e1 · unit outdoor unit l01 29 l01 31 30 30 4 4 31 12 32 33 14 1 1. [email protected] 4809 vue...

6
[email protected] 4809 Vue Du Lac Place, Suite 201 Manhattan, Kansas 66503 785.587.8042 FAX 785.587.8039 LST Consulting Engineers, PA Project 15020 December 2015 E1.6 3/32" = 1'0" BASEMENT POWER PLAN 1 44"/GFI 44"/GFI J J 1. PROVIDE 20A/1P SNAP SWITCH AND 120V POWER FOR OVERHEAD DOOR OPERATOR. PROVIDE ADDITIONAL CONDUIT(S) FOR CLOSE LOOP CONTROL WIRING, PROXIMITY READERS, ETC. COORDINATE ALL REQUIREMENTS WITH GC AND EQUIPMENT INSTALLER. 2. 30A FUSED DISCONNECT SWITCH WITH SOLID NEUTRAL AND (1) 20A DUALELEMENT, TIME DELAY FUSE IN NEMA 1 ENCLOSURE FOR ELEVATOR CAB LIGHTS & EXHAUST. SWITCH SHALL BE CAPABLE OF BEING LOCKED "OFF". MOUNT AT 6'0" AFF TO TOP AND LABEL WITH CORRESPONDING ELEVATOR CAR NUMBER AND CIRCUIT NUMBER. COORDINATE EXACT MOUNTING LOCATION AND REQUIREMENTS WITH ELEVATOR EQUIPMENT INSTALLER. PROVIDE FINAL ELECTRICAL CONNECTION TO ELEVATOR CONTROLLER. 3. ELEVATOR POWER MODULE SWITCH: 200A/480V/3P SWITCH COMPLETE WITH 125A DUAL ELEMENT, TIME DELAY CLASS 'J' FUSES, 120V CONTROL TRANSFORMER, FIRE ALARM SAFETY INTERFACE RELAY, KEY TEST SWITCH, GREEN PILOT LIGHT, AUXILIARY CONTACTS FOR ELEVATOR RECALL, AND FIRE ALARM VOLTAGE MONITORING RELAY. COOPER BUSSMAN #PS2T48R1KGN2BF1 OR EQUAL. COORDINATE EXACT MOUNTING LOCATION AND REQUIREMENTS WITH ELEVATOR EQUIPMENT INSTALLER. PROVIDE FINAL ELECTRICAL CONNECTION TO ELEVATOR CONTROLLER. 4. INSTALL RECEPTACLE ON WALL OF ELEVATOR PIT. VERIFY EXACT LOCATION WITH ELEVATOR EQUIPMENT INSTALLER. 5. PROVIDE CENTRAL LIGHTING INVERTER WITH 120V1 Ȉ INPUT 120V1 Ȉ OUTPUT, 750 WATT CAPACITY, (1) INPUT AND (1) OUTPUT BREAKER, COMPACT SIZE CABINET, UL 924 AND UL 1778 LISTED, WITH FULL 120 MINUTE BATTERY BACKUP CAPACITY, COMPATIBLE WITH LED LIGHTING, MULE #ES.75A0100N11 OR EQUAL. PROVIDE 31/2" CONCRETE HOUSEKEEPING PAD. 6. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED CIRCUIT FROM INVERTER. 7. DEDICATED RECEPTACLE FOR FIRE SPRINKLER SYSTEM COMPRESSOR. VERIFY EXACT LOCATION WITH FIRE SPRINKLER CONTRACTOR. 8. PAD MOUNTED UTILITY TRANSFORMER, SEE SITE PLAN ON SHEET E1.0 AND CIVIL DRAWINGS FOR EXACT LOCATION ON SITE. 9. UNDERGROUND ELECTRICAL PRIMARY. SEE SITE PLAN ON SHEET E1.0 FOR MORE INFORMATION. 10. UNDERGROUND ELECTRICAL SERVICE LATERAL, SEE POWER RISER DIAGRAM ON SHEET E6.2 AND ELECTRICAL SITE PLAN ON SHEET E1.0 FOR MORE INFORMATION. EXACT ROUTING MAY BE ADJUSTED AS REQUIRED TO SUIT FIELD CONDITIONS. 11. PROVIDE 11/4" RMC CONDUIT WITH PULL STRING FOR POWER COMPANY PROVIDED C:T METERING WIRING. 12. ELECTRICAL UTILITY METER. MOUNT CENTER OF METER SOCKET 42" TO 60" ABOVE GRADE. VERIFY EXACT LOCATION WITH KCP&L. 13. COMBINATION STARTER FOR EXHAUST FAN AND MAKE FINAL CONNECTION TO EQUIPMENT. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON SHEET E6.1 FOR MORE INFORMATION. 14. MOUNT CONTROL TRANSFORMER AND RELAYS FOR EXHAUST FAN CONTROL ADJACENT TO "TOXALERT" CONTROL PANEL. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON SHEET E6.1 FOR MORE INFORMATION. 15. ROUTE CIRCUIT THROUGH RELAY FOR CONTROL OF MOTORIZED DAMPERS BY "TOXALERT" CONTROL PANEL. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON SHEET E6.1 FOR MORE INFORMATION. 16. FAN SHALL OPERATE CONTINUOUSLY. CIRCUIT TO UNSWITCHED HOT CONDUCTOR. 17. 30A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. PROVIDE FINAL CONNECTION TO TRASH COMPACTOR. VERIFY REQUIREMENTS WITH GC AND EQUIPMENT INSTALLER. 18. PROVIDE (5) #10, #10G, 3/4"C FROM THE WALKIN FREEZER CONDENSING UNIT TO THE FREEZER EVAPORATOR, WIRED THROUGH THE UNIT TIME CLOCK. VERIFY EXACT REQUIREMENTS WITH KEC AND MAKE ALL FINAL ELECTRICAL CONNECTIONS. 19. 