ee w03.2 w_ 1. the system (transmission) part 2 & electricity generation part 1 (economics and...

71
• Monday, double lecture in computer lab – 13:30-15:00 & 15:15-16:45

Upload: silvester-van-koten

Post on 16-Apr-2017

347 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

• Monday, double lecture in computer lab– 13:30-15:00 & 15:15-16:45

Page 2: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

• http://www.dynamicdemand.co.uk/grid.htm

Frequency and Synchronicity

Page 3: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 4: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 5: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 6: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

UCTE = Continental

Synchronous Area

LS

Page 7: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 8: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

On the very day of the reconnection, October 10 2004, the key steps were the following:

– Preparation: all interconnecting overhead lines ready for operational use and idle.

– The command to Bucurest to take over the frequency regulation in 2nd synchronous zone (Romania regulates the frequency, Greece, Bulgaria and EKC only the exchange).

– The command to Budapest to discontinue the pluralistic CENTREL regulation and to assume the regulation by itself.

– 9:34 after fulfilling conditions ΔU< 20kV; α< 10°; 0,03 Hz < fII –fI < 0.05 Hz in Arad substation, Sandorfalva overhead line was connected (RESYNCHRONIZATION was carried out).

– 9:41 Subotica overhead line connected to Sandorfalva substation. – Command to all synchronous zone block 2 controllers to restore

the LFC regulation mode. – 9:58 Podgorica overhead line connected to Trebinje substation;

• Prior to the resynchronization, this overhead line had the biggest voltage difference (over 60 kV) which activated all compensation equipment in Croatia, the operating compensation generator in BIH was CHE Čapljina, and in Montenegro the aluminium factory was put out of operation for a few minutes in order to raise voltage.

– 10:07 Rosiori overhead line connected to Mukačevo substation. – 10:20 Mladost overhead line connected to Ernestinovo substation. – 10:58 220 kV Trebinje − Peručica, 220 kV Višegrad − Požega and

110 kV Trebinje − Herceg Novi overhead lines connected. – 11:00 – Main coordinators announced the successful completion

of the reconnection. • The sequence of connecting interconnection lines is shown in Fig. 4.• As no problems in system operation were observed by TSOs involved in the process during the test run commencing on October 31 2004, the test run, which was not approved for commercial contracts between former 1st and 2nd UCTE synchronous zone, was rated successful. • For the period between November 1 2004 and the end of 2004, UCTE issued the recommendation regarding the gradual increase of trade volume directed from the former 2nd UCTE zone towards the former 1st UCTE zone (monthly increase by 30% to complete NTC values).

http://www.wseas.us/e-library/conferences/2009/cambridge/EE/EE64.pdf

Page 9: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

UCTE = Continental

Synchronous Area

Page 10: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 11: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 12: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

•Azerbaijan, Belarus, Georgia, Kazakhstan, Moldova, Mongolia, Ukraine

•Armenia•Latvia, Lithuania, Estonia

•Kazakhstan, Kyrgyzstan?•Uzbekistan, Tajikistan

http://so-ups.ru/index.php?id=ees

Page 13: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

03:26

All interconnectors are automatically disconnected

Frequency and Synchronicity

Page 14: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 15: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 16: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Mini circuit breakersFrequency and Synchronicity

Page 17: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

High voltage circuit breakersFrequency and Synchronicity

Page 18: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Why AC?

Page 19: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Easy & cheap transformation

Page 20: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

1. Transmission lines limits

2. Dispatch

3. Frequency and synchronicity

4. Transmission shortage in the EU

Page 21: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

03:26

Interconnectors very high loaded at night!

The future of the EU transmission network

Page 22: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Internal EU market induces increase in cross-border trading

The future of the EU transmission network

Page 23: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 24: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 25: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 26: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 27: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Massive deployment of wind and solar energy

The future of the EU transmission network

Page 28: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

European Climate

Foundation

Increase of almost

400%

The future of the EU transmission network

2050 Increase from 34 GW to 127

GW

How much does a transmission line cost per km?• 2- 5 M$ / km (overhead)• 8-25 M$ /km (underground)

Page 29: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 30: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 31: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 32: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 33: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Mettlen-Lavorgo

Sils-Soazza

03:01

“Cross-border transmission lines”

“Interconnectors”

Tree flashover!

Page 34: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

1. Transmission lines limits

2. Dispatch

3. Frequency and synchronicity

4. Transmission shortage in the EU

Page 35: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

September 28th, 2003

Huge blackout cripples Italy!

Page 36: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Transmission

Page 37: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

1. Transmission lines limits

2. Dispatch• Meshed networks

3. Frequency and synchronicity

4. Transmission shortage in the EU

Page 38: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

• Final Report of the Investigation Committee on the 28 September 2003 Blackout in Italy Final Report

• (https://www.entsoe.eu/fileadmin/user_upload/_library/publications/ce/otherreports/20040427_UCTE_IC_Final_report.pdf)

Page 39: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Frequency and Synchronicity

AlternatingCurrent (AC)

50 Hertz

Page 40: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Frequency and Synchronicity

Direct Current (DC)

Alternating Current (AC)

Page 41: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Frequency and Synchronicity

AlternatingCurrent (AC)

50 Hertz

Page 42: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Out of phase possible?

