technical assistance “on site” - iss · pdf filetechnical assistance “on...
TRANSCRIPT
ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES
Il pr
esen
te d
ocum
ento
è p
ropr
ietà
del
la IS
S In
tern
atio
nal S
pA e
non
può
ess
ere,
tota
lmen
te o
par
zial
men
te, d
iretta
men
te o
indi
retta
men
te, t
rasf
erito
, rip
rodo
tto, c
opia
to, r
ivel
ato
o us
ato,
sen
za l’
auto
rizza
zion
e de
lla IS
S In
tern
atio
nal S
pA.
The
pres
ent d
ocum
ent i
s pr
oper
ty o
f IS
S In
tern
atio
nal S
pA a
nd s
hall
not b
e to
tally
or p
artia
lly, d
irect
ly o
r ind
irect
ly, t
rans
ferr
ed, r
epro
duce
d, c
opie
d, d
iscl
osed
or u
sed,
with
out t
he a
utho
rizat
ion
of IS
S In
tern
atio
nal S
pA.
Technical Assistance Technical Assistance “On “On SiteSite””
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Services
Tecnomare
Italy 2010 12 months Activity in Fano (Italy) for Iraqi project (Zubair)
• Team for coordinating the activities relevant Iraqi project as follows: Mechanical, Electrical, Piping and Construction phase.
Foster Wheeler SpA
Italy 2010 6 months Thessaloniki, Greece • Commissioning Services
Saipem SpA
Nigeria 2010 18 months Escravos Site • Organization and coordination of all camp personnel.
Saipem SpA
Pakistan 2009 12 months Engro Site, UREA production, Pakistan • Mechanical Supervisor Services
Saipem SpA
Pakistan 2009 18 months Engro Site, UREA production, Pakistan • Commissioning Services
Saipem SpA
Qatar 2010 12 months Qafco V, Mesaieed City, Qatar) • Commissioning HSE Supervision
Tozzi Sud Italy 2010 12 months LERs Field Ravenna • Welding Engineering Supervision Services
Tecnomare
Italy 2010 5 months Home Office Home Office
• Technical assistance services for the O&M “TOOL Contracts Management”
Comart Italy 2010 8 months Home Office Ravenna • QC engineering Services • FPSO Project (AQUILA)
Tecnomare TMKB
Kazakhstan 2009 / 2010 16 months Kashagan project, Atyrau Client’s Offices • Engineering Design Services
ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Services
Ansaldo Energia
Italy 2010 2 months ISAB Central Priolo Gargallo
• Technical Assistance activities for the Start-Up
Tozzi Sud Italy 2010 12 months LERs Field Ravenna • Electrical design engineering services
Saipem SpA
Algeria 2010 24 months Onshore • QA/QC Activities
Tecnomare
Italy 2008 / 2010 27 months Kashagan Project at Milan Client’s Head Quarter
• Engineering Design Service
Snamprogetti U.K.
Kazakhstan 2010 24 months Kashagan Project • Civil Engineering Services
Comart Italy 2009/2010 7 months
Client’s Offices in Ravenna, Italy for Manifa project
• Services of E&I Supervision
Jahanpars Engineering & Construction
Iran 2008/2009 16 months
Oil center onshore in Darquain
• Construction and Precommissioning Supervision Activities
Saipem
UAE 2008/2009 18 months
3RD Train NLG Ruwais project
• Project design and Commissioning Supervision Activities
Saipem
Pakistan 2008/2010 20 months Daharki Pakistan project • Construction Supervision Activities
Comart UAE 2008 11 months
Fabtech Technologies (Jebel Ali, Dubai)
• Mechanical and Piping Supervision Activities
Comart Italy 2008/2009 11 months
Client’s Offices in Ravenna • Process Design Services
Tecnomare
Italy / Congo 2008/2009 8 months
Client’s Offices at Milan (Italy) and Congo • Contract Administration Services
ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Services
Comart Italy 2008 10 months
Client’s offices in Ravenna, Italy • Engineering Design Service
Tozzi Sud
Italy 2008/2009 11 months LER’s site • Engineering Design Service and
site supervision activities
Saipem SA
Nigeria 2008/2009 12 months Nembe pipeline • Construction Manager Activities
Technip KTI
Poland 2008/2009 12 months Lotos refinery (Danzica) • Piping Supervision Activities
Saipem SA
Qatar 2008/2009 9 months
Qatofin project Doha, Qatar • Technical Assistance Services
Urea Casale
Qatar 2008 12 months Fertilizer field • Site supervision activities
Technip SA Ltd
Saudi Arabia 2008 9 months
Yansab Olefin-I plant project (Yanbu)
• Technical Assistance for Planning Activities
Comart UAE 2008/2009 181 months Descon Sharja project • Piping Supervision Activities