480V/3P COMBINATION NEMA SIZE 0 MOTOR STARTER/NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. STARTER SHALL BE FULL VOLTAGE NONREVERSING TYPE WITH 24V CONTROL TRANSFORMER, HOA SELECTOR SWITCH, AND MELTING ALLOY THERMAL OVERLOADS. MAKE FINAL FLEXIBLE CONNECTION TO PUMP. ROUTE 24VAC CONTROL WIRING TO START CONTACTS IN BOILER FOR PUMP START SIGNAL. 20. 100A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL FLEXIBLE CONNECTION TO EQUIPMENT. 21. PROVIDE STARTERS FOR GEYSER PUMPS AND MAKE ALL FINAL ELECTRICAL CONNECTIONS. COORDINATE LOCATION AND REQUIREMENTS WITH FOUNTAIN EQUIPMENT INSTALLER. SEE SHEET SP2.1 FOR MORE INFORMATION. 22. PROVIDE STARTERS FOR MAIN FOUNTAIN PUMP, POOL PUMP, AND SPA PUMP AND MAKE ALL FINAL ELECTRICAL CONNECTIONS. COORDINATE LOCATION AND REQUIREMENTS WITH FOUNTAIN EQUIPMENT INSTALLER. SEE SHEETS SP2.1, SP3.1, SP3.2 AND SP3.3 FOR MORE INFORMATION. 23. PUSHBUTTON MOUNTED AT 72" AFF FOR EMERGENCY SHUTDOWN OF BOILER. PROVIDE COMPLETE WITH MAINTAINED CONTACT, 40mm RED MUSHROOM PUSHBUTTON, N.C. CONTACT BLOCK, NEMA 4X SURFACE MOUNT NONMETALLIC BACKBOX (PILLA MODEL #BSD120 OR EQUAL). PROVIDE PLAQUE ON WALL WITH 3/8" HIGH WHITE LETTERS ON RED BACKGROUND TO READ "EMERGENCY BOILER SHUTDOWN". 24. VERIFY POWER REQUIREMENTS FOR FOUNTAIN FLOW, FLOAT SWITCH, AND WATER LEVEL CONTROLLER WITH EQUIPMENT INSTALLER. SEE SHEET SP2.1 FOR MORE INFORMATION. 25. COORDINATE POWER CONNECTION TO LED LIGHTING TRANSFORMER AND PROGRAMMER WITH FOUNTAIN EQUIPMENT INSTALLER. 26. COORDINATE ALL POOL, SPA AND FOUNTAIN ELECTRICAL REQUIREMENTS WITH SHEETS SP2.1, SP3.1, SP3.2 AND SP3.3, AND WITH EQUIPMENT INSTALLER. PROVIDE ADDITIONAL ELECTRICAL INSTALLATION AS REQUIRED FOR A COMPLETE SYSTEM. 27. ELECTRICAL INSTALLATION FOR SNOWMELT SYSTEM PUMP, BOILER AND GLYCOL MAKEUP SYSTEM SHALL BE PRICED SEPARATELY AS PART OF A BID ALTERNATE. SEE SPECIFICATIONS FOR INFORMATION ON PROJECT ALTERNATES. 28. 60A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL FLEXIBLE CONNECTION TO EQUIPMENT. 29. PROVIDE (3) #12, #12G, 1/2"C TO COMPANION INDOOR UNIT ABOVE CEILING IN KITCHEN ABOVE. SEE SHEET E1.7 FOR INDOOR UNIT LOCATIONS. 30. ELEVATOR SUMP PUMP ALARM PANEL. PROVIDE POWER CONNECTION AND (2) 1" CONDUITS FROM ALARM PANEL STUBBED INTO ELEVATOR PIT FOR POWER AND CONTROL CABLING. COORDINATE ALL WORK WITH PLUMBING CONTRACTOR. 31. PUSHBUTTON MOUNTED AT 54" AFF FOR OVERRIDE OPERATION OF ELEVATOR RELIEF HOOD MOTORIZED DAMPERS. SEE "ELEVATOR RELIEF HOOD DAMPER CONTROL" ON SHEET E1.10. PROVIDE PLAQUE ON WALL WITH 3/8" HIGH WHITE LETTERS ON RED BACKGROUND TO READ "ELEVATOR RELIEF HOOD MANUAL OVERRIDE". 32. CT CABINET ON EXTERIOR WALL. SEE RISER DIAGRAM ON SHEET E6.2. 33. COORDINATE WITH GC AND PLUMBING CONTRACTOR FOR INSTALLATION OF ELECTRICAL TO AVOID GREASE INTERCEPTOR. 34. VIERIFY EXACT LOCATION OF WALKIN REFRIGERATOR AND FREEZER CONDENSING UNITS WITH GC AND KITCHEN EQUIPMENT INSTALLER. POWER PLAN NOTES BY SYMBOL # 1 1 GFI GFI L01 GFI 2 3 1/4" = 1'0" ENLARGED EQUIPMENT ROOM POWER PLAN 2 2 E1.6 L01 2 SES 5 SES 4 L01 4 L01 8 L01 6 H01 6 5 L01 3 L01 16 L02 4 L02 6 7 8 10 10 10 11 L02 9 L02 15 L02 21 13 13 13 R R TR L02 5 D D D D ON CCT 'L025' 15 ON CCT 'L025' 15 L02 8 L02 10 L02 12 L02 16 L02 18 L02 20 L02 22 16 UH1 UH2 L02 24 L02 25 17 1/4" = 1'0" ENLARGED POOL EQPM ROOM POWER PLAN 3 D02 17 D02 16 3 E1.6 L01 7 L01 9 L01 11 L01 13 L01 12 L01 15 L01 18 L01 14 KITCHEN EQUIPMENT TAG. SEE 'KITCHEN EQUIPMENT ELECTRICAL CONNECTION SCHEDULE' ON SHEET E4.3 FOR EQUIPMENT INFORMATION (TYP). 1/2 19 H01 10 L01 17 L01 19 L01 21 16 20 L03 L03 4 L01 22 L01 28 21 22 L03 3 L03 9 23 24 L03 10 L03 8 L01 23 25 L03 15 L03 16 L03 19 L03 20 CHLORINE GENERATORS POOL HEATER SPA HEATER L03 24 UV CHAMBER L03 23 L03 25 L03 26 ACID PUMPS FLOW CONTROL L03 27 UV CHAMBER FLOW CONTROL SPA LED PROGRAMMER / TRANSFORMER L03 30 SPA LED PROGRAMMER / TRANSFORMER L03 29 26 L03 12 27 L02 36 L02 40 L02 44 29 29 29 OUTDOOR UNIT 28 20 28 28 OUTDOOR UNIT OUTDOOR UNIT L01 29 L01 31 30 30 4 4 31 12 32 33 14 1 1

