  • 8/12/2019 Draft Panipat Proposal Ppt

    1/28

    PROJECT PROPOSAL FOR

    PANIPAT CLUSTER

    Department of Industries

    Government of HaryanaPrepared by: Access Consultancy Services

    www.accessconsulting.in

  • 8/12/2019 Draft Panipat Proposal Ppt

    2/28

    CLUSTER PROFILE

    Primary stakeholder of cluster comprise of

    manufacturers and exporters of home furnishingproducts. The cluster has

    3000 manufacturing units

    300 registered export units

    Turnover of Rs. 11,000 crores per annum

    Export oriented units with annualturnover of Rs. 3000 crores

    Units catering to domestic market have

    an annual turnover of Rs. 8000 crores

    Employment: 50,000 persons

    Cluster caters to both domestic and international markets

    Products: Carpets, durries, rugs, blankets (acrylic, shoddy and woolen),

    upholstery, curtains, bed sheets etc.

  • 8/12/2019 Draft Panipat Proposal Ppt

    3/28

    1 INTRODUCTION

    2 KEY CHALLENGES3 CLUSTER DEVELOPMENT APPROACH/PROCESS4 GLOBAL SCENARIO (HOME FURNISHINGS/CARPETS)

    5 CLUSTER SCENARIO/PROFILE6 SWOT ANALYSIS/NEED ASSESSMENT7 PROJECT PROFILE

    8 PROPOSED FACILITIES9 PROJECT COST & MEANS OF FINANCE

    10 ENVISIONED IMPACT ASSESSMENT

    STRUCTURE OF THE PRESENTATION

  • 8/12/2019 Draft Panipat Proposal Ppt

    4/28

    INTRODUCTION- PANIPAT CARPET CLUSTER

    INDIAS GLOBAL SHARE IN TUFTED CARPETS IS 8.5%

    WE ARE RANKED 5TH IN GLOBAL EXPORTS

    ANNUAL GROWTH HAS BEEN NEGATIVE (-2%) OVER 2005 TO

    2009-10

  • 8/12/2019 Draft Panipat Proposal Ppt

    5/28

    KEY CHALLENGES

    LONG PRODUCT DEVELOPMENT TIME

    LONG LEAD TIME

    10% YARN WASTAGE

    NO PROFESSIONAL DESIGN CENTER

    LIMITED CARPET WIDTH < 10 FT

    AUTO SECONDARY BACKING NOT AVAILABLE

    AUTOMATIC PRINTING FACILITY NOT AVAILABLE

    CLUSTER IS INTO PRICE BASED COMPETITION NOT DIFFERENTIATION BASED (DESIGNSAND BRANDING)

    SHORTAGE OF SKILLED MANPOWER

  • 8/12/2019 Draft Panipat Proposal Ppt

    6/28

    GLOBAL SCENARIO-HOME FURNISHING

    S.NO. EXPORTERSVALUE EXPORTED IN 2009,

    IN USD THOUSAND

    ANNUAL GROWTH IN

    VALUE

    2005-2009 (%)

    SHARE IN WORLD

    EXPORTS

    (%)

    1 CHINA 1331471 5 36.1

    2 INDIA 1022263 -3 27.83 TURKEY 158823 1 4.3

    4 VIETNAM 122257 29 3.3

    5 GERMANY 99654 21 2.7

    INDUSTRY WORLD LEADER MARKET

    SHARE (CHINA)

    INDIAS MARKET SHARE

    HOME FURNISHING 36% 27%

  • 8/12/2019 Draft Panipat Proposal Ppt

    7/28

    GLOBAL SCENARIO-CARPETS (TUFTED)

    INDUSTRYWORLD LEADER

    MARKET SHARE

    (BELGIUM)

    INDIAS MARKET

    SHARE

    CARPETS (TUFTED) 18% 8.5%

    S.NO. EXPORTERSVALUE EXPORTED

    IN 2009 (USD

    THOUSAND)ANNUAL GROWTH

    IN VALUE, 2005-

    2009 (%)SHARE IN WORLD

    EXPORTS (%)

    1 BELGIUM 2056714 -2 18

    2 CHINA 1491264 15 13

    3 TURKEY 1075733 15 9.4

    4 NETHERLANDS 1000220 1 8.7

    5 INDIA 978190 -2 8.5

  • 8/12/2019 Draft Panipat Proposal Ppt

    8/28

    CLUSTER SCENARIO CURRENT PRODUCTION:

    30% OF CLUSTERS ANNUAL

    PRODUCTION IS EXPORTED.

