ecuador fortuna project - proactiveinvestors na...strategically located in the south-central part of...
TRANSCRIPT
Ecuador Fortuna Projectby Alain Moreau, P.Geo
Technical Advisor
July 2018
TSX. V:LJ Corporate Presentation July 2018 2 / 29
Disclaimer
The statements in this presentation represent the considered views of Lucky
Minerals includes certain statements that may be deemed "forward-looking
statements“. All statements in this presentation, other than statements of
historical facts, that address future market developments, government actions
and events, are forward-looking statements. Although Lucky Minerals believes
the outcomes expressed in such forward-looking statements are based on
reasonable assumptions, such statements are not guarantees of future
performance and actual results or developments may differ materially from
those in forward-looking statements. Factors that could cause actual results to
differ materially from those in forward-looking statements include changes in
general economic, market or business conditions.
While Lucky Minerals has made every reasonable effort to ensure the veracity
of the information presented it cannot expressly guarantee the accuracy and
reliability of the estimates, forecasts and conclusions contained herein.
Accordingly, the statements in the presentation should be used for general
guidance only.
TSX. V:LJ Corporate Presentation July 2018 3 / 29
Context
• Fortuna is an early stage exploration project strategically located in the South-Central part of Ecuador, about 50 km South-East of major town of Cuenca
• The project is comprised of 12 contiguous concessions totalling approximately 54,985 Ha (550 km2)
• Fortuna is surrounded by many multi-million ounces gold and billion lbs polymetallic properties
TSX. V:LJ Corporate Presentation July 2018 4 / 29
History
• Placer mining for gold since the Inca times
• Fortuna has been sporadically explored for gold since the 1990’s
• Reconnaissance work and basic geochemistry surveys identified many geological features associated to large epithermal gold and porphyry deposits
• The concessions have never seen any drilling
TSX. V:LJ Corporate Presentation July 2018 5 / 29
History (cont’d)
• 1992-2017 Exploration work
- 1992-2000
✓ Reconnaissance prospecting of property
✓ Discovery of extensive mineralization and alteration
zones
✓ Up to 10,5 g/t Au in stream sediment
- 2007-2017
✓ Identification of major structures
✓ Reconnaissance geochemistry sampling
✓ Numerous Cu anomalies reported in stream sediment
TSX. V:LJ Corporate Presentation July 2018 6 / 29
A New Perspective
• A new stable geopolitical environment since 2015 that spurred investments from major companies has revived interest in the country
• Numerous world class discoveries and projects close to production
• Exploration focus is on gold and copper
• Fortuna project exhibits many similarities with significant epithermal gold and Cu-Mo porphyry deposits
TSX. V:LJ Corporate Presentation July 2018 7 / 29
Notable Major Players
• Lundin Gold (V-LUN) Fruta del Norte (9.48 M oz Au I+Inf)
• Sol Gold (T-SOLG) Cascabel (7,4 M tonnes CuEq)
• Lumina Gold (V-LUM) Cangrejo (8,8 M oz Au +1.1B lbs Cu Inf)
• INV Metals (T-INV) Loma Larga (3.09 M oz Au +125 M lbs Cu I+Inf)
• China National Rail Mirador (2.7 M oz Au and 5.9 B lbs Cu M+I)
TSX. V:LJ Corporate Presentation July 2018 8 / 29
Fortuna Strategic Play
Major Deposits
Zones of Interest
Mirador
Loma Larga
Fruta del
Norte
Cangrejo
Condor
Gaby
TSX. V:LJ Corporate Presentation July 2018 9 / 29
The Game Plan
• Near term financing of US$1M for the delineation of major targets on the property (airborne geophysics, exploration targets prospecting and identification of drilling targets)
• Mid-term financing of US2$M for drilling in 2019/2020
• Additional financing for resource definition by 2020-2021
TSX. V:LJ Corporate Presentation July 2018 10 / 29
Regional Location Map
TSX. V:LJ Corporate Presentation July 2018 11 / 29
Property Location Map
TSX. V:LJ Corporate Presentation July 2018 12 / 29
Property Satellite Imagery
TSX. V:LJ Corporate Presentation July 2018 13 / 29
Regional Geological Map
TSX. V:LJ Corporate Presentation July 2018 14 / 29
Regional Geological Map Legend
TSX. V:LJ Corporate Presentation July 2018 15 / 29
Porphyry Copper Deposit Tracts by Age
in the Northern Andes
From Cunningham et al (2008)
Fortuna
• Porphyry Copper Deposit Tracts by age, discovered and prospects, in the Andes
• Fortuna concessions are located in tract
- SA05PC (Miocene)