Upload: others

Post on 24-May-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: E1 · UNIT OUTDOOR UNIT L01 29 L01 31 30 30 4 4 31 12 32 33 14 1 1. mail@LSTengineers.com 4809 Vue Du Lac Place, Suite 201 Manhattan, Kansas 66503 785.587.8042 FAX 785.587.8039 LST

[email protected]

4809 Vue Du Lac Place, Suite 201

Manhattan, Kansas 66503

785.587.8042 FAX 785.587.8039

LST Consulting Engineers, PAProject 15020 December 2015

E1.63/32" = 1'0"

BASEMENT POWER PLAN1

44"/GFI

44"/GFI

J

J

1. PROVIDE 20A/1P SNAP SWITCH AND 120V POWER FOR OVERHEAD DOOR OPERATOR.

PROVIDE ADDITIONAL CONDUIT(S) FOR CLOSE LOOP CONTROL WIRING, PROXIMITY

READERS, ETC. COORDINATE ALL REQUIREMENTS WITH GC AND EQUIPMENT

INSTALLER.

2. 30A FUSED DISCONNECT SWITCH WITH SOLID NEUTRAL AND (1) 20A DUALELEMENT,

TIME DELAY FUSE IN NEMA 1 ENCLOSURE FOR ELEVATOR CAB LIGHTS & EXHAUST.

SWITCH SHALL BE CAPABLE OF BEING LOCKED "OFF". MOUNT AT 6'0" AFF TO TOP

AND LABEL WITH CORRESPONDING ELEVATOR CAR NUMBER AND CIRCUIT NUMBER.

COORDINATE EXACT MOUNTING LOCATION AND REQUIREMENTS WITH ELEVATOR

EQUIPMENT INSTALLER. PROVIDE FINAL ELECTRICAL CONNECTION TO ELEVATOR

CONTROLLER.

3. ELEVATOR POWER MODULE SWITCH: 200A/480V/3P SWITCH COMPLETE WITH 125A

DUAL ELEMENT, TIME DELAY CLASS 'J' FUSES, 120V CONTROL TRANSFORMER, FIRE

ALARM SAFETY INTERFACE RELAY, KEY TEST SWITCH, GREEN PILOT LIGHT, AUXILIARY

CONTACTS FOR ELEVATOR RECALL, AND FIRE ALARM VOLTAGE MONITORING RELAY.

COOPER BUSSMAN #PS2T48R1KGN2BF1 OR EQUAL. COORDINATE EXACT

MOUNTING LOCATION AND REQUIREMENTS WITH ELEVATOR EQUIPMENT INSTALLER.

PROVIDE FINAL ELECTRICAL CONNECTION TO ELEVATOR CONTROLLER.

4. INSTALL RECEPTACLE ON WALL OF ELEVATOR PIT. VERIFY EXACT LOCATION WITH

ELEVATOR EQUIPMENT INSTALLER.

5. PROVIDE CENTRAL LIGHTING INVERTER WITH 120V1 Ȉ INPUT 120V1Ȉ OUTPUT, 750

WATT CAPACITY, (1) INPUT AND (1) OUTPUT BREAKER, COMPACT SIZE CABINET, UL

924 AND UL 1778 LISTED, WITH FULL 120 MINUTE BATTERY BACKUP CAPACITY,

COMPATIBLE WITH LED LIGHTING, MULE #ES.75A0100N11 OR EQUAL. PROVIDE

31/2" CONCRETE HOUSEKEEPING PAD.

6. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED CIRCUIT FROM

INVERTER.

7. DEDICATED RECEPTACLE FOR FIRE SPRINKLER SYSTEM COMPRESSOR. VERIFY EXACT

LOCATION WITH FIRE SPRINKLER CONTRACTOR.

8. PAD MOUNTED UTILITY TRANSFORMER, SEE SITE PLAN ON SHEET E1.0 AND CIVIL

DRAWINGS FOR EXACT LOCATION ON SITE.

9. UNDERGROUND ELECTRICAL PRIMARY. SEE SITE PLAN ON SHEET E1.0 FOR MORE

INFORMATION.

10. UNDERGROUND ELECTRICAL SERVICE LATERAL, SEE POWER RISER DIAGRAM ON SHEET

E6.2 AND ELECTRICAL SITE PLAN ON SHEET E1.0 FOR MORE INFORMATION. EXACT

ROUTING MAY BE ADJUSTED AS REQUIRED TO SUIT FIELD CONDITIONS.

11. PROVIDE 11/4" RMC CONDUIT WITH PULL STRING FOR POWER COMPANY PROVIDED

C:T METERING WIRING.

12. ELECTRICAL UTILITY METER. MOUNT CENTER OF METER SOCKET 42" TO 60" ABOVE

GRADE. VERIFY EXACT LOCATION WITH KCP&L.

13. COMBINATION STARTER FOR EXHAUST FAN AND MAKE FINAL CONNECTION TO

EQUIPMENT. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON SHEET E6.1 FOR MORE

INFORMATION.

14. MOUNT CONTROL TRANSFORMER AND RELAYS FOR EXHAUST FAN CONTROL

ADJACENT TO "TOXALERT" CONTROL PANEL. SEE "PARKING EXHAUST CONTROL

DIAGRAM" ON SHEET E6.1 FOR MORE INFORMATION.

15. ROUTE CIRCUIT THROUGH RELAY FOR CONTROL OF MOTORIZED DAMPERS BY

"TOXALERT" CONTROL PANEL. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON

SHEET E6.1 FOR MORE INFORMATION.

16. FAN SHALL OPERATE CONTINUOUSLY. CIRCUIT TO UNSWITCHED HOT CONDUCTOR.

17. 30A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. PROVIDE FINAL

CONNECTION TO TRASH COMPACTOR. VERIFY REQUIREMENTS WITH GC AND

EQUIPMENT INSTALLER.

18. PROVIDE (5) #10, #10G, 3/4"C FROM THE WALKIN FREEZER CONDENSING UNIT TO

THE FREEZER EVAPORATOR, WIRED THROUGH THE UNIT TIME CLOCK. VERIFY EXACT

REQUIREMENTS WITH KEC AND MAKE ALL FINAL ELECTRICAL CONNECTIONS.

