ectro engineering presentation
TRANSCRIPT
-
8/12/2019 ECTRO Engineering Presentation
1/28
ECTRO EngineeringBespoke KNX Automation Design TEAM
-
8/12/2019 ECTRO Engineering Presentation
2/28
Speakers Team 33
Speaker 1: James Michael Howard Speaker 2: Alex Shams
Speaker 3: Nathan Duong
-
8/12/2019 ECTRO Engineering Presentation
3/28
Presentation Content
KNX Introduction
Research
Competitive Products
Risks and Hazards
System Design
KNX Modules and Bus
Software
Project Planning and Budget
Conclusion
-
8/12/2019 ECTRO Engineering Presentation
4/28
KNX Automation
KNX decentralized electrical automation system
Does not require each individually controlled unit to beconnected directly to a central control unit
Ease of installation, modifications become an ease
Excellent for industrial, commercial and homeautomation applications.
can be used to control anything ranging from roomlighting, room temperature and a security system
Energy efficient
-
8/12/2019 ECTRO Engineering Presentation
5/28
ECTRO ENGINEERING
ECTRO Engineering's project aims to achieve some ofthese automation applications on a smaller scale
Create a mock house to demonstrate the KNXautomation system
Will include the automation of lights, a cooling fan,
blind shutters and a security system
-
8/12/2019 ECTRO Engineering Presentation
6/28
Goal and research
Cater for most Australian modern homes or offices
Reliability and ease of use
Flexible options
-
8/12/2019 ECTRO Engineering Presentation
7/28
Competitive Products
Work with already installed power circuits
Easy and affordable but limited control andautomation
Limited Security Features
Suffers from high overhead
-
8/12/2019 ECTRO Engineering Presentation
8/28
C-BUS
Needs to be implemented during the
construction phase.Modules and implementation are very
expensive, runs for $15,000 AUD for a smallhome.
Better suited for commercial buildings to
take advantage of low voltage operation.
-
8/12/2019 ECTRO Engineering Presentation
9/28
-
8/12/2019 ECTRO Engineering Presentation
10/28
Research
Research based mainly on manuals
Have not yet had hands on experience with KNX modules
Problems that we have run into will appear in industry
Good experience as the project does emulate real life situations
-
8/12/2019 ECTRO Engineering Presentation
11/28
Mitigation of Risks and Hazards
Hazards:
240 Volts 60Hz AC electricity
Mitigation:
Work on de-energized circuits.
Properly ground experiment and enclosure.
Never work alone, always have a partner who knows yourequipment and the risks and hazards involved.
-
8/12/2019 ECTRO Engineering Presentation
12/28
Design
Major and minor specification changethrough out the first half.
KNX module Product Instruction books asmost reliable resource.
Product final specification based on theKNX module available through KNX lab.
-
8/12/2019 ECTRO Engineering Presentation
13/28
SystemArchitecture
Graphical representation offunctionality
-
8/12/2019 ECTRO Engineering Presentation
14/28
KNX Specification
-
8/12/2019 ECTRO Engineering Presentation
15/28
KNX Modules
Blinds Actuator
Control 4 AC motorsindependently
Rated Current of 6 Amp
KNX Bus connection anexternal 240 VAC supp
Can control doors, windowsshutters
-
8/12/2019 ECTRO Engineering Presentation
16/28
Fan Coil Actuator
KNX Modules
4 independent output rated t240VAC
Rated Current of 0.5 Amper output pair
KNX Bus connection anexternal 240 VAC supp
Can control fans, reverse cyand ventilation systems
-
8/12/2019 ECTRO Engineering Presentation
17/28
Security Terminal
4 inputs and 3 outputs
Inputs for NO & NC senwith 2.7K Ohms resiste
4 zones available, PIR, switch and alarms
Internal and External surveilwith delay function
KNX Modules
KNX Modules
-
8/12/2019 ECTRO Engineering Presentation
18/28
KNX Modules
Universal Interface
Used to connect external de
KNX Bus Connection
Can connect switches sensors
Four channels
KNX M d l
-
8/12/2019 ECTRO Engineering Presentation
19/28
Power Supply
Energy Actu
Monitor Power, currenfrequency
Represent informationand store in log
Monitor power efficien
Supply the KNX bus line with30VDC for up to 64 modules
If significantly less modules are
used a second Bus line can beextracted as AUX 30VDC power.
KNX Modules
KNX M d l
-
8/12/2019 ECTRO Engineering Presentation
20/28
KNX Modules
DALI Light Controller
115VAC & 240VACoperation
Dimming function Up to 64 Dali devices
can be connected 8 inputs for ambient
light sensors
Dim Actu
Two channels Total power out 300W p
500W for a single chann Only loads of the same
on each channel eg: 240Halogen lamps
-
8/12/2019 ECTRO Engineering Presentation
21/28
Four types of Bus available: Twisted Pair
Ethernet
Power Line
Wireless
Original specs designed for Ethernet
Current design for twisted pair
KNX Lab only has twisted pair with nowireless capability.
KNX Communication Bus
-
8/12/2019 ECTRO Engineering Presentation
22/28
Software
Engineering Software Tool Version4 (ETS4)
Can create rooms and hallwayswith associated electrical actuators
Capable of creating commandsbased on sensor or forced inputs
Data must be transferredindividually through USB port andthe bus to each module
Can program multiple modules torespond to one input
Basic GUI programing
-
8/12/2019 ECTRO Engineering Presentation
23/28
Original Project Timeline
-
8/12/2019 ECTRO Engineering Presentation
24/28
Project Planning
-
8/12/2019 ECTRO Engineering Presentation
25/28
Budget
Item Store # Price perUnit TotalMotion Sensor Donated by teammember 2 $0.00 $0.00
AC motor Donated by teammember 3 $0.00 $0.00Alarm speaker Jay Car 1 $19.95 $19.95
Building materials Bunnings NA $50.00 $50.00Shutter Building
Metrials Donated by teammember 2 $0.00 $0.00Wiring 240V AC
rated
http://caravansplus.c
om.au 30 $1.94 $58.20
Reed Switch Donated by teammember 3 $0.00 $0.00Lights Coles 4 $2.95 $11.80
Light bulb housing Farnell Australia 4 $15.00 $60.00TOTAL COST
$199.9
5
ResourcesCost Per
HourH
Engineering Team
(X6) $1,200.00 15Industry Staff $250.00 25ECE Research $250.00 25ECE Technicians $150.00 25ECE Resources $150.00 25Industry Resources $150.00 25Total
Real Budget
V
http://caravansplus.com.au/http://caravansplus.com.au/http://caravansplus.com.au/http://caravansplus.com.au/ -
8/12/2019 ECTRO Engineering Presentation
26/28
Future Events
Further development based on the available KNXequipment
Programming KNX modules to specifications
Testing of individual modules
Testing of whole system.
-
8/12/2019 ECTRO Engineering Presentation
27/28
Conclusion
Currently on time in accordance with Gantt chart
Project is on Budget
Rearranging our priorities due to equipment access
Begin Trial and Testing in the second half
Expect to have a working model by mid September
-
8/12/2019 ECTRO Engineering Presentation
28/28
Questions