Bentini Spa
France 2007 4 months Pumping station • Support Services for Mechanical
Engineering Activities
Tecnomare
Italy 2007/2009 26 months Milano Client’s Offices • Engineering Design Service
Proger
Italy 20077 5 months San Giovanni Teatino • Basic Engineering Design Service
ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Services
Snamprogetti
Italy 2007 12 months
Kashagan project construction yard at La Spezia
• Project Management Services
Brindisi LNG
Italy 2007 10 months
LNG plant in Brindisi (Italy) • Technical Services
ENI Div. Agip
Italy 2007 12 months
Offshore platform Adriatic sea, Italy
• Support Services as per D. Lgs. 624/96 requirements
Technip
Italy 2007 12 months
ISS’s Rome Home office activities
• Technical Assistance for Planning Activities
SICIM Spa
Kazakhstan 2007 10 months
TCO Asset development project (Tengzil)
• Site Management & Supervison Erection Services
Saipem Kazakhstan Branch
Kazakhstan 2007 10 months Kashagan project • Activities of Drilling Site Contruction
Snamprogetti SA
Kazakhstan 2007/2008 10 months
Khursaniyah Oil & Gas plant and the Hawiah NGL plant
• Technical Assistance for the Construction of the Khursaniyah Oil& Gas Plant and the Hawiyah NGL Plant
Snamprogetti
KSA 2007 10 months
Khursanyia – Khurais (KSA)
• Technical support and site supervision activities
Techint Mexico
Mexico 2007 10 months Onshore • Instrumental Engineering activities
Technip SA Ltd
Saudi Arabia 2007/2008 10 months
Yansab Olefin-I pant project (Yanbu)
• Technical Assistance for Planning Activities
ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Services
Saipem SA
Saudi Arabia 2007/2009 10 months
GOSP, WIPS plant Khurais (Yanbu)
• Technical Assistance for the Construction of GOSP and WIPS
Snamprogetti U.K.
U.A.E. 2007/2009 10 months
Kashagan project (Sharja)
• Specialist Engineering Service on Site
Saipem Energy International
Congo 2006/2008 10 months
Ikalou South & Ikalou Platform
• Engineering Activities for detailed Electrical Discipline
Tozzi sud
France 2006/2008 10 months LNG plant (Marseille) • E&I Erection and Field Engineer
Activities On Site - LNG Plant
Tozzi Sud
France 2006/2008 10 months LNG plant (Marseille) • Site Management & Supervison
Erection Services
APS Engineering
Italy 2006 6 months
Home office in ISS’s Rome Head Quarter
• Process Design Services (FEED Study)
Foster Wheeler Italy
Italy 2006/2007 10 months Onshore • Engineering Activities for Electrical,
Instrumental & Piping Discipline
Tecnomare TMKB
Kazakhstan 2006/2007 8 months
Karachaganak project Development Aksay
• Specialist Engineering Service on Site
Tecnomare TMKB
Kazakhstan 2006 10 months
Karachaganak project Development Aksay
• Uralsk - Aksai Pipeline Project Site Assistance
Sicim Spa
Kazakhstan 2006 7 months
TCO Asset development project (Tengzil) • Erection Assistance on Site
Agip KCO
Kazakhstan 2006 9 months Kashagan project • Erection Assistance on Site
ISS INTERNATIONAL SpA TECHNICAL ASSISTANCE “ON SITE” SERVICES
CLIENT PERIOD DESCRIPTION
Name Logo COUNTRY
Year Duration Plant / Unit Services
Foster Wheeler Italy
UAK 2006 8 months KSA refinery services • HSE Field Management
Inprotec / Honeywell Algeria
Algeria 2005 2 months Onshore and Home office • Process Control on TPS
Maire Engineering S.p.A. Italy 2005 8 months
Oil treatment centre: Combined cycle T/G power generation plant Trecate
• Engineering Activities for Electrical Discipline; Preparation of Operating & Maintenance Manuals
APS Engineering
Italy 2005 11 months Livorno refinery • E&I Survey Activities
Foster Wheeler Italy
Italy 2005 5 months Onshore
• Engineering Activities for Topping & Vacuum revamping/versus automotive gasoil sulphur limits; Stress Analysis and metallic structures engineering; Auto-oil 2
Sicim Spa
Kazakhstan 2005 10 months
TCO Asset development project (Tengzil) • Technical Assistance on Site
Snamprogetti S.p.A.
Qatar 2005 12 months
Ras Laffan LNG Onshore Expansion Project Doha
• Engineering Activities for: Utility, Off-Site, Off-Plot Units
EDISON S.p.A.
Italy 2004 6 months Onshore
• Engineering Activities for: Piping, E&I Discipline; Preservation & Maintenance Gas Turbine