19. 480V/3P COMBINATION NEMA SIZE 0 MOTOR STARTER/NONFUSED DISCONNECT

SWITCH IN NEMA 1 ENCLOSURE. STARTER SHALL BE FULL VOLTAGE NONREVERSING

TYPE WITH 24V CONTROL TRANSFORMER, HOA SELECTOR SWITCH, AND MELTING

ALLOY THERMAL OVERLOADS. MAKE FINAL FLEXIBLE CONNECTION TO PUMP. ROUTE

24VAC CONTROL WIRING TO START CONTACTS IN BOILER FOR PUMP START SIGNAL.

20. 100A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL

FLEXIBLE CONNECTION TO EQUIPMENT.

21. PROVIDE STARTERS FOR GEYSER PUMPS AND MAKE ALL FINAL ELECTRICAL

CONNECTIONS. COORDINATE LOCATION AND REQUIREMENTS WITH FOUNTAIN

EQUIPMENT INSTALLER. SEE SHEET SP2.1 FOR MORE INFORMATION.

22. PROVIDE STARTERS FOR MAIN FOUNTAIN PUMP, POOL PUMP, AND SPA PUMP AND

MAKE ALL FINAL ELECTRICAL CONNECTIONS. COORDINATE LOCATION AND

REQUIREMENTS WITH FOUNTAIN EQUIPMENT INSTALLER. SEE SHEETS SP2.1, SP3.1,

SP3.2 AND SP3.3 FOR MORE INFORMATION.

23. PUSHBUTTON MOUNTED AT 72" AFF FOR EMERGENCY SHUTDOWN OF BOILER.

PROVIDE COMPLETE WITH MAINTAINED CONTACT, 40mm RED MUSHROOM

PUSHBUTTON, N.C. CONTACT BLOCK, NEMA 4X SURFACE MOUNT NONMETALLIC

BACKBOX (PILLA MODEL #BSD120 OR EQUAL). PROVIDE PLAQUE ON WALL WITH 3/8"

HIGH WHITE LETTERS ON RED BACKGROUND TO READ "EMERGENCY BOILER

SHUTDOWN".

24. VERIFY POWER REQUIREMENTS FOR FOUNTAIN FLOW, FLOAT SWITCH, AND WATER

LEVEL CONTROLLER WITH EQUIPMENT INSTALLER. SEE SHEET SP2.1 FOR MORE

INFORMATION.

25. COORDINATE POWER CONNECTION TO LED LIGHTING TRANSFORMER AND

PROGRAMMER WITH FOUNTAIN EQUIPMENT INSTALLER.

26. COORDINATE ALL POOL, SPA AND FOUNTAIN ELECTRICAL REQUIREMENTS WITH

SHEETS SP2.1, SP3.1, SP3.2 AND SP3.3, AND WITH EQUIPMENT INSTALLER. PROVIDE

ADDITIONAL ELECTRICAL INSTALLATION AS REQUIRED FOR A COMPLETE SYSTEM.

27. ELECTRICAL INSTALLATION FOR SNOWMELT SYSTEM PUMP, BOILER AND GLYCOL

MAKEUP SYSTEM SHALL BE PRICED SEPARATELY AS PART OF A BID ALTERNATE. SEE

SPECIFICATIONS FOR INFORMATION ON PROJECT ALTERNATES.

28. 60A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL

FLEXIBLE CONNECTION TO EQUIPMENT.

29. PROVIDE (3) #12, #12G, 1/2"C TO COMPANION INDOOR UNIT ABOVE CEILING IN

KITCHEN ABOVE. SEE SHEET E1.7 FOR INDOOR UNIT LOCATIONS.

30. ELEVATOR SUMP PUMP ALARM PANEL. PROVIDE POWER CONNECTION AND (2) 1"

CONDUITS FROM ALARM PANEL STUBBED INTO ELEVATOR PIT FOR POWER AND

CONTROL CABLING. COORDINATE ALL WORK WITH PLUMBING CONTRACTOR.

31. PUSHBUTTON MOUNTED AT 54" AFF FOR OVERRIDE OPERATION OF ELEVATOR RELIEF

HOOD MOTORIZED DAMPERS. SEE "ELEVATOR RELIEF HOOD DAMPER CONTROL" ON

SHEET E1.10. PROVIDE PLAQUE ON WALL WITH 3/8" HIGH WHITE LETTERS ON RED

BACKGROUND TO READ "ELEVATOR RELIEF HOOD MANUAL OVERRIDE".

32. CT CABINET ON EXTERIOR WALL. SEE RISER DIAGRAM ON SHEET E6.2.

33. COORDINATE WITH GC AND PLUMBING CONTRACTOR FOR INSTALLATION OF

ELECTRICAL TO AVOID GREASE INTERCEPTOR.

34. VIERIFY EXACT LOCATION OF WALKIN REFRIGERATOR AND FREEZER CONDENSING

UNITS WITH GC AND KITCHEN EQUIPMENT INSTALLER.

POWER PLAN NOTES BY SYMBOL#

1

1

GFI

GFI

L01

GFI

2

3

1/4" = 1'0"

ENLARGED EQUIPMENT ROOM POWER PLAN2

2

E1.6

L01

2

SES

5

SES

4

L01

4 L01

8

L01

6

H01

6

5

L01

3

L01

16

L02

4

L02

6

7

8

10

10

10

11

L02

9

L02

15

L02

21

131313R

R TR

L02

5

D

D

D

D

ON CCT

'L025'

15

ON CCT

'L025'

15

L02

8

L02

10

L02

12

L02

16

L02

18

L02

20

L02

2216

UH�1

UH�2

L02

24

L02

25

17

1/4" = 1'0"

ENLARGED POOL EQPM ROOM POWER PLAN3

D02

17

D02

16

3

E1.6

L01

7

L01

9

L01

11

L01

13

L01

12

L01

15

L01

18

L01

14

KITCHEN EQUIPMENT TAG. SEE 'KITCHEN

EQUIPMENT ELECTRICAL CONNECTION

SCHEDULE' ON SHEET E4.3 FOR

EQUIPMENT INFORMATION (TYP).