- SA03PC (Jurassic)
TSX. V:LJ Corporate Presentation July 2018 16 / 29
Estimated Undiscovered Porphyry Copper
Deposits in the Northern Andes
Fortuna
From Cunningham et al (2008)
• Porphyry copper deposit tracts by amount of mean estimated
• Fortuna concessions are located in tracts between 30Mt and 50Mt Cu
TSX. V:LJ Corporate Presentation July 2018 17 / 29
Undiscovered Copper in the Northern Andes
From Cunningham et al (2008)
• Porphyry copper deposit tracts by density of mean estimated undiscovered copper Mt/km2 in the Andes
• Fortuna concessions are located in tracts between 600 and 1000 Mt Cu/km2
Fortuna
TSX. V:LJ Corporate Presentation July 2018 18 / 29
Source: Column chart from Cunningham et al (2008)
Copper Production, Reserves, and
Resources of the Andes
• The total estimated
copper in the Andes
amounts to a grand
total of about 1.3B Mt
• The study estimates
there is about 1.3 times
as much copper to be
found in porphyry
copper deposits in the
Andes as has already
been found
TSX. V:LJ Corporate Presentation July 2018 19 / 29
Similarities With Other Systems
Feature Cu
Porphyry
Epithermal
Gold
Fortuna
Concessions
Caldera like structure
Multiple intrusions and dykes of diorite to
quartz monzonite
Inner Quartz-Sericite alteration
Outer Epidote-Chlorite alteration
Fractures filled with sulphides
Hydrothermal breccia
Copper and Molybdenum minerals
Volcanic pyroclastic rocks
Advanced argillic alteration
Pervasive silicification
Pyrite
TSX. V:LJ Corporate Presentation July 2018 20 / 29
Strategic Exploration - Structures
Major NNE Structure
Other NNE Structure
TSX. V:LJ Corporate Presentation July 2018 21 / 29
Top Property Exploration Targets
Top Priority NNE Structure
Top Priority Target
Major NNE Structure
Major Target
Other NNE Structure
Other Target
TSX. V:LJ Corporate Presentation July 2018 22 / 29
Geochemistry Gold Anomalies
Au > 5 g/t
Au > 300 ppb
Survey Limits
TSX. V:LJ Corporate Presentation July 2018 23 / 29
2018 Survey Alteration Anomalies
Argillization
Propylitic Alteration
Silicification
Sericitization
Advanced Argilization
Breccia Zone
Survey Limits
TSX. V:LJ Corporate Presentation July 2018 24 / 29
Alteration Zone Targets
Epithermal Gold
Porphyry Copper
Mine Workings
Canopy Limits
TSX. V:LJ Corporate Presentation July 2018 25 / 29
Detailed Alteration Anomalies
Argillization
Propylitic Alteration
Silicification
TSX. V:LJ Corporate Presentation July 2018 26 / 29
Field Exploration Targets
A
BC
D
T
A to D Exploration Targets
Tunneling Activities
Top Priority NNE Structure
Major NNE Structure
A
T
TSX. V:LJ Corporate Presentation July 2018 27 / 29
Field Sampling Zones 2018
Argillization
Propylitic Alteration
Silicification
Field Sampling Zones
Caldera Rim
AD
C
B
TSX. V:LJ Corporate Presentation July 2018 28 / 29
Expected Milestone
• 2018
- Social and community activities
- Airborne magnetics geophysical survey to be
realized in July 2018 on the entire property
- Structural interpretation and soil sampling
(August 2018)
- Delineation of promising exploration targets
(October 2018)
- DDH targets definition (December 2018)
- Report filing
TSX. V:LJ Corporate Presentation July 2018 29 / 29
Exploration Budget – 2018 – Phase I
• Airborne GeophysicalSurvey
- 5,600km
- US$450,000
• Structural Study
- US$25,000
• GIS, Maps, Drone Survey
- US$90,000
• Base Camp (6 to 8 people)
- 3 Months
- US$60,000
• Personnel
- Geologists and Technicians
- US$225,000
• Assays (Soil and Rock)
- US$50,000
• Equipment
- US$35,000
• Environment & Contingencies
- US$65,000
• TOTAL PHASE I
- US$1,000,000
TSX. V:LJ Corporate Presentation July 2018 30 / 29
Exploration Budget – 2019 – Phase II
• Drilling Infrastructure Access
- 100 km
- US$500,000
• GIS and Maps
- US$90,000
• Lodging at Nabon
- 6 people
- US$90,000
• Drilling
- 3,000m
- US$600,000
• Assays
- 3,500 samples
- US$175,000
• Equipment
- US$30,000
• Contingencies
- US$115,000
• TOTAL PHASE II
- US$1,600,000
TSX. V:LJ Corporate Presentation July 2018 31 / 29
Conclusion
• Fortuna property has considerable potential to host significant gold and porphyry mineralized systems such as Fruta del Norte and Mirador deposits
• 2018 Exploration Program will focus on
- Complete airborne geophysical coverage
- Geochemistry and structural analysis
- Identification of drilling targets for 2019
TSX. V:LJ Corporate Presentation July 2018 32 / 29
Contact
• Robert Rosner, CEO
(310) 435-0435
• Alain Moreau, Technical Advisor
(514) 924-6840
• Santiago Yepez, Country Manager (Ecuador)
593 9 95887204
Thank you!