ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES

Il pr

esen

te d

ocum

ento

è p

ropr

ietà

del

la IS

S In

tern

atio

nal S

pA e

non

può

ess

ere,

tota

lmen

te o

par

zial

men

te, d

iretta

men

te o

indi

retta

men

te, t

rasf

erito

, rip

rodo

tto, c

opia

to, r

ivel

ato

o us

ato,

sen

za l’

auto

rizza

zion

e de

lla IS

S In

tern

atio

nal S

pA.

The

pres

ent d

ocum

ent i

s pr

oper

ty o

f IS

S In

tern

atio

nal S

pA a

nd s

hall

not b

e to

tally

or p

artia

lly, d

irect

ly o

r ind

irect

ly, t

rans

ferr

ed, r

epro

duce

d, c

opie

d, d

iscl

osed

or u

sed,

with

out t

he a

utho

rizat

ion

of IS

S In

tern

atio

nal S

pA.

Technical Assistance Technical Assistance “On “On SiteSite””

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Tecnomare

Italy 2010 12 months Activity in Fano (Italy) for Iraqi project (Zubair)

• Team for coordinating the activities relevant Iraqi project as follows: Mechanical, Electrical, Piping and Construction phase.

Foster Wheeler SpA

Italy 2010 6 months Thessaloniki, Greece • Commissioning Services

Saipem SpA

Nigeria 2010 18 months Escravos Site • Organization and coordination of all camp personnel.

Saipem SpA

Pakistan 2009 12 months Engro Site, UREA production, Pakistan • Mechanical Supervisor Services

Saipem SpA

Pakistan 2009 18 months Engro Site, UREA production, Pakistan • Commissioning Services

Saipem SpA

Qatar 2010 12 months Qafco V, Mesaieed City, Qatar) • Commissioning HSE Supervision

Tozzi Sud Italy 2010 12 months LERs Field Ravenna • Welding Engineering Supervision Services

Tecnomare

Italy 2010 5 months Home Office Home Office

• Technical assistance services for the O&M “TOOL Contracts Management”

Comart Italy 2010 8 months Home Office Ravenna • QC engineering Services • FPSO Project (AQUILA)

Tecnomare TMKB

Kazakhstan 2009 / 2010 16 months Kashagan project, Atyrau Client’s Offices • Engineering Design Services

Page 2: Technical Assistance “On Site” - ISS · PDF fileTECHNICAL ASSISTANCE “ON SITE” SERVICES l A CLIENT l A. ... Foster Wheeler SpA ... Descon Sharja project • Piping Supervision

ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Ansaldo Energia

Italy 2010 2 months ISAB Central Priolo Gargallo

• Technical Assistance activities for the Start-Up

Tozzi Sud Italy 2010 12 months LERs Field Ravenna • Electrical design engineering services

Saipem SpA

Algeria 2010 24 months Onshore • QA/QC Activities

Tecnomare

Italy 2008 / 2010 27 months Kashagan Project at Milan Client’s Head Quarter

• Engineering Design Service

Snamprogetti U.K.

Kazakhstan 2010 24 months Kashagan Project • Civil Engineering Services

Comart Italy 2009/2010 7 months

Client’s Offices in Ravenna, Italy for Manifa project

• Services of E&I Supervision

Jahanpars Engineering & Construction

Iran 2008/2009 16 months

Oil center onshore in Darquain

• Construction and Precommissioning Supervision Activities

Saipem

UAE 2008/2009 18 months

3RD Train NLG Ruwais project

• Project design and Commissioning Supervision Activities

Saipem

Pakistan 2008/2010 20 months Daharki Pakistan project • Construction Supervision Activities

Comart UAE 2008 11 months

Fabtech Technologies (Jebel Ali, Dubai)

• Mechanical and Piping Supervision Activities

Comart Italy 2008/2009 11 months

Client’s Offices in Ravenna • Process Design Services

Tecnomare

Italy / Congo 2008/2009 8 months

Client’s Offices at Milan (Italy) and Congo • Contract Administration Services

Page 3: Technical Assistance “On Site” - ISS · PDF fileTECHNICAL ASSISTANCE “ON SITE” SERVICES l A CLIENT l A. ... Foster Wheeler SpA ... Descon Sharja project • Piping Supervision

ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Comart Italy 2008 10 months

Client’s offices in Ravenna, Italy • Engineering Design Service

Tozzi Sud

Italy 2008/2009 11 months LER’s site • Engineering Design Service and

site supervision activities

Saipem SA

Nigeria 2008/2009 12 months Nembe pipeline • Construction Manager Activities

Technip KTI

Poland 2008/2009 12 months Lotos refinery (Danzica) • Piping Supervision Activities

Saipem SA

Qatar 2008/2009 9 months

Qatofin project Doha, Qatar • Technical Assistance Services

Urea Casale

Qatar 2008 12 months Fertilizer field • Site supervision activities

Technip SA Ltd

Saudi Arabia 2008 9 months

Yansab Olefin-I plant project (Yanbu)

• Technical Assistance for Planning Activities

Comart UAE 2008/2009 181 months Descon Sharja project • Piping Supervision Activities