1/2

19

H01

10

L01

17

L01

19

L01

21

16

20

L03

L03

4

L01

22

L01

28

21

22

L03

3

L03

9

23

24L03

10

L03

8

L01

23

25

L03

15

L03

16

L03

19

L03

20

CHLORINE

GENERATORS

POOL HEATER

SPA HEATER

L03

24

UV CHAMBER

L03

23

L03

25L03

26

ACID PUMPS

FLOW CONTROL

L03

27

UV CHAMBER

FLOW CONTROL

SPA LED

PROGRAMMER /

TRANSFORMER

L03

30

SPA LED

PROGRAMMER /

TRANSFORMER

L03

29

26

L03

12

27

L02

36

L02

40

L02

4429

29

29

OUTDOOR

UNIT

28

20

28

28

OUTDOOR

UNIT

OUTDOOR

UNIT

L01

29

L01

31

30

30

4

4

31

12

32

33

14

1

1

Page 2: E1 · UNIT OUTDOOR UNIT L01 29 L01 31 30 30 4 4 31 12 32 33 14 1 1. mail@LSTengineers.com 4809 Vue Du Lac Place, Suite 201 Manhattan, Kansas 66503 785.587.8042 FAX 785.587.8039 LST

[email protected]

4809 Vue Du Lac Place, Suite 201

Manhattan, Kansas 66503

785.587.8042 FAX 785.587.8039

LST Consulting Engineers, PAProject 15020 December 2015

E1.73/32" = 1'0"

FIRST FLOOR POWER PLAN1

3

E4.1

3

E4.1

3

E4.1

3

E4.1

1

E4.1

3

E4.1

1

E4.1

1

E4.1

3

E4.1

3

E4.1

3

E4.1 1

E4.1

1

E4.2

1

E4.2

1

E4.2

1

E4.2

1

E4.2

1

E4.2

1

E4.2

1

E4.2

CT

GFI

1

E4.3

L11

L12

BC�1

BC�2

EF�5

L02

33

L02

29

WP/GFI

J

J

L03

32

L03

31

GFI

1. PROVIDE EQUIPOTENTIAL BONDING FOR POOL AND SPA AREA PER NEC 680.26 AND

PER NOTES ON SHEET SP3.3.

2. PROVIDE 120V POWER TO POOL AND SPA CHEMICAL ANALYZERS. VERIFY

REQUIREMENTS WITH EQUIPMENT INSTALLER.

3. 30A/2P NONFUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE. MAKE FINAL

LIQUIDTIGHT CONNECTION TO EQUIPMENT.

4. 60A/2P NONFUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE. MAKE FINAL

LIQUIDTIGHT CONNECTION TO EQUIPMENT.

5. 100A/2P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL

FLEXIBLE CONNECTION TO EQUIPMENT.

6. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED 120V CIRCUIT.

7. 60A/3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL

FLEXIBLE CONNECTION TO EQUIPMENT.

8. 30A/3P NONFUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL

FLEXIBLE CONNECTION TO EQUIPMENT.

9. 30A/3P NONFUSED DISCONNECT SWITCH IN NEMA 3R ENCLOSURE. MAKE FINAL

LIQUIDTIGHT FLEXIBLE CONNECTION TO EQUIPMENT.

10. REMOTE ALARM PANEL FOR "TOXALERT" VENTILATION CONTROL SYSTEM. VERIFY

EXACT LOCATION WITH OWNER. SEE "PARKING EXHAUST CONTROL DIAGRAM" ON

SHEET E6.1 FOR WIRING REQUIREMENTS.

11. 30A/3P MANUAL MOTOR CONTROLLER SNAP SWITCH (WITHOUT OVERLOAD

PROTECTION) IN NEMA 1 ENCLOSURE. MOUNT ADJACENT TO UNIT ABOVE CEILING

AND MAKE FINAL FLEXIBLE CONNECTION TO EQUIPMENT.

12. PROVIDE (3) #12, #12G, 1/2"C FROM OUTDOOR UNIT LOCATED IN PARKING GARAGE

BELOW. SEE E1.1 FOR LOCATION AND MORE INFORMATION.

13. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED CIRCUIT.

14. PROVIDE 120V POWER FOR POWER DOOR ASSIST OPERATOR AND WIRE TO PUSH

BUTTON OPERATORS. VERIFY EXACT PUSH BUTTON LOCATIONS WITH GC PRIOR TO

ROUGHIN.

15. PROVIDE 120V POWER TO MOTORIZED WINDOW SHADES. INSTALL AND WIRE

REMOTE CONTROL STATION FURNISHED WITH EQUIPMENT. COORDINATE WITH GC

AND EQUIPMENT INSTALLER.

16. ALL DUPLEX RECEPTACLES IN THIS APARTMENT BEDROOM SHALL BE GFCI TYPE.

17. ALL DUPLEX RECEPTACLES ON THIS WALL OF THIS APARTMENT BEDROOM SHALL BE

GFCI TYPE.

18. MOUNT OUTLET HORIZONTAL, CENTERED BETWEEN COUNTERTOP AND BOTTOM OF

WINDOW.

POWER PLAN NOTES BY SYMBOL#

1

2

GFI

GFI

WP/GFI

WP/GFI

L12

34

L12

38

L02

37

3 4

D02

18D02

18

5 5

6

L12

42L12

44

L12

46

WP/GFI

WP/GFI

L12

48

L12

50L12

52

L12

54

L12

56

L11

17

L11

26

L11

6

L11

2

L11

25

POOL HVAC UNIT

H01

16 H01

22

H01

26

7

8

3

4

3

L11

10

L11

14

L11

18

L11

23

L11

19

L11

21

9

L11

22

L11

24

L11

28

m

11

11

11

12

1212

INDOOR

UNIT

INDOOR

UNIT

INDOOR

UNIT

EF�4 13

J

J

J

J

J

J

L11

2714

14

J

J

J

J

14

J

J

J

L11

27

L11

27

J

J

J

14

L11

27

14

J

J

J

L11

27

14

J

J

J

15

15

RE: 1:E1.8

RE: 1:E1.8

RE: 1:E1.8

15

10

16

17

CT

CT

CT

1

18

18

1

1

1

Page 3: E1 · UNIT OUTDOOR UNIT L01 29 L01 31 30 30 4 4 31 12 32 33 14 1 1. mail@LSTengineers.com 4809 Vue Du Lac Place, Suite 201 Manhattan, Kansas 66503 785.587.8042 FAX 785.587.8039 LST

[email protected]

4809 Vue Du Lac Place, Suite 201

Manhattan, Kansas 66503

785.587.8042 FAX 785.587.8039

LST Consulting Engineers, PAProject 15020 December 2015

E1.83/32" = 1'0"

SECOND FLOOR POWER PLAN1

3

E4.1

1

E4.2

1

E4.1

1

E4.2

3

E4.1

1

E4.2

3

E4.1

1

E4.2

1

E4.1

1

E4.1

1

E4.2

3

E4.1

3

E4.1

1

E4.1

1

E4.2

1

E4.2

1

E4.2

3

E4.1

3

E4.1

3

E4.1

60"

CT/GFI

CT/GFI

CT

60"

2

E4.3

CLG

L22

L21

CT/GFI

CT

J

1. COORDINATE POWER REQUIREMENT FOR FIRE PLACE WITH EQUIPMENT INSTALLER.

2. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED CIRCUIT.