    CARPETS ACCOUNT FOR MORE

    THAN 25% OF EXPORTS.

    BLANKETS 50%. BED SHEETS 16%

  • 8/12/2019 Draft Panipat Proposal Ppt

    9/28

    STRENGTHS

    TRADITIONAL BRAND STRENGTHS.LOCATED NEAR DELHI .

    PRESENCE OF SUPPORT INSTITUTIONS.

    CLUSTER CURRENTLY CATERING TO THEEXPORT MARKET.

    MARKETING INFRASTRUCTURE IN PLACE.

    WEAKNESSESLIMITED RANGE OF PRODUCTS.

    LOW FACTOR PRODUCTIVITY.

    NO DIFFERENTIATED PRODUCT. REPETITIVE DESIGNS

    SMALLER WIDTH CARPETS BEING PRODUCED

    MANUAL, SPRAY LATEXING, SUB STANDARD QUALITY

    TRADITIONAL PRINTING NOT VERY ACCURATE AND

    APPEALING.

    OPPORTUNITY

    A NATURAL CLUSTER OF 1000 + MSME.

    DIVERSIFICATION OF PRODUCTS.MOVING UP THE VALUE CHAIN.

    CONSOLIDATION OF PRODUCT PROFILE.

    UN-EXPLORED MARKETS ( AFRICA & LATINAMERICAS

    THREATS

    STIFF COMPETITION FROM CHINA.

    FAST EVOLVING PRODUCTION TECHNOLOGIES.

    VAST VARIETIES OF DESIGNS.

    FASTER DELIVERY SCHEDULES.

    QUALITY BACKING AND PRINTING TECHNOLOGY.

    SWOT ANALYSIS

  • 8/12/2019 Draft Panipat Proposal Ppt

    10/28

    NEED ASSESSMENT- GAP ANALYSISPRODUCT REASONS FOR LIMITED SUCCESS INTERNATIONALLY PREVALENT TECHNOLOGY

    BATH

    MATS &

    RUGS

    Absence of raw material bank (possibility

    of cost cutting by7-10%)

    Low accuracy of designs

    Long product development cycle on

    account of manual processes

    Delayed shipments and limited sampling

    techniques resulting in cost overrun

    Use of CAD / CAM for product development for

    more accurate designs and allows design

    variations

    CARPETS

    Non availability of wide carpets on account

    of lack of wide width looms

    Low productivity

    Non availability of faster printing faclitiesand techniques.

    Inability to develop designs that cater to

    changing global taste

    High wastage involved in experimenting

    with designs while replicating products

    which have a growing demand ininternational market

    Wide width tufting machine that ensures higher

    productivity during mass production

    Presence of modern weaving carpet units with

    wide width looms which facilitate execution of

    bulk orders.

    Use of technology that involves shorter product

    production cycle

    CAD/ CAM allows experimenting with designs on

    computer before actually replicating it on the

    carpets.