Bentini Spa

France 2007 4 months Pumping station • Support Services for Mechanical

Engineering Activities

Tecnomare

Italy 2007/2009 26 months Milano Client’s Offices • Engineering Design Service

Proger

Italy 20077 5 months San Giovanni Teatino • Basic Engineering Design Service

Page 4: Technical Assistance “On Site” - ISS · PDF fileTECHNICAL ASSISTANCE “ON SITE” SERVICES l A CLIENT l A. ... Foster Wheeler SpA ... Descon Sharja project • Piping Supervision

ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Snamprogetti

Italy 2007 12 months

Kashagan project construction yard at La Spezia

• Project Management Services

Brindisi LNG

Italy 2007 10 months

LNG plant in Brindisi (Italy) • Technical Services

ENI Div. Agip

Italy 2007 12 months

Offshore platform Adriatic sea, Italy

• Support Services as per D. Lgs. 624/96 requirements

Technip

Italy 2007 12 months

ISS’s Rome Home office activities

• Technical Assistance for Planning Activities

SICIM Spa

Kazakhstan 2007 10 months

TCO Asset development project (Tengzil)

• Site Management & Supervison Erection Services

Saipem Kazakhstan Branch

Kazakhstan 2007 10 months Kashagan project • Activities of Drilling Site Contruction

Snamprogetti SA

Kazakhstan 2007/2008 10 months

Khursaniyah Oil & Gas plant and the Hawiah NGL plant

• Technical Assistance for the Construction of the Khursaniyah Oil& Gas Plant and the Hawiyah NGL Plant

Snamprogetti

KSA 2007 10 months

Khursanyia – Khurais (KSA)

• Technical support and site supervision activities

Techint Mexico

Mexico 2007 10 months Onshore • Instrumental Engineering activities

Technip SA Ltd

Saudi Arabia 2007/2008 10 months

Yansab Olefin-I pant project (Yanbu)

• Technical Assistance for Planning Activities

Page 5: Technical Assistance “On Site” - ISS · PDF fileTECHNICAL ASSISTANCE “ON SITE” SERVICES l A CLIENT l A. ... Foster Wheeler SpA ... Descon Sharja project • Piping Supervision

ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Saipem SA

Saudi Arabia 2007/2009 10 months

GOSP, WIPS plant Khurais (Yanbu)

• Technical Assistance for the Construction of GOSP and WIPS

Snamprogetti U.K.

U.A.E. 2007/2009 10 months

Kashagan project (Sharja)

• Specialist Engineering Service on Site

Saipem Energy International

Congo 2006/2008 10 months

Ikalou South & Ikalou Platform

• Engineering Activities for detailed Electrical Discipline

Tozzi sud

France 2006/2008 10 months LNG plant (Marseille) • E&I Erection and Field Engineer

Activities On Site - LNG Plant

Tozzi Sud

France 2006/2008 10 months LNG plant (Marseille) • Site Management & Supervison

Erection Services

APS Engineering

Italy 2006 6 months

Home office in ISS’s Rome Head Quarter

• Process Design Services (FEED Study)

Foster Wheeler Italy

Italy 2006/2007 10 months Onshore • Engineering Activities for Electrical,

Instrumental & Piping Discipline

Tecnomare TMKB

Kazakhstan 2006/2007 8 months

Karachaganak project Development Aksay

• Specialist Engineering Service on Site

Tecnomare TMKB

Kazakhstan 2006 10 months

Karachaganak project Development Aksay

• Uralsk - Aksai Pipeline Project Site Assistance

Sicim Spa

Kazakhstan 2006 7 months

TCO Asset development project (Tengzil) • Erection Assistance on Site

Agip KCO

Kazakhstan 2006 9 months Kashagan project • Erection Assistance on Site

Page 6: Technical Assistance “On Site” - ISS · PDF fileTECHNICAL ASSISTANCE “ON SITE” SERVICES l A CLIENT l A. ... Foster Wheeler SpA ... Descon Sharja project • Piping Supervision

ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES

CLIENT PERIOD DESCRIPTION

Name Logo COUNTRY

Year Duration Plant / Unit Services

Foster Wheeler Italy

UAK 2006 8 months KSA refinery services • HSE Field Management

Inprotec / Honeywell Algeria

Algeria 2005 2 months Onshore and Home office • Process Control on TPS

Maire Engineering S.p.A. Italy 2005 8 months

Oil treatment centre: Combined cycle T/G power generation plant Trecate

• Engineering Activities for Electrical Discipline; Preparation of Operating & Maintenance Manuals

APS Engineering

Italy 2005 11 months Livorno refinery • E&I Survey Activities

Foster Wheeler Italy

Italy 2005 5 months Onshore

• Engineering Activities for Topping & Vacuum revamping/versus automotive gasoil sulphur limits; Stress Analysis and metallic structures engineering; Auto-oil 2

Sicim Spa

Kazakhstan 2005 10 months

TCO Asset development project (Tengzil) • Technical Assistance on Site

Snamprogetti S.p.A.

Qatar 2005 12 months

Ras Laffan LNG Onshore Expansion Project Doha

• Engineering Activities for: Utility, Off-Site, Off-Plot Units

EDISON S.p.A.

Italy 2004 6 months Onshore

• Engineering Activities for: Piping, E&I Discipline; Preservation & Maintenance Gas Turbine