3. INTERLOCK MAKEUP AIR UNIT WITH KITCHEN EXHAUST HOOD CONTROL PANEL.

COORDINATE REQUIREMENTS WITH KITCHEN EQUIPMENT INSTALLER.

4. PROVIDE 60A/2P MANUAL MOTOR STARTER SNAP SWITCH W/O OVERLOAD

PROTECTION. COORDINATE SWITCH MOUNTING LOCATION WITH MECHANICAL

CONTRACTOR. MAKE FINAL FLEXIBLE CONNECTION TO HVAC UNIT.

5. HEAVY DUTY 7DAY DIGITAL WALL SWITCH TIMER FOR EXHAUST FAN CONTROL.

TIMER SHALL HAVE LCD DIGITAL CLOCK AND READOUT, MANUAL OVERRIDE, AND

SHALL BE RATED FOR 1HP AT 120V. INTERMATIC #ST01C OR EQUAL. INSTALL AT

46" AFF AND COORDINATE WITH OWNER FOR PROGRAMMING AND SCHEDULING.

6. PROVIDE 120V POWER TO MOTORIZED WINDOW SHADES. INSTALL AND WIRE

REMOTE CONTROL STATION FURNISHED WITH EQUIPMENT. COORDINATE WITH GC

AND EQUIPMENT INSTALLER.

7. PROVIDE 120V POWER TO FIELD INSTALLED MOTORIZED DAMPER. INTERLOCK

DAMPER WITH EXHAUST FAN DAMPER SHALL OPEN WHEN EXHAUST FAN IS

ENERGIZED. COORDINATE WITH MECHANICAL CONTRACTOR.

POWER PLAN NOTES BY SYMBOL#

MUA

UHP�1

UHP�1

UHP�1

EF�8

L21

2

L21

6

L21

8

1

1

L21

14

L21

18

L21

20

L21

22

L21

24

L21

17

L21

19

L21

21

L21

23

L21

25

L21

27

L21

29

2

L21

24

L22

11

L22

15

m

L22

19

L22

25

L22

23

L22

27

L22

33

L22

29

L22

31

3

L22

30

L22

32

L22

28

L22

34

4

T

5

L21

28

J

J

J

J

J

L21

30

RE: 1:E1.7

RE: 1:E1.7

RE: 1:E1.7

6

6

1

L21

31

1

1

L21

33

1

1

D

7

1

1

1

Page 4: E1 · UNIT OUTDOOR UNIT L01 29 L01 31 30 30 4 4 31 12 32 33 14 1 1. mail@LSTengineers.com 4809 Vue Du Lac Place, Suite 201 Manhattan, Kansas 66503 785.587.8042 FAX 785.587.8039 LST

[email protected]

4809 Vue Du Lac Place, Suite 201

Manhattan, Kansas 66503

785.587.8042 FAX 785.587.8039

LST Consulting Engineers, PAProject 15020 December 2015

E1.133/32" = 1'0"

SECOND FLOOR SPECIAL SYSTEMS PLAN1

3

E4.1

1

E4.2

1

E4.1

1

E4.2

3

E4.1

1

E4.2

3

E4.1

1

E4.2

1

E4.1

1

E4.1

1

E4.2

3

E4.1

3

E4.1

1

E4.1

1

E4.2

1

E4.2

1

E4.2

3

E4.1

3

E4.1

3

E4.1

P

P

P

P

P

tv

tv

48"

CLG

1. PROVIDE ROUGHIN FOR CARD READER. COORDINATE EXACT QUANTITY, LOCATION

AND REQUIREMENTS WITH OWNER AND G.C.

2. ELEVATOR LOBBY SMOKE DETECTOR. SEE DETAIL 2:E6.1.

3. ADDRESSABLE FIRE ALARM RELAY FOR CONTROL OF ELECTROMAGNETIC DOOR

HOLDERS. UPON DETECTION OF SMOKE, FIRE ALARM CONTROL PANEL SHALL SEND

SIGNAL TO RELAY AND DOORS SHALL RELEASE.

SPECIAL SYSTEMS PLAN NOTES BY SYMBOL#

1

CR

CR

1

2

3

R

3

72"

1

60"

1

1

60" 1

3

1

1

94"

94" 1

1

1

Page 5: E1 · UNIT OUTDOOR UNIT L01 29 L01 31 30 30 4 4 31 12 32 33 14 1 1. mail@LSTengineers.com 4809 Vue Du Lac Place, Suite 201 Manhattan, Kansas 66503 785.587.8042 FAX 785.587.8039 LST

[email protected]

4809 Vue Du Lac Place, Suite 201

Manhattan, Kansas 66503

785.587.8042 FAX 785.587.8039

LST Consulting Engineers, PAProject 15020 December 2015

1

2 B

KITCHEN EQUIPMENT ELECTRICAL CONNECTION SCHEDULE

Tag#

Item Description Voltage � Phase Load (VA) Type of ConnectionMounting

Height (AFF)Remarks

2A WALK�IN REFRIGERATOR LIGHTS 120V�1Ȉ 480 HARDWIRED 8'�6" .

2B WALK�IN REFRIGERATOR EVAPORATOR 208V�1Ȉ 188 HARDWIRED 9'�0" .

2C WALK�IN FREEZER LIGHTS/HEATER 120V�1Ȉ 720 HARDWIRED 8'�6" .