    Usage of automatic small tools in tufting,latexing and finishing resulting in standardization

  • 8/12/2019 Draft Panipat Proposal Ppt

    11/28

    PROPOSED FACILITY-

    CLUSTER STANDARD VS GLOBAL STANDARD

    PROPOSEDFACILITY

    CLUSTER STANDARD GLOBAL STANDARD

    CARPETS 10 FT. X 12 FT. WIDTH UPTO 16 FT. AND MORE

    10% YARN WASTAGE NEGLIGIBLE YARN WASTAGE WITH ADVANCED

    PRODUCTION MACHINES

    TUFTING 1 METRE PER DAY PERARTISAN

    3-4 METRES PER HOUR

    BACKING MANUAL SPRAY LATEXING. FULLY AUTOMATED SECONDARY BACKING

    PLANTS. SUPERIOR & LONG LASTING FINISH

    TIME OVER RUNS AND

    DELAY IN DELIVERY

    SHORTER PRODUCTION CYCLE RESULTING IN

    REDUCTION IN COST OVER RUN AND ON TIME

    DELIVERY

    PRINTING TRADITIONAL MANUAL

    DYEING

    CHROMOJET / PRINTING MACHINE WITH

    VERSATILITY OF COLOR AND SPEED.

  • 8/12/2019 Draft Panipat Proposal Ppt

    12/28

    Introduction- Panipat Carpet ClusterEXISTING TECHNOLOGY -TUFTING

  • 8/12/2019 Draft Panipat Proposal Ppt

    13/28

    EXISTING PRODUCTSCARPETS / RUGS GLOBAL RANGE OF PRODUCTSCARPETS / RUGS

  • 8/12/2019 Draft Panipat Proposal Ppt

    14/28

    SKILLS DEVELOPMENT AND TRAINING

    To address the need of the cluster for skilled man

    power shortage and to enable them to work on

    the proposed facilities. The SPV would undertakeimparting trainings on diverse skills required by

    the cluster units

    PROJECT PROFILE

  • 8/12/2019 Draft Panipat Proposal Ppt

    15/28

    PROJECT PROFILE

    Projectimplementation on

    a 1 acre plot insector 28 Panipat.Land Allotted byHUDA, with acomfortable 3 yearpayment plan

    LAND

  • 8/12/2019 Draft Panipat Proposal Ppt

    16/28

    PROPOSED FACILITIES CFC

    1. PRODUCT DEVELOPMENT

    CAD & CAM CENTER WITH WIDE WIDTH TUFTED

    SAMPLING MACHINE.

    2. COMMON FACILITY CENTRE AUTOMATED BACKING PLANT.

    CHROMOJET PRINTING.

    3. SKILL DEVELOPMENT & TRAINING

  • 8/12/2019 Draft Panipat Proposal Ppt

    17/28

    CARPETS- PRODUCT DEVELOPMENT

    Cluster gets designs from buyers and tracemakers convert thesedesigns form paper to cloth

    Mostly trial and error for product development

    CAD / CAM is not used

  • 8/12/2019 Draft Panipat Proposal Ppt

    18/28

    PRODUCT DEVELOPMENT

    CAD & CAM Center

    Relevant soft waresand related hard wareon whichdemonstrative tuftingof different pile heightand loops can be done.

    This machine shall tuftthe latest designs forcluster members totake approvals fromtheir buyers

    Wide Width TuftingSampling Machine.

  • 8/12/2019 Draft Panipat Proposal Ppt

    19/28

    AUTOMATED PRINTING LINE

    No Screens- no Limitationin pattern repeats

    Design change on the fly

    Full penetration

    Pile weight 250 up to1500 g/m2

    For polyamide, wool,

    acrylic and (up to certainextent) polyester yarns

    Complete print line fromone supplier

  • 8/12/2019 Draft Panipat Proposal Ppt

    20/28

    PROJECT COST

    &

    MEANS OF FINANCE

  • 8/12/2019 Draft Panipat Proposal Ppt

    21/28

    TOTAL PROJECT COSTS No Component Cost (Rs Crores)

    1 LAND AND DEVELOPMENT COST 2.46

    2 BUILDING 1.72

    3 PLANT AND MACHINERY 13.86

    4 MISC FIXED ASSETS 2.04

    5 PRELIM AND PRE-OP EXPENSES 0.02

    6 CONTINGENCIES 0.137 MARGIN FOR WORKING CAPITAL 0.27

    TOTAL PROJECT COST 20.50

    Source Amount (Rs Lacs) %Equity from cluster members 5.23 25.51%

    Grant under CDP 13.50 65.85%

    Grant from State Govt 1.769 8.63%

    Total 20.50 100.0%

    IMPLEMENTATION SCHEDULE

  • 8/12/2019 Draft Panipat Proposal Ppt

    22/28

    SL ACTIVITY/MONTH JUNE JULY AUG SEPT OCT NOV DEC JAN FEB MAR APR MAY1 POSSESSION IN FAVOUR OF SPV.2 FOLLOW-UP FINAL SANCTION OF

    GRANT.

