7/29/20 1 Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM Lights dimmed and power shut down Generator running Fire Alarm Active Room had visible smoke shoulder height and above All Electrical and Gas checked No cause found Fire Department gave all clear to occupy the building 2

Upload: others

Post on 14-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Electrical and Mechanical Preventative Maintenance (2)ucip.utah.gov/wp-content/uploads/2020/07/... · Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM •Lights

7/29/20

1

Electrical and Mechanical Preventative Maintenance

1

Thursday 12:10 PM• Lights dimmed and power shut down• Generator running• Fire Alarm Active• Room had visible smoke shoulder height and

above• All Electrical and Gas checked• No cause found Fire Department gave all clear

to occupy the building

2

Page 2: Electrical and Mechanical Preventative Maintenance (2)ucip.utah.gov/wp-content/uploads/2020/07/... · Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM •Lights

7/29/20

2

Friday 2:10 PM

• Loud Arching heard from Electrical Room• Events of Thursday took place• Basement filled with smoke• Pre Action Fire Alarm was triggered• All systems shut down and Building evacuated

3

4

Page 3: Electrical and Mechanical Preventative Maintenance (2)ucip.utah.gov/wp-content/uploads/2020/07/... · Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM •Lights

7/29/20

3

5

Related Costs

• Restoration of Finishes Approximately $10,000• Replacement of UPS $58,000• Complete replacement of 3,000 Amp Main

Electrical Distribution $413,000• Supporting equipment and fuel $6,000• Lost labor costs $4,500 per hour. • Total cost $535,000

6

Page 4: Electrical and Mechanical Preventative Maintenance (2)ucip.utah.gov/wp-content/uploads/2020/07/... · Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM •Lights

7/29/20

4

Preventative technics for Electrical Maintenance

• Infrared Scanning

7

8

Page 5: Electrical and Mechanical Preventative Maintenance (2)ucip.utah.gov/wp-content/uploads/2020/07/... · Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM •Lights

7/29/20

5

Infrared uses

• Electrical trouble shooting and preventative care

• Motor and bearings• Boilers and Chillers• Steam traps• Plumbing• Leak detection in walls and ceilings

9

Other means and methods for Electrical Maintenance

• Shut down and tighten

• Ultrasonic testing

10

Page 6: Electrical and Mechanical Preventative Maintenance (2)ucip.utah.gov/wp-content/uploads/2020/07/... · Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM •Lights

7/29/20

6

Boiler/Chiller care

11

Scenario

• Receive a call that the Fire sprinkler system has activated at 10:30 PM

• On site manager arrives and the sprinkler head in the Boiler room had failed

• 165 degree head• Over the next week we checked boilers and

suppression and everything checked out as operational

12

Page 7: Electrical and Mechanical Preventative Maintenance (2)ucip.utah.gov/wp-content/uploads/2020/07/... · Electrical and Mechanical Preventative Maintenance 1 Thursday 12:10 PM •Lights

7/29/20

7

Second event

• One week later same scenario as the first 10:37 PM

• Same head failed only this head was a 225 degree

• Boiler operates at 180 degree’s and was producing steam

• Replaced all controls, tore boilers down and cleaned.

13

Basic Chiller/Boiler care

• Tear down and clean annually• Test Water Treatment no less than weekly• Clean all strainers or bag filters regularly• Test all safeties monthly• Clean all condensing until or towers as needed• Maintain all mechanical linkages for

equipment

14