7th CSMC Meeting Proposal
(Himachal Pradesh)
Beneficiary-Led construction for Individual Households under PMAY, Housing for All-(Urban) Project
Details of Beneficiaries as per Annexure 7 ‘C’
ULB Name
No. of Beneficiaries
(New Construction)
DU Cost (New
Construction under BLC vertical)
Beneficiary Share
(C-F+G)
Total Beneficiaries cost (B*D)
(Total) Central Grant
@150000 (B*150000)
(Total) State
Contribution @15000
(B*15000)
GRAND TOTAL (F+G)
A B C D E F G H
MC Solan 9 573100 408100 3672900 1350000 135000 1485000
MC Nahan 90 540000 375000 33750000 13500000 1350000 14850000
MC Bilaspur* 88* 500000 335000 29480000 13200000 1320000 14520000
MC Una 251 392000 227000 56977000 37650000 3765000 41415000
MC Hamirpur 21 434450 269450 5658450 3150000 315000 3465000
MC Mandi 75 645000 480000 36000000 11250000 1125000 12375000
MC Kullu 137 610000 445000 60965000 20550000 2055000 22605000
MC Dharamshala
28 470000 305000 8540000 4200000 420000
4620000
MC Chamba 378 540000 375000 141750000 56700000 5670000 62370000
TOTAL 1077
376793350 161550000 16155000
177705000
Note : 8* Beneficiaries have been shifted from enhancement to new construction under Beneficiaries Lead Construction Vertical of HFA in Bilaspur Town.
Details of Beneficiaries as per SLSMC Minutes
S. No. ULB Name No. of Beneficiaries
(New Construction)
No. of Beneficiaries
(Enhancement)
Total Project Cost
(Rs. in Lakhs)
1. MC Solan 9 10 19 66.783
1. MC Nahan 90 56 146 788.4
1. MC Bilaspur 96 300 396 1980
1. MC Una 251 506 757 2967.44
1. MC Hamirpur 21 19 40 235.2
1. MC Mandi 75 12 87 561.15
1. MC Kullu 137 36 173 1050.06
1. MC Dharamshala 28 163 191 897.7
1. MC Chamba 378 0 378 2438.1
1077 1110 2187 10990.833
Structural design of houses
Architectural Drawings Structural design of house
Option-1
Architectural Drawings Structural design of house
Option-2
Architectural Drawings Structural design of house
Option-3
Adoption of Disaster and Earthquake resistant technologies
Seismic zone of Himachal Pradesh
Earthquake Resistant Design and Construction of Buildings
• As per revised Annexure 7 A,B,C Format circulated in Mar 2016, wherein structural safety features has been suggested to incorporate in concept design and implementation of the project.
• Earthquake Resistant Design and Construction of Buildings as per the Bureau of Indian Standards (BIS) has been complied in the State of Himachal Pradesh referring to the codes below:
1. IS 1893:1984 Criteria for Earthquake Resistant Design of Structures
2. IS 1893 (PART-1):2002 Criteria for Earthquake Resistant Design of Structures : Part 1 General provisions and Buildings’
3. IS 4326 :1993 Earthquake Resistant Design and Construction of
Buildings - Code of Practice
Typical Earthquake Resistant Footing Design under PMAY-HFA in Himachal Pradesh
Footing design has been considered for Zone-V throughout the State of HP. Similarly for beams and columns are designed for better structural safety.
Adoption of disaster and Earthquake resistant technologies
• Even as a normal practice in the state, while preparing the building estimates (BOQ) costing of disaster proof features usually has been ensured (in Govt. building/Govt. projects) as per the standards.
• However It is ensured to be taken into consideration the disaster & earthquake resistant technologies at the time of construction of dwelling units under PMAY, HFA (Urban) in Himachal Pradesh and Structural safety features will be ensured.
Other Issues Beneficiary list mapped with SECC data. • The SECC data has been received from NIC Centre, Delhi in the month of Feb 2016
and has been handed over to 6 implementing ULBs. Cross check with beneficiary details has been initiated now by the respective ULBs.
Project completion time for projects under BLC vertical.
• The Project will be completed within the two years time frame.
Status of Demand Survey/ time line for completion of Demand Survey
• The Demand Survey will be completed within two month by the consultants(by May 2016 end) for all the identified project cities. However the process of assessing Housing Demand has been initiated by some of the ULBs as a part of HFA-DPR exercise.
Time line for submission of HFAPoA/ AIP
• The Letter of Award has been given to selected firm M/s Stesalit System Ltd., Salt lake, Sector-V, Kolkata and HFAPoA will be submitted for all towns within three months by end of June 2016.
Other Issues conti . . .
Readiness of States for Geo-tagging of houses under BLC vertical. • The State is ready for Geo-tagging during different phases of house
construction under Beneficiary led individual Housing Scheme. The process will be initiated as soon as the construction work has been initiated by the beneficiaries after approval.
Status of occupancy position as well as pending UCs in respect of JNNURM and RAY projects • No utilization Certificate is pending for RAY Project
Plan to rehabilitate beneficiaries in 428 constructed DUs lying unoccupied under JNNURM ------- Any other relevant information.