    3 TYING UP OF CONTRIBUTION OFSPV /STAKEHOLDERS.

    4 COLLATE INFORMATION ONDEFICIENCIES

    5 FOLLOW-UP FOR RELEASE OFGRANT.

    6 PREPARATION OF DETAILEDDRAWINGS.

    7 FORMATION OF PURCHASECOMMITTEE.

    8 FINALIZE BOQ OF EQUIPMENTS9 SEEKING QUOTATIONS FROM

    MANUFACTURERS & CALLING

    TENDERS10 CONSTRUCTION OF FACILITIES.11 OBTAINING STATUTORY

    CLEARANCES/ APPROVALS.12 PURCHASING OF MACHINERY

    AND EQUIPMENT.13 INSTALLATION AND TRIAL RUN

    OF MACHINERY AND

    EQUIPMENT.14 PROGRESS REPORTS OF

    IMPLEMENTATION SCHEDULE

  • 8/12/2019 Draft Panipat Proposal Ppt

    23/28

    Working Assumptions

    Year Capacity Utilization

    1 50%

    2 55%

    3 60.50%

    EXPENDITURE ASSUMPTIONS

    RAW MATERIAL COST % OF SALES REVENUE 72%

    MANUFACTURING OVERHEADS % OF SALES REVENUE 5%

    ADMINISTRATION OVERHEADS AS A % OF PROJECT COST

    0.64%

    SALARY & WAGES AS A % OF TOTAL REVENUE 3.72%

    LEASE RENTALS RS. 15,000 PER MONTH FOR USING THE LAND AREA

  • 8/12/2019 Draft Panipat Proposal Ppt

    24/28

    Revenue Assumptions

    Year SALES REVENUE

    1 1500 LACS

    2 1650 LACS

    3 1815 LACS

  • 8/12/2019 Draft Panipat Proposal Ppt

    25/28

    Key Financial Indicators

    S No. Financial Indicators

    1 Debt Service Coverage Ratio 4.53

    2 Break Even Point 56.02%

  • 8/12/2019 Draft Panipat Proposal Ppt

    26/28

    Bench mark The Henan province V/S

    Panipat

    Solution proposed

    Raw material Yarn is cheaper, locally

    available in cluster

    Raw material bank

    Marketing Group model Common brand name

    Machinery Sophisticated, supports

    standardization anddifferentiation

    Wide width tufting

    facilities, backing plant,Chromojet Printing

    Printing Printing is done on

    group approach

    Chromojet Printing

    Financial services Loans at 3-5% interest A financial servicesthrough SPV

    Skill development Skilled labor Skill Development

    centre to be set up by a

    technical partner.

    PERCIEVED I t

  • 8/12/2019 Draft Panipat Proposal Ppt

    27/28

    PERCIEVED Impact

    1 Enhanced growth of cluster in terms of technological

    advancement.

    Facilities at CFC will

    encourage members toinvest in Automatic Tufting

    Machines. 11 Members

    already in discussions to

    upgrade.

    2 Scaling the value chain while being competitive innational and international market

    Repetitive and very basicdesigns would not fetch

    good price. Its expected to

    increase revenues by at least

    10%

    3 New product development for higher unit valuerealization

    Current system of designingshall be taken over by

    4 Skill development initiatives for addressing the

    manpower shortage in cluster

    The quality of products shall

    improve as the skill the skill

    levels go up.

    5 Design Center Expertise The design center shall workon creating newer varieties