Yes, loads can be inductive (mostly) or capacitive• Inductive: lags current relative to voltage (shifts current leftwards)• Capacitive: lags voltage relative to current (shifts voltage leftwards)

Need to restore this is called a need for reactive power.• Can be done by generators or devices (often capcitators)

Page 43: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 44: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 45: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

• The optimal generation mix - economics

Page 46: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Markets refresher

Page 47: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

101010999777

Consumer:Maximum buying price

Producer:Minimal selling price

972

9662200

0

9

333

Page 48: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Deriving a the equilibrium price

3 6 9 12

2

6

910

87

45

3

10

105421 7 8 11

11

Quantity ofdiamonds

P

Demand (function) 101010999777

Consumer:Maximum selling price

333

Page 49: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Deriving a the equilibrium price

3 6 9 12

2

6

910

87

45

3

10

105421 7 8 11

11

Quantity ofdiamonds

P Supply (function)

972

9662200

0

9

Page 50: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Deriving a the equilibrium price

3 6 9 12

2

6

910

87

45

3

10

105421 7 8 11

11

Quantity ofdiamonds

P

P*

Q*

Equilibrium price

Equilibrium quantity

Demand (function)

Supply (function)

Page 51: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

101010999777

Consumer:Maximum buying price

Producer:Minimal selling price

972

9662200

0

9

333

Free market mechanism imposes a rich structure

Page 52: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Looking at total welfare

3 6 9 12

2

6

910

87

45

3

10

105421 7 8 11

11

Quantity ofdiamonds

P

P*

Q*

Equilibrium price

Equilibrium quantity

Demand (function)

Supply (function)

7 7 7

5 5 5

1 1

PS=38

3 3 32 2 2

CS=15W= 53

• You always pair the strongest buyer with the strongest seller.

• Until supply and demand intersect

• Isn’t that unfair?

Page 53: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

2

Other possible arrangements: Communist “fair” dictator

Wine3 6 9 12

2

6

910

87

45

3

10

105421 7 8 11

1010

109 997

773

33

97

0

9966

2 2

00

1 1 1

2 3 3

5 5 5

W= 35W(Free market)=53(difference =18)

Free market maximizes W=CS+PS

3 3 3

Consumer ProducerCould this be more efficient?

Page 54: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Deriving a the equilibrium price

3 6 9 12

2

6

910

87

45

3

10

105421 7 8 11

11

Quantity ofdiamonds

P

P*

Q*

Equilibrium price

Equilibrium quantity

Demand (function)

Supply (function)

7 7 7

5 5

-61 1

PS=38

3 3 32 2 2

CS=15W= 53

Profit!

-6 -6

Trades with a negative value

Page 55: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Prices in purely competitive

markets (energy only markets)

Page 56: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

80PROFITS!

Page 57: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

80

Page 58: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

80

Page 59: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

8060

Page 60: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

D S

$/MWHUniform price auction

Baseload plants (MC=0)

Peaker plants

8060

Quasi-PROFITS!

Page 61: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Optimal Dispatch

Page 62: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 63: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 64: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)
Page 65: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Fixed cost Power (MW)

years Days/ year

Hrs/ day

Hrs / year

total hours

FC/ MWh

1,300,000,000 500 30 365 24 8760 262800 9.9

5,000,000,000 500 30 365 24 8760 262800 38.1

≈40

≈10

Levelized costs of generation

Technology Costs Table

Page 66: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Multitude of generation types

• Trade-off:– Economics of scale

– Flexibility

Baseload power plants

Midload power plants

Fixed cost per MWh

Variable cost per

MWhBaseload 40 0Midload 20 30Peaker 10 50

Peaker power plants

Technology Costs Table

Page 67: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

P

GWNuclear Coal Gas Oil Shortage

0

20

30

50

67

The supply stack

(also called “merit order”)

Page 68: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Shively, p32.

Page 69: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Very Low

Nuclear Coal Gas Oil Shortage

Exceptionally high

Very highModerateLow

0

20

30

50

Load curve

00 05 07 10 13 15 18 24

Very Low

Low

Moderate

Very high

Exceptionally high

Hours

69

P

Page 70: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

Nuclear Coal Gas Oil Shortage

Exceptionally high

Very highModerateLow

Load curve

00 05 07 10 13 15 18 24

Very Low

Low

Moderate

Very high

Exceptionally high

Very Low

P

0

20

30

50

P=0

P=20

P=30

P=50 P=CAP

Hours

70

Page 71: Ee  w03.2 w_ 1. the system (transmission) part 2 &  electricity generation part 1 (economics and dispatch)

• Monday, double lecture in computer lab– 13:30-15:00 & 15:15-16:45