2D WALK�IN REFRIGERATOR CONDENSING UNIT 208V�1Ȉ 2642 HARDWIRED 36" (9)

2E WALK�IN FREEZER CONDENSING UNIT 208V�3Ȉ 5400 HARDWIRED 36" (1) (10)

7A MIXER 120V�1Ȉ 1200 NEMA 5�20R 24" .

9A PORTABLE WORK TABLE RECEPTACLE 120V�1Ȉ 1200NEMA 5�20R CORD

DROP6'�6" (2)

11A SLICER 120V�1Ȉ 360 NEMA 5�20R 24" .

12A FOOD PROCESSOR 120V�1Ȉ 1080 NEMA 5�20R 48" .

13A WORK TABLE RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 48" .

14A REFRIGERATOR 120V�1Ȉ 888 NEMA 5�20R 24" .

17A DISHWASHER 480V�3Ȉ 19695 HARDWIRED 18" .

22A HOOD LIGHTS AND CONTROL 120V�1Ȉ 800 HARDWIRED 63" .

23A STEAMER 120V�1Ȉ 120 NEMA 5�20R 24" .

24A FREEZER BASE 120V�1Ȉ 600 NEMA 5�20R 24" .

28A REFRIGERATED BASE 120V�1Ȉ 650 NEMA 5�20R 24" .

30A DOUBLE DECK OVEN FAN MOTORS 120V�1Ȉ 1440 NEMA 5�20R 24" .

32A CONVEYOR TOASTER 120V�1Ȉ 1500 NEMA 5�20R 48" .

34A HOT FOOD TABLE 208V�1Ȉ 3454 HARDWIRED STUB�UP (3)

35A REFRIGERATED PREP TABLE 120V�1Ȉ 936 NEMA 5�20RSTUB�UP

TO 4".

36A PASS�THROUGH REFRIGERATOR 120V�1Ȉ 1152 NEMA 5�20RFLUSH IN

CEILING.

37A PICK�UP COUNTER RECEPTACLE 120V�1Ȉ 1200 HARDWIRED STUB�UP (4)

37B PICK�UP COUNTER P.O.S. PRINTER RECEPT 120V�1Ȉ 1200 HARDWIRED STUB�UP (4)

37C PICK�UP COUNTER RECEPTACLES 120V�1Ȉ 1200 HARDWIRED STUB�UP (4)

37D MICROWAVE OVEN 120V�1Ȉ 1608 HARDWIRED STUB�UP (4)

37E STRIP HEATER 120V�1Ȉ 1600 HARDWIRED STUB�UP (5)

37F HEATED PLATE DISPENSER 120V�1Ȉ 456 NEMA 5�20RSTUB�UP

TO 4".

37G CONVENIENCE RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 48" .

37H SOUP WELLS 120V�1Ȉ 828 EA HARDWIRED 18" (6)

38A COFFEE BREWER 208/120V�1Ȉ 3600 VERIFY 48" .

39A TEA BREWER 120V�1Ȉ 1200 NEMA 5�20R 48" .

41A JUICE DISPENSER 120V�1Ȉ 1200 NEMA 5�20R 48" .

42A SODA DISPENSER AND CARBONATOR 120V�1Ȉ 1200 NEMA 5�20R 18" .

43A CONVENIENCE RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 48" .

44A ICE MAKER 208V�1Ȉ 2310 HARDWIRED 80" (7)

46A P.O.S. MACHINE 120V�1Ȉ 1200 NEMA 5�20R 48" .

47A BEER AND WINE REFRIGERATOR 120V�1Ȉ 732 NEMA 5�20R 18" .

B1A UNDER BAR LIGHTS 120V�1Ȉ 1200 HARDWIRED 39" .

B3A BAR RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 39" .

B3B BLENDER 120V�1Ȉ 1800 HARDWIRED 12" (8)

B3C CARBONATOR & SODA GUN 120V�1Ȉ 1200 NEMA 5�20R 12" .

B6A GLASSWASHER 120V�1Ȉ 420 NEMA 5�20R 14" .

B7A BAR RECEPTACLE 120V�1Ȉ 1200 NEMA 5�20R 39" .

B8A CONVENIENCE RECEPTACLE 120V�1Ȉ 180 NEMA 5�20R 46" .

B9A DRAFT BEER REFRIGERATOR 120V�1Ȉ 780 NEMA 5�20R 18" .

B10A BACK BAR REFRIGERATOR 120V�1Ȉ 780 NEMA 5�20R 18" .

B11A P.O.S. MACHINE 120V�1Ȉ 1200 NEMA 5�20R 48" .

B14A ICE MACHINE 120V�1Ȉ 1728 HARDWIRED 66" (6)

B15A REFRIGERATOR 120V�1Ȉ 696 NEMA 5�20R 86" .

B16A WORK TABLE RECEPTACLE 120V�1Ȉ 180 NEMA 5�20R 48" .

GENERAL NOTES:

• Electrical Contractor shall make all final electrical connections to kitchen equipment.

• Hardwired connections shall be made with LFMC with insulated ground wire bonded at both ends.

• Verify all equipment requirements (including those scheduled) with equipment installer prior to rough�in.

• All 20A, 120V receptacles installed in the kitchen area shall be GFCI type.

• Mounting heights shown in this schedule are for bidding purposes only. Coordinate exact heights with KEC.

REMARKS:

(1) 208V�1Ȉ power and control wiring for the evaporator fan and defrost shall be routed from condensing unit through the time clock

to the evaporator.

(2) Provide cord drop per detail, this sheet.

(3) Stub�up power and connect to NEMA 6�30R receptacle furnished on hot food table at 4" AFF.

(4) Stub�up power and connect to J�box in base of table for pre�wired duplex receptacle for equipment.

(5) Connect to J�box in base of table for pre�wired strip heater.

(6) Provide 20A/1P snap switch and make final flexible connection to equipment.

(7) Provide 20A/2P snap switch and make final flexible connection to equipment.

(8) Provide flexible connection from j�box in bar die to duplex receptacle on underside of blender shelf.

(9) Provide 30A/2P non�fused disconnect switch in NEMA 1 enclosure and make final flexible connection to equipment.

(10) Provide 30A/3P non�fused disconnect switch in NEMA 1 enclosure and make final flexible connection to equipment.

REMOTE FIRE PULL STATION. CABLE, AND ANY

OTHER MISCELLANEOUS EQUIPMENT SHALL BE

PROVIDED BY OTHERS.

