIDCO, Data Center, First Floor, CIDCO Bhavan
CBD Belapur, Navi Mumbai - 400 614
Whereas <<Name of the bidder>> (hereinafter called 'the Bidder') has submitted the bid
for Submission of RFP # <<RFP Number>> dated <<Date>> for Supply, Installation and
Maintenance of Server for CIDCO, Aurangabad (hereinafter called "the Bid") to
<<Nodal Agency>>
Know all Men by these presents that we <<>> having our office at <<Address>>
(hereinafter called "the Bank") are bound unto the <<Nodal Agency>> (hereinafter called
"the Purchaser") in the sum of Rs. <<Amount in figures>> (Rupees <<Amount in words>>
only) for which payment well and truly to be made to the said Purchaser, the Bank binds
itself, its successors and assigns by these presents. Sealed with the Common Seal of the
said Bank this <<Date>>
The conditions of this obligation are:
a) If the Bidder having its bid withdrawn during the period of bid validity specified by
the Bidder on the Bid Form; or
b) If the Bidder, having been notified of the acceptance of its bid by the Purchaser during
the period of validity of bid
c) Withdraws his participation from the bid during the period of validity of bid
document; or
d) Fails or refuses to participate in the subsequent Tender process after having been
short listed;
We undertake to pay to the Purchaser up to the above amount upon receipt of its first
written demand, without the Purchaser having to substantiate its demand, provided that
in its demand the Purchaser will note that the amount claimed by it is due to it owing to
the occurrence of one or both of the two conditions, specifying the occurred condition or
conditions.
This guarantee will remain in force up to 180 days from the last date of submission and
any demand in respect thereof should reach the Bank not later than the above date.
NOTHWITHSTANDING ANYTHING CONTAINED HEREIN:
`
Page 22
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
a) Our liability under this Bank Guarantee shall not exceed Rs. <<Amount in figures>>
(Rupees <<Amount in words>> only)
b) This Bank Guarantee shall be valid upto <<insert date>>)
c) It is condition of our liability for payment of the guaranteed amount or any part
thereof arising under this Bank Guarantee that we receive a valid written claim or
demand for payment under this Bank Guarantee on or before <<insert date>>) failing
which our liability under the guarantee will automatically cease.
(Authorized Signatory of the Bank)
Seal:
Date:
`
Page 23
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
3.3. Annexure – Guidelines for Commercial Proposal
3.3.1. Commercial Proposal Cover Letter
(To be submitted on the Letterhead of the bidder)
Date: dd/mm/yyyy
To
System Manager CIDCO, Data Center, First Floor, CIDCO Bhavan CBD Belapur, Navi Mumbai - 400 614 Contact number: 02267918699/8631 Fax: 02267918166
Subject: Submission of proposal in response to the RFP for Supply, Installation and
Maintenance of Server for CIDCO, Aurangabad
Ref : CA No. 02/CIDCO/SM/2014-15
Dear Sir,
We, the undersigned, offer to provide the services for “Supply, Installation and Maintenance
of Server for CIDCO, Aurangabad” in accordance with your Request for Proposal dated
[Insert Date]. Our attached Commercial Proposal for is for the sum of [Insert amount(s) in
words and figures]. We are aware that any conditional financial offer will be outright
rejected by CIDCO. This amount is Inclusive of Taxes except service tax as listed at
ANNEXURE 3.3.2 attached.
Our Commercial Proposal shall be binding upon us subject to the modifications resulting
from Contract negotiations, up to expiration of the validity period of the Proposal (180
days) from the date of submission of Bid.
We hereby declare that our Tender is made in good faith, without collusion or fraud and the information contained in the Tender is true and correct to the best of our knowledge and belief.
We understand that our Tender is binding on us and that you are not bound to accept a Tender you receive. We confirm that no Technical deviations are attached here with this commercial offer. We remain,
Yours sincerely,
Authorized Signature [In full and initials]:
Name and Title of Signatory:
Date and Stamp of the signatory
Name of Firm:
`
Page 24
Supply, Installation and Maintenance of Server for CIDCO, Aurangabad
3.3.2. Commercial Proposal Format
Note: Services Charges for AMC will be paid as per the prevailing rates at the time of
releasing the payments
Authorised Signatory
Name:
Company Name and Stamp
Equipment as per technical specifications provided in RFP
Sr No Item Description Specification/Make Qty Unit Cost (Rs) Total Cost
(Rs)
1 Data Base Server
As per Technical
Specifications given
in Section 2.21
1
2 Application Base
Server
1
3 Support Server 2
4 Server Racks 42U 1
5 KVM 1
6 AMC Onsite Annual
Maintenance
Support for the
period of 2 years
NA NA
Grand Total (Rs)
Total Cost Inclusive of all Taxes except service tax (In Figures / Words