PROVIDE 4" OCTAGONAL JUNCTION BOX WITH

SCREW THREADS SET AT THE 2 & 8 O'CLOCK

POSITIONS.

1/2" CONDUIT�ONLY, EXTENDED INSIDE WALL TO

ABOVE ACCESSIBLE CEILING SPACE.

NOTE: COORDINATE EXACT LOCATION WITH

AUTHORITY HAVING JURISDICTION, FIRE INSPECTOR

AND ARCHITECT PRIOR TO ROUGH�IN.

3

2

Coordinate electrical rough#in requirements

for all owner provided equipment with owner

and/or kitchen equipment supplier.

1. JUNCTION BOX AND CONDUIT FOR FIRE SUPPRESSION SYSTEM PULL STATION PER

DETAIL 3, THIS SHEET.

2. PROVIDE (5) #10, #10G, 3/4"C FROM THE WALK�IN FREEZER CONDENSING UNIT TO

THE FREEZER EVAPORATOR, WIRED THROUGH THE UNIT TIME CLOCK. VERIFY EXACT

REQUIREMENTS WITH KEC AND MAKE ALL FINAL ELECTRICAL CONNECTIONS.

3. CONNECT TO HOOD LIGHTS. COORDINATE WITH KEC.

4. HOOD FIRE SUPPRESSION SYSTEM CABINET. COORDINATE WIRING REQUIREMENTS

WITH SYSTEM INSTALLER.

5. FAN SHALL OPERATE CONTINUOUSLY. CONNECT TO UNSWITCHED 120V CIRCUIT.

6. PROVIDE 0.50 KVA BUCK�BOOST TRANSFORMER (120 x 240 PRIMARY VOLTS � 16/32

SECONDARY VOLTS) TO BOOST 208V�1PH TO 240V�1PH FOR CONNECTION TO

DUMBWAITER MOTOR. ACME ELECTRIC T181058 OR EQUAL.

7. 30A/2P NON�FUSED DISCONNECT SWITCH IN NEMA 1 ENCLOSURE. MAKE FINAL

FLEXIBLE CONNECTION TO DUMBWAITER MOTOR. VERIFY REQUIREMENTS WITH

EQUIPMENT INSTALLER.

ELECTRICAL PLAN NOTES BY SYMBOL#

E4.3

EMT CONDUIT

LIGHT FIXTURE FURNISHED WITH

WALK�IN. EC SHALL INSTALL

FIXTURE, SEAL BETWEEN BASE &

CEILING AND PROVIDE LAMPS.

OR

PROVIDE "ES" SEALING HUB BY

CROUSE HINDS (OR EQUAL)

PROVIDE NON�METALLICCONDUIT THRU WALK�IN

AND SEALANT BETWEEN

CONDUIT AND SLEEVE

THIS PORTION OF DETAIL IS

TYPICAL FOR ALL COOLER OR

FREEZER PENETRATIONS

4" STAMPED STEELJUNCTION BOX BY EC

CUT HOLE AS DIRECTED BYFSC. PROVIDE VINYL SLEEVE

AND GROMMETS.

NOTES:

• ALL CONDUIT TO BE RUN ON EXTERIOR OF WALK�IN BY EC.

• ALL PENETRATIONS THRU WALK�IN TO BE THOROUGHLY SEALED

• ALL LIGHT FIXTURES SHALL BE FURNISHED WITH EQUIPMENT, INSTALLED BY EC.

• ALL CONDUIT, INTERWIRING, AND MOUNTING OF FIXTURES BY EC.

WALK�IN

CEILING

WALK�IN

CEILING

4

CORD DROP DETAIL

NO SCALE5

FINISHED FLOOR

STRUCTURE

CONDUIT SUPPORTED TO

UNDERSIDE OF STRUCTURE

FLUSH MOUNTED JUNCTION

BOX WITH STAINLESS STEELCOVERPLATE TO ALLOW

CONNECTION TO 'KELLEM'

TYPE WIRE MESH STRAINRELIEF WITH ATTACHED

COUPLING

SUSPENDED GRID CEILING

'CADDY' T�GRID BOX

HANGER FOR MOUNTING

J�BOX TO CEILING

'KELLEM' GRIP WIRE

MESH STRAIN RELIEF

DROP CORD TO BE TYPE

"SO", WIRE SIZE TO

MATCH BRANCH CIRCUIT

'KELLEM' GRIP WIRE

MESH STRAIN RELIEF

CONNECTOR BODY,

(NEMA 5�20R UNO)

EQUIPMENT CORD

AND PLUG (BY OTHERS)

HEIGHT ABOVE FINISHEDFLOOR PER SCHEDULE

(VERIFY WITH KEC)

1

L12

2

L12

19

L12

11

L12

21L12

23

L12

27

L12

25L12

29

L12

31

L12

33

L12

35

L12

39

L12

37

L12

41

4

JJ

JJ

J

J

L12

14

L12

22

L12

24

L12

18

L12

26

L12

28

L12

8

L12

30

L12

9 L12

13 L12

15L12

17L12

10

L12

45

L12

43

L12

32

L12

6

L12

2

L12

4

L12

3L12

1

L22

2

L22

4L22

6

L22

8

L22

10

L22

12

L22

14

L22

16

L22

18

H01

4

L22

20

L22

22

L22

24

L12

20

WP/GFI

EF#9

5

L22

35

BX

J

6

7 L12

63

L12

61

L22

361

1

Page 6: E1 · UNIT OUTDOOR UNIT L01 29 L01 31 30 30 4 4 31 12 32 33 14 1 1. mail@LSTengineers.com 4809 Vue Du Lac Place, Suite 201 Manhattan, Kansas 66503 785.587.8042 FAX 785.587.8039 LST

[email protected]

4809 Vue Du Lac Place, Suite 201

Manhattan, Kansas 66503

785.587.8042 FAX 785.587.8039

LST Consulting Engineers, PAProject 15020 December 2015

12�15�2015

SE

NIO

R C

OM

MU

NIT

Y D

EV

EL

OP

ME

NT

LE

AW

OO

D,

KA

NS

AS

E6.4

1. CIRCUIT BREAKER SHALL BE GROUND FAULT CIRCUIT INTERRUPTER (GFCI) TYPE.

PANEL SCHEDULE NOTES BY SYMBOL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

